Tadawul TowerKing Abdullah Financial DistrictRiyadh, Saudi Arabia
SCHEMATIC DESIGNOUTLINE SPECIFICATION
February 2011
Tadawul TowerKing Abdullah Financial DistrictRiyadh, Saudi Arabia
April 2012
DESIGN DEVELOPMENT REPORT
-
TADAWUL TOWERDETAIL DESIGN REPORT
APRIL 2012 1
-
TADAWUL TOWERDETAIL DESIGN REPORT
APRIL 2012
The DD phase commenced on 9 July 2011 with the approval of Schematic Design. In order to accelerate the procurement of a Main Contractor, the design was split into several packages for a staggered release of tenders:
Package 1 (TAD3000) Main Works (incl. structure, bldg envelope, VT)Package 2 (TAD6000) MEP Works (incl. Base build and Data Center) Package 3 (TBA) public and shared zones fit out worksPackage 4 (TAD7000) IT, AV, and SecurityPackage 5 (TBA) Tadawul offices fit outPackage 6 (TBA) other tenants offices fit out
This staggered, fast track approach means that the various packages move on separatetimelines and their coordination and demarcation becomes a critical concern. The Main Works package has moved past the DD phase into Construction Documentation with in-progress submissions for review instead of client approval phase gates (i.e. without stopping the development of drawings for client approval).
The Main Works tender was released to the market on 25 January 2012 with bids expected on 8 April, MEP and IT Works are planned for release by End of April.The fit-out of public and shared zones (Package 3) is under design (awaiting Tadawul Design approval at the time of writing) to move ahead) while P.5 is on hold until Tadawul has confirmed their final space program.
Key Design DevelopmentsKey Design Developments
Responding to newly enforced fire code requirements, a Refuge Floor (22F) was introduced into the project as a precondition for Civil Defense approval. An additional office floor could be fitted in to counter the loss of feasibility and leasable area.The area and usage of the LED media faade was refined, resulting in an iconic and elegant lighting solution on the tower envelope and a dedicated media screen on the northeast corner of the first floor, making use of the exposure to this main route of approach into the financial plaza area 1.The Forum grand atrium space was developed and refined in geometry, use and concept.The interior design concept was progressed and finish materials discussed and agreed for key spaces throughout the building.
A review meeting was held with UPTIME Institute to ensure the data center s compliance with UI requirements.
Authority IssuesAuthority IssuesRIC SD approval was obtained on 10 April 2011. DD approval was applied for on 12 August 2011, issues raised were discussed in meetings and correspondence with RIC.RIC requested to revise and resubmit for DD approval due to 2 outstanding issues: The setback utilization issue was settled (no changes required) at a meeting with RIC on 21 Nov; the B1F VIP drop-off was verbally agreed at a meeting MACE/Tadawul with RIC in December, however later written statements by RIC seem to contradict this.
Formal submission has been made to Civil Defense on 18 Sept; no major issues have been raised in the presentation. RIC has indicated that they are in negotiations with RCD for a waiver of the refuge floor requirement and it is assumed that all approvals are on hold until the issue is resolved on higher levels. The design however confirms to all RCD requirements, including the refuge floor. It is also understood that RIC has begun an aeronautical survey of KAFD to serve as a base for submissions top and approvals from GACA, the Authority for Civil Aviation.
EXECUTIVE SUMMARY
2
-
BIRDS EYE VIEW
-
Executive Summary
Project overview
Building Circulation & Vertical Transportation
Site Analysis & Orientation
Sustainability
Landscape
Building Envelope
Lighting Strategy SignageDelivery and Waste management
Structural Engineering
MEP Design
Appendix : Drawings
Main Entrance View Functions Distribution Parcel Utilization Area Schedule
Building Circulation Vertical Transportation
Site Analysis OrientationViews & Visibility
Building Envelope Facade Access (Cleaning)
Structural System
Codes &Standards / Design Criteria,Materials
Design Loads
Geotechnical Investigation
Project Requirement, Applicable Codes and Standards
Environment Condition, Design Strategy
MEP / IT Design Criteria
Electrical Design Description
Mechanical System Description
Information & Communication Technology(ICT),Audiovisual(AV) Design Description
TABLE OF CONTENTS
TADAWUL TOWERDD REPORT
APRIL 2012 3
5788
1013
161718
20
25
2
2729
31
39
51
54
57
58
64
66
67
69
70
79
86
-
PROJECT OVERVIEW
-
MAIN ENTRANCE VIEW
-
TADAWUL TOWER
DD REPORT
APRIL 2012 5
-
FUNCTION DISTRIBUTION &
PARCEL UTILIZATION &
AREA SCHEDULE
-
TADAWUL TOWER
DD REPORT
APRIL 2012 7
-
Floor Configuration
Exterior Finish Aluminum Curtain Wall with Low-e Glass Unit Aluminum Curtain Wall with Low-e Glass Unit
3F-6F, 34F-41F (TADAWUL HQ.) 7F-20F, 23F-33F (Tenant)
GF-1F (TADAWUL HQ.) GF,2F (Tenant)
Escalators Up 3
Down 3
Service + Emergency EV 3
Others 2
High- bank EV 6
(Tenant Office) Low-bank EV 6
Local EV 5
VIP EV 1
(TADAWUL HQ.) Shuttle EV 3
Lifts
Structure
No. of Floors
Max. Height
Parking Lots No parking below tower footprint
RC core + Flat Slab System
39 Floors
200 m (tip of Faade)
RC core + RC Rigid Framing System
4 Floors (above GL) 5 Levels(below GL)
25 m (roof level)
PODIUMTOWER
Use
Height Office, Retail
200m
BUA: 138,332 sqm BUA : Built up area is based on Interior Gross Area (IGA) as per BOMA 2010
Total Floor Area
Building Footprint 3,981 sqm
GENERAL
BOMA:Building Owners and Managers Association International.
Parcel 1.17 Current Project Profile
current design parcel controls
*1 GFA GFA (Gross Floor Area) is based on Interior Gross Area as per BOMA2010 *2 NUA NUA (Net Usable Area) is based on Preliminary Floor Area as per BOMA2010
Parcel Area Parcel Area Parcel Utilization Parcel Utilization GFA (Gross Floor Area)*1 GFA (Gross Floor Area)*1 NUA (Net Usable Area)*2 NUA (Net Usable Area)*2 Tower Height Tower Height Podium Height Restriction Plane Podium Height Restriction Plane Open Space Easement Open Space Easement Public Access Easement Public Access Easement Faade Regulations Faade Regulations Mandatory Floor to Floor Height Mandatory Floor to Floor Height
Ground floor to first floor: First floor to second floor: Ground floor to B1F:
(N/A)3,981m2 (77.1%)138,332m2124,399m2200m25m
Comply
5,166m2 4,205m2 (81%) 131,847 - 146,497m2 (N/A) 200m 25m (N/A) (N/A)
6.4m 5.6m -6.0m
6.4m 5.6m -6.0m
General Facility Information
PARCEL UTILIZATION
-
AREA SCHEDULE AREA SCHEDULEE - 20,DECEMBER,2011
TADAWUL HQTENANTOFFICE
TADAWULHQ
TENANTOFFICE
TADAWUL HQ OTHERS TADAWUL HQ OTHERS
200.00
ROOF+2.0 7.70 192.30 141 23 164
ROOF 2.00 190.30 145 71 215
42F 4.35 185.95 2,051 144 2,195
41F 4.65 181.30 2,244 523 138 2,906
40F 4.10 177.20 2,236 529 138 2,903
39F 4.00 173.20 2,210 35 527 139 2,911
38F 4.00 169.20 2,213 35 533 139 2,920
37F 4.00 165.20 2,215 35 539 139 2,928
36F 4.00 161.20 2,217 545 174 2,936
35F 4.00 157.20 2,399 556 202 3,157
34F 6.66 150.54VIP DININGVIP DINING
/MEETING RM. MECH 1,592 1,095 311 272 3,271
33F 3.94 146.60 2,410 476 289 3,176
32F 3.94 142.66 2,417 531 235 3,182
31F 3.94 138.72 2,423 531 235 3,188
30F 3.94 134.78 2,429 531 235 3,194
29F 3.94 130.84 2,435 531 235 3,200
28F 3.94 126.90 2,440 531 235 3,206
27F 3.94 122.96 2,446 531 235 3,211
26F 3.94 119.02 2,451 531 235 3,216
25F 3.94 115.08 2,455 531 235 3,221
24F 3.94 111.14 2,460 531 235 3,225
23F 3.94 107.20 2,464 531 235 3,229
22F 6.50 100.70 3,101 293 3,394
21F 3.34 97.36 462 2,777 3,239
20F 3.84 93.52 2,477 464 301 3,242
19F 3.94 89.58 2,480 464 301 3,245
18F 3.94 85.64 2,483 464 301 3,248
17F 3.94 81.70 2,486 464 301 3,251
16F 3.94 77.76 2,488 464 301 3,253
15F 3.94 73.82 2,490 464 301 3,255
14F 3.94 69.88 2,492 464 301 3,257
13F 3.94 65.94 2,493 464 301 3,258
12F 3.94 62.00 2,495 464 301 3,260
11F 3.94 58.06 2,496 464 301 3,261
10F 3.94 54.12 2,497 464 301 3,262
9F 3.94 50.18 2,497 464 301 3,262
8F 3.94 46.24 2,498 464 301 3,263
7F 3.94 42.30 2,476 486 301 3,263
6F 6.9 35.40 2,882 380 3,262
5F 6.1 29.30 2,881 380 3,261
4F 5.10 24.20 2,494 392 374 3,260
3F 7.55 16.65 3,912 303 4,215
2F 4.65 12.00 1,755 888 326 2,968
1F 5.6 6.40 346 2,654 326 3,326
MGF 3.3 3.10 81 12 94
GF 3.0 0.10 573 1,200 1,866 342 3,981
LGF 6.99 -6.89 520 549 2,548 323 87 4,028
B1F 5.0 -11.89 905 324 18 1,246
B2F 3.5 -15.39 3,593 360 36 3,989
B3F 3.5 -18.89 132 235 10 377
B4F 3.5 -22.39 3,636 249 3,885
B4F-6250 6.25 -28.64 66 66
15,388 68,438 1,628 22,113 2,980 13,853 3,709 10,224 0 0 48,403 89,930
1,628 22,113 13,933
138,33213,591
151,923
REQUIREMENT NOTE
PARCEL AREA 5,166 sqm Basement floors are not included in Area Calculation
PARCEL UTILIZATION Max 81% equivalent to max 4,205 sqm Building amenity area is included in TADAWUL area
GROSS FLOOR AREA 131,847 sqm - 146,497 sqm Building service area is included in TADAWUL area
Basement area is excluded from Total interior gross area
Prime floors in TADAWUL area are calculated in Tenant office
Calculation method : BOMA 2010
Convention Center,Stationary Shop,Reception,Hall,Exhibition,Tea Service
Media Center,Studio Space,Virtual Trading Room,Tenant Lounge,
Locker and Shower Facilities,Cafeterria,Food Service Facilities,Fountain,
Gymnasium.
Mechanical Rooms,Lobbies,Public Corridors,Toilets, Janitorial Closets,
Service Staff,Fire Command Room,Drop Off,Public Prayer Room,
Post Room,Gargage Room.
Pantry,Prayer Room,Tea Service,Mechanical Observatory Deck,Staging,
Drainage Pipe Shafts,Air Handling Units,Elevator Hall,Ventilation Shafts,
Vertical Ducts,Storage,Pipe Shafts, Electrical Pipe Shafts.
Drainage Pipe Shafts, Air Handling Units, Elevator Hall,Ventilation Shafts
Vertical Ducts,Storage,Pipe Shafts, Electrical Pipe Shafts.
(G) Occupant Storage
(F) Parking Parking.
(E) Major VerticalPenetrations
(D) Floor Service & AmenityArea
GRAND TOTAL AREA
Public Storages.
TENANT
Interior Gross Area(A+B+C+D+E+G)
TADAWUL HQ.
Usable Area
Usable Area Exclusions
GRAND TOTAL(UNDER GROUND)
GRAND TOTAL( ABOVE GROUND)
(A) Occupant Area
Usable Area Exclusions
Office,Common area for office use ( EV Hall, Storage)
TADAWUL HQ.
PreliminaryFloor Area(A+B+C+D)
Room
Office,Common area for office use ( Lobby, Archive, EV Hall, Storage )
TENANT
Area Definition
(C) Building Service Area
(B) Building Amenity Area
Elevator Shafts, Stair Shafts.
OCCUPANT AREA (A)
FLOORLEVEL
USABLE AREA (A+B)
INTERIOR GROSS AREA (IGA)
BUILDINGSERVICEAREA (C)
SUB TOTAL / FLOOROCCUPANT
STORAGE (G)PARKING (F)
MAJOR VERTICALPENETRATIONS (E)FLOOR SERVICE & AMENITY
AREA (D)
USAGE
PRELIMINARY FLOOR AREA (A+B+C+D)
BUILDINGAMENITY AREA
(B)
FLOORHEIGHT
FLOOR
TO
WER
MECH
MECH
SUB-STATION & UPS
SUB-STATION & UPS
EXECUTIVE OFFICE
48,403
SHOWER ROOM
EV PIT
138,332
ENTRANCE
ENTRANCE / ETS / SUB STATION
16,832
ENTRANCE HALL / OPEN CAF /TENANT OFFICE
83,826
PO
DIU
M
CONFERENCE HALL/MEDIA OFFICE
VIP ENTRANCE
OFFICE ENTRANCE / RETAIL / SKY WALK
MECH
BA
SE
WATER TANK
GYM
DATACENTER
TADAWUL HQ
MECH
TADAWUL HQ TOTAL (ABOVE GROUND)
SUB-TOTAL(ABOVE GROUND)
TADAWUL HQ SKYLOBBY
TENANT OFFICE
TADAWUL HQ
TADAWUL HQ
TENANT OFFICE
TENANT OFFICE
TENANT OFFICE
TENANT OFFICE
TENANT OFFICE
TENANT OFFICE
TENANT OFFICE
TENANT OFFICE
TENANT OFFICE
TENANT OFFICE
TENANT OFFICE
REFUGE FLOOR
MECH
TENANT OFFICE
TENANT OFFICE
TENANT OFFICE
TENANT OFFICE
TENANT OFFICE
TENANT OFFICE
TENANT OFFICE
TENANT OFFICE
TENANT OFFICE
TENANT OFFICE
TENANT OFFICE
TENANT OFFICE
TENANT OFFICE
TENANT OFFICE
TENANT OFFICE
8
-
BUILDING CIRCULATION &
VERTICAL TRANSPORTATION
-
SS
VIP
TENTEN
V PV
TENTEN
SEREVEESE
EVVEESER
EV
SEREVEEE
ER
VERSEREV
SEREVESE
EEEV
SEREV
PPPPPP
VIPEV VV PVVEVEIVVPV
VIP EV
TEN( L )ET
( LEELN)
N))(
TEN( L )
TEN( L )ET
( LEEL
NN))(
TEN( L )
TEN( M )MMM(( MMMMMTENTENTEN( M )
TEN( M )MMMMMMMM ))TENTENTEN( M )
ENTRANCE
N
Makkah
Main Access Road
Loading
Other Roads
Access from Plaza
Shop
Access from Car Parking
1.16 1.17
1.18 1.14
1.15
B2, B3 Floor
Entrance
B1 Floor
N
Makkah
BB
1.16 1.17
1.18 1.14
1.15
Entrance
B1F LEVEL Connection Level to the Financial Plaza commercial zone. Entrance to the building is located at SW corner facing the Plaza. A drop-off berth is being requested as part of the Financial Plaza design
B2F, B3F LEVEL Connection Level to the KAFD common car parking
level. Access to the car parking provided through
common drive ways.
B1F PLAN
BUILDING CIRCULATION
N
Makkah
S=1/600
0 1 5 10 20 M
TADAWUL TENANT VISITORS SERVICE
ENTRANCE
TENANT EVTEN
SERVICE EVSER EV
TADAWUL EVTAD
PODIUM EVP
VIP EVVIP
Note:Configuration of VIP drop-off under consideration withTadawul and RIC.Ref. to Nikken transmittal #98(10.Dec.2010)
-
S SS
PPPPPPP PPPPPP
SEREV
SEEE
EVVEESER
EV
SEREVEE
EEEV
SEREV
SEREVEEE
EVR
VESEREV
ENTRANCE
Main Access Road
Loading
Other Roads
Access from Plaza
Shop
DNDN
DN
DN
UPUP
DNDN
UPUP1.16
1.17
1.18 1.14
1.15
N
Makkah
Lower Ground Floor
Entrance
Loading
LGF PLAN
LGF LEVEL Connection to the Financial Plaza commercial zone. Entrance to the building is located at SW corner. Adjacent to the perimeter road, loading dock is provided for discharge and loading of all deliveries.
Access from Financial Plaza (LGF)
ENTRANCE FOR SERVICE
N
Makkah
S=1/400
0 1 5 10 20 M
TADAWUL TENANT VISITORS SERVICE
ENTRANCE
TENANT EVTEN
SERVICE EVSER EV
TADAWUL EVTAD
PODIUM EVP
VIP EVVIP
Note: Coordination of Loading Entry/Exit requested with RIC. Ref. to Nikken transmittal #97(10.Dec.2010)
10
-
S S
S
GF
SS
SS SS
GFFGGFFGG
SEREV
SEEVV
SEREV
SEREVEEVVSEREV
SEREVEEVVVVVSEREV
PPPPPPPPPPPPPP
ENTRANCE FOR FIREFIGHTING
ENTRANCE
ENTRANCE
EntranceEntranceEntrance
EntranceEntranceEntrance
Point
Main Access Road Other Roads
Drop-off Zone
Access from Plaza
Security
D NND
INNIO U TTUO
INNI
O U TTUO
VIPD rop off
VIPDrop off
VIPDrop off Financial
Plaza
1.16
1.09
1.07
1.06
1.18 1.14
1.15
1.10
1.12 1.13 Ground Floor
N
M ak ak
h
D rop offDrop off
1.17
GF PLAN
N
Makkah
S=1/400
0 1 5 10 20 M
GF LEVEL Main Entrance level for the Office Tower. Main car circulation level within the Financial Plaza
with drop-offs and entry to parking. VIP drop-off and entrance area is located at SW
corner facing the Plaza. Second entrance with a drop-off is provided, facing
the perimeter road for daily use.
TADAWUL TENANT VISITORS SERVICE
ENTRANCE
TENANT EVTEN
SERVICE EVSER EV
TADAWUL EVTAD
PODIUM EVP
VIP EVVIP
BUILDING CIRCULATION
-
S S
TEN( L )
NNT( LLLLLLTEN( L )
TEN( L )
NNT( LLL )TEN( L )
TEN( L )
NNT( LLL )TEN( L )
TEN( L )TENTENT( LEELLLEENTEN
( L )TEN( L )TENTENT( LEEL
N)NTEN
( L )TEN( L )TENTENT( LEEL
NTEN( L )
TEN( M )
NNTTTT(T( M
EEMMM
NNTEN( M )
TEN( M )
NNTTEEM
T(T
MEEM
NTEN( M )
TEN( M )
NNTEMEM
TTMENENM
N)
N)
TEN( M )
TEN( M ))TENTEN(T
MT(T( M
EEMM
NNTEN( M )
TEN( M ))TENTEN(TEE
MT(T
MEEM
NNTEN( M )
TEN( M ))TENTEN(
EMEM
TTMENENM
NTEN( M )
TAD( S )(TATA( SASAS
DDTAD( S )
TAD( S )(TATA( SASAS
D)
DTAD( S )
TAD( S )(TATA( SASAS ))
DDTAD( S )
VIPEVVEVEIVPPV
VIPEV
SEREV
SSEEE
EVRR
VSEREV
SEREV
SEEE
EVR
VERSER
EV
PPPPPPPPPP
ENTRANCE
ENTRANCE
ENTRANCE
DNDN
DNDN
UPUP
DNDN
UPUP1.16
1.17
1.181.14
1.15
N
Makkah
Entrance
Loading
Skywalk
Pedestrian Flow
1st Floor N
M akkha
Financial Plaza
1.16
1.09
1.07
1.06
1.18 1.14
1.10
1.12 1.13
1.17
1F PLAN
1F LEVEL Main pedestrian level with skywalk connection to
adjacent buildings. Corporate Entrance / Lift Lobby situated in connection to the Skywalk circulation
N
Makkah
S=1/400
0 1 5 10 20 M
TADAWUL TENANT VISITORS SERVICE
ENTRANCE
TENANT EVTEN
SERVICE EVSER EV
TADAWUL EVTAD
PODIUM EVP
VIP EVVIP
PARCEL 1.07 PARKING
SAMBA TOWER
CMA TOWER
11
-
TADAWULTENANTVISITORSSERVICE
ENTRANCE
TENANT EVTEN
SERVICE EVSEREV
TADAWUL EVTAD
PODIUM EVP
VIP EVVIP
R
SS
RSEREVEEE
EVERV
SEREV
SEREVV
RERVRRSER
EV
SEREV
SSEEE
EVVVERRSEREV
PPPPPP
2F PLAN / SERVISED OFFICE
BUILDING CIRCULATION
-
LOWER GROUND FLOOR- CONFERENCE HALL &
PRE-FUNCTIONSPACE
- MEDIA OFFICE
- LOADING
GROUND FLOOR- TADAWUL FORUM
- OFFICE
FIRST FLOOR- CORPORATE LOBBY
- RETAIL
- SKYWALK CIRCULATION
SECOND FLOOR- GYM
SKY LOBBY
The Tadawul Forum
This public atrium rising almost 15 meters from Ground Floor provides a lively and attractive location for gathering for a casual break, in informal meeting or to obtain the latest financial information real-time right from the heart of the Saudi Financial market, the Stock Exchnage itself.
Adressing the wider KAFD public, the Forum presents a unique branding opportunity, benefiting from the exposure to the access on 3 levels (Financial Plaza retail on LGF, the Plaza on GF and the Skywalk network on 1F).
The Forum presents itself and the Tadawul brand to the outside plaza with a media facade and internally with a media wall on the wastern side of the building core, creating endless opportunities for customized content to be broadcast for specific events or for general information related to the activities of the project stakeholders.
TADAWUL
ACCESS: ELEVATORS:
TENANT
VISITORS
SERVICETENANT EVTEN
SERVICE EVSEREV
TADAWUL EVTAD
PODIUM EVP
VIP EVVIP
SEREV
SEREV
SEREV
P P
ENTRANCE FOR SERVICE
Skywalk
SEREV
SEREV
SEREV
P PPP
SEREV
SEREV
P P
TAD(S)
TAD(S)
TAD(S)
TEN(M)
TEN(M)
TEN(M)
TEN(M)
TEN(M)
TEN(M)
TEN(L)
TEN(L)
TEN(L)
TEN(L)
TEN(L)
TEN(L)
ENTRANCEENTRANCE
ENTRANCE
ENTRANCE
ENTRANCE
ENTRANCE
VIP
SE
))))
N
TEN))L)
EN)
E
CMATOWER
PARCEL 1.07PARKING
SAMBATOWER
SEREV
SEREV
SEREV
P P
EVSEEV
D
(((((MT
ER
12
-
TADAWULTENANTVISITORSSERVICE
ENTRANCE
TENANT EVTEN
SERVICE EVSEREV
TADAWUL EVTAD
PODIUM EVP
VIP EVVIP
S
( H )
( H )
SEREV
SEREV
RRSEREV
SEREV
DTAD( H )D)
ATAD( H )
TAD( S )TAD( S ) TAD( S )
TAD( S ) TAD( S )
TAD( S )
))TAD( VIP AIP
TAD( VIP )
( )( H )TAD( H )ATAD( H )
DTAD( H )D)
ATAD( H)
( H )( H )( H )(TADTEN( H )ATADTEN( H )
TADTEN( H )ADTADTEN( H )
35F PLAN / Tadawul SKY LOBBY
BUILDING CIRCULATION
-
186.2
3.96.2
5.16.3
25(P
ODIU
M HE
IGNT
)
NORTH EDGE HEIGHT=200M
9.74.9
4.07.5
54.6
55.6
6.3
13.8
3.93.9
3.93.9
3.93.9
3.93.8
3.36.5
3.93.9
3.93.9
3.93.9
3.93.9
3.93.9
4.44.0
4.04.0
4.04.2
6.96.1
3.93.9
3.93.9
3.95.0
7.03.5
3.23.5
3.5
0.1
22.5
4.1
31ST FL32ND FL
36TH FL
17TH FL
35TH FL
14TH FL
33RD FL
42ND FL
34TH FL
22ND FL
15TH FL
1ST FL
G FL 637.30
2ND FL
3RD FL
4TH FL
5TH FL
6TH FL
10TH FL11TH FL12TH FL13TH FL
18TH FL19TH FL20TH FL 21ST FL
23RD FL24TH FL25TH FL26TH FL27TH FL28TH FL29TH FL30TH FL
39TH FL38TH FL37TH FL
ROOF FL
7TH FL
40TH FL
8TH FL9TH FL
16TH FL
LGFL
B3 FL
B1 FLB2 FL
B4 FL
GL 637.20
41TH FL
SERVICE SERVICE
VIP PARKING
SKYWALK (S8)
MV INCOMING
DPS
DPS
DPS
CHILLER PLANT(A) CHILLER PLANT(B)
CENTER
COMMAND
MECH
HALL2
MEDIA OFFICE
TANK ROOMMECHROOM
ETS
STOR
HALL RETAIL
CORR
MD-B
BATTERY-1B
BATTERYCHARGER RM.
CS-3B
F.TOILET
A/V
GYM
CORR
GAS
CYLINDER
CORR M.TOILET
F.TOILETM.TOILET
HALLEV
DPS
HALLEV
STOR STOR CORR
F.TOILET
CORR
ROOM
HALLEV
HALLEV
HALLEV
STOR COUNSELING
STOR DPS
PS HALLEV
DPS
DPS CORRDSGAS
CYLINDERCORR
GAS CYLINDERCORR
OH
OFFICE(3)
SHAFTEV
SHAFTEV
SHAFTEV
ROAD MC 08
ROAD MC 02
SHAFTEV
SHAFTEV
SHAFTEV
CORR
DPS
DPS
DPS
DPS
DPS
DPS
DPS
TRENCH
STOR
MECHROOMCORR
HALL-1EV
VIP
CORR
S1-2
EV PIT
LR1,2EV PIT EV PIT
LR4,5,6EV PIT
LR4,5,6
EV PITSH1,2,3EV PIT
S3 EVPIT
STOR
HALL-1EV
SERVICE
HALL-1EV
SERVICE
HALL-1EV
SERVICE
HALL-1EV
SERVICE
DPS
DPS
DPS
HALL-2EV
HALLEVVIP
HALL-1EV
SERVICE
HALL-1EV
SERVICE
HALL-2EV
SERVICE
EV HALL TOILETHALL-2
EVSERVICE
TOILET EV HALL TOILETPIT PIT
EV MACHINE
EV MECHEV HALL MECHMECH
SHAFTEV
SHAFTEV
SHAFTEV
SHAFTEV
SHAFTEV
OH
TADAWUL SKY LOBBYOFFICE EV HALL MECH OFFICE
HALLEVVIP
EV HALL
EV MACHINE ROOM
CATWALK EV COOLING OH
VIP EV HALL
STOR
HALL-1EV
SERVICE
OH
EV MACHINE ROOM
UTILITY TUNNEL
PS
PS
PS
PS
No.17/1.17PERCEL CONNECTION STOR
M.TOILETMECH
RM
STOR
DPS STOR DPS CORR
STOR
CORR
TENANTOFFICE(1)
SERVICE
MECH A1
TENANTOFFICE(1) DS
TENANTOFFICE(3)
VIP
SH1-3
EV MECH
EV MECH
S1-2
HR1-2HR3-5
SH
VIP
LR1-3
LR4-6
MR1-3
MR4-6
EV MACHINE
OFFICE
STOR
ECC
ECC
EV MACHINE ROOM
OH
COURTINTERIOR
EV COOLING
MECH
TRAINERSRM
CORR
ACCESS HATCH
(HR1-5)(S1-2)
ROOM(S3)
CORR
PS
EV COOLINGROOM(HR1-5)OH
CT MAKEUPWATER ROOFTANK ROOM
PRESSURIZEDFAN ROOM
ROOM(MR1-6)
ROOM(MR1-6)
ROOM(LR1-6)
WATERTANK
STRMWATERWATER
TANK
STRM
MR1,2
(SH1-3)
EVCOOLING HALL
EVVIP
HALLEVVIP
HALLEVVIP
HALLEVVIP
HALLEVVIP
HALLEVVIP
HALL-2EV
SERVICE
(SH1-3)
(SH1-3)
OFFICE
HALL-1EV
SERVICE
HALL-1EV
SERVICE
HALL-1EV
SERVICE
SHAFTEV
S1-2
EV HALL TOILETMECH
A1TENANTOFFICE(1)
TENANTOFFICE(3)DS
MECH A1
(LR4-6)(LR1-3)
CLINDERGAS
TOILETHALLEVTENANT
OFFICE(1)TENANTOFFICE(3)TOILET
SERVICE SERVICE
HALL-1EV
HALL-2EV MECHMECH
SERVICE
HALL-1EV
SERVICE
HALL-1EV
SERVICE
HALL-2EV
SERVICE
HALL-2EV
SERVICE
HALL-2EV
SERVICE
HALL-2EV
SERVICE
HALL-2EV
SERVICE
HALL-2EV
SERVICE
HALL-2EV
SERVICE
HALL-2EV
VIP
TOILET CORR
SERVICE
HALL-2EV
SERVICE
HALL-2EV
IRRIGATION
HALL-1EV
SERVICE
HALL-1EV
SERVICE
(VIP)
WP8WP8
WP8WP8
MECH REFUGE FLOORREFUGE FLOOR
MECH
PIT
STOR
CORRPLENUM
STOR TOILETPSTOILET
TOILETPSTOILET
PLENUMPLENUM
STOR
CORR
PS
ECC
DS
PLENUM
MECH DS
TOILETHALLEVTENANT
OFFICE(1)TENANTOFFICE(3)TOILET
SERVICE SERVICE
HALL-1EV
HALL-2EVMECH
0
SERVICEEEEE SERVICEEES CE
VIP PARKING
SKYWALK (S8)
NMV INCOMINGMM N NGNNN
DPS
DPS
DPS
CHILLER PLANT(A)C LE CHILLER PLANT(B)
CENTERE
COMMANDM
MECH
HALL2
MEDIA OFFICED O
OMTANK ROOOOTATA OOMMMMTAMECHROOME R
ETS
STORS OS R
HALL RETAIL
CORR
MD-B
BATTERY-1BY
M.BATTERYCHARGER RRE H RRB RR
CS-3BC B
F.TOILETT
A/V
GYM
CORRCC RC
GAS
CYLINDERC RRCC RRCCY
CORRC M.TOILETT
TF.TOILETTF TM.TOILETTTT
HALLH LHALLEVEVV
DPS
HALLH LAHALLEVEVV
STOR STOR CORR
F.TOILET
CORR
RO
HALLEV
HALLEV
HALLEV
STOR GCOUNSELINNNCC NC GC
STOR DPS
PS HALLEV
DPS
DPS CORRDSGAS
CYLINDERRRCORR
GAS CCYLINDERRRCCORRM.M.
OH
SHAFTEV
SHAFTE
SHAFTE
ROAD MC 08
ROAD MC 02
SHAFTE
SHAFEEV
SHAFTE
CORRGG
DPS
DPS
DPS
DPS
DPS
DPS
DPS
TRENCH
STOR
MECHROOMC OCORR
HALL-1EV
VIP
CORR
S1-2
EV PIT
LR1,2EV PIT EV PIT
6LR4,5,66EV PIT
LR4,5,66
EV PITSH1,2,3EV PIT
S3 EVPIT
STOR
HALL-1AHHHEVE
ESERVICEEESERSER
HALL-1EV
ESERVICEEEEEEE
HALL-1EV
ESERVICEEEEEEE
HALL-1EV
ESERVICEEEEEE
DPS
DPS
DPS
HALL-2EV
AALLHAALLALLHEEVEVVIPV
HALL-1EV
ESERVICEEE
HALL-1EV
ESERVICEEE
HALL-2EV
SERVICEEE
HALL-2EV
SERVICEEEE
TOILET EV HALL TOILETPIT PIT
EV MACHINE
EV MECHEV HALLAEV HAV MECHMECH
SHAFEEV
SHAFTE
SHAFTV
SHAFTEV
SHAFTEV
OH
TADAWUL SKY LOBBYOFFICE EV HALLL MECHC OFFICE
HALLAHEVEVIPVVIP
EV HALL
EV MACHINE ROOMMMMMME
CATWALKKKKKKC K GEV COOLINGGGNG OH
VIP EV HALLH LHALHA
STOR
HALL-1EV
SERVICEEEEEEE
OH
EV MACHINE ROOMH MMHIHI
UTILITY TUNNEL
PSPS
PSPS
SPSP
SPSSSSS
No.17/1.17PERCEL CONNECTION STOR
M.TOILETMECH
RM
STOR
DPS STOR DPS CORR
STOR
CORR
SERVICEEE
MECH A1
TENANTOFFICE(1) DS
TENANTOFFICE(3)
VIP
SH1-3
EV MECHHHE HE
EV MECHHHE HE
S1-2
HR1-2HR3-5
S
VIP
LR1-3
LR4-6
MR1-3
MR4-6
EV MACHINE
OFFICE
STOR
ECC
ECC
EV MACHINE ROOM
OH
COURTINTERIOR
GEV COOLINNNGEEE NG
MECHCM
TRAINERSSSSSRM
CORRCCC
ACCESSHATCH
(HR1-5)(S1-2)
ROOM(S3)
CORR
PSPS
GEV COOLINNNEE NGG5)ROOM(HR1--RRR -555- OHGG5)5)
CT MAKEUPWATER ROOFTANK ROOM
PRESSURIZEDFAN ROOM
ROOM(MR1-6)
6)ROOM(MR1--RRR 1R -
ROOM(LR1-6)
WATERTANK
STRMWATERWATER
TANK
STRM
MR1,2
(SH1-3)
EVCOOLINGGGCC GC HALLAH
EVEVIPVIPVVIP
HALLAHEVEVIPVVIP
HALLAHEVEVIPVVIP
HALLAHEVEVIPVVIP
HALLAHEVEVIPVVIP
HALLEVVIP
HALL-2EV
SERVICEEEE
(SH1-3)
(SH1-3)
OFFICE
HALL-1EV
SERVICEEEEEEE
HALL-1EV
SERVICEEEEEE
HALL-1EV
ESERVICEE
SHAFTEV
S1-2
EV HALLEV HALL TOILETTOILETMECH
A1TENANTTENANTOFFICE(1)OFFICE(1)
TENANTOFFICE(3)DS
MECH MA1
(LR4-6)(LR1-3))
CLINDERRGAS
TOILETHALLEVTENANT
OFFICE(1)TENANTOFFICE(3)OFFICE(3)TOILET
ESERVICEESERVICEEEEEESERVICE SERVICESERVICEEEESERVICE
HALL-1EV
HALL-2EV MECHMECH
ESERVICEESERVICEEEEEESERVICE
HALL-1EV
ESERVICEEEEEES C
HALL-1EV
SERVICESERVICEEESERVICE
HALL-2EV
SERVICESERVICEEESERVICE
HALL-2EV
SERVICESERVICEEEESERVICE
HALL-2EV
SERVICESERVICEEESERVICE
HALL-2EV
SERVICESERVICEEEESERVICE
HALL-2EV
SERVICESERVICEEEEESERVICE
HALL-2EV
SERVICESERVICEEESERVICE
HALL-2EV
SERVICESERVICEEECSERS RE VSERVIC
HALL-22H LAAHALEVVEEVV
VIP
TOILETT CORR
SERVICEEEE
HALL-2EV
SERVICEEEEVSSERVSESERREMMMMM
HALL 2HALL-2LLHHAAHAHEVVVEV
ORRIGATIONOOR OONIR
HALL-1HHAHHHEVE
EESERVICESERVICEEESERSERVICEEEESSERR
HALL-1AHHHEVE
ESERVICESERVICEEES RSER EEESERVICE
(VIP)
WP8WP8
WP88W 888WP8
MECH REFUGE FLOORREFUGE FLOOR
MECH
PIT
STOR
CORRC RCCPLENUME MP NPL
STOR TOILETPSSSSSSPTOILET
TOILETPSSSSSSPTOILET
PLENUME MPLENUMUE
STOR
C
PSPPP
ECC
DS
PLENUMUE
MECHC DS
TOILETHALLEVTENANT
OFFICE(1)TENANTOFFICE(3)TOILET
ESERVICEEE SERVICEEEE
HALL-1EV
HALL-2EVMECH
M
CH
AV1
AFV1-
AV4
AFV4-
AV
AFV
AFV
-
H
S T
T
HAEV1
AV
1-
AFHAS
HR1-21
AV3
CORR
SHAFTA
LR4 64 V
SHS
21S
M
OOMECH
OMCH
P
GROUP DESIGNNATION
FOR TADAWULSHUTTLE LOCAL VIP
FOR TENANTLOW RISE HIGH RISE
FOR PODIUMFOR SERVICE
EMERGENCYSERVICESERVICE PODIUM
VIP
TADAWUL HQ
Sky Lobby
LONG SECTION
MECHANICAL/ELECTRICALREFUGE FLOOR
MEP / TRAINING / CLUB
TENANT OFFICE
TENANT OFFICE
DATA CENTER (RACK SPACE)
MECHANICALGYMRETAIL / OFFICE LOBBYCAFE / TADAWUL FORUM/ MEDIA WALL / TENANT
LOBBY / CONFERENCE HALL
ETS / SUB-STATION / OIL TANKVIP ENTRANCE
SUB-STATIONUPS
SUB-STATIONUPS
WATER TANK
TADAWUL SKY LOBBY
TADAWUL OFFICE
TADAWUL EXECUTIVE OFFICE
TAD
AWU
LTE
NA
NT
TAD
AW
UL/
CO
MM
ON
TA
DAW
UL
VERTICAL TRANSPORTATION
13
-
TADAWUL TOWER
TEN( L )
TEN( L )
TEN( L )
TEN( L )
TEN( L )
TEN( L )
TEN( M )
TEN( M )
TEN( M )
TEN( M )
TEN( M )
TEN( M )
TAD( S )
TAD( S )
TAD( S )
VIPEV
SEREV
SEREV
PP
LIFT ZONE DUTY CONTROL TYPE LEVELS SERVED
NETUSABLE AREA
(SQ. M.)
FLOOR LOADING(SQ.M./
PERSON)
PROJECTEDZONE
POPULATION(PERSONS)
INDIVIDUALCAR LOAD (PERSONS)
CALCULATEDROUND-
TRIP TIME(SECONDS)
NUMBEROF
LIFTSPER GROUP
5-MINUTE, A.M., UP PEAK ELEVATORINGAVERAGE WAITING TIME GROUP HANDLING CAPACITY
(SECONDS) (PERSONS/PERCENTAGE)
AVERAGE TRANSIT TIME TO DESTINATION
(SECONDS)
MEETS DESIGN
CRITERIA ?
PODIUM SHUTTLES 1600 KG @ 1.75 MPS CONVENTIONAL 2 -BUTTON B3 B1, LG, G, 1, 2 NA AS PROVIDED 190 2.0 69.4 2 15.8 25/13.0% 34.0 YES
LOW RISE ZONE 1600 KG @ 6.0 MPS DESTINATION BASED 1, 4, 7 20 31,483 15 2099 X 85% = 1784 14.0 110.4 6 21.5 232/13.0% 80.5 YES
MID RISE ZONE 1600 KG @ 6.0 MPS DESTINATION BASED 1,4, 23 - 33 24,562 15 1638 x 85% = 1392 13.0 116.4 6 20.0 181/13.0% 83.4 YES
1,4, 21, 23 - 33 1778 X 85% = 1511 120.6 6 21.6 196/13.0% 88.5 YES
SKY LOBBY SHUTTLES 1800 KG @ 6.0 MPS CONVENTIONAL 2 -BUTTON 1, 4, 35(SL) NA AS PROVIDED 868 x 85% = 738 14.0 116.7 3 13.3 111/15.0% 71.0 YES
1800 KG @ 7.0 MPS CONVENTIONAL 2 -BUTTON 14.0 112.5 3 9.1 62.2 YES
TADAWUL SHUTTLES 1600 KG @ 1.75 MPS DESTINATION BASED 34, 35(SL), 36 - 41 AS PROVIDED 868 x 85% = 738 11.0 73.5 3 13.5 96/13.0% 52.6 YES
NOTE: SKY LOBBY FLOOR 35 NET USEABLE AREA AND ASSOCIATED POPULATION ACCOUNTED FOR IN CALCULATIONS FOR SKY LOBBY PASSENGER SHUTTLE LIFTS. LEVEL 34 TADAWUL EXECUTIVE DINING POPULATION CONSIDERED TO OCCUR OFF-PEAK.
RECOMMENDED DESIGN CRITERIA INTERNATIONAL CLASS A STANDARDS
AVERAGE WAITING TIME: 18-22 SECONDSAVERAGE TIME TO DESTINATION: 90 SECONDSGROUP HANDLING CAPACITY - TYPICAL: 13% OF ZONE POPULATION MOVED SKY LOBBY SHUTTLE HANDLING CAPACITY: 15% OF ZONE POPULATION MOVEDPOPULATION DENSITY:LOW RISE FLOORS: 15 SQ.M./PERSON, N.U.A.MID RISE FLOORS: 15 SQ.M./PERSON, N.U.A.HIGH RISE FLOORS: AS PROVIDEDTENANCY TYPE: DIVERSIFIEDMEASUREMENT PERIOD: MORNING, UP-PEAKNOMINAL ELEVATOR CAR LOADS (MAXIMUM ANALYSIS LOADS)CAPACITY NORTH AMERICAN STANDARDS EUROPEAN STANDARDS (EN81) ACCELERATION/DECELERATION AND JERK RATES UTILIZED (ACV3F):1600KG 19-20 PERSONS 21 PERSONS1800KG 22-24 PERSONS 24 PERSONS 1.2 M./SEC & 1.4 M./ SEC (0.8 M./SEC & 1.0 M./ SEC FOR PODIUM MRL LIFTS)
CHART 1TADAWUL HEADQUARTERS TOWER
RIYADH, KINGDOM OF SAUDI ARABIAOFFICE PASSENGER LIFT ANALYSISCONVENTIONAL SINGLE DECK LIFTS
26 JANUARY 2012 CONVERSION OF 21ST FLOOR REFUGE FLOOR TO OFFICE
EV DESIGN CRITERIAOFFICE PASSENGER LIFTS OFFICE CRITERIAPOPULATION DENSITY: LOW RISE ZONE :15M2 / PERSON, NET USABLE AREA MID RISE ZONE :15M2 / PERSON, NET USABLE AREA HIGH RISE ZONE :15M2 / PERSON, NET USABLE AREA TADAWUL ZONE :AS INFORMATION BY TADAWUL AVARAGE WAITING TIME: LESS OR EQUAL 18 - 22 SECONDS AVARAGE TIME TO DESTINATION: LESS OR EQUAL 90 SECONDSGROUP HANDLING CAPACITY: MORE OR EQUAL 13% OF ZONE POPULATIONTENANCY TYPE: DIVERSIFIED TENANCYTRAFFIC TYPE: ONE WAY, MORNING UP-PEAK
EV (ELEVATOR) P : PODIUM EV SEREV : SERVICE EV TAD(S) : TADAWUL OFFICE SHUTTLE EV TAD(L) : TADAWUL OFFICE LOCAL EV TEN(L) : TENANT OFFICE LOW RISE EV TEN(H): TENANT OFFICE HIGH RISE EV
Legend
1F PLAN
-
FLOORNUMBERING
FLOORHEIGHT USAGE FRONT FRONT FRONT FRONT FRONT FRONT FRONT FRONT FRONT FRONT FRONT FRONT
ROOF +4.05 5650ROOF+2.0 2050
ROOF 200042 4350 MECH 1 141 4650 VIP 1 1 1 1 140 4100 TADAWUL 1 1 1 1 139 4000 TADAWUL 1 1 1 1 138 4000 TADAWUL 1 1 1 1 137 4000 TENANT OFFICE 1 1 1 1 136 4000 TENANT OFFICE 1 1 1 1 135 4000 TADAWUL SKYLOBBY 1 1 1 1 1 134 6660 MEETING 1 1 1 1 133 3940 TENANT OFFICE 1 1 PIT PIT 1 1 132 3940 TENANT OFFICE 1 1 1 1 131 3940 TENANT OFFICE 1 1 1 1 130 3940 TENANT OFFICE 1 1 1 1 129 3940 TENANT OFFICE 1 1 1 1 128 3940 TENANT OFFICE 1 1 1 1 127 3940 TENANT OFFICE 1 1 1 1 126 3940 TENANT OFFICE 1 1 1 1 125 3940 TENANT OFFICE 1 1 1 1 124 3940 TENANT OFFICE 1 1 1 1 123 3940 TENANT OFFICE 1 1 1 1 122 6500 MECH 1 1 121 3340 REFUGE 1 1 120 3840 TENANT OFFICE 1 1 1 1 119 3940 TENANT OFFICE 1 1 1 1 118 3940 TENANT OFFICE 1 1 1 1 117 3940 TENANT OFFICE 1 1 1 1 116 3940 TENANT OFFICE 1 1 1 1 115 3940 TENANT OFFICE 1 1 1 1 114 3940 TENANT OFFICE 1 1 1 1 113 3940 TENANT OFFICE 1 1 1 1 112 3940 TENANT OFFICE 1 1 1 1 111 3940 TENANT OFFICE 1 1 1 1 110 3940 TENANT OFFICE 1 1 1 1 19 3940 TENANT OFFICE 1 1 1 1 1
8 3940 TENANT OFFICE 1 1 1 1 17 3940 TENANT OFFICE 1 1 1 1 16 6900 UPS 1 1 15 6100 SUB STATION 1 1 14 5100 DATA CENTER 1 1 1 13 7550 MECH 1 1 12 4650 SERVICE OFFICE 1 1 1 11 5600 RETAIL / FOOD COURT 1 1 1 1 1 1 1 1 1 1G 6300 ENTRANCE / LOBBY /GYM PIT PIT PIT 1 1 1 1LG 6990 LOBBY AND CAF 1 1 1 1B1 5000 VIP ENTRANCE 1 1 1 1 1 1 1B2 3500 MECH PIT PIT PIT 1 1 1 1 1 1 1B3 3500 MECH PIT 1 G 6400 G G GB4 3500 MECH 1 1 1 PIT
PIT PIT PIT LG 6990 LG
No. of Opngs. 16 15 13 12 8 8 3 10 47 47 38 7No. of Stops. 16 15 13 12 8 8 3 10 47 47 38 7
Approx Rise(m) 105.41 87.12 158.49 140.2 30.76 30.76 150.8 193.19 208.34 208.34 168.99 30.89 Rise(m) 6.99 6.3 5.8
Total Units 26 2 3 3 1 1 1 1 2 TOTAL UNITS 8 4 2 2
GroupDesignnation
HIGH RISE(SINGLE DECK)
HIGH RISE(SINGLE DECK)
PANAROMIC
TADAWUL OFFICESHUTTLE(SINGLE
DECK)
TADAWULVIP(SINGLE
DECK)
SERVICE/TRANSFORMER
MOVEMENTSERVICE SERVICE PASSENGERPANAROMIC ESCALATOR NO.
ES1-ES2 ,ES7-8 ES3-ES4 ES5-ES6
Lift No. LR1 - 2 LR3 - 6 MR1- 2 MR3- 6 HR1 -2 HR3 -5 SH1-3 VIP S1 S2 S3 P1-P2
HEAT EMISSION PERESCALATOR (J/S)VERIFY VT LAYOUTSFOR FINAL VALUES
1757 3514 3514
1600 1600 1800 1800 2500/6500 2500 2500 1600 MOTOR (KW) 11.2 15 15
21 21 24 24 33 33 33 21 INCLINATION 30DEG 30DEG 30DEG
1.75 (105) 1.75 (105) 6.0(360) 6.0(360) 5.0 (300) / 2.5(150) 5.0 (300) 5.0 (300) 1.75(105) CLEAR WELLWAY
(LENGTH X WIDTH)12350/ 10600
X 1200 16300X1200 15500X1200
YES YES YES NO NO NO NO NO # FLAT STEPS 2 2 2
6040 x 2700 9450 x 2700 9450x2700 3050 X 3450 2900 x 3450 6000 X 2500
2100 x 1600 1600 x 2150 2350x1600 2350x1600 1825x2750 1850x1875
1100 x 2400 1100 x 2400 1100 x 2400 1100 x 2400 1400 x 2600 1100 x 2100
6000 6450 6000 6450 6450 6050 6250 3500
7650 6700 30250 5500
3950 3300 4050 N/A
Hoistways aboveoverrun.
Hoistways andLobby area
above overrun
Hoistwaysabove
overrun.WITHIN HOISTWAY
10658 10658 18271 13808 13808 5155
82 82 115 100 100 30
Note Emergency doors at every third floor or 11 meter whichever less in an express zoneUNLESS MENTIONED ALL SIZES ARE IN MM.
1) ENTRANCE HEIGHT IS 2800MM HIGH FOR FLOORS LGF AND 22
DATE : DEC 18 2011REV 11
Hoistways and Lobby area aboveoverrun
6150 X 3450
1825x2750
1400 X 2600 (1)
6250
6850
4000
OVERHEAD
TADAWUL
ESCALATORS
CWT SAFETY
HOISTWAY SIZES (W X D )
OFFICES
Entrance( W x H)
Clear cab( W x D x H)
PIT DEPTH
TRACTION DRIVE RATING(KW) (VERIFY FINAL VALUES
IN VT DRAWINGS)
HEAT EMISSION PER LIFT(J/S) VERIFY VT LAYOUTS
FOR FINAL VALUES
MACHINE ROOM SIZES(VERIFY VT LAYOUTS)
MACHINE ROOMHEIGHT(VERIFY VT LAYOUTS)
CAPACITY(KG)
SPEED M/S (MPM)
NO.OF PERSONS
2100x1600
1100 x 2400
8000
3500
21
6.0(360)
YES
9450 x 2700
21
5.0 (300)
YES
6
MID RISE(SINGLE DECK)
6
1600
LOW RISE (SINGLE DECK)
1600
3300
Hoistways and Lobby area aboveoverrun
9224
67
9450 x 2700
2100x1600
1100 x 2400
6750
7000
30
Hoistways and Lobby area aboveoverrun
13909
67
4590
10800
2400
Hoistways and Lobby area aboveoverrun
VERTICAL TRANSPORTATION DIAGRAM
14
-
SITE ANALYSIS & ORIENTATION
-
SITE ANALYSIS
MonorailStation
MonorailStation
MonorailStation
MonorailStation
MonorailStation
From/ToDedicated Parking (and Bus Stop)
Access toCar Park
0 100 200M
ATTRACTORSATTRACTORS
WADIWADI
TADAWUL TOWERTADAWUL TOWER
FINANCIALPLAZAFINANCIALPLAZA
N
Makkah
ATTRACTORSATTRACTORS
N o r t h R i n g R o a d
To Northern Highways
To Downtown
RiyadhRing Rd(East)
RiyadhRing Rd
(West)
To Airport
Kin
g
Fa
hd
R
oa
d
TH
UM
AM
AH
RO
AD
TH
UM
AM
AH
RO
AD
Master PlanKing Abdullah Financial District
-
1
2
3
4
5
6
MonorailStationMonorailStation
MonorailStationMonorailStation
MonorailStation
MonorailStation
MonorailStation
MonorailStation
MonorailStationMonorailStation
N
Makkah
0 100 200m
Airport
From/ToDedicated Parking (and Bus Stop)
From/ToDedicated Parking (and Bus Stop)
TADAWUL
TADAWUL
Access toCar ParkAccess toCar Park
N
Makkah
0 50 100m
Specific qualities of parcel 1.17:
CENTRALRIYADH
CENTRALRIYADH
S I T ES I T E
Al Faisaliah TowerAl Faisaliah Tower
Kingdom TowerKingdom Tower
King Fahd Road
King Fahd Road
-Very good public transport connectivity-Large & diverse transit footfall on Skywalk level-Great exposure to North and East directions, limited south exposure, very limited west exposure
-Least exposure to Financial Plaza-Link & position between Financial Plaza and Attractor A04 (Financial Academy, Park, Wadi)
The site is KAFD Parcel 1.17, one of 5 high-rise parcels that contain the heart of KAFD, the Financial Plaza
ATTRACTORS
WADI
TADAWUL TOWER
TH
UM
AM
AH
RO
AD
16
-
TimeDay 8:00
9/21
3/21
6/21
12/21
10:00 12:00
ORIENTATION
-
The building is in the sun from the morning, up to the early afternoon.
Shadings for the low/mid-rise sun are required on the East and South faade.
The sun hits the building from NE and NW, in the early morning and the late afternoon.
The building enters in the shade of CMA (parcel1.16) from the early afternoon on.
The installation of shad-ings (for very low sunlight) on Northern sides of the building might be appro-priate.
The top half of the build-ing will be exposed to low-rise sun pretty much for a whole day, although "a whole day" can mean rather short time in this season.
Southern half of the building faade may require some kind of shading.
: Indicates the faade area with direct sun
14:00 16:00 18:00 Comments
17
-
View from height of 100m
300~(m)
200~
50~0~
100~
N
Makkah
0 100 200m
View from height of 160~200m
N
Makkah
0 100 200m
View / Building Height
Clear & unobstructed view from TADAWUL Headquarters Tower top floor.Views around are secured in the lower floors as well.
VIEWS & VISIBILITY
-
View From Point A
View From Point C View From Point D
View From Point B
The below views illustrate the appearance of the Financial Plaza as the ensemble
at the heart of KAFD from key approaches along King Fahad Road, North Ring
Road and Thumamah Road.
They show clearly how the Tadawul tower works in the context of the 5-tower
ensemble to form an urban crown for KAFD, reacting to and complementing the
gesture made by the other towers while retaining a strong identity.