Construction of Pantai 2 Sewage Treatment Plant,
Federal Territory of Kuala Lumpur (Design & Build)
Presented by :
Ahmad Rozian Othman
Jabatan Perkhidmatan Pembetungan
22 April 2015
THE PANTAI 2 EXPERIENCE :
Underground construction & Green Tech
Applications
Project Tittle Construction of Pantai 2 Sewage Treatment Plant, Federal
Territory of Kuala Lumpur (Design & Build)
Owner Kementerian Tenaga, Teknologi Hijau & Air (KeTTHA)
Implementing Agency Jabatan Perkhidmatan Pembetungan (JPP)
Project Management Consultant Kumpulan Ikhtisas Projek (M) Sdn. Bhd. – MECIP (M) Sdn. Bhd. JV
Design & Build ContractorBEWG (M) Sdn Bhd
(Contract novated from Beijing Enterprises Water Group Ltd)
Design Capacity 1,423,000 PE (320 MLD or 70.4 MGD)
Treatment SystemAdvanced A2O Biological Treatment System (Liquid Stream) +
Mesophilic Anaerobic Digester (Solid Stream)
Contract Cost RM 983,246,360.00
Date of Letter of Acceptance 4th July 2011
Date of Site Possession 28th July 2011
Overall Construction Period 6 years
Construction Period (Liquid Stream) 4 years
Operation & Maintenance 2 years (after construction completed)
Contract End Date 27th July 2017
PROJECT BACKGROUND
WORK PROGRAMME2018
STP Construction & Installation (Underground Structures)
STP Construction & Installation (Above Ground Structures)
Construction of the Facilities
O&M and DLP of the STP
Defects Maintenance & DLP of the Facilities
• CSC = Certificate of Sectional Completion• CPC = Certificate of Practical Completion• DLP = Defect Liability Period• STP = Sewage Treatment Plant• O&M = Operation & Maintenance• DLP = Defects Liability Period
2011 2012 2013 2014 2015 2016 2017
27/1/2016 (CSC 2)
27/1/2016
27/7/2017 (CPC)
28/7/2011
28/7/2015
28/1/2016
27/7/2015 (CSC 1)
27/1/2016 (CSC 3)
27/1/2018 (DLP2)
We are here (90% completion)3
Design & Construction Period
JINJANG
KEPONG
BUNUS
DAMANSARA
LOWER KERAYONG
Pantai 1 STP (377,000 PE)
Pantai 2 STP (1.423 Mil PE)
Pantai 2 STP
PROJECT BACKGROUNDCatchment Area
4
DESA
BAIDURI
Pantai 1 STP (377,000 PE)
Pantai 2 STP (1.423 Mil PE)
PPR PANTAI RIA
PPR SRI CHEMPAKA
PPR SRI PANTAI
PROJECT BACKGROUNDExisting Site Condition
5
THE P2STPSewage Treatment Plant (STP) Cross Section
6
Facilities:
• Football field (1)
• Futsal courts (4)
• Basketball court (1)
• Sepak takraw (1)
• Volleyball (1)
• Tennis courts (2)
• Jogging track
• Children park
• Community Center
(400 pax)
GREEN TECHNOLOGYComponents
7
Biogas
Effluent Reuse Biosolids Reuse
Wastewater Source Heat Pump
Aquatic Skylight + Skylight
Solar PV
Turbo Blowers
Rainwater
Harvesting
8
FOOT PRINT OF UNDERGROUND
PANTAI 2 STP
• Capacity – 1.42 million PE• Underground Excavation
- 185m wide X 270m long- 12 to 15m below ground
P2STP CHALLENGESDesign Aspect – Geotechnical Design for
Deep Excavation
Excavation Edge
Electrified Double Track Railway Line
Apartment Blocks
Klang River
A
A
Site Constraints
9
CONSTRUCTION PHOTOGRAPHS FOR CBP
10
CONSTRUCTION FOR GROUND ANCHOR
11
P2STP CHALLENGESConstruction Activities
Challenges Solution
Unfavorable feedback from
surrounding residents at early
stage
• Received lots of complaints
due to site construction
activities
• Environmental issues i.e.
odour, dust & noise
• Executed communication plan
strategy by carrying out
frequent engagement with
residents
• In environmental aspect,
minimizing the impact by
carrying out continuous
monitoring & fast response for
every complaint
Continuous incoming sewage flow
to the Site
• To decommission 4 out of 6
ponds in order to give way for
construction activities
(underground excavation)
• Providing Temporary Treatment
Facilities (TTF) in the
remaining 2 ponds with
extensive treatment involving
additional surface aerators &
submerged biomedia to cope with
incoming sewage flow
12
P2STP CHALLENGESConstruction Activities
Challenges Solution
Sludge removal
• Huge quantity and difficulty
in off-site disposal as
landfill has limited capacity
• Some of the dried sludge sent
to fertilizer factory to
produce fertilizer
• Used Geotube technology to
desludge and now the dewatered
sludge (biosolids) is reused as
planting soil for the landscape
area.
• Late approval on wayleave from
KTMB to allow for ground
anchor to be installed
underneath KTMB reserve
• Took more than 6 months but
Contractor manage to recover by
increasing the production rate.
13
P2STP CHALLENGESConstruction Activities
Challenges Solution
Insufficient semi & fully skilled
workers for jet grouting works &
carpentry works
The Contractor brought in skilled
workers from P.R China
Water shortage during water
rationing period
• Reuse of filtered rainwater for
concrete mixing use hence less
dependence on SYABAS water
• Pre-storage of SYABAS water
when supply is available
High water table during
excavation works for the
underground structure
Carried out extensive pumping and
plugging of leakages points
Water seepage after erection of
underground structure during
equipment installation
Requires water pumping for the
areas in order for equipment
installation to be done and
plugging off the affected areas
14
P2STP CHALLENGESDesign Activities
Challenges Solution
Different reference standards
while performing detailed design
i.e. Chinese Standard (GB)
compared with BS/MS (relevant
standards practiced in Malaysia)
• Took longer time to review,
recheck and acceptance of
proposed detailed design (in
multiple submissions)
The D&B Consultants have to do
parallel design to counter check
the proposed design to ensure all
engineering consideration are
complied to BS/MS including all
related drawings detailing.
Different working
culture/practice
• i.e. no preparation of civil
guidance drawings
Amendments / revisions on
structural drawings were carried
out for several times albeit they
involved several minor changes.
15
16
JULY 2012
JULY 2013
SITE OVERVIEW
17
SITE OVERVIEW
JULY 2014
APRIL 2015
PROPOSED P2STP LAYOUT With Above Ground Facilities
18
19
For more information about the Project, please visit our website @
www.pantai2stp.com.my