tahsil / district / state tahsil, district, … 1 : 250 1 : 2500 vertical horizontal scale : datum...
Post on 21-Mar-2018
219 Views
Preview:
TRANSCRIPT
MHMH
MHMH
MH
MH
MH
MH
MHMH
MH
MH
MHMHMH
MH
MH
MH
MH
MH
MH
MH
MH
MH
MHMH
MH
MH
MH
MHMH
MH
MH
MH
MH
MH
MH
MH
MH
MH
1 : 2501 : 2500
VERTICALHORIZONTAL
SCALE :
DATUM LEVEL : 541 M
GROUND LEVELS
DISTANCE BETWEEN LEVELPOINTS (IN METRES)
(IN METRES)CUMULATIVE CHAINAGE
SURFACE / TERRAIN DETAILS
SURVEY
CITY-LOCOLITY-CORPORTION LIMIT
DEPTH IN 'm
'
SOIL STRATIFICATION
SOIL RESISTIVITY (OHM-M)
(IN METRES)
PLANIMETRY
SCALE1 : 2500
GROUND PROFILE
1.01.52.0
DEFLECTION ANGLEDISTANCE BETWEEN TPs (m)
TAHSIL / DISTRICT / STATE
MINIMUM (MILLIMETRES)PIPE LINE COVER
DESIGN CRITERIA
INSTALLATIONCATHODIC PROTECTION
CROSSINGS
INTERSECTION POINTS TP
BENCH MARKGPS STATION, LOCATION NOCO-ORDINATES (X,Y,Z)
NOTES
SYMBOL DESCRIPTION DESCRIPTIONSYMBOL
EP
EB
MH
BS
HANDPUMP
RELIGEOUS PLACE LIGHT POLE
FLAG
ELECTRIC POLE
TELEPHONE POLE
TREE TRANSFORMER
ELECTRIC BOX
MAN HOLE
GATE
KILOMETER STONE
BUS STAND
STONE & OFC STONE
DESCRIPTIONSYMBOL
CEMENTED FOOTPATH
KACCHA FOOTPATH
BRICK FOOTPATH
PARKPARK
FENCING
BRIDGE
CULVERT
HOSPITAL & DISPENSARY
RAILWAY TRACK
NALLA/DRAIN WITH CULVERT
PROPOSED STEEL P/L
16" FEEDER LINESB SIGN BOARD
TBM
KM
SIGNALLP
LIGHT POLE
NH ROAD
SEWER LINE
POWER LINE
ISSUED RECORD
SCALE
AS SHOWN
REV.
R0
DRAWING NO.
BGL/MNEC/HYD/BAL-BHAD/ALN/002
3.000 km TO 6.000 km:CHAINAGE
:DWG. TITLE PROPOSED STEEL PIPELINE ROUTE
BHAGYANAGAR GAS LTD.
MECON LIMITED
M/S. M. N. NILAWAR, EC&C
M N E C
PROJECT :DFR FOR CITY GAS DISTRIBUTION - HYDERABADSURVEY OF PIPELINE ROUTE
:SECTION BALANAGAR TO BHADURPALLI - ROUTE 3
CLAYEY SAND WITH GRAVELS
REFUSAL
CLAY
HARD ROCK
MURRAM WITH CLAY
SILTY CLAY
SILTY SAND
SANDY SILT
SANDY CLAY WITH GRAVELS
SILTY CLAY WITH GRAVELS
GRAVELLY CLAY
CLAYEY SAND
CLAYEY SILT
SLIGHTLY WEATHERED ROCK
WEATHERED ROCK
SAND
DRAWING NODRAWING TITLE
REFERENCE DRAWINGS NOTES
2 ALL LEVELS ARE WITH RESPECT TO MEAN SEA LEVEL.
1 ALL DIMENSIONS ARE IN METRES UNLESS OTHERWISE SPECIFIED
1.0
0.0
3.0
2.0
CLAYEY SAND WITH GRAVELS
TP
TELEPHONE LINE
TAHSIL, DISTRICT, ANDHRA PRADESH STATE
N
EPEPEP
COMPOUND WALL
LP
DRAIN
POWER
LINE 33
KV
H17.253
POWER LINE 33 KV
POWER LINE 33 KV H9.082M
POWER LINE 33 KV
H21.547
LT LINE
H17.326
EP EP
EP
EP
EPEP
EP
EP
EP
EP
EP
EPEP
EPEP
EPEP
EP
EP
EPEP
EP
EPEP
EPEP EP
EP
EP
EP
EP
EP
EP
EP
EP
EP
EP
EPEP
EP
EP
DP
BUILDING
BUILDING
BUILDING
Shapur Nagar
Shapur Nagar
APCII Colony
BUILDING
BUILDING
ASPHALTE
D ROAD
ASPHALTE
D ROAD
ASPHALTED
ROAD
ASPHALTED ROAD
ASPHALTED ROAD
ASPHALTED ROAD
ASPHALTED ROAD
SHOP'S
SHOPSHOP
SHOP'S
SHOP
OFC STONE
OFC STONEDP
DP
DPCOMPOU
ND
OFC ST
ONE
OFC
TEMPLE
BUILDING
BUILDING
BUILDING
BUILDING
BUILDING
CART TRACK
CART TRACK
TEMPLE
DIVIDERDIVIDER
DIVIDER
TOILET
BUS STAND
OFC LINE
OFC LINE
OFC LI
NE
OFC LI
NE
POWER LINE 11 KV
POWER LINE 33 KV
POWER LINE 11 KV
POWER LINE 33 KVPOW
ER LINE
33 KV
POWER
LINE 11
KV
STATE HIGHWAYSTATE HIGHWAY
STATE HI
GHWAY
PETROL
LP
LPLP
LP
LT LINE
LT LINE
LT LINE H
4.1M
EPEP
EP
EP
EPEP
EP
EP
EP EP EP EPEP
EPEP
EP
EPEP
EP
EP
EP
EP EP
EPEP
EPEP
EP
EP
EP
EP
EPEP
EP
EP EP
EP
EP
CART TRACK
HOUSE
BUILDING
To Shapur Nagar
Shapur Nagar
IDA Jeedimetla
BUILDING
CEMENT ROAD
ASPHALTED ROAD
ASPHALTED ROAD
SHOP
OFC STONE
OFC STONE
DP
DP
DPCOMPOUND WALL
FENCING
ASPHALTE
D ROAD
ASPHALTED ROAD
BUILDING
BUILDING
BUILDING
BUILDING
BUILDING BUILDING
BUILDING BUILDINGBUILDING H18.458
BUILDING
DIVIDER
DIVIDER
DIVIDER
CEMENT ROAD
SHOP
OFC LINE
OFC LINE
OFC LINE
DP
POWER LINE 33 KV H.7.458 M.
POWER LINE 11 KVPOWER LINE 33 KV
POWER LINE 33 KV
POWER LINE 11 KV
POWER LINE 33 KV
POWER LINE 33 KVSTATE HIGHWAY
STATE HIGHWAYSTATE HIGHWAY
BUS STAND
TOILET
USHOYA TOWER
LP
LP
LP
LP
LP
LP
LP
POWER LINE 11KV H.5.765 M.
COMPOUND WALL
LT LINE
CIRCLE
POLICE CHOUKI
EPEPEP
EPEP
GATE
EP
EP
EP
EP
EP
EP
EPEP
EP
EP
EP
EP
EP
EP
EP
EPEP
EPEP
STONE
STONEROAD
STONE
ASPHALTED ROAD
CART TRACK
OFC STONE
OFC STONE
OFC STONE
OFC STONE
OFC STONE
OFC STONE OFC STONE
OFC STONEOFC STONE
DP
COMPOUND
FENCING
FENCING
FENCING
ROAD STONE
ROAD STONE
ROAD
OFC
PETROL
DIVIDER
DIVIDER
TEMPLE
OFC LINE
OFC LINE
OFC LINE
OFC LINE
POWER LINE 11 K
VPOWER
LINE 33 KV
POWER LINE 33 KV POWER LINE 11 KV
POWER LINE 33 KV
POWER LINE 11 KV
STATE HIGHWAY
STATE HIGHWAY
ROAD STONE
BUS STAND
WATER TANK
LP
LP
LP
LPLP
LP
LP
LP
LP
LP
LP
ASP ROAD
OFC STONE
EPOFC STON
EEP
EP
EPEP
EP
EP
OFC STONE
EP
EPRD STONE
RD STONE
HMT LTD
OFC STONE
ASPHALTE
D ROAD
ASPHALTED ROAD
OFC STONE
OFC STONE
OFC STONE
OFC STONE
OFC STONE
OFC STONE
OFC STONE
DP
COMPOUND WALLO
FC STONE
RD STONEDIVIDER
DIVIDER
COMPOUND WALL
COMPOUND WALL
OFC LINE
OFC LINE
OFC LINE
OFC LINE
OFC STONE
SHOPPOWER LIN
E 11 KV
POWER LINE 33 KV
POWER LINE 11 KV
POWER LINE 11 KVPOWER LINE 33 KV
POWER LINE 11 KV
STATE HIGHWAY
STATE HIGHWAY
SHED
LP
LP
LP
LP
LP
LP
LP
POWER LIN
E 11K
V H.5.673 M.
POWER LIN
E 11K
V H.5.234 M.
NALA
POWER LINE 11 KV
POWER LINE 33 KV
POWER LIN
E 33KV
POWER LINE 33KV RD STONE
OFC STONE
EPEP
EP
EP
EPEPEP EP EPEP
EP
EP
EP
EP EP
EPEP
EPEP
EP
EP
EP EP
EP
TO Qutubullapur
LP
LP
LP
STATE HIGHWAY-0
6DIVIDER
STATE HIGHWAY-06DIVIDER
DIVID
ER
COMPOUND WALL
COMPOUND W
ALL
COMPOUND W
ALL
COMPOUND WALL
CART TRACK
ASPHALTED ROAD
MAZAR
COMPOUND WALL
FENCING FENCING
FENCING
FENCING
OFC STONE
OFC LINE
OFC LINE
OFC STONEOFC LINE
OFC LINE
OFC LINE
OFC STONE
COMPOUND WALL
DIVIDER
OFC LINE
POWER LINE 33 KV
POWER LINE 11 KV
STATE HIGHWAY
LP
POWER LINE 33KV
POWER LINE 33KV
FENCING
POWER LINE 11KV
POWER LINE 33KV
RD STONE
OFC STONE
HUTOFC STONE
TOILET
L. BOX
SHOP
OFC STONE
OFC STONE
OFC DP
OFC STONE
EP
EP
EP
EP
EP
EP
EP
EP
EPEPEP
EP
EP
EP
LT LIN
E
LP
LP
LP
LP
LP
LP
LP
KM
Padm
anagar Colony
Chintal Nagar
STATE HIGHWAY-06
DIVIDER
CART TR
ACK
CART TRACK
CART TR
ACK
BUS STAND
SHOP
SHOP
SHOP
SHOP
SHOP
SHOP
BUS STAND
ROYAL JRFENCING
OFC LINE
OFC LINE
OFC LINE
OFC LINE
STATE HIGHWAY-06
DIVIDER
COMPOUND WALLCOMPOUND WALL
CART TRACK
CART TRACK
SHOPFENCING OFC LINE
SHOP
SHOP'S
TP 08
TP 09
TP 10
TP 11TP 12
TP 13
TP 14
DWG NO.-003-R1
MATCH LIN
E FOR CONT REFER
CH:6.000 Km
DWG NO.-001-R1
MATCH LIN
E FOR CONT REFER
CH:3.000 Km
006.0km005.5km005.0km004.5km004.0km003.5km003.0km
2.82
16.85
17.43
15.52
16.90
15.56
11.72
12.46
2.02
13.12
13.84
14.20
18.25
18.92
12.31
11.43
14.36
13.42
2.37
21.03
19.67
18.97
2.13
11.87
16.30
13.61
6.47
2.10
1.60
13.06
14.81
15.99
15.99
15.89
16.16
17.75
15.02
20.48
21.73
20.61
21.57
22.42
19.89
16.62
23.08
14.04
14.97
16.37
14.42
2.58
1.60
2.47
15.93
21.03
15.57
10.38
1.41
13.72
32.95
23.77
28.19
30.10
26.45
4.15
11.78
1.37
5.38
4.30
2.61
14.80
4.00
14.47
10.06
11.33
18.98
20.82
5.29
23.52
18.25
18.28
16.07
16.31
19.74
10.11
5.38
2.13
15.52
13.27
20.13
20.21
22.57
20.45
21.45
18.34
15.35
29.69
23.34
24.23
22.37
13.59
17.46
12.99
21.10
21.84
22.20
24.43
24.60
21.67
23.47
23.22
25.35
27.86
24.06
27.12
24.10
23.00
27.06
24.48
13.44
2.02
13.80
22.41
21.16
27.37
10.76
1.21
1.02
29.86
22.70
20.21
27.97
33.91
27.07
20.57
11.19
0.90
18.25
17.99
2.69
14.75
2.36
19.43
20.13
23.92
29.47
18.30
21.06
18.12
13.41
20.59
21.77
19.29
18.95
16.59
16.10
14.12
17.36
15.30
17.72
17.52
15.69
15.77
18.65
21.11
21.47
19.49
22.03
26.51
24.51
19.97
12.13
12.78
12.48
2.22
15.12
14.06
2.60
7.61
4.99
12.26
17.39
24.03
5994.516
5989.126
5972.277
5954.844
5939.327
5922.426
5906.866
5895.146
5882.682
5875.146
5862.025
5848.186
5833.991
5815.739
5796.822
5784.516
5773.082
5758.726
5745.301
5740.251
5719.217
5699.543
5680.578
5676.484
5664.609
5648.310
5634.703
5628.232
5620.630
5607.574
5592.764
5576.777
5560.788
5544.899
5528.737
5510.990
5495.966
5475.483
5453.757
5433.146
5411.576
5389.151
5369.259
5352.640
5329.559
5315.520
5300.546
5284.177
5269.759
5267.179
5259.114
5243.184
5222.154
5206.582
5196.199
5189.265
5175.541
5142.590
5118.816
5090.624
5060.523
5034.073
5029.923
5016.776
5008.472
5003.093
4996.176
4981.372
4977.369
4962.899
4952.835
4941.503
4922.520
4901.701
4896.409
4872.887
4854.640
4836.358
4820.284
4803.971
4784.233
4774.120
4768.744
4760.735
4745.210
4731.936
4711.804
4691.596
4669.024
4648.575
4627.121
4608.777
4593.429
4563.738
4540.395
4516.163
4493.796
4480.209
4462.751
4449.757
4428.653
4406.817
4384.615
4360.187
4335.583
4313.911
4290.439
4267.222
4241.868
4214.012
4189.954
4162.829
4138.728
4115.724
4088.666
4064.185
4050.740
4046.924
4033.127
4010.721
3989.562
3962.195
3951.432
3947.084
3917.219
3894.516
3874.310
3846.341
3812.430
3785.363
3764.796
3752.713
3734.462
3716.476
3711.490
3696.743
3694.382
3674.954
3654.823
3630.905
3601.435
3583.133
3562.074
3543.950
3530.535
3509.947
3488.181
3468.888
3449.934
3433.346
3417.248
3403.133
3385.776
3370.472
3352.757
3335.234
3319.541
3303.770
3285.124
3264.011
3242.541
3223.052
3201.022
3174.514
3150.005
3130.037
3117.902
3105.120
3092.640
3088.514
3073.394
3059.330
3049.123
3038.982
3026.719
3009.328
569.82
569.82
569.20
569.21
568.96
568.44
568.18
568.03
567.68
567.59
567.26
566.98
566.81
566.43
566.17
565.98
565.86
565.89
565.48
565.49
565.15
565.63
564.75
564.76
564.73
564.63
564.85
564.80
564.79
564.76
564.86
564.94
565.07
565.24
565.88
566.06
565.90
566.03
566.32
566.59
566.53
566.78
567.02
567.01
566.75
567.17
567.17
567.27
567.52
567.42
567.38
567.48
567.52
567.89
567.97
567.99
568.56
568.19
568.68
569.82
568.54
569.00
569.10
569.24
569.37
569.38
569.47
569.81
569.90
570.38
569.64
570.43
570.28
570.05
570.07
569.90
569.79
569.61
569.19
569.07
569.14
569.18
568.73
568.77
568.15
567.84
567.65
567.20
566.80
566.44
566.01
565.62
565.25
564.93
564.28
563.99
563.44
562.78
562.72
562.63
562.44
562.16
561.92
561.41
560.78
560.20
559.73
559.41
558.99
558.61
558.15
557.85
557.53
556.98
557.06
556.96
557.32
557.31
556.78
556.82
556.88
556.57
557.12
557.10
556.69
556.60
556.61
556.62
556.81
556.83
556.70
556.72
556.68
556.37
556.36
556.32
556.27
556.04
555.59
554.78
554.98
554.71
554.61
554.51
554.03
553.61
553.19
552.85
552.33
552.01
551.82
551.49
551.22
551.03
550.74
550.45
550.18
549.98
549.77
549.37
549.12
548.60
548.68
548.15
547.64
547.49
547.24
546.99
546.75
546.73
546.62
546.46
546.10
545.92
545.89
545.91
3000.000
545.77
569.91
5.72
6000.000
STONE SHOPSHOP
SHOP
COLLAGE
SHOP'S
EP
STONEOFC
PUMP
WALL
PUMP
SHOP'SWAL
L
STONE
RockHardHard
RockRockHard
RockHard
RockHard
038.936010.048027.506056.520072.848056.771031.149
038.622016.014033.441072.534090.432060.947034.383
035.796032.028035.419096.712092.944065.626047.226
5.694
4.620
4.146
3.573
3.113
BH-9
BH-8
BH-07
BH-06
BH-05
CS/RD/002REF DWG No.
CART TRAC
K
33 K
V
ASP RO
AD
33 K
V
ASP RO
AD
ASP RO
AD
ASP RO
AD
CEM
ENT RD.
LT LINE
ASP RO
AD
OFC
LINE
33 K
V
ASP RIAD
33 K
V
OFC
LINE
33 K
V
11 K
V
ASP RO
AD
CART TRAC
K
NALA
LT LINE
11 K
V
11 K
V
CART TRAC
K
OFC
LINE
OFC
LINE
LT LINE
LT LINE
CART TRAC
K
LT LINE
CART TRAC
K
762.749
15.92
21.97
18.80
14.47
1379.766
10°55'23" L24°31'44" L18°47'25" R
36°18'48" R18°54'24" L
14°25'47" L10°52'52" L
TP 14TP 13TP 12TP 11TP 10TP 09TP 08
216.49
TP 08 3583.133TP 09 4962.899TP 10 4977.369TP 11 4996.176TP 12 5018.147TP 13 5034.073TP 14 5796.822
ASP ROAD CS/RD/002
BH-05
BH-06
BH-07
BH-8
BH-11
BH-9
9.26
7.356.91
10.72
10.66
10.63
10.31
5.74
20.26
17.32
21.96
14.29
15.12
9.15
6.96
7.72
13.56
17.21
9.799.67
12.36
8.360
.90
HP
ASP ROAD
BPCL
582.90
APPDCHKDDRN BGL
MANAGERPROJECT
CHECKENGINEER.
APPR'LCLIENT
DATENO.
CHECKDRAFTING
DRAWN
SIGN.
REVISIONS
LEADERSECTION
PRAVIN AMAR Premdas
ISSUED FOR CLIENT REVIEWR0
DATE
ANANDVISHAL
28.08.09
19.08.09 21.08.09 24.08.09 26.08.09 27.08.09
R1 02.02.10 ISSUED FOR CLIENT APPROVAL
MH
MH
MH
MH
MH
MH
MH
MH
MHMH
MHMHMH
MH
MHMH
MH
MH
MH
MH
MH
MH
MH
MH
MH
MHMH
MH
MH
MH
MH
MH
MH
MH
MH
MH
MHMHMH MHMH
MH
MH
MH
MH
MH
MH
MHMH
MH
MH
MH
MH
MHMH
1 : 2501 : 2500
VERTICALHORIZONTAL
SCALE :
DATUM LEVEL : 528 M
GROUND LEVELS
DISTANCE BETWEEN LEVELPOINTS (IN METRES)
(IN METRES)CUMULATIVE CHAINAGE
SURFACE / TERRAIN DETAILS
SURVEY
CITY-LOCOLITY-CORPORTION LIMIT
DEPTH IN 'm
'
SOIL STRATIFICATION
SOIL RESISTIVITY (OHM-M)
(IN METRES)
PLANIMETRY
SCALE1 : 2500
GROUND PROFILE
1.01.52.0
DEFLECTION ANGLEDISTANCE BETWEEN TPs (m)
TAHSIL / DISTRICT / STATE
MINIMUM (MILLIMETRES)PIPE LINE COVER
DESIGN CRITERIA
INSTALLATIONCATHODIC PROTECTION
CROSSINGS
INTERSECTION POINTS TP
BENCH MARKGPS STATION, LOCATION NOCO-ORDINATES (X,Y,Z)
NOTES
SYMBOL DESCRIPTION DESCRIPTIONSYMBOL
EP
EB
MH
BS
HANDPUMP
RELIGEOUS PLACE LIGHT POLE
FLAG
ELECTRIC POLE
TELEPHONE POLE
TREE TRANSFORMER
ELECTRIC BOX
MAN HOLE
GATE
KILOMETER STONE
BUS STAND
STONE & OFC STONE
DESCRIPTIONSYMBOL
CEMENTED FOOTPATH
KACCHA FOOTPATH
BRICK FOOTPATH
PARKPARK
FENCING
BRIDGE
CULVERT
HOSPITAL & DISPENSARY
RAILWAY TRACK
NALLA/DRAIN WITH CULVERT
PROPOSED STEEL P/L
16" FEEDER LINESB SIGN BOARD
TBM
KM
SIGNALLP
LIGHT POLE
NH ROAD
SEWER LINE
POWER LINEAPPDCHKDDRN BGL
MANAGERPROJECT
CHECKENGINEER.
APPR'LCLIENT
DATENO.
CHECKDRAFTING
DRAWN
SIGN.
REVISIONS
LEADERSECTION
ISSUED RECORD
PRAVIN AMAR Premdas
ISSUED FOR CLIENT REVIEWR0
DATE
SCALE
AS SHOWN
REV.
R0
DRAWING NO.ANAND
BGL/MNEC/HYD/BAL-BHAD/ALN/001
0.000 km TO 3.000 km:CHAINAGE
:DWG. TITLE PROPOSED STEEL PIPELINE ROUTE
BHAGYANAGAR GAS LTD.
MECON LIMITED
M/S. M. N. NILAWAR, EC&C
M N E C
PROJECT :DFR FOR CITY GAS DISTRIBUTION - HYDERABADSURVEY OF PIPELINE ROUTE
:SECTION BALANAGAR TO BHADURPALLI - ROUTE 3
CLAYEY SAND WITH GRAVELS
REFUSAL
CLAY
HARD ROCK
MURRAM WITH CLAY
SILTY CLAY
SILTY SAND
SANDY SILT
SANDY CLAY WITH GRAVELS
SILTY CLAY WITH GRAVELS
GRAVELLY CLAY
CLAYEY SAND
CLAYEY SILT
SLIGHTLY WEATHERED ROCK
WEATHERED ROCK
SAND
DRAWING NODRAWING TITLE
REFERENCE DRAWINGS NOTES
2 ALL LEVELS ARE WITH RESPECT TO MEAN SEA LEVEL.
1 ALL DIMENSIONS ARE IN METRES UNLESS OTHERWISE SPECIFIED
1.0
0.0
3.0
2.0
CLAYEY SAND WITH GRAVELS VISHAL
TP
TELEPHONE LINE
TAHSIL, DISTRICT, ANDHRA PRADESH STATE
N
TP-65
POWER LINE 33KV
EP
EP
CART TRACK
OFC STONE
SHOPSHOP
COMPOUND WALL
EP
EPEP
EP
EP EPEP
EP
EPEP
EP
EPEP
EPEP
EP
EP
EPEP
EP EP EP
EP
EP
EP
EP EP
EP
SBLP
LPLP
LP
LP
LP
LP
Sowbha nagar
Padmanagar Colony
STATE HIGHWAY-06DIVIDER
COMPOUND WALL
COMPOUND WALL
CART TRACK
CART TRACK
CART TRACK
CART TRACK
CART TRACK
CART TRACK
CART TRACK
SHOP
SHOP
SHOPSHOP
SHOP
SHOP
SHOP
SHOP
SHOP
SHOPS
HOP
SHOP
SHOP
SHOP
SHOP'S
BUS STAND
SHOPSHOP
SHOP SHOP
DRAIN DRAINDRAIN
DRAIN
SHOP
DP
OFC STON
COMPOUND WALLOFC LINE
OFC LINEOFC LINE
BUILDING
CINEMA HALL
STONE RD
OFC STONE
POWER LIN
E 33KV H.7.5M.
EP
EPEP
EP EP EP
EPEP
EPEP
EP EP
EP
EP EP
EP
EP
EP
EP EP
EP
EPEP
LPLP
LP
LP
LP
LP
LP
LP LP LP LP
LPLP
LPLP
KM
TEMPLE
STATE HIGHWAY-06DIVIDER
COMPOUND WALLCOMPOUND WALL
CART TRACK
CART TRACK
CART TRACK
ASP ROAD
SHOP'S
SHOP
HUT
HOUSE
SHOPSHOPSHOPSHOP
BUS STAND
HUT
FENCINGBUS STAND
DPOFC LINE
OFC LINE
OFC LINE
OFC LINE
RD STONE
OFC STONE
TOWER LIN
E 66KV 15.793 M.H.
OFC STONE
LT LINE
OFC STONE
EP
EP
EP
EP
EP
EP
EPEP
EP
EP
EP
EPEP EPEP
EP
EP
EP
EP
EPEP
EPEP
EP
EP
EPEP
LP
LPLP
LP LP
LP
LPLP
Sowbha nagar
Sowbha nagar
ASPHALTED ROAD
CART TR
ACK
STATE HIGHWAY-06
DIVIDER STATE HIGHWAY-06DIVIDER
STATE HIGHWAY-06DIVIDER
COMPOUND WALL
COMPOUND WALL
CART TR
ACK
CART TRACK
CART TRACK
SHOP
SHOP
SHOP
SHOP
SHOP
SHOPSHOPSHOP
TEMPLE BUS STAND
BUS STAND
BUS STAND
PETROL
TOILET
DRAIN
IOCL
CEMENT ROAD
TEMPLE
BUS STAND
FENCIN
G
DIVIDER
OFC LINE
OFC LINE
OFC LINE
OFC
LIN
E
OFC LINE
OFC LINE
OFC LINE
OFC LINE
BUILDING
BUILDING
EPEPEP
EP
ASP ROAD
POWER LINE 33KV
POWER LINE 33KV
NALA
NALA
EP
EP
EP
EP
EPEP
EP
LP
LP
LPLP
LPLP LP
LP
LP
LP
LPLP
LP
KM To Balanagar
DIVIDER
STATE HIGHWAY-06
STATE HIGHWAY-06DIVIDER
COMPOUND WALL
COMPOUND WALL
COMPOUND WALL
CART TRACK
FENCING
FENCINGFENCING
FENCING OFC LINE
OFC STONE
OFC LINE
EP
BUILDING
POWER LINE 33KVPOWER LINE 11KV
EPEP EP
EP
COMPOUND WALL
EP
EP EP
EP
EPEP
EP
EPEPEP
EP
EPEP
INDUSTR
Y
INDUSTR
Y
LPLP
LPLP
LP
LP
LP
LP LPLP LP LP
LP
KM
KM
EPEP
To Kukutapalli
Industry
Area
STATE HIGHWAYDIVIDER
DIVIDER
STATE HIGHWAY-06
COMPOUND WALL
COMPOUND WALL
COMPOUND WALL
CART TRACK
COMPOUND WALL
OFC LINEOFC LINE
OFC LINE OFC LINE
INDUSTR
Y
INDUSTRY
EPEP
POWER LINE 33KV
16" BOWENPALLI TO PATANCHERU ROUTE-2
SHOP
DIVIDER STATE HIGHWAY-06
EP EP EP
HUT
EP
EPEP
EP
EP
EPEP
EP
LPLP
LPLP
LPLPLP
LP LP
SBSB
SB SB SBSB
To Kukutapalli
Industry
Area
ASP ROAD
ASP ROAD
NATIONAL HIGHWAY-9
COMPOUND WALL
LP
FURNETU
RE
SHOP
WALL
BAJAJ
TI JEE DIMETLA ROAD
TO BHARAT NAGAR
POWER LINE 11KV
SHOP
PIPE BOOTH
BUS STAND
TRIMALA UPADI
WALL
LP
LP
LP
LP
LP
EP
EPEP
EP
EP
EP
SHOP
COMPOUND WALL
DIVIDER STATE HIGHWAY-06
COMPOUND WALL COMPOUND WALL COMPOUND WALL
CART TRACK
CART TR
ACK
CART TR
ACK
BUS STANDHUT
BUS STAND
BUS STAND
SHOPSHOP
SHOPSHOP
BUS STANDGATE
BOX
TOILET
SHOP
OFC LINEOFC LIN
E
OFC LINEOFC LINE
OFC LINE
OFC LINEOFC LINE OFC LINE OFC LINE
BUILDING BUILD
ING
INDUSTR
Y
INDUSTR
Y
INDUSTR
Y
TP 00
TP 01TP 02
TP 03
TP 04
TP 05
TP 06
TP 07
14.70
20.26
2.07
17.12
19.87
22.89
15.83
2.73
21.13
21.98
26.53
28.20
17.48
16.70
12.44
21.04
3.68
10.48
13.36
15.33
22.66
3.27
2.77
23.80
20.49
19.88
2.48
12.76
19.47
16.37
3.25
14.03
13.47
19.17
17.20
4.93
1.11
16.94
13.10
20.93
7.85
6.22
8.99
8.52
2.15
7.95
5.47
24.24
25.21
18.77
20.76
10.21
1.12
1.30
20.82
19.86
13.29
14.77
7.01
6.38
16.06
16.97
3.16
3.12
15.33
19.20
25.98
25.18
23.07
17.97
1.63
4.78
15.82
18.69
21.98
6.15
21.57
20.19
13.78
12.25
11.01
13.57
14.15
11.36
1.59
25.48
2985.297
2965.034
2960.926
2943.806
2923.940
2901.048
2885.215
2879.813
2858.682
2836.697
2810.166
2781.967
2764.490
2747.792
2735.353
2714.311
2706.522
2696.044
2682.681
2667.348
2644.685
2638.651
2614.853
2594.366
2574.485
2565.565
2552.807
2533.340
2516.968
2510.464
2496.429
2482.957
2463.785
2446.583
2441.649
2437.046
2418.997
2405.900
2384.971
2376.173
2369.957
2360.965
2352.441
2342.337
2332.975
2308.735
2283.521
2264.751
2243.991
2233.777
2228.310
2207.488
2187.625
2174.332
2159.566
2152.555
2146.179
2130.116
2113.149
2103.779
2088.448
2069.248
2043.266
2018.085
1995.011
1977.042
1966.218
1950.402
1931.713
1909.729
1903.575
1882.008
1861.814
1848.034
1835.788
1824.781
1811.207
1797.059
1785.699
002.5km002.0km001.5km001.0km000.5km000.0km
30.29
17.88
21.66
17.95
28.51
1.11
12.71
3.21
2.76
30.22
19.48
14.07
17.37
6.89
13.55
12.90
16.11
9.48
0.71
13.43
16.43
16.01
28.50
3.27
4.52
19.60
19.58
18.64
18.92
22.23
25.54
24.67
19.77
18.84
17.02
18.39
11.05
15.16
15.46
15.69
1.16
7.00
19.10
14.69
21.81
16.81
14.49
3.38
20.92
19.40
7.00
5.80
15.90
21.13
8.71
9.35
11.43
21.05
20.05
22.17
21.99
18.27
22.29
16.35
21.03
20.45
18.50
22.37
21.57
18.82
19.99
23.00
17.28
1.73
2.18
19.70
20.07
16.48
22.58
3.35
13.38
21.44
20.53
18.93
18.06
19.72
4.62
6.40
6.01
17.00
20.72
22.42
19.02
18.43
28.27
22.52
23.88
23.32
23.33
21.67
22.01
21.30
31.09
12.03
10.93
1756.928
1726.642
1708.762
1687.107
1669.161
1640.656
1626.839
1620.551
1612.186
1581.962
1562.485
1548.420
1531.054
1524.169
1510.617
1497.713
1481.602
1472.122
1455.674
1439.244
1423.237
1394.736
1383.907
1364.307
1344.730
1326.089
1307.173
1284.938
1259.394
1234.728
1214.954
1196.114
1179.091
1160.702
1149.656
1134.498
1119.040
1103.353
1099.840
1092.839
1073.744
1059.053
1037.246
1020.439
1005.945
1002.560
981.641
962.236
955.241
949.442
933.546
912.420
903.713
894.366
882.940
861.888
841.835
819.661
797.671
779.399
757.107
740.754
719.724
699.279
680.783
658.411
636.839
618.019
598.027
575.026
557.748
549.197
529.495
509.429
492.953
470.378
467.024
453.644
432.203
411.676
392.750
374.689
354.965
350.348
343.950
337.936
320.939
300.219
277.797
258.776
240.350
212.078
189.559
165.675
142.354
119.025
97.355
75.349
54.046
22.959
10.926
0.000
545.55
545.37
545.38
545.56
545.38
545.26
545.25
545.26
546.51
545.33
545.77
545.43
545.54
545.44
545.24
545.17
545.16
544.95
544.99
545.21
545.19
545.20
545.29
545.32
545.45
545.54
545.48
545.45
545.89
545.91
546.18
546.31
546.19
546.34
546.36
546.24
546.75
546.60
546.81
546.82
546.98
547.01
547.00
546.86
546.93
547.12
547.55
547.77
548.25
548.69
548.70
549.19
549.49
548.96
548.49
548.28
548.17
547.75
547.34
546.86
546.44
546.35
545.41
544.94
544.52
544.56
544.52
544.65
544.83
545.09
545.17
545.55
546.22
546.41
546.90
546.99
547.16
547.60
547.70
548.03
548.00
548.30
548.53
548.89
549.10
549.39
549.43
549.68
548.91
548.96
549.05
549.00
548.96
548.99
549.12
549.28
549.52
549.21
549.59
549.39
549.45
549.46
549.60
549.59
550.07
549.87
550.09
550.17
550.35
550.51
550.55
551.31
551.88
552.22
552.17
551.91
551.66
551.58
551.61
551.85
552.01
552.16
552.52
553.18
552.61
552.38
552.17
552.17
552.15
552.22
552.13
552.10
552.30
552.19
552.18
551.92
551.69
551.68
551.75
551.78
551.39
550.73
550.41
550.07
549.69
549.06
549.42
548.69
548.04
548.48
548.50
548.46
546.79
546.14
545.88
545.74
545.66
545.02
544.31
543.89
543.49
543.22
542.91
542.89
542.88
542.62
541.76
541.19
541.42
541.32
540.76
540.31
539.84
539.52
538.97
538.55
538.46
538.38
537.79
537.65
537.64
003.0km
3000.000
545.77
COLONY
SHOP'S SHOP SHOPSHOP SHOP
PUMP
PETROL PUMP
SHOP
SHOP
SHOP
SHOP
SHOP
SHOP
SHOP
SHOP
SHOP
SHOP
SHOP
SHOP
SHOP
SHOP'S
SHOP'S
SB
SB
DWG NO.-002-R1
MATCH LINE FOR CONT REFER
CH:3.000 Km
041.071045.467
053.129051.245
046.598060.602
RockHard
RockHard
RockHardN
IL
078.374045.970040.820048.607031.149
081.200051.245045.970053.129033.441
072.032057.399047.351059.095043.144
2.604
2.075
1.523
0.458
BH-04
BH-03
BH-02
BH-01
CS/RD/001REF DWG No.
ASP RO
AD
CART TRAC
K
CART TRAC
K
ASP RO
AD
66 K
V
CART TRAC
K
CEM
ENT RO
AD
CART TRAC
K
CART TRAC
K
33 K
V H7.5M
CART TRAC
K
OFC
LINE
OFC
LINE
CART TRAC
K
33 K
V
33 K
V
NALA
CART TRAC
K
33 K
V
OFC
LINE
33 K
V
OFC
LINE
33 K
V
CART TRAC
K
OFC
LINE
OFC
LINE
OFC
LINE
ASP RO
AD
33 K
V
OFC
LINE
OFC
LINE
CART TRAC
K
OFC
LINE
CART TRAC
K
CART TRAC
K
33 K
V
33 K
V
CART TRAC
K
CART TRAC
K
841.31511.899
13.81
620.895
3.385
979.601
12.03
10.92
12°52'9" L
20°31'2" L
19°59'35" R16°1'10" L13°25'54" R
30°41'36" L28°0'39" L
0°0'0"
TP 07TP 06TP 05TP 04TP 03
TP 02
TP 01
TP 00
TP 00 0.000TP 01 10.926TP 02 22.959
TP 03 1002.560TP 04 1005.945
TP 05 1626.839TP 06 1640.656TP 07 2152.555
ASP ROAD CS/RD/001
BH-01 BH-02
BH-03
BH-04
7.43 3
.63 4
.51
22.75
19.67
42.57
17.87
3.70
7.27 4
.67
13.65
12.95
16.48
16.80 12.88
15.41
15.37
16.86
12.93
14.58
13.46
25.79 8.928.08
12.26
12.10
9.92
18.92
11.90
11.01
5.74
7.21 11.72
28.08.09
19.08.09 21.08.09 24.08.09 26.08.09 27.08.09
PETROL PUMP
IBPL
R1 02.02.10 ISSUED FOR CLIENT APPROVAL
ASP ROAD
CART TRACK
ASP ROAD
TO PATA
NCHERU
TO BOWENPALLI
NH 9
MH
MH
MH
MH
MH
MHMH
MH
MH
MH
MH
MH
MH
MH
MH
MHMH
MH
MH
MH
MH
MH
MH
MH
MH
MH
MH
MH
MH
MH
MH
MH
MH MH
MH
MH
1 : 2501 : 2500
VERTICALHORIZONTAL
SCALE :
DATUM LEVEL : 520 M
GROUND LEVELS
DISTANCE BETWEEN LEVELPOINTS (IN METRES)
(IN METRES)CUMULATIVE CHAINAGE
SURFACE / TERRAIN DETAILS
SURVEY
CITY-LOCOLITY-CORPORTION LIMIT
DEPTH IN 'm
'
SOIL STRATIFICATION
SOIL RESISTIVITY (OHM-M)
(IN METRES)
GROUND PROFILE
1.01.52.0
DEFLECTION ANGLEDISTANCE BETWEEN TPs (m)
TAHSIL / DISTRICT / STATE
MINIMUM (MILLIMETRES)PIPE LINE COVER
DESIGN CRITERIA
INSTALLATIONCATHODIC PROTECTION
CROSSINGS
INTERSECTION POINTS TP
BENCH MARKGPS STATION, LOCATION NOCO-ORDINATES (X,Y,Z)
NOTES
SYMBOL DESCRIPTION DESCRIPTIONSYMBOL
EP
EB
MH
BS
HANDPUMP
FLAG
ELECTRIC POLE
TELEPHONE POLE
TREE TRANSFORMER
ELECTRIC BOX
MAN HOLE
GATE
KILOMETER STONE
BUS STAND
STONE & OFC STONE
DESCRIPTIONSYMBOL
CEMENTED FOOTPATH
KACCHA FOOTPATH
BRICK FOOTPATH
PARKPARK
FENCING
BRIDGE
CULVERT
HOSPITAL & DISPENSARY
RAILWAY TRACK
NALLA/DRAIN WITH CULVERT
PROPOSED STEEL P/L
16" FEEDER LINESB SIGN BOARD
TBM
KM
SIGNALLP
LIGHT POLE
NH ROAD
SEWER LINE
POWER LINEAPPDCHKDDRN BGL
MANAGERPROJECT
CHECKENGINEER.
APPR'LCLIENT
DATENO.
CHECKDRAFTING
DRAWN
SIGN.
REVISIONS
LEADERSECTION
ISSUED RECORD
PRAVIN AMAR Premdas
ISSUED FOR CLIENT REVIEWR0
SCALE REV.ANAND
6.000 km TO 9.000 km:CHAINAGE
:DWG. TITLE PROPOSED STEEL PIPELINE ROUTE
BHAGYANAGAR GAS LTD.
MECON LIMITED
M/S. M. N. NILAWAR, EC&C
M N E C
PROJECT :DFR FOR CITY GAS DISTRIBUTION - HYDERABADSURVEY OF PIPELINE ROUTE
:SECTION Bowenpalli Mother Station To Patancheru - ROUTE 2
CLAYEY SAND WITH GRAVELS
CLAY
HARD ROCK
MURRAM WITH CLAY
SILTY CLAY
SILTY SAND
SANDY SILT
SANDY CLAY WITH GRAVELS
SILTY CLAY WITH GRAVELS
GRAVELLY CLAY
CLAYEY SAND
CLAYEY SILT
SLIGHTLY WEATHERED ROCK
WEATHERED ROCK
SAND
DRAWING NODRAWING TITLE
REFERENCE DRAWINGS NOTES
2 ALL LEVELS ARE WITH RESPECT TO MEAN SEA LEVEL.
1 ALL DIMENSIONS ARE IN METRES UNLESS OTHERWISE SPECIFIED
CS/RD/009ASP ROAD
1.0
0.0
3.0
2.0
CLAYEY SAND WITH GRAVELS VISHAL
TP
TELEPHONE LINE
N
EP EPEP
EPEP
EP
EP EP
EP
EP
EP
EPEP
EP
EP EP EP
EP
EP
LPLP
LPLPLP
LPLPLP
LPLPLP
LPLP
SANDVK
SHOP
MASJIDPETROLBUS STAND
BUS STANDWA
LLTRIMALA UPADI
BUS STANDPIPE BOOTH
SHOP
POWER LINE 11KV
POWER LINE 11KV
POWER LINE 11KV
TI JEE DIMETLA ROAD
BAJAJ
WALL
SHOPFURNETURE
SHOP
LP
SHOP
TRANSPORT
COMPOUND WALLCOMPOUND WALL
DIVIDER
NATIONAL HIGHWAY-9DIVIDER
NATIONAL HIGHWAY-9
ASP ROAD
ASP ROAD
EP
EP
EP
EP
EP EP
EP
EP
EP
EPEP EP
EP EPEP
EP
EP
EP
EP
EP
EP
EPEP EP
EP
EPEP
STONEOFC
STONEOFC
KMLP
LPLP
LPLP
LPLP
LPLP
LPLP
LPLP
INDUSTRIESSHOP
POWER LINE
11KV
POWER LINE 11KV
GALLY
CULVERT DRAIN
CULVERT
EP
POWER LINE 11KV
BUS STANDINDUSTRIES
HOUSE COMPOUND WALL
WALLCOMPOUND WALL
ASP ROAD
TO BHARAT NAGAR COLONY
DIVIDERNATIONAL HIGHW
AY-9
ASP ROAD
INDUSTRIESINDUSTRIES
INDUSTRIESINDUSTRIES
EPEP
EP
EPEP EP
EPEPEP
EP
EP
EP
EPEPEP
EPEP
EP
EP
EP
EP
EPEP
EP EP
EP
STONEOFC
LP
LPLP
LPLP
LPLP
LPLP
LPLP
LP
LPLP
BUILDING
TEMPLE
POWER LINE 11KV
POWER LINE 11KV
HOUSE
LP
LP
GULLY
KM
COMPOUND WALL
WALL
POWER LINE 11KV
POWER LINE 11KV
POWER LINE 11KV
STONE CULVERT
BUS STAND
DRAIN
ASP ROAD
COMPOUND WALL
COMPOUND WALL
COMPOUND WALL
DIVIDERNATIONAL HIGHWA
Y-9
DIVIDERNATIONAL H
IGHWAY-9
TO BHARAT NAGAR COLONY
EP EP
EP
EPEPEP EPEP EP EP
EPEPEPEP
EP
EP
EP
EP
EP
EP EP
EPEPEP
EP EP
EP
EP
EP
EP EP
EPEP
EP EP EP EP
EPEP EP EP
EP
STONEOFC
LPLP
LP
LPLP
LP
LP
LP
LPLP
LP
DRAIN
BUS STAND
POWER LINE 11KV
POWER LINE 11KV
EPLP
LP
LP
EPPOWER LINE 11KV
ASP ROAD
COMPOUND WALL
COMPOUND WALL
COMPOUND WALL
COMPOUND WALL
DIVIDERNATIONAL HIGHWAY-9
DIVIDERNATIONAL HIG
HWAY-9
DIVIDERNATIONAL
HIGHWAY-9
EP
EP
EPEP EPEP
EP
EP
EPEP
EP
EP
EP
EPEP EP
EP
EP
EPEP
EP
EP
EP
EP EP EP
EP
EPEP
EPEP
EP
STONEOFC
STONE
LP
LP
LPLP
LPLP
LP
LP
LP
LP
CEMENT ROAD
CEMENT ROAD
DRAIN
HOTAL
SHOPDRAIN
BUS STAND
LP
DRAIN
DP
POWER LINE 11KV
POWER LINE 11KV
POWER LINE 11KV POWER LINE 11KV
DIVIDER
NATIONAL HIGHWAY-9
OPEN LAND
EPHOUSE
EP
CULVERT
CULVERTDARGA
CULVERT
LP
LP
OFC
STONE
CART TRACK
COMPOUND WALL
COMPOUND WALL
COMPOUND WALLCOMPOUND WALL
DIVIDERNATIONAL HIGHWAY
-9
NALA
TO KUKATPALLI
EP
EPEP
EP
EP
EP
EP
EP
EP
EP
EPEP
EP EP
EP
EPEP
EP EP
EP
EPEPEP
EP EP
EP
EP
STONEOFC
STONEOFC
STONEOFC
STONEOFC
STONE
KM
KM
KM
KM
KM STONE D10
LP
LP
LP
LP
LP
LP
LP
LP
LP
LP
LP
LP
LP
LP
LP
LP
SB
DRAINMYUNDRI
WALL
TVS SHOP
SAMSNG BRIDGE
LP
DHARAM KATA
RAJ ELECTRIC SHOP
TATA
DRAIN
BUS STAND
POWER LINE 11KV
POWER LINE 11KV
POWER LINE 11KV
DIVIDER
NATIONAL HIGHWAY-9
DIVIDER
DIVIDER
NATIONAL HIGHWAY-9Moosapet Road
OPEN LAND
HOTALRAM
STACHUSB
POLICE BOOTHSTONEOFC POLICE BOOTH
SBSB
SB
STONEOFC
STONEOFC
BUILDINGCANARA
EP
SB
BANK
ROAD
COMPOUND WALL
COMPOUND WALL
TO AGI COLONY
EP EP
EP
EPEP
EP
EP
FENCING
PETROL PUMP
LP
LP
LP
DHARAM KATA
PETROL PUMPHOUSE
DIVIDER
NATIONAL HIGHWAY-9
WALL
LP
INDUSTRIESINDUSTRIES INDUSTRIES
INDUSTRIESSUMEET INDUSTRY
11 KVSUB STATION
HOTEL
GULLY
GULLY GATE MSME
INDUSTRIESINDUSTRIES
TEMPLE GATE
TP-62
TP-63
TP-64
TP-65
TP-66
TP-67TP-68
006.0km
25.45
15.99
12.88
26.72
4.02
5.36
7.65
8.10
4.69
6.09
29.99
25.22
7.50
1.80
6183.894
6158.439
6142.446
6129.570
6102.849
6098.830
6093.468
6085.816
6077.719
6073.024
6067.212
6061.123
6031.136
6005.914
538.67
538.31
538.27
538.26
538.10
537.97
538.10
538.13
538.08
537.99
537.74
537.78
537.22
537.06
537.02
5994.746
007.5km007.0km006.5km
12.84
11.66
9.91
15.71
15.03
16.62
5.46
9.65
8.99
20.17
22.84
18.37
20.13
20.07
21.08
21.19
21.20
20.61
24.09
19.25
15.56
15.09
24.10
24.02
36.06
21.55
25.44
24.72
28.53
26.97
26.50
22.15
21.57
13.97
30.02
29.89
29.21
32.30
28.37
6.12
7.41
36.04
30.17
30.67
23.55
28.31
6.74
5.14
19.47
23.16
35.52
14.38
15.03
21.55
19.44
25.65
25.23
9.41
12.53
37.65
36.67
36.63
23.39
22.39
24.66
7583.957
7571.117
7559.452
7549.542
7533.836
7518.809
7502.191
7496.726
7486.057
7477.062
7456.895
7434.050
7415.684
7395.553
7375.486
7354.404
7333.215
7312.010
7291.400
7267.314
7248.067
7232.511
7217.426
7193.328
7169.313
7133.254
7111.705
7086.269
7061.546
7033.013
7006.046
6979.545
6957.398
6935.827
6921.862
6891.842
6861.953
6832.739
6800.438
6772.073
6765.954
6760.916
6752.198
6716.162
6685.989
6655.322
6631.776
6603.466
6596.728
6586.640
6567.169
6544.011
6508.492
6494.109
6479.078
6457.530
6438.090
6412.439
6387.211
6377.804
6365.276
6327.624
6290.958
6254.333
6230.947
6208.555
541.47
541.29
541.61
541.57
541.65
541.60
541.58
541.49
541.38
541.24
541.63
541.61
542.27
541.67
541.45
541.24
541.24
541.08
540.97
540.77
541.07
540.59
540.54
540.46
540.00
540.00
539.19
539.57
539.54
539.54
539.39
539.06
539.07
538.90
538.91
538.69
538.90
539.01
538.54
538.80
538.75
538.77
539.03
538.93
538.90
538.78
538.69
538.71
538.89
538.77
539.18
539.27
539.47
539.45
539.59
539.75
539.66
539.72
540.13
540.08
540.00
539.98
539.46
539.06
539.28
538.76
008.5km008.0km
23.60
27.05
34.39
25.59
25.03
23.51
22.61
18.73
17.74
22.65
21.06
23.40
25.50
3.99
8.48
4.11
26.95
18.37
20.73
9.13
12.39
19.32
22.47
26.36
16.87
18.85
17.58
23.77
18.31
14.77
15.35
15.43
4.37
2.40
4.75
7.08
24.95
4.99
8.35
15.07
15.93
23.57
23.77
25.05
24.33
21.97
18.51
3.17
3.24
25.89
1.29
7.67
29.61
28.17
28.68
28.78
24.37
23.38
23.75
25.24
23.16
20.95
23.23
20.61
24.13
25.41
20.29
21.24
19.98
18.43
20.05
23.20
8968.724
8945.120
8918.066
8883.678
8858.085
8833.059
8809.551
8786.942
8768.211
8750.472
8727.821
8706.760
8683.356
8657.855
8651.710
8640.848
8636.740
8609.794
8591.421
8570.695
8561.566
8549.178
8529.859
8507.386
8481.022
8464.148
8445.293
8427.708
8403.940
8385.628
8370.857
8355.508
8340.079
8328.303
8323.722
8316.332
8309.252
8284.300
8279.313
8270.961
8255.891
8239.961
8216.387
8192.618
8167.571
8143.241
8121.270
8102.760
8097.725
8092.738
8064.290
8056.623
8027.009
7998.836
7970.157
7941.379
7917.004
7893.626
7869.871
7844.628
7821.468
7800.522
7777.292
7756.679
7732.554
7707.146
7686.858
7665.620
7645.637
7627.211
7607.162
546.68
546.02
546.11
545.56
545.59
545.41
545.37
545.23
545.15
545.01
544.77
544.74
544.85
544.21
544.13
544.14
544.08
543.49
543.17
542.63
542.62
542.24
542.60
542.16
541.96
541.78
541.78
541.71
541.88
541.61
541.74
541.74
541.96
541.79
541.84
541.79
541.74
541.61
541.57
541.53
541.92
541.89
541.85
541.67
541.85
542.37
542.93
542.63
542.42
542.47
542.59
542.72
541.78
541.80
541.97
541.87
542.02
542.00
541.90
541.93
541.73
541.57
541.36
541.40
541.45
541.44
541.56
541.06
541.10
541.38
541.49
009.0km
546.71
546.66
546.60
9007.380
9000.000
8991.729
23.01
4.64
3.61
MEMORIAL
STONEOFC
PUMP
SHOP
DWG NO.-002-R1
MATCH LINE FOR CONT REFER
CH:06.000 Km
DWG NO.-004-R1
MATCH LINE FOR CONT REFER
CH:09.000 Km
REF DWG No.CS/RD/009
11KV
ASP RO
AD
11KV
11KV
11KV
11KV
CEM
ENT RD
11KV
661KV
CART TRAC
K
ROAD
11KV
11KV
11KV
11KV
11KV
11KV
ASP RO
AD
11KV
CART TRAC
K
11KV
11KV
11KV
11KV
11KV
ASP RO
AD
11KV
11KV
CART TRAC
K
8.05720.77768.776.481424.959.64
41°24'59" R47°34'35" R12°35'19" L
15°54'10" R15°17'11" L
21°34'0" R18°2'13" L
TP 68TP 67TP 66TP 65TP 64TP 63TP 62
TP 62 6061.123TP 63 6070.761
TP 64 7495.706TP 65 7502.191TP 66 8270.961
TP 67 8991.729TP 68 8999.779
1.96
6.30
5.49
5.10
8.56
2.91
7.30
11.56
7.67
3.982.172.03
7.40
TAHSIL, DISTRICT, ANDHRA PRADESH STATE
REF DWG No.CS/RD/011
TOWER LINE 66KV H. 9.00M.
132KV TOWER LINE H.37.980 M.
NIL
HardRock
NIL
HardRock
NIL
HardRock
BH-18
BH-17
BH-16
BH-15
BH-14
BH-13
008.807
008.116
007.470
007.116
006.855
006.618
018.714072.848039.062036.424017.584042.704026.376020.975019.091034.571084.780046.817053.694031.086050.868032.970028.354042.861092.818078.500097.968076.616045.216055.892034.540030.584041.888
CS/RD/010NALA
BH-14
BH-12
BH-13
BH-14
BH-15
BH-16
BH-17
BH-18
NIL
BH-12
006.042
GPS 4X = 227437.157 Y = 1933504.935 Z = 541,562
TBM 4R.L.541,562
GPS 4TBM 4
RELIANCE
IOCL
BPCLPLANIMETRY
SCALE1 : 2500
NALA
REF DWG No.CS/NA/010
CS/RD/011CEMENT ROAD
132 KV
6000.000
537.04
R1 02.02.10 ISSUED FOR CLIENT APPROVAL20.08.09
10.08.09 14.08.09 16.08.09 18.08.09 19.08.09
61.12
MH
MH MH MH
MH
MH
MH
MH
MH
MHMH
MH
MH
MH
MHMH
MH
MH
MH
MH MH
MH MH
MH
MH
MH
MH
MH
MH
MH
MH
MH
MH
MH
MH
MH
MHMH
MH
MH
MH
MH
MH
MH
MHMH
MH
MH
MH
MH
MH
1 : 2501 : 2500
VERTICALHORIZONTAL
SCALE :
DATUM LEVEL : 540 M
GROUND LEVELS
DISTANCE BETWEEN LEVELPOINTS (IN METRES)
(IN METRES)CUMULATIVE CHAINAGE
SURFACE / TERRAIN DETAILS
SURVEY
CITY-LOCOLITY-CORPORTION LIMIT
DEPTH IN 'm
'
SOIL STRATIFICATION
SOIL RESISTIVITY (OHM-M)
(IN METRES)
GROUND PROFILE
1.01.52.0
DEFLECTION ANGLEDISTANCE BETWEEN TPs (m)
TAHSIL / DISTRICT / STATE
MINIMUM (MILLIMETRES)PIPE LINE COVER
DESIGN CRITERIA
INSTALLATIONCATHODIC PROTECTION
CROSSINGS
INTERSECTION POINTS TP
BENCH MARKGPS STATION, LOCATION NOCO-ORDINATES (X,Y,Z)
NOTES
SYMBOL DESCRIPTION DESCRIPTIONSYMBOL
EP
EB
MH
BS
HANDPUMP
FLAG
ELECTRIC POLE
TELEPHONE POLE
TREE TRANSFORMER
ELECTRIC BOX
MAN HOLE
GATE
KILOMETER STONE
BUS STAND
STONE & OFC STONE
DESCRIPTIONSYMBOL
CEMENTED FOOTPATH
KACCHA FOOTPATH
BRICK FOOTPATH
PARKPARK
FENCING
BRIDGE
CULVERT
HOSPITAL & DISPENSARY
RAILWAY TRACK
NALLA/DRAIN WITH CULVERT
PROPOSED STEEL P/L
16" FEEDER LINESB SIGN BOARD
TBM
KM
SIGNALLP
LIGHT POLE
NH ROAD
SEWER LINE
POWER LINEAPPDCHKDDRN BGL
MANAGERPROJECT
CHECKENGINEER.
APPR'LCLIENT
DATENO.
CHECKDRAFTING
DRAWN
SIGN.
REVISIONS
LEADERSECTION
ISSUED RECORD
PRAVIN AMAR Premdas
ISSUED FOR CLIENT REVIEWR0
SCALE REV.ANAND
9.000 km TO 12.000 km:CHAINAGE
:DWG. TITLE PROPOSED STEEL PIPELINE ROUTE
BHAGYANAGAR GAS LTD.
MECON LIMITED
M/S. M. N. NILAWAR, EC&C
M N E C
PROJECT :DFR FOR CITY GAS DISTRIBUTION - HYDERABADSURVEY OF PIPELINE ROUTE
:SECTION Bowenpalli Mother Station To Patancheru - ROUTE 2
CLAYEY SAND WITH GRAVELS
CLAY
HARD ROCK
MURRAM WITH CLAY
SILTY CLAY
SILTY SAND
SANDY SILT
SANDY CLAY WITH GRAVELS
SILTY CLAY WITH GRAVELS
GRAVELLY CLAY
CLAYEY SAND
CLAYEY SILT
SLIGHTLY WEATHERED ROCK
WEATHERED ROCK
SAND
DRAWING NODRAWING TITLE
REFERENCE DRAWINGS NOTES
2 ALL LEVELS ARE WITH RESPECT TO MEAN SEA LEVEL.
1 ALL DIMENSIONS ARE IN METRES UNLESS OTHERWISE SPECIFIED
CS/RD/012ASP ROAD
1.0
0.0
3.0
2.0
CLAYEY SAND WITH GRAVELS VISHAL
TP
TELEPHONE LINE
EPEP
EP
EP
EP
EP
EP
EP
EP
EPEP
EP EP EP
EP
EP
EP
EP EP EP
EP
EP
EP
EP
STONEOFC STONE
OFC
STONEOFC STONEOFC
FENCING
HONDA SHOP
MAHAVIR BUILDING
TRAVELS
SHOP
TO K
UKATPALLI
SBDP
FENCING
ASP ROAD
LPLP
LPLPLPLP
LPLP
LP
LPLP
HOUSEDHARAM KATA
POWER LINE 11KVPOWER LINE 11KV
POWER LINE 11KV
POWER LINE 11KV
POWER LINE 11KV
DIVIDER
NATIONAL HIGHWAY-9DIVIDERNATIONAL HIGHWAY-9
EP
GULLY
EP
TRAFFIC
WALL WALL
TO KUKATPALLY
ASP ROAD
ASP ROAD
EP
EP
EP
EP EP
EP EPEP
EP EP
EP
EP
EP
EPEP
EP EP
EP
EP
EP
EP EPEP
EP
EPEP
EP EP EP
EPEP
EP EP
EP
STONEOFC
STONEOFC STONE
OFC
OFCSTONE
STONE
HOTAL
BUILD
ING
CEMENT ROAD
BUS STAND
SB
SHOP
SBHOUSE
Fencing
FENCINGLP
LP
LP
LPLP
LPLP
LP
LP
LP
LP
SHOP
HOUSE SHOP
BUILDING
APARMENTWATER TANK
OPEN DRAINHOUSE
HOUSE
PARKING
POWER LINE 11KV
DIVIDER NATION
AL HIGHWAY-
9POWER LINE 11KV
POWER LINE 11KV
DIVIDER
NATIONAL HIGHWAY-9
TO IDL ACCESS ROAD
TO SHANTI N
AGAR
LP
EP
OFCSTONEDP
DP
DP
STONEOFC
STONEOFC SBWATER TANK
POWER LINE 11KV
WALL
WALL
WALL
POWER LIN
E 11KV
WALL
ASP ROAD
CEM
ENT R
OAD
CEMENT ROAD
TO SHANTI NAGAR
TO VIVEK NAGAR
3378 NH 9 CEMENT ROD 122.342
EP
EP
EP
EP
EP
EP
EP
EPEP
EP
EP
EP
EP
EP
EP
EP
EP
EP
EPEP
EP
KM
STONEOFC
STONEOFC
STONEOFC
STONEOFC
ASP ROAD
SHOPSHOP
SHOP
SHOP
SHOP
BUILDING
SHOPSHOP
SHOP
SHOP
SHOPSHOPSHOPSHOPSHOPSHOP
STACHU
TO VIVEK NAGAR
SHOP
BUILDING
TO SHANTI NAGAR
LP
LP
LP
LP
LP
LPLPLP
LP
LP
LP
HOUSE
HOUSE
BUILDINGSHOP
DIVIDER
NATIONAL HIGHWAY-9
POWER LINE 11KV
POWER LINE 11KV
POWER LINE 11KV
POWER LINE 11KV
DIVIDER
NATIONAL HIGHWAY-9
PARKING
HOUSE
DPTEMPLE
STONEOFC
POWER LINE 11KVPOWE
R LINE 11K
V
SB
EP
SHOP
POWER LINE 11KV
ASP ROAD
POWER LINE 11
KV
TO VIVEK NAGAR
ASP ROAD
ASP ROAD SHOP BUILDING
BUILDING
SHOP
CART TRACK
SHOP
BUSBUILDING
BUILD
ING
BUILD
ING
LP
LP
LP
LP
LP
LP
EP
EP
EP
EP
EP
EPEP
EP EP
EPEP
EP
EPEP
EPEP
EP
EP
EP
EP
EP
EP
MH
MH
STONEOFC
STONEOFC
HOTAL
HP PETROLL
SHOP
BUS STAND
ASP ROAD
SHOP
LP
LP
LP
LP
LP
DIVIDERNATIONAL HIGHWAY-9
11 KV LINE
POWER LINE 11KV
BUILD
ING
EP
BUS STAND
DIVIDERNATIONAL HIGHWAY-9
11 KV LINE
Fencing
Fencing
TO SUMITR
A NAGAR
HUT BUS STAND
BUILD
ING
BUILD
ING
COMPOUND
WALL
BUS STAND
BUS STAND
BUILDING
LT LINEDP
SHOP
EP
SHOP
SHOP
HUTCULVERT
COMPOUND WALL
SB
SB
SB
OFCSTONE TCL
OFCSTONE B OFC
STONE BOFC
STONE B
OFCSTONE
OFCSTONE
LP
LP
LP
LP
LP
LPLP
LP
LP
LP
LP
LP
EP
EP
EP EP
EPEP
EP
EPEP
EPEPEP
EP
EPEPEPEP
EP
RDSTONE
OFCSTONE B
DP
SB
DIVIDER
NATIONAL
HIGHWA
Y-9
11 KV LINE
11 KV LIN
E
DIVIDER
NATIONAL HIGHW
AY-9
TO SUMITRA NAGAR
ASP ROAD
Fencing
Fencing
ASP ROAD
TO SUMITRA NAGAR
BUILD
ING
BUILD
ING
TEMPLE
SHOP
BUILD
ING
BUILD
ING
BUILDING
BUILDING
ASP ROADDP
DPEP
BUILDING
BUILDING
BUILD
INGBUILD
ING
BUILD
ING
DP
SBI BUIL
DING
MARBALES
HUT
CEMENT ROAD
SB
SB
SB
RDSTON
E
RDSTONE
OFCSTONE
OFCSTONE
OFCSTONE
LP
LP
LP
LP
LP
LP
LP
LP
LP
LP
LP
LP
EPEPEP
EP
EP
EP
EP
EPEP
EP
EP
EP
EP
EP
EPEP
EP
EP
EPEP
EPEP
EP
EP
EP
EP
EP
EP
EP
HOTEL SW
AGAT
HMT ROAD
CEMENT R
OADCEME
NT ROAD
CEMENT R
OAD
BOREASP
ROAD
TCB
STATUECUL
ASP ROAD DIVID
ER
NATIONAL
HIGHWA
Y-9
DIVIDER
NATIONAL
HIGHWAY-
9
11 KV LINE
POWER LINE 11K
V
11 KV LIN
E
ASP ROAD
DIVIDER
NATIONAL
HIGHWAY-
9
TELEPHO
NE LINE
BUILDING
COMPOUND
WALL
JAI VAYU VIHAR NAGAR
ASP ROAD
SHOP BUS STAND
DP
BUS STAND
CEMENT R
OAD
LP
LP
EPEP
EP
EPEP EP
EP
BUILDING
BUILDING
POWER LINE
11KV
POWER LIN
E 11KV TO KPH
B PH
ASE II
LP
LP
PARKING
LP
BUILD
ING
BUILD
ING
TP-79
TP-78
TP-77
TP-76
TP-75
TP-74TP-73
TP-72
TP-71
TP-70TP-69TP-68
TP-67
N
009.0km
546.95
546.74
546.75
546.77
546.76
546.85
546.66
20.65
13.40
2.18
5.75
5.69
3.61
9038.190
9024.790
9018.817
9013.069
9007.380
9000.000
010.0km009.5km
32.59
28.73
27.60
17.21
20.51
18.80
16.85
15.46
21.23
1.74
11.96
12.98
20.36
18.26
16.78
16.18
16.83
5.06
4.59
7.82
27.25
3.72
3.19
9.97
10.88
26.41
21.05
16.23
18.29
8.74
3.36
27.85
29.77
22.38
28.30
18.81
24.74
2.69
4.87
14.72
17.00
17.51
12.55
14.47
17.54
20.91
20.08
17.69
8.17
34.86
22.92
23.17
17.78
25.67
26.54
6.40
2.53
5.60
22.17
24.06
24.41
16.47
5.94
3.87
33.35
31.67
21.90
18.84
19.41
21.43
20.75
10356.067
10323.481
10294.754
10267.152
10249.946
10229.440
10210.636
10193.782
10178.324
10157.098
10151.680
10146.390
10134.432
10121.454
10101.092
10082.831
10066.054
10049.875
10033.044
10025.633
10018.867
10011.044
9983.789
9973.713
9964.164
9954.194
9943.309
9916.902
9895.849
9879.618
9861.332
9850.172
9844.620
9816.772
9787.000
9764.618
9733.402
9711.833
9687.095
9680.174
9671.084
9656.367
9639.367
9621.854
9609.304
9594.836
9577.300
9556.391
9536.307
9515.586
9504.605
9469.740
9446.816
9423.642
9405.862
9380.191
9353.653
9342.228
9340.248
9327.462
9305.290
9281.233
9256.827
9240.354
9232.169
9226.196
9192.845
9161.171
9139.271
9120.431
9101.018
9079.592
9058.838
564.97
564.58
564.26
563.38
563.38
563.04
562.62
562.97
562.15
561.50
561.49
561.44
561.07
560.95
560.71
559.91
559.50
559.28
558.95
558.80
558.81
558.75
558.24
558.17
558.00
557.75
557.62
557.70
557.81
557.70
557.61
557.50
557.50
557.61
557.62
557.70
557.57
557.05
556.60
556.58
556.72
556.59
555.72
555.02
554.71
554.19
554.13
553.21
553.35
552.76
552.93
552.24
551.26
551.00
550.95
550.45
549.91
549.83
549.91
549.81
549.14
548.95
548.63
548.18
548.35
548.09
548.02
547.66
547.17
547.52
547.55
547.47
547.10
011.0km010.5km
27.02
28.52
28.93
25.53
21.28
19.45
6.50
1.33
2.24
11.03
2.27
2.26
1.83
15.68
24.37
24.76
20.14
21.86
21.45
20.50
6.22
4.00
28.98
14.06
15.84
18.75
23.04
28.43
19.72
21.79
20.72
15.16
13.02
31.36
21.72
22.91
12.59
13.99
20.97
31.32
17.67
16.27
24.13
16.86
0.83
22.02
23.71
29.30
11245.340
11218.323
11189.805
11160.879
11135.347
11114.064
11094.616
11085.037
11082.047
11075.613
11062.315
11053.868
11047.871
11032.195
11007.822
10983.063
10962.923
10941.060
10919.610
10899.114
10892.894
10884.352
10855.375
10841.316
10825.477
10806.729
10783.693
10755.267
10735.545
10713.758
10693.034
10677.872
10664.851
10633.489
10611.769
10588.860
10576.274
10562.279
10541.308
10509.985
10492.319
10476.047
10451.916
10435.058
10433.043
10409.076
10385.367
10356.067
576.04
575.74
575.14
574.54
573.77
573.13
572.36
572.16
572.07
571.71
571.49
571.45
571.07
570.89
570.67
570.40
570.34
570.30
570.07
569.75
569.77
569.65
569.83
569.43
569.27
569.34
569.14
568.92
568.74
568.41
568.28
568.17
568.28
567.94
567.87
567.81
567.32
567.39
567.39
567.36
567.28
567.01
566.10
566.07
565.51
565.30
564.97
011.5km
16.24
21.89
25.91
25.32
29.45
24.87
25.54
25.98
33.50
27.90
11485.697
11463.806
11437.899
11412.583
11383.131
11358.260
11332.721
11306.738
11273.241
580.25
580.68
579.44
578.97
578.79
578.28
577.76
577.23
576.29
DATU
M LE
VEL :
560 M
HOUSE
BUILDING
POLICE
STONEOFC
PUMP
STAND
REF DWG No.CS/RD/012
11KV
ASP RO
AD REF DWG No.CS/RD/013
ASP RO
AD
ASP RO
AD
CART TRAC
K
11KV
11KV
ASP RO
AD
CEM
ENT RD
ASP RO
AD
11KV
11KV
ASP RO
AD
11KV
CEM
ENT RD.
CEM
ENT RD.
CEM
ENT RD.
CART TRAC
K
11KV
11KV
ASP RO
AD
11KV
ASP RO
AD
14°0'28" L
TP 69
21.89302.93113.0115.68676.13124.0568.889.97267.10662.30
16°29'35" R13°20'30" L14°10'33" L
15°5'45" R12°48'1" R10°54'17" R13°4'33" L
10°13'32" R13°5'7" LTP 78TP 77TP 76TP 75TP 74TP 73TP 72TP 71TP 70
24.79 198.97
TP 69 9024.790TP 70 9687.095TP 71 9954.194TP 72 9964.164TP 73 10033.044TP 74 10157.098TP 75 11032.195TP 76 11047.871TP 77 11160.879TP 78 11463.806TP 79 11485.697
CS/RD/013ASP ROADCS/RD/014
TAHSIL, DISTRICT, ANDHRA PRADESH STATE
GULLY C
EMENT ROAD
7.75
7.08
12.08
17.27
9.09
20.61
11.69
20.97
8.37
9.35
5.71
13.35
15.96
20.53
7.00
5.24
19.04
16.63
6.81
6.41
7.77
21.76
22.69
1.10
32.72
38.81
32.56
DWG NO.-003-R1
MATCH LINE FOR CONT REFER
CH:09.000 Km
DWG NO.-005-R1
MATCH LINE FOR CONT REFER
CH:12.000 Km
HardRock
HardRock
HardRock
HardRock
HardRock
HardRock
BH-24
BH-23
BH-22
BH-21
BH-20
BH-19
011.902
011.320
010.810
010.305
009.437
009.410
033.158017.584018.840047.728045.216038.936059.158025.434020.724057.462041.448059.346070.462033.284020.724038.936032.028072.848
1.74
BH-19
BH-20
BH-21
BH-22
BH-23
BH-24
025.120033.912035.168
GPS 5X = 225283.539 Y = 1934901.099 Z = 559,890
TBM 5R.L.559,890
GPS 5TBM 5
PLANIMETRY
SCALE1 : 2500
TP-77
TP-76
TP-75
TP-80
TP-81
TP-77
TP-76
TP-75
14°4'0 R13°24'52 L
13°2'27" L
6.72
48.14
TP 79 TP 80TP 81
012.0km
20.38
23.88
20.17
26.79
15.84
15.18
17.65
4.34
19.27
8.36
5.63
8.27
14.61
18.88
19.98
16.77
8.00
13.89
5.61
33.69
4.46
15.00
22.08
17.11
10.07
18.57
21.69
19.64
10.17
6.72
5.81
7.21
7.07
4.21
12000.77
11980.39
11956.51
11936.33
11909.55
11893.71
11878.54
11860.88
11852.30
11833.02
11824.67
11819.03
11810.76
11796.15
11777.27
11757.29
11740.53
11732.53
11718.64
11713.03
11679.34
11674.88
11659.88
11637.80
11620.69
11610.62
11592.05
11570.37
11550.73
11540.56
11533.84
11524.76
11517.55
11510.47
11501.93
584.47
584.46
584.29
584.07
583.77
583.56
583.41
583.24
583.33
582.84
582.76
582.70
582.63
582.46
582.24
581.92
581.72
581.62
581.42
581.36
581.52
581.93
582.22
581.33
581.47
581.06
580.18
580.26
580.29
580.30
580.33
580.48
580.17
579.88
580.17
CS/RD/014REF DWG No.
ASP ROAD
11 KV
11 KV
ASP ROAD
459.44
ASP ROAD
R1 02.02.10 ISSUED FOR CLIENT APPROVAL20.08.09
10.08.09 14.08.09 16.08.09 18.08.09 19.08.09
MH
MH
MHMH
MH
MH
MH
MH
MH
MH MH
MH MH
MH
MH
MH MH
MH
MH
MH
MH
MH
MH
MH
MH
MH
MH
MHMH
MH
MH
MH
MH
MH
MHMH
MH MHMH MH
MH
MH
MHMH
MH MH
MH
MHMH
1 : 2501 : 2500
VERTICALHORIZONTAL
SCALE :
DATUM LEVEL : 580 M
GROUND LEVELS
DISTANCE BETWEEN LEVELPOINTS (IN METRES)
(IN METRES)CUMULATIVE CHAINAGE
SURFACE / TERRAIN DETAILS
SURVEY
CITY-LOCOLITY-CORPORTION LIMIT
DEPTH IN 'm
'
SOIL STRATIFICATION
SOIL RESISTIVITY (OHM-M)
(IN METRES)
GROUND PROFILE
1.01.52.0
DEFLECTION ANGLEDISTANCE BETWEEN TPs (m)
TAHSIL / DISTRICT / STATE
MINIMUM (MILLIMETRES)PIPE LINE COVER
DESIGN CRITERIA
INSTALLATIONCATHODIC PROTECTION
CROSSINGS
INTERSECTION POINTS TP
BENCH MARKGPS STATION, LOCATION NOCO-ORDINATES (X,Y,Z)
NOTES
SYMBOL DESCRIPTION DESCRIPTIONSYMBOL
EP
EB
MH
BS
HANDPUMP
FLAG
ELECTRIC POLE
TELEPHONE POLE
TREE TRANSFORMER
ELECTRIC BOX
MAN HOLE
GATE
KILOMETER STONE
BUS STAND
STONE & OFC STONE
DESCRIPTIONSYMBOL
CEMENTED FOOTPATH
KACCHA FOOTPATH
BRICK FOOTPATH
PARKPARK
FENCING
BRIDGE
CULVERT
HOSPITAL & DISPENSARY
RAILWAY TRACK
NALLA/DRAIN WITH CULVERT
PROPOSED STEEL P/L
16" FEEDER LINESB SIGN BOARD
TBM
KM
SIGNALLP
LIGHT POLE
NH ROAD
SEWER LINE
POWER LINEAPPDCHKDDRN BGL
MANAGERPROJECT
CHECKENGINEER.
APPR'LCLIENT
DATENO.
CHECKDRAFTING
DRAWN
SIGN.
REVISIONS
LEADERSECTION
ISSUED RECORD
PRAVIN AMAR Premdas
ISSUED FOR CLIENT REVIEWR0
SCALE REV.ANAND
12.000 km TO 15.000 km:CHAINAGE
:DWG. TITLE PROPOSED STEEL PIPELINE ROUTE
BHAGYANAGAR GAS LTD.
MECON LIMITED
M/S. M. N. NILAWAR, EC&C
M N E C
PROJECT :DFR FOR CITY GAS DISTRIBUTION - HYDERABADSURVEY OF PIPELINE ROUTE
:SECTION Bowenpalli Mother Station To Patancheru - ROUTE 2
CLAYEY SAND WITH GRAVELS
CLAY
HARD ROCK
MURRAM WITH CLAY
SILTY CLAY
SILTY SAND
SANDY SILT
SANDY CLAY WITH GRAVELS
SILTY CLAY WITH GRAVELS
GRAVELLY CLAY
CLAYEY SAND
CLAYEY SILT
SLIGHTLY WEATHERED ROCK
WEATHERED ROCK
SAND
DRAWING NODRAWING TITLE
REFERENCE DRAWINGS NOTES
2 ALL LEVELS ARE WITH RESPECT TO MEAN SEA LEVEL.
1 ALL DIMENSIONS ARE IN METRES UNLESS OTHERWISE SPECIFIED
CS/RD/015ASP ROAD
1.0
0.0
3.0
2.0
CLAYEY SAND WITH GRAVELS VISHAL
TP
TELEPHONE LINE
TELEPHONE LINE
BUILDING
TIN COMPOUNDDP
BUS STAND
DP
DP
BUILDINGBUILDINGBUILDINGBUILDING
ASP ROAD
BUILDING
DP
BUILD
ING
BUILD
ING
BUILD
ING
BUILDING
COMPOUND WALL
ASP ROAD
DP
ASP ROAD
SHOP
BUS STAND
BUILDING
SB
SB
SBOFCSTONE
LP
LP
LPLP
LP
LP
LP
LPLP
LP
LP
LP
EP
EP
EP
EPEP
EP
EP
EP
EP
EP EP
EP
EP
EPEP
EPEP
EPEP
EPEP EP
EP
BUILDING
TO JAL VAYU
NATIONAL HIGHWAY-9
DIVIDER
NATIONAL HIGHWAY-9
DIVIDER
11KV POWER LINE ASP ROAD
NATIONAL HIGHWAY-9
POWER LINE 11KV
POWER LINE 11KV
POWER LINE 11KV
TO KPHB PHASE II
CEMENT ROAD
TCB
TCB
TEMPLE
66KV TOW
ER LINE
66KV TOWER LINE
BUILDING
WATER TANKBPCL
BUILDING
DP
CEMENT ROAD
SHOP
BUILDING
SBSB
SB
RDSTONE
RDSTONE
OFCSTONE
OFCSTONE
OFCSTONE
LPLP
LP
LP
LP
LP
LP LP LPLP LP
LP
LP
LP
LP
LP
LP
EP EP EP
EP
EP
EP
EP EP
EP
EP EP
TO KPHB ROAD
SHOP
TCBTCB
DIVIDER
NATIONAL HIGHWAY-9
DIVIDERPOWER LINE 11KV
11KV POWER LINE
ASP ROAD
ASP ROAD
DIVIDER
POWER LINE 11KV
COMPOUND WALLTELEPHONE LINE
POWER LINE 11KV POWER LINE 11K
V
ASP ROAD
TO KPHB
ROAD
CEMENT ROAD
JAL VAYU VIHAR NAGAR
DP BUILDINGBUILDING
SHOP
TCB
TCB
TO NIZAMPET ROAD
TIN COMPOUND
CART TRACK
BUILDING
ASP ROAD
SHOP
DIVIDER
SHOP
BUILDING
BUS STAND
SHOP
SB
SB
SB
RDSTONE
RDSTONE
OFCSTONE TTSL
LP
LP
LP
LP
LP
LP
LP
LP
LP
LP
LP
LP
LPLP
LP
LP
EP
EP EP
EPEP
EP
EP
EP
EP
EP
EP
EP
EPEP
EPEPEP
EP
EPEP
EP
EPEP
SHOP
BUILDINGPETROL P
UMP
CART TRACK
BUILDING
TEMPLE
BUS STAND
SHOP
NATIONAL HIGHWAY-9
DIVIDER NATIONAL HIGHW
AY-9DIVIDER
11KV POWER LINE
11KV POWER
LINE
SBSB
ASP ROAD
TO VASANT NAGAR
ASP ROAD
COMPOUND W
ALL DP
COMPOUND W
ALL
SHOP
BUILDING
BUILDING
DP
ASP ROAD
SB
LP
LP
LP
LP
EP
EP
EP
EP
EP
EPEP
EP
EP
EP
EP
EP
EP
DIVIDER
NATIONAL HIG
HWAY-9
11KV POWE
R LINE
TO VASANT NAGAR
N
STATUE
MAZAR
SHOPSHOP
SHOP
SHOP
BUIILDING
SHOP
LT LINE
CART TRACK
BUILDING
TO HYDERNAGAR
BUILDING
SHOP
BUILDING
CART TRACK
COMPOUND WALL
SHOP
SHOP
BUILDING U/C
SBSB
SB
SB
SB
SB
SB
SB
RDSTONE OFC
STONE TTSL
OFCSTONE
LP
LP
LPLP
LP
LP
LP
LP
EP
EPEP
EP EPEP
EP
EP
EP
EPEP
EP
EP
EP
EP
EP
EP
EP
EPEP
EPEP
EP
EP
EP
EP
EP
BUIILDING
CART TRACK
FOOTPATH
BUS STAND
BUS STAND
DIVIDERNATIONAL HIGHWAY-9
11KV POWER LINE
COMPOUND WALL HOUSE
HOUSE
CART TRACK
11KV POWER LINE
ASP ROAD
HUT11KV
POWER LIN
E
CART TRACK
CART TRACK
132 KV LIN
E
TEMPLE
66KV TOWER LINE
WATERTANK
CART TR
ACK
SHOP
SHOP
SHOP
SB
SB
SB
SB
SB
SB
RDSTONE
OFCSTONE T
OFCSTONE T OFC
STONE B
LPLP
LPLP
LP
LP
LP
LP
LP
LP
LP
EP
EP
EP EP EP
EP
EP
EP
EP
EP
EP
EP
EP
EP
EP
EP
EP
EP
SHOP
CUL
CUL
TO HYDERNAGAR
SHOP
ASP ROAD
TEL.OFC
DIVIDER
NATIONAL
HIGHWA
Y-9
DIVIDER
NATIONAL H
IGHWAY-9
11KV POW
ER LINE
COMPOUN
D WALL
COMPOUND WALL
COMPOUN
D WALL
COMPOUND WALL
11KV POWER
LINE
CEM
ENT ROAD
HUTHUT
TANK HUT
HUT
HUT HUT
MAHINDRA
HUT
SB
SB
SB
SB
SB
SB
RDSTONE
RDSTONE
RDSTONE
OFCSTONE B
OFCSTONE
LP
LP
LP
LPLP LP LP LP
LP
LP
LPLPLP
EP
EP
EP
EP
EP
EP
EPCART TRACK
LP
CULVERT
CULVERT
SB
DIVIDER
NATIONAL HIGHWAY-911KV P
OWER LINE
DIVIDERNATIONAL HIGHWAY-9
SB
LP LP
EP
ASP ROAD
ASP ROAD
LP
PETROL
DIVIDER
N
VIHAR NAGAR OFC
STONE
BUILDING
PUMP
CS/RD/016ASP ROAD
TAHSIL, DISTRICT, ANDHRA PRADESH STATE
DWG NO.-004-R1
MATCH LINE FOR CONT REFER
CH:12.000 Km
MATCH LINE
MATCH LINE
DWG NO.-006-R1
MATCH LINE FOR CONT REFER
CH:15.000 Km
1.844.36
36.02
34.10
19.02
19.65
17.25
17.63
19.73
6.51
12.06
10.36
REFUSAL
HardRock
HardRock
HardRockREFUSAL
HardRock
HardRock
BH-29
BH-28
BH-27
BH-26
BH-25
014.629
014.045
013.515
012.953
012.418
067.824011.053028.888025.120046.472012.434020.096013.942079.128018.369025.434028.260048.042011.963017.898014.318063.428023.676019.468024.492033.284014.632012.560015.700
BH-25
BH-26
BH-27
BH-28
BH-29
071.592072.534064.056
TBM 6 GPS 6
GPS 6X = 223669.900 Y = 1936271.536 Z = 590,014
TBM 6R.L.588,237
PETROL PUMP
TOWER LINE
BPCL
IOCL
PLANIMETRY
SCALE1 : 2500
BUILDING
TP-84
TP-83
TP-82
TP-93
TP-92
TP-91
TP-90
TP-89
TP-88
TP-87
TP-86TP-85
11°17'54 R11°34'14 R25°32'16 R22°20'34 L36°20'1 L
33°30'3 R
18°52'40 R
16°28'10 L16°32'51 L42°48'4 R45°2'6 L
48.14367.35162.4239.04275.7422.34422.1930.73648.23354.4736.81592.54
TP 82 TP 83 TP 84 TP 85 TP 86 TP 87 TP 88 TP 89 TP 90 TP 91 TP 92
015.0km012.0km 012.5km 013.0km 013.5km 014.0km 014.5km
17.10
20.01
11.04
37.05
19.80
13.17
17.29
23.16
23.75
19.91
21.53
21.04
25.45
23.24
33.31
19.06
17.02
17.24
17.55
17.79
23.96
23.29
18.39
28.97
15.70
21.22
22.47
8.42
9.57
17.41
12.06
13.41
10.58
22.06
19.27
24.97
24.61
20.12
25.72
16.89
13.78
1.94
14.73
8.78
28.46
17.40
11.74
11.36
10.98
23.37
12.49
19.69
11.01
4.97
3.14
10.09
19.88
3.36
5.36
23.38
16.46
9.34
7.91
9.04
24.82
29.65
23.23
21.84
17.82
3.00
17.05
16.61
15.23
12.45
3.58
13.58
10.77
3.79
14.74
18.73
12.00
30.92
10.93
25.13
12.85
15.54
17.78
10.11
31.37
18.85
14.63
19.55
22.13
20.22
23.19
19.20
21.66
22.65
25.57
11.69
19.35
24.33
11.24
1.49
7.55
7.19
5.62
9.66
12.53
2.64
18.83
11.53
19.44
21.37
21.96
12.75
21.66
21.56
13.20
18.08
28.69
21.56
9.00
16.04
17.71
24.24
18.07
6.93
23.59
19.36
6.52
20.20
22.60
20.67
12.82
17.76
16.25
21.11
13.28
20.85
15.96
2.35
4.34
20.78
16.08
18.96
21.87
22.64
14.68
12.21
28.68
15.31
5.18
27.58
25.01
16.29
21.56
26.01
14.26
17.22
27.68
30.73
20.39
23.79
21.61
19.31
13.89
25.53
21.20
13.72
4.57
4.60
20.60
14982.90
14962.89
14951.86
14914.80
14895.00
14881.83
14864.55
14841.39
14817.65
14797.73
14776.20
14755.17
14729.72
14706.47
14673.16
14654.10
14637.08
14619.84
14602.29
14584.50
14560.54
14537.25
14518.86
14489.89
14474.20
14452.98
14430.50
14422.08
14412.52
14395.10
14383.05
14369.64
14359.06
14337.00
14317.74
14292.77
14268.16
14248.04
14222.33
14205.44
14189.72
14173.68
14164.90
14136.44
14119.04
14107.31
14095.95
14084.97
14061.60
14049.11
14029.42
14018.41
14013.44
14008.02
13997.93
13978.05
13972.09
13966.73
13943.35
13926.89
13917.55
13909.64
13900.60
13875.78
13846.13
13822.90
13801.06
13783.24
13777.60
13760.55
13743.93
13728.71
13716.26
13709.76
13696.17
13685.41
13677.52
13662.78
13644.05
13632.05
13601.14
13590.21
13565.08
13552.23
13536.69
13518.91
13508.80
13477.43
13458.58
13443.95
13424.40
13402.26
13382.05
13358.86
13339.66
13318.00
13295.35
13269.78
13258.09
13238.74
13214.41
13203.17
13195.92
13188.37
13181.18
13173.32
13163.66
13148.49
13127.28
13115.75
13096.31
13074.94
13052.98
13040.23
13018.58
12997.02
12983.82
12965.74
12937.05
12915.49
12906.49
12890.44
12872.74
12848.50
12830.43
12823.49
12799.90
12780.55
12774.03
12753.83
12731.23
12710.56
12697.74
12679.99
12663.73
12642.63
12629.35
12608.50
12592.54
12586.68
12580.33
12576.03
12555.25
12539.17
12520.21
12498.35
12475.71
12461.03
12448.82
12420.14
12404.82
12399.64
12372.06
12347.05
12330.76
12309.20
12283.18
12268.93
12251.71
12224.03
12193.30
12172.91
12149.12
12127.51
12108.20
12094.32
12068.79
12047.58
12033.86
12029.29
12021.37
12000.00
599.94
599.83
599.79
600.98
601.25
601.62
602.08
602.61
603.08
603.36
603.73
604.03
604.37
604.49
604.23
604.27
604.02
604.10
603.78
604.06
604.38
604.43
604.60
605.04
605.16
605.24
605.17
605.05
604.86
604.83
604.95
604.87
604.58
604.35
603.97
603.73
603.48
603.24
602.68
602.26
602.18
601.46
601.91
601.93
601.96
601.98
602.27
602.15
602.13
601.99
601.45
601.49
601.53
601.42
601.23
600.58
600.33
600.24
599.45
599.03
598.88
598.69
598.54
598.13
597.67
597.14
596.85
596.63
596.64
596.71
596.38
596.31
596.01
596.09
595.93
595.91
595.85
595.64
595.81
595.52
595.51
595.39
595.03
594.94
594.85
594.85
594.74
594.49
594.33
594.25
594.05
593.78
593.80
593.49
593.77
593.84
593.34
593.61
593.69
593.82
594.27
594.17
594.30
594.44
594.45
594.54
594.62
595.09
595.26
595.27
595.16
595.16
595.76
595.95
596.26
596.53
597.05
597.13
597.08
597.05
596.99
596.82
596.62
596.22
596.04
595.90
595.65
595.13
594.98
594.58
594.15
594.68
594.05
593.22
593.08
593.13
593.03
593.25
593.00
592.80
592.83
592.88
592.37
592.03
591.97
592.15
591.98
591.69
591.74
591.89
591.73
591.87
591.31
591.08
591.11
590.73
590.95
590.39
589.84
588.43
587.75
587.32
586.83
586.13
585.87
585.60
585.04
585.01
584.91
585.07
584.86
584.47
CS/RD/017REF DWG No.
CS/RD/016REF DWG No.
CS/RD/015REF DWG No.
CART TRACK
ASP ROAD
CART TRACK
ASP ROAD
CART TRACK
ASP ROAD
CART TRACK
ASP ROAD
CART TRACK
ASP ROAD
11 KV
ASP ROAD
15000.00
600.08
TP 82 12592.54TP 83 12629.35TP 84 12983.82TP 85 13632.05TP 86 13662.78TP 87 14084.97TP 88 14107.31TP 89 14383.05TP 90 14422.08TP 91 14584.50TP 92 14951.86
CS/RD/017ASP ROAD
R1 02.02.10 ISSUED FOR CLIENT APPROVAL20.08.09
10.08.09 14.08.09 16.08.09 18.08.09 19.08.09
1 : 2501 : 2500
VERTICALHORIZONTAL
SCALE :
DATUM LEVEL : 520 M
GROUND LEVELS
DISTANCE BETWEEN LEVELPOINTS (IN METRES)
(IN METRES)CUMULATIVE CHAINAGE
SURFACE / TERRAIN DETAILS
SURVEY
CITY-LOCOLITY-CORPORTION LIMIT
DEPTH IN 'm
'
SOIL STRATIFICATION
SOIL RESISTIVITY (OHM-M)
(IN METRES)
PLANIMETRY
SCALE1 : 2500
GROUND PROFILE
1.01.52.0
DEFLECTION ANGLEDISTANCE BETWEEN TPs (m)
TAHSIL / DISTRICT / STATE
MINIMUM (MILLIMETRES)PIPE LINE COVER
DESIGN CRITERIA
INSTALLATIONCATHODIC PROTECTION
CROSSINGS
INTERSECTION POINTS TP
BENCH MARKGPS STATION, LOCATION NOCO-ORDINATES (X,Y,Z)
NOTES
SYMBOL DESCRIPTION DESCRIPTIONSYMBOL
EP
EB
MH
BS
HANDPUMP
FLAG
ELECTRIC POLE
TELEPHONE POLE
TREE TRANSFORMER
ELECTRIC BOX
MAN HOLE
GATE
KILOMETER STONE
BUS STAND
STONE & OFC STONE
DESCRIPTIONSYMBOL
CEMENTED FOOTPATH
KACCHA FOOTPATH
BRICK FOOTPATH
PARKPARK
FENCING
BRIDGE
CULVERT
HOSPITAL & DISPENSARY
RAILWAY TRACK
NALLA/DRAIN WITH CULVERT
PROPOSED STEEL P/L
16" FEEDER LINESB SIGN BOARD
TBM
KM
SIGNALLP
LIGHT POLE
NH ROAD
SEWER LINE
POWER LINEAPPDCHKDDRN BGL
MANAGERPROJECT
CHECKENGINEER.
APPR'LCLIENT
DATENO.
CHECKDRAFTING
DRAWN
SIGN.
REVISIONS
LEADERSECTION
ISSUED RECORD
PRAVIN AMAR Premdas
ISSUED FOR CLIENT REVIEWR0
SCALE REV.ANAND
3.000 km TO 6.000 km:CHAINAGE
:DWG. TITLE PROPOSED STEEL PIPELINE ROUTE
BHAGYANAGAR GAS LTD.
MECON LIMITED
M/S. M. N. NILAWAR, EC&C
M N E C
PROJECT :DFR FOR CITY GAS DISTRIBUTION - HYDERABADSURVEY OF PIPELINE ROUTE
:SECTION Bowenpalli Mother Station To Patancheru - ROUTE 2
CLAYEY SAND WITH GRAVELS
CLAY
HARD ROCK
MURRAM WITH CLAY
SILTY CLAY
SILTY SAND
SANDY SILT
SANDY CLAY WITH GRAVELS
SILTY CLAY WITH GRAVELS
GRAVELLY CLAY
CLAYEY SAND
CLAYEY SILT
SLIGHTLY WEATHERED ROCK
WEATHERED ROCK
SAND
DRAWING NODRAWING TITLE
REFERENCE DRAWINGS NOTES
2 ALL LEVELS ARE WITH RESPECT TO MEAN SEA LEVEL.
1 ALL DIMENSIONS ARE IN METRES UNLESS OTHERWISE SPECIFIED
CS/RLY/005RAILWAY
1.0
0.0
3.0
2.0
CLAYEY SAND WITH GRAVELS VISHAL
TP
TELEPHONE LINE
N
EP
EP
EP
EP
EP
EP
EP
EP
EP
MH
MH
LP
LP
LP
LP
SHOP
LP
POWER LINE 11KV
POWER LINE 11KV
NH-0
9
ANAND NAGAR (BOWENPALLI)
OPEN LAND
COMPOUND WALL
LP EP
BUS STAND
LP
LP
NATIO
NAL H
IGHWAY-
7DIVID
ER
TO B
ANGLORE
ASP ROAD
EP
EP
EPEP EP EP
EPEP
EPEP
EP
EP
EPMH
MH
MH
MH
MH
MHMH
MH
STONEOFC
KM
LPLP
LPLP
LPLP
LPLP
LP
LP SHOP
SHOP
HUT
HOUSEHERO HONDA
SHOWROOM
SHOP
HOTAL SABNAM
MAJAR
TUBE WELL
HOUSE
BUILDINGTOLLTAX BOOTH
MASJID
SRINIVASA FURNITURETEMPLE
BUS STAND
COMPOUND WALL
WALL
POWER LINE 11KV
POWER LINE 11KV
HOUSE
SHOP
DRAIN
DRAIN
SHOP
SHADE
CULVERT
CULVERT
ASP ROAD
NH-09
NATIONAL HIGHWAY-9DIVIDER
TO NEW
HOUSE
EPEPEP
EPEP EP
EPEP
EP
EPEP
EP
EP
EP
KM
MH
LP
LP
LP
LPLP
LPLP
LP
LPLP
BH PETROLL PUMP
SCHOOL GATE
POWER LINE 11KV
CEMENT FOOTPATH
WALL
WALL
CULVERT
CULVERT
ASP ROAD
FOOTPATHNATIONAL HIGHWAY-9DIVIDER
NATIONAL HIGHWAY-9
DIVIDER11KV LINE H4.369M
LP
HARDWARE
GULLY
EP
TP-45
TP-43TP-42
EPEP
EP EP
EP
MH
MH
LPLPLPLPLP
LP
KM
POWER LINE 11KV
POWER LINE 11KV
NATIONAL HIGHWAY-9DIVIDER
EP
EP
EP
EP
EP
EP
EP EPEP
EP
EP
EP
EP
EP EP EPEP
EP EP EP EP
LP
MH
MHMH
STONEOFC
LP
LP
LPLP
LP
LP
LP
LPLP
LPLPLPLPLP
SHOP
HOUSEAIRCEL SHOP
BUS STAND
SBI BANK
GULLY
GURUNIVAS SHOP
ASP RO
ADBUS STAND
ASP ROAD
KM
POWER LINE 11KV
POWER LINE 11KV
POWER LINE 11KV
POWER LINE 11KV
POWER LINE 11KV
Ferozeguda Area
Ferozeguda Area
HOUSE
HOUSE
HOUSE
HOUSE
AIR FORCE GET
COMPOUND WALL
WATER TANK
EPEP
EP
LP
LP
BUILDING
HOUSE
ASP ROAD
ASP ROAD
NATIONAL HIGHWAY-9 EP
DIVIDER
TO FATH
ENAG
AR
EPEP
EP EP
EP EPEPEP
EP
EPEP
EPEP
EP
EP
EPEP
EP
EP
EP
EP
EP
EP
EP
EP
EP
EP
EP
EP
EP
KM
MH
MH
MH
MH
MH
MH
MH
MH
LP
LP
LP
LP
LP
LP
LP
LP
LPLP
LPLP
LP
LP
SHOP
REMEAD
AY
CAR
T TRAC
K
DP
RUBY BAKERY
HOSPITAL
SHOP
BHART
LODGE
DRAIN
SHOPDP
DPBUS STAND
MADICAL
KRANTH
IA BANK
SHOP
LODGE
BUILDIN
G
SHOP
ASP ROAD
DPSB
DRAIN
HERO
POWER
LINE 11
KVPOWER LINE 11KV
SINGLE TRACK
OVER BRIDGE
HONDA
SHOP
HOSPITA
L SHOP
HOUSE BUILDING
WALL
DIVIDER
DIVIDER
SERVICE ROAD
DIVIDER
NATION
AL HIG
HWAY-9
NATION
AL HIG
HWAY-9
NATIONAL HIGHWAY-9
TO FEROZEGUDA
TO FATHENAGAR
TO BALANAGAR
EP
EP
EPEP
EP
EP
EP
EP
EP EP
EP
EPEP
EP
EP
EPEPEP
EPEP
EP
EP
EP
EPEP
EP
EP
EP
MH
MH
MH
MHSTONEOFC STONE
LP
LP
LP
LP
LPLPLP
LPLP
LP
LP
LP
LP
LP
LP
LP
LP
ARISTROCRAT
BUILDINGBUS STAND
TRAVELS SHOP
ASP ROAD
TOILET
BUILDINGHONDA PARTS
POLICE STATION
SHOPFANTOOSH SHOP
BUS STANDDP
SHOPSHOP
HOUSE
STACHU
INTER PAL
ACE
SHOP
SILICON SHOP
POWER LINE 11KVPOWER LINE 11KV
POWER LINE 11KV
OLD AIRPORT ROAD
MH
LP
EP
CEMENT
EP
STACHUSTACHU
EP
FUNCTIONAL HOLL
OFC
SHOPS
COMPOUND WALL
WALL
DIVIDER
DIVIDER
NATIONAL HIGHWAY-9
NALA
NALA
ASP ROAD
ASP
RO
AD
POWER LINE 11KV
NATIONAL HIGHWAY-
9
TO BALANAGAR
TO B
ALAN
AGAR
TO FATHENAGAR
TO FATHENAGAR
EPEP
EPEP
EP
EP
EP
EP
EP
EP
EPEP
EPEP
EP
EPEP
EP
EP
EPEPEP
EP
EP
EP
EP
EP
EP
EPEPEP
EP
EP
EPEP
EP
EPEP
EP
EP
EP
KM
MH
MH
MH
MH
MH
MH
STONEOFC
STONEOFC
LP
LP
LP
LP
LPLP
LP
LP
LP
LP
LP
LP
LP
LP
LP
LP
MAHADA
GULLY
SHOP
PETROL
SHOP
BUILDING
CALL LINE
ELECTRICAL
SHOP
SBI BANK
SHOPSHOPSHOP G
ULLY
BOXCHINA BAZAR
BALAJEE
DRESH
SHOP
AIRCEL
SHOP
JANTA
SHOP
SHOPVODA PHONE
NRSC GET
HOUSE
BOX
SUDHA HOTELP
OWER GEEM
POWER LINE 11KV
POWER LINE 11KV
TO FA
THE N
AGAR M
AIN ROAD
DP
SHOP
SCHOOLCRAGY
EP
AVENKATA MEDECAL
HOTAL
SUMADHURA
GULLY
PETROLL PUMP
BUILD
ING
SHOP
NOKIA BUILD
ING
RESTU
RENT
SHOP
WALLSHOP
ASP ROAD
ASP ROAD
ASPHALTED
ROAD
EP
EPEP
EP
EP EPMH
MH
MH
LP
LP
LP
SHOP
DWARKA
SHOP
BAJAJ
COMPOU
ND WAL
L
DIVIDER
NATIONAL HIGHWAY-9
SHOP
VODAHONE
SHOP
AIR FORCE
GULLY GULLY
SHOP
LP
THEATER
GULLY
SHOP
GULLY
SHOP HOTEL
GULLY
HOUSE G
ULLY
GULLY
HOUSE
HAKIMI
NOKIA
SHOP
SHOP
GU
LLY
TP-61
TP-60TP-59
TP-58TP-57
TP-56TP-55
TP-54
TP-53TP-52
TP-51
TP-50
TP-49TP-48
TP-47TP-46TP-45
N
N
DWG NO.-001-R1
MATCH LINE FOR CONT REFER
CH:03.000 Km
BOWENPALLI
POWER LINE 11KV
LP
PUMP
PETROL PUMP
AIRCEL
JAISWAL FOOD
DIVIDER
NATIONAL HIGHWAY-9
TP-44
RAILWAY LINE
003.0km
31.28
19.84
7.73
5.52
2.53
1.24
28.10
3088.216
3056.940
3037.105
3029.374
3020.120
3013.423
2985.323
532.28
532.85
533.14
533.19
533.17
533.19
532.96
21.05
25.78
7.06
24.48
3145.541
3119.764
3112.700
531.53
531.62
531.80
005.5km005.0km004.5km004.0km003.5km
16.61
19.93
20.74
19.73
20.22
2.04
1.15
36.45
2.57
1.75
20.92
17.43
16.54
14.12
16.09
22.94
8.30
17.51
18.63
22.53
27.74
25.42
25.58
13.67
13.48
8.75
3.78
11.84
2.14
3.51
4.70
1.97
3.52
9.73
17.68
16.15
3.59
2.20
3.47
12.11
25.37
14.47
13.36
17.27
13.41
6.24
23.00
22.08
7.17
11.61
1.46
1.41
10.53
10.89
33.40
5.19
4.57
18.22
14.55
15.21
24.80
7.90
2.86
15.29
14.78
14.43
3.79
19.09
2.16
2.21
5.84
22.42
18.61
19.65
3.25
2.87
7.62
26.39
17.22
3.18
1.83
14.15
1.18
11.78
2.01
18.85
17.78
26.55
20.40
15.65
16.24
14.48
6.03
1.44
8.11
22.68
17.64
24.47
3.63
13.02
1.55
9.25
26.51
3.74
5.65
3.80
13.72
21.67
0.27
10.62
22.44
7.89
8.55
9.83
20.02
19.66
13.10
10.79
2.01
12.09
1.33
8.53
16.17
22.70
18.91
21.55
1.94
1.00
25.98
21.92
1.57
3.10
25.63
16.49
17.73
12.41
12.90
13.46
32.44
14.42
14.33
7.07
15.17
4.14
3.00
16.45
1.52
19.04
18.31
29.21
15.87
21.08
26.59
5.32
13.96
14.15
22.84
22.08
25.39
27.33
23.45
16.22
6.25
0.74
14.89
15.37
22.06
21.08
19.04
17.14
2.49
5.66
8.29
12.02
1.30
20.02
21.74
14.53
27.16
17.83
15.95
19.31
15.90
19.48
15.44
34.94
21.38
20.34
28.88
0.93
4.02
25.97
2.53
1.03
14.09
22.53
5978.140
5958.213
5937.474
5917.742
5897.527
5895.488
5856.802
5850.601
5829.681
5812.248
5795.711
5781.594
5765.502
5742.566
5734.269
5716.755
5698.130
5675.595
5647.857
5622.433
5596.849
5583.179
5569.694
5560.946
5557.164
5545.324
5533.357
5524.724
5516.861
5509.788
5500.061
5482.383
5466.234
5458.174
5450.493
5438.379
5413.011
5398.539
5385.176
5367.909
5354.496
5348.256
5325.252
5303.172
5295.999
5284.387
5279.958
5274.942
5264.409
5253.522
5220.117
5214.932
5203.869
5185.649
5171.103
5155.897
5131.095
5121.754
5117.517
5102.224
5087.443
5073.010
5050.135
5040.329
5032.902
5010.486
4991.874
4972.228
4958.798
4951.176
4924.781
4907.563
4904.385
4897.299
4883.153
4879.084
4867.305
4865.299
4846.451
4828.676
4802.130
4781.728
4766.077
4749.842
4735.364
4729.331
4724.216
4716.109
4693.432
4675.790
4651.320
4647.687
4634.662
4631.738
4622.491
4595.980
4583.916
4572.140
4558.422
4536.754
4520.812
4510.194
4487.753
4479.860
4471.313
4461.481
4441.464
4421.803
4408.708
4397.921
4395.913
4383.821
4380.678
4369.182
4353.016
4330.317
4311.406
4289.861
4279.082
4252.103
4225.103
4220.287
4194.653
4178.167
4160.440
4148.027
4131.380
4117.920
4085.475
4071.051
4056.725
4049.650
4034.480
4025.263
4016.398
3999.952
3979.392
3961.084
3931.874
3916.003
3894.928
3868.341
3863.021
3849.060
3834.911
3812.070
3789.990
3764.604
3737.275
3713.824
3697.609
3688.580
3683.272
3668.387
3653.012
3630.948
3609.868
3590.824
3573.679
3564.623
3558.964
3550.669
3537.349
3516.036
3494.299
3479.767
3452.612
3434.786
3418.834
3399.529
3383.630
3364.148
3348.711
3313.768
3292.393
3272.049
3243.172
3237.259
3211.289
3203.202
3189.114
3166.588
536.99
537.01
536.77
536.75
536.26
536.21
535.82
535.71
535.65
535.35
535.19
535.19
534.95
535.04
535.11
534.38
534.30
534.40
534.11
534.12
534.07
534.04
534.00
533.98
533.97
534.03
533.96
533.94
534.17
534.25
534.10
534.16
533.92
533.91
533.87
533.93
533.91
533.88
533.96
534.04
534.00
533.99
534.04
533.97
534.00
533.90
533.87
533.92
534.04
534.14
534.13
534.12
534.10
534.07
533.93
533.90
534.10
534.05
534.32
534.00
533.79
533.95
533.72
533.69
533.19
533.26
533.45
533.07
530.01
533.15
532.30
532.77
532.75
532.75
533.17
533.11
533.10
533.19
533.11
533.47
533.21
533.24
533.20
533.06
532.95
532.94
533.10
533.15
533.36
533.87
533.45
533.76
533.35
534.11
534.20
534.23
534.22
534.35
537.26
535.87
535.66
535.83
535.96
536.07
536.34
536.31
537.26
537.32
537.32
537.23
537.35
537.42
537.71
537.83
538.65
538.73
539.39
539.64
539.74
539.95
540.45
540.82
541.05
541.24
541.17
541.50
541.31
541.40
541.33
541.92
541.97
541.56
541.37
541.33
541.32
541.20
541.11
540.86
540.73
539.95
539.67
539.12
538.69
538.59
538.33
537.87
537.40
537.00
536.96
536.75
536.58
536.99
536.37
536.39
536.23
536.12
535.75
535.47
535.07
534.98
534.92
534.86
534.76
534.51
534.50
533.78
533.19
532.95
532.17
532.05
531.74
531.29
531.22
531.37
531.46
531.23
530.42
531.03
530.85
531.04
530.99
530.92
530.95
531.20
531.56
006.0km
7.50
1.80
6005.914
6000.000
5994.746
537.06
537.04
537.02
MATCH LINE
MATCH LINE
DWG NO.-003-R1
MATCH LINE FOR CONT REFER
CH:06.000 Km
CS/RD/008REF DWG No.REF DWG No.
CS/NA/007
CS/RD/006REF DWG No.
CART TRAC
K
CART TRAC
K
CART TRAC
K
11KV
11KV
11KV
ASP RO
AD
11KV
11KV
11KV
ASP RO
AD
11KV
11KV
11KV
ASP RO
AD
11KV
ASP RO
AD
CART TRAC
K
11KV
11KV
CART TRAC
K
NALA
11KV
CART TRAC
K
11KV
CART TRAC
K
11KV
DRAIN
ASP RO
AD
11KV
11KV
11KV
CART TRAC
K
ASP RO
AD
11KV
ASP RO
AD
11KV
11KV
ASP RO
AD
11KV
11KV
11KV
ASP RO
AD
ASP RO
AD
CART TRAC
K
DRAIN
CART TRAC
K
483.14633.714.07283.1023.8413.7223.1114.5
122.892.01115.172.66130.0616.6596.904.14293.07534.0783.447.06
10°22'27" L12°25'38" R
19°28'35" L10°27'14" L10°52'15" R
16°55'12" L19°53'12" R15°20'5" L
28°42'18" R35°46'7" R
25°7'58" L24°41'27" L
16°45'20" R12°0'29" R
22°30'17" L19°40'26" L12°18'25" R11°42'8" L
32°47'2" R17°36'6" L
TP 61TP 60TP 59TP 58TP 57TP 56TP 55TP 54TP 53TP 52TP 51TP 50TP 49TP 48TP 47TP 46TP 45TP 44TP 43TP 42
112.70
TP 42 3112.700TP 43 3119.764
TP 44 3203.202TP 45 3737.275
TP 46 4030.340TP 47 4034.480
TP 48 4131.380TP 49 4148.027TP 50 4278.086TP 51 4280.744TP 52 4395.913
TP 55 4535.311
TP 56 4558.422TP 57 4572.140
TP 58 4595.980TP 59 4879.084
TP 60 4883.153TP 61 5516.861
CS/RD/006ASP ROADCS/NA/007NALACS/RD/008ASP ROAD
TAHSIL, DISTRICT, ANDHRA PRADESH STATE
9.670 m.h.
0.10
0.36
0.62
0.56
0.19
0.79
0.21
0.24
0.54
0.39
0.66
0.29
0.33
0.72
0.30
0.40
0.33
HardRock
HardRock
NIL
HardRock
HardRock
BH-11
BH-10
BH-09
BH-08
BH-07
005.450
004.955
004.318
003.768
003.279
018.589026.376024.994099.224046.221029.014008.792023.927028.260023.644105.504070.462051.716008.478038.371024.492032.782089.176098.219086.476062.800
BH-07
BH-08
BH-08
BH-09
BH-10
BH-11
045.718
054.448072.094
GPS 3X = 229814.092 Y = 1932635.956 Z = .532.758
TBM 3R.L.532.758
TBM-3GPS-3
HP
BPCL
IOCL
21.65
21.52
ASP RO
AD
CS/RLY/005REF DWG No.
3000.000
533.08
14.68
R1 02.02.10 ISSUED FOR CLIENT APPROVAL20.08.09
10.08.09 14.08.09 16.08.09 18.08.09 19.08.09
top related