sunway university- banker presentation

Post on 07-Jan-2017

1.074 Views

Category:

Documents

5 Downloads

Preview:

Click to see full reader

TRANSCRIPT

SUNWAY UNIVERSITY

NEW UNIVERSITY BUILDING

Project Brief

Project Title : Cadangan Tambahan dan Ubahsuai Sebuah University

(Sunway University) yang Mengandungi :-

1) 1 Blok Institusi Pendidikan dan 2 Tingkat Sub-Besmen

2) Sebuah Pondok Pengawal

3) Sebuah Pusat Pembuangan Sampah

4) Sebuah Pusat Pencawang Elektrik

Di Atas Lot-Lot PT. 28, PT. 1904, Dan PT. 1905, Bandar Sunway,

Mukim Damansara, Daerah Petaling, Negeri Selangor Darul Ehsan,

Untuk Tetuan Sunway Destiny Sdn. Bhd.

Date of Commencement : 15th August 2012

CCC Date (Phase 1- Car Park) : 26th Dec 2013

CCC Date (Phase 2- Tower Block) : 5th March 2015

CPC Date : 5th March 2015

Contract Sum : RM 203 917 687.49

Project Brief

List of Client & Consultants:

Client : Sunway Destiny Sdn Bhd

Architect : SA Architects Sdn Bhd

C & S Engineer : Perunding ACE Sdn Bhd

M & E Engineer : KTA Tenaga Sdn Bhd

Post Tension Engineer : PT Solutions Sdn Bhd

Interior Designer : Sunway Design Sdn Bhd

Quantity Survey : Langdon & Seah Sdn Bhd

Project Brief

Additional Information

Total Land Size : 68, 121m2

Land Area (Tower) : 10, 660m2

Floor Area : 52, 530m2

Lecture Theater Seating Capacity : 112 nos.

Auditorium Seating Capacity : 452 nos. (Auditorium 1)

: 610 nos. (Auditorium 2 & 3)

Laboratory : 22 nos.

(Animal Lab, Toxicology Lab, Cell / Molecular Lab, Industrial Incubator Lab, Virology Lab, Physiology Lab, Medical Biotech Lab)

Kitchen : 5 nos.

New University Building

• World Class as brand new state-of-the-art university

building

• equipped with excellent facilities and infrastructure

• easy access to all of the facilities of Sunway Resort

City via canopy walkway.

Overview of Building (Day View)

Overview of Building (Evening View)

Overview of Building (Night View)

Drop Off 1,Concourse

Bird Sculpture, Concourse

Cafeteria, Concourse

Cafeteria, Concourse

Lounge, Concourse

Lounge & Library Search, Library

Computer Area, Library

Library (Help Desk)

Library (Book Shelves)

Library (Study Area)

Basement Library (Water Feature)

Student Center, B1 Link

Dance Studio, B1 Link

Common Lift Lobby

Exec. Lift Lobby, Level 12

Cafeteria, Mezzanine Floor

Open Deck, Mezz Cafe

Pre Function, Level 1

Auditorium 1 (JC 1)

Auditorium 2 (JC 2)

Auditorium 3 (JC 3)

Lecture Theatre

IT Services, Comp Labs, Level 2

Public Search Area, Comp. Lab

Computer Labs, Level 2

Classrooms

Laboratories, Level 4

Mock-Up Room SHTLM, Level 5

Mock-Up Room SHTLM, Level 5

Kitchens, Level 5

Training Restaurant SHTLM, Level 6

Restaurant, Level 6

Pre-Function, Level 12

Pre-Function, Level 12

Meeting Room, Level 12

Board Room, Level 12

Executive Offices, Level 12

Lift Car

Toilet (Male)

Toilet (Female)

Link Bridge 1 – External View

Corridor to Link Bridge 1

Link Bridge 2

Link Bridge 2 – Inner View

FIFA Football Field & Sport Court

Football Field & Sport Court

Football Field, Ground Floor

Sport Court (Inner View)

Jogging Track & Perimeter Fencing

Auditorium 1 (During Construction)

COB constructed,

ready for steel

structure installation

Brickwall ready for

plastering

Auditorium 1 (During Construction)

Sunway Red Fin and

Cladding In Progress

Perforated Panel

Installation in

Progress

Auditorium Façade (Day View)

Auditorium Façade (Night View)

Auditorium Façade (Night View)

Auditorium Façade (Night View)

Auditorium Façade (Night View)

Guard House (Day View)

Guard House (Night View)

Driveway, Ground Floor

Thank

You

top related