Status of the development of Mini-Camera for the 1st LST camera.
Toko Yamamoto @ Konan Univ. Japan
A test module for the 1st LST camera, which is called Mini-Camera, is under development.
• 19 Cluster = 133 pixels• Same components as 1st LST camera
except of Frontal Aluminum plate is 5 mm thickness instead of 25 mm.
• 750 x 750 mm
Purpose• check mechanics of the Camera• Test and verification for the Electric circuits and
communications• Develop software for the data acquisition system
Schedule • Design of the Mini-Camera is already done by Carlos Diaz
Ginzo.• 2015 Q1 : Mechanics (rails, structure) is made in CIMAT. • 2015 Q2 : Dragon boards, PMT modules, Light Guide will come by May 2015. Backplane v2 (not final version) , Trigger will be available after May (?). • 2015 Q3 : Full camera development started. Trigger board will be available end of 2015. Backplane will come end of 2015.
Some remarks on the Mini-Camera• Idea of the mini-camera was already exist
since several years ago.
• Current mini-camera was proposed and discussed in Padova LST meeting Jul 2014 (although it might not be appropriate manner).
• It may not be enough time to reflect results of the test using mini-camera to the development of the Full camera.
• Full camera will be constructed in Spain. So mini-camera is crucially important for development work in Japan.
FPI/Electronics ScheduleComponents P=
ProductionMini-Camera(19 clusters)
Full-Camera(265 clusters)
Light Guide P Apr 2015 Aug 2015
PMT+HV+PreAmp QC Oct 2014 Dec 2014
Slow Control Board P & QC Dec 2014 May 2015
Dragon V5
P Mar 2015 July 2015 (Japan)July 2015 (Italy)
QC Apr 2015 Sep 2015 (Japan)Dec 2015 (Italy)
L0+L1 Trig. mezzanineP Dec 2014 Jul 2015
QC Jun 2015 @IFAE Mar 2016
BackplaneP
V2Dec 2014
V3.2April 2016
QC May 2015 @IFAE
Oct 2016
Trig. Interface Board P & QC Mar 2015 Mar 2015
Month when P/QC is completed
Red=month when all components of a mini/full camera are ready
FPI/Electronics ScheduleComponents P=
ProductionMini-Camera(19 clusters)
Full-Camera(265 clusters)
Light Guide P Apr 2015 Aug 2015
PMT+HV+PreAmp QC Oct 2014 Dec 2014
Slow Control Board P & QC Dec 2014 May 2015
Dragon V5
P Mar 2015 July 2015 (Japan)July 2015 (Italy)
QC Apr 2015 Sep 2015 (Japan)Dec 2015 (Italy)
L0+L1 Trig. mezzanine(full budget)
P Dec 2014 Jun 2015
QC May 2015 @IFAE Dec 2015
Backplane(full budget)
P
V2
Dec 2014
V3.2
Sep 2015
QC May 2015 @IFAE
Dec 2015
Trig. Interface Board P & QC Mar 2015 Mar 2015
Red=month when all components of a mini/full camera are ready
If production/QC is accelerated by full budget,