sumare payload

Post on 25-Feb-2016

28 Views

Category:

Documents

0 Downloads

Preview:

Click to see full reader

DESCRIPTION

SUMARE PAYLOAD. CONTENTS Objectives. Sensors choice. Sensors performances. Implant possibilities. Sensors conditioning. Schedule. Sensors integration drawings. Fins navigation trials. Fresh water tank measurement sensors. 2. OBJECTIVES - PowerPoint PPT Presentation

TRANSCRIPT

RESERVE SOCIETE

SUMARE PAYLOAD

TMS SAS 00/S/EDA/NC/088 - MP

RESERVE SOCIETE

CONTENTS

• Objectives.• Sensors choice.• Sensors performances.• Implant possibilities.• Sensors conditioning.• Schedule.• Sensors integration drawings.• Fins navigation trials.• Fresh water tank measurement sensors.

2

TMS SAS 00/S/EDA/NC/088 - MP

RESERVE SOCIETE

OBJECTIVES

The “Payload” will assume two main operational functions.

• Monitoring of the volumetric evolution of sand banks.• Obstacles avoidance.

3

TMS SAS 00/S/EDA/NC/088 - MP

RESERVE SOCIETE

SENSORS CHOICE

Altimeter.

Acoustic high frequency transducer ( Resolution)

Obstacles avoidance.

The inner Mauve transducer is not available (Software limits / Discrimination).

The transducer is the same than for altimeter.

4

TMS SAS 00/S/EDA/NC/088 - MP

RESERVE SOCIETE

5

TMS SAS 00/S/EDA/NC/088 - MP

SENSORS PERFORMANCES

Measurement limit : 50 mMeasurement mode : Free runMeasurement speed : 10 HzPower supply : 12 or 24 VDCInterface : RS 232 or RS 485Frequency : 500 kHzConical beam : 6°

RESERVE SOCIETE

TMS SAS 00/S/EDA/NC/088 - MP

IMPLANT POSSIBILITIES

1 : Risk on Payload structure (depth)Obstacle avoidance sensor not possible.

2 : Risk on launching.

3 : chosen solution

6

1

2

3

RESERVE SOCIETE

SENSORS CONDITIONING

Conditioning electronic : two output

Two output are available on MMNS

1 RS 2321 RS 485

The two electronic signal conditioning units will be connected on these outputs

7

TMS SAS 00/S/EDA/NC/088 - MP

RESERVE SOCIETE

SCHEDULE

8

TMS SAS 00/S/EDA/NC/088 - MP

2000 20015 6 7 8 9 10 11 12 1 2 3 4 5 6 7 8 9 10 11 12

fins dummy productionVillefranche Fins dummy navigation sea trials Measurement system specificationPayload implant proposalfins prototype productionVillefranche Fins prototype navigation sea trials Software / Payload validatePayload productionFresh water tank Payload measurementVillefranche sea trials

RESERVE SOCIETE

SENSORS INTEGRATION.

4 configurations will be tested at sea.

• 1 :Fins 60 mm long in front of the payload.• 2 :Fins 60 mm long in back of the payload.• 3 :Fins 120 mm long in front of the payload.• 4 :Fins 120 mm long in back of the payload.

9

TMS SAS 00/S/EDA/NC/088 - MP

RESERVE SOCIETE

1 :Fins 60 mm long in front of the payload.10

TMS SAS 00/S/EDA/NC/088 - MP

FRONT VIEWSIDE VIEW

TOP VIEW

RESERVE SOCIETE

1 :Fins 60 mm long in back of the payload.11

TMS SAS 00/S/EDA/NC/088 - MP

FRONT VIEWSIDE VIEW

TOP VIEW

RESERVE SOCIETE

3 :Fins 120 mm long in front of the payload.12

TMS SAS 00/S/EDA/NC/088 - MP

FRONT VIEWSIDE VIEW

TOP VIEW

RESERVE SOCIETE

4 :Fins 120 mm long in back of the payload.13

TMS SAS 00/S/EDA/NC/088 - MP

FRONT VIEWSIDE VIEW

TOP VIEW

RESERVE SOCIETE

fins with their moulds14

TMS SAS 00/S/EDA/NC/088 - MP

RESERVE SOCIETE

FRESH WATER TANK MEASUREMENT SENSORS

15

TMS SAS 00/S/EDA/NC/088 - MP

Computer

Signal generatorPower amplifier

Amplifier

Oscilloscope

Rotating unit

Reference hydrophone

top related