Sichuan Jinfu Paper Co., Ltd
Environmental
Management Plan
September, 2011
E2813 v7
Contents
OVERVIEW.............................................................................................................................................2
1. ENTERPRISE OVERVIEW..................................................................................................................22. AIMS OF AND STANDARDS OF ENVIRONMENTAL PROTECTION.......................................................23. ENVIRONMENTAL PROTECTION MANAGEMENT PLAN.....................................................................24. ENVIRONMENTAL MONITORING PLAN............................................................................................25. STAFF TRAINING.............................................................................................................................26. ESTIMATED EXPENSES FOR ENVIRONMENTAL MANAGEMENT PLAN...............................................27. INFORMATION EXCHANGE.............................................................................................................28. RECORD.........................................................................................................................................29. REPORT..........................................................................................................................................2
1
Overview
This environmental management plan was prepared on the basis of “Environmental impact report of 52 thousand t/a of paper pulp, 57 thousand t/a of paper products and related equipments of Sichuan Jinfu Paper Co., Ltd”, “Environmental impact report of energy-conservation and technology upgrading project of Sichuan Jinfu Paper Co., Ltd” and “Environmental impact report of energy-conservation and technology upgrading project concerning pulp system of Sichuan Jinfu Paper Co., Ltd” and provided with appropriate supplements. This environmental impact report of is a separate document, including all environmental protection actions need to be implemented during project design period, construction period and operation period, providing an action principles and working framework for implementing discharge reduction measures, environmental protection and environmental monitoring during construction period and operation period. This report includes following main contents:
*Project overview*Project’s potential environmental impact*Departments and responsibilities *Environmental management plan *Environmental monitoring plan
Purpose of this environmental management planThe pulp and paper production equipments of Sichuan Jinfu Paper Co., Ltd aim to reduce the
negative impact of enterprise’s production on society and environment through high-quality design and construction as well as strict environmental evaluation, and resolve the left environmental problems through environmental measures.
As of the inevitable environmental impact, one major purpose of environmental evaluation is to determine the potential impact of project on environment and propose technically feasible, finically sustainable and operable environmental measures implemented during project construction and operation period. These environmental measures have been determined during environmental evaluation phase, will be proposed reasonably and feasibly in environmental management plan and applied during project construction and operation period.The function of environmental management plan is to list environmental measures need to be implemented during project construction and operation period as well as the measures taken by in monitoring and department level, thus to avoid or control the negative impact of this project on environment and propose specific actions to implement these measures. Environmental management plan will become an important link between environmental measures and actions determined in environmental impact and environmental evaluation, and achieve the aims of environmental measures through actions in environmental management plan.
2
1. Enterprise overview
1.1 Enterprise development, current situation and origin of technology upgradingSichuan Jinfu Paper Co., Ltd (hereinafter referred to as “Jinfu”) is a private business with its
plant located at Tangjiawan, Fulu Town, Shwan District, Leshan city, occupying 12.13 hectare (182 Mu). The total asset of the enterprise is 250 million RMB. It was called as Leshan bathroom tissue Plant, Fulu Branch before 1999. In 1999, Sichuan Fuhua Group purchased this plant and changed its name to Sichuan Leshan Fuhua Paper Co., Ltd. Its name again changed to Sichuan Jinfu Paper Co., Ltd after reorganization and restructuring in 2009. Jinfu’s production capability is 52 thousand t/a of bleached bamboo pulp and 57 thousand t/a of paper products. All produced bleaching bamboo pulp is used by itself without selling out. The major products of the enterprise are bleached pulping paper board, cultural paper, and bathroom tissue, etc.
Jinfu’s production capability reached the scale of 52 thousand t/a of pulp and 57 thousand t/a of paper products in 2004, and then Jinfu became a pulp and paper enterprise with facilities of chemical pulp making, paper making, soda recycling, medium waste water treatment, white water recycling etc. Its environmental evaluation report was replied by Sichuan Environmental Protection Bureau in 2010 (Chuan Huan Shen Pi [2010] No. 479). Now Jinfu is conducting the construction of “energy-conservation, discharge reduction and technology upgrading project” as well as “energy-conservation, discharge reduction and technology upgrading project concerning pulp system”. These two projects were recorded in Leshan economy and information committee. And the environmental evaluation of “energy-conservation, discharge reduction and technology upgrading project” is replied by Leshan environmental protection Bureau (Le Shi Huan Shen [2011] No. 26). The “energy-conservation, discharge reduction and technology upgrading project concerning pulp system” is undertaking its environmental evaluation work.
The above two upgrading projects will fully improve the whole production technique of Jinfu, promote the Clean Production of Jinfu to a new level to reduce energy and material consumption, thus to eventually make sure the discharged waste water meeting the discharge limit in table 2 pulping and paper making joint enterprise in GB 3544-2008 which entered into effect on 1st July 2011. Meanwhile, the two project will effectively reduce the POP in waste water such as AOX and Dioxin, etc, as well as the generation and discharge of odor pollutants special to paper making industry. In addition, this project will eliminate environmental risks caused by use of liquid chlorine.
2.1 Enterprise’s project composition and major technical indicatorsEnterprise’s current situation
Jinfu uses bamboo chips to make pulp and applies the methods of dry raw material preparation, sulphate low energy consumption Intermittent cooking-ball cooking system, vacuum pulp washer suite to wash pulp, pressure screening, medium concentration sand remover to purify and low chlorine four-stage bleaching.
3
Jinfu uses a multi-cylinder long mesh paper machine with breadth of 1760 mm and working speed of 200 m/min to produce cultural paper, and 11 tissue paper machines with breadth of 2200 mm and working speed of 180 m/min to produce bathroom tissue paperJinfu uses five-effect evaporators to evaporate, concentrate, combust, causticize and recycle soda. The white sludge is sent to slag yard of the enterprise for landfill.
There is a 35 t/h circulating fluidized bed coal-fired boiler, a 8 t/h and a 6 t/h chain boilers, with the total low-pressure steam production capability of 49 t/h in boiler room.The waste water station uses “ABR + contact oxidation” two-stage biochemical treatment technique to treat medium waste water, excessive white water, householdwaste water and floor wash water, reaching the treatment capacity of 20 thousand t/d. The treated waste water is discharged to Dadu River through pipelines after meeting the requirements in table 1 “pulp and paper enterprises” of “Discharge standard of water pollutants for pulp and paper industry” (GB3544—2008).
The smoke from boiler is discharged through chimney of 50 m after furnace desulfuration and electrostatic precipitation of 3-electric field. The smoke from soda furnace is discharged through chimney of 80 m after electrostatic precipitation of 3-electric field. The enterprise set a sanitary protection zone of 100m wide for the non-organized discharge of odorous pollutant from pulp making.
Refer to table 1.1 for current project composition and major environmental problems.
Table 1.1 current project composition and major environmental problems
Item Name Content
Major environmental
problems during
operation
Major environmental protection measures
during operation
Main part Material
storage yard
and material
preparation
This project uses dry raw
material preparation:
purchase qualified
bamboo chips stored in
material storage yard of
4500m3and sent to
cooking workshop after
selection and screening.
Waste bamboo slag,
fermentative gas
Waste bamboo slag is sent to boiler for
combustion.
4
Pulp making
workshop
Pulp making capacity: 52
thousand t/a;
1) cooking-ball:
10×25m3;2) vacuum pulp washer
suite for black liquid
collection
3) pressure screening
and purification
4) CEHP four-stage
bleaching
black liquid from pulp
making, medium waste
water, steam from
cooking, bamboo slag
after section removal,
potential leakage risk of
chlorine used for
bleaching
black liquid from pulp making is sent to
soda recycling workshop for combustion;
medium waste water is sent to waste water
station for treatment and discharge, steam
from cooking is discharged directly,
bamboo slag after section removal is sent
to cooking-ball. There shall be an
emergency soda pool for potential leakage
risk of chlorine used for bleaching
Soda
recycling
workshop
Evaporation: two suits of
five-effect pipe and board
combined evaporator with
the total evaporation area
of 4250m2
Combustion: combustion
capacity of soda furnace
is 225tds/d with the side
product of 1.27MPa
steam of 25m3/h
Digestion and
causticization: including
green liquor clarifier,
continuous causticizer,
white liquor clarifier,
white sludge washer.
Smoke from soda furnace
combustion, water vapor
from dissolving tank of
soda furnace, evaporated
non-condensable gas,
white sludge, lime slag,
cool waste water from
black liquor evaporation,
water seal water at the
outlet of vacuum pump
Smoke from soda furnace combustion is
discharged through chimney of 80 m after
three times of electric dust removal, water
vapor from dissolving tank of soda furnace
is discharged through exhaust-funnel of
35m, evaporated non-condensable gas is
discharge after absorption of seal water at
the outlet of vacuum pump, white sludge
and lime slag are sent to slag yard for
landfill, cool waste water from black liquor
evaporation is sent to waste water station
for treatment, water seal water at the outlet
of vacuum pump is sent to waste water
station for treatment.
Paper making
workshop
Production capacity: 57
thousand t/a, including 14
production lines of
bathroom tissue, pulping
paper board and cultural
paper
White water from paper
machine, damaged paper
White water from paper machine is largely
used for washing and screening after white
water recycling and treatment, excessive
white water is sent to waste water station
and discharged. Damaged paper is recycled
after changed to pulp in this workshop.
Auxiliar
y public
and
environ
mental
protectio
n
Total production capacity
is 1.27MPa steam of 49
t/h: including a 35 t/h
circulating fluidized bed
boiler, a 6 t/h and 8 t/h
chain boiler. Equipped
with diesel-driven
generator
SO2, smoke, boiler slag,
lime ash, noise of fans
Furnace desulfuration in circulating
fluidized bed boiler, the smoke from boiler
is discharged through chimney of 50 m
after three times of electric dust removal.
Boiler slag and lime ash are sold to cement
plant
Boiler room
5
facilities
Dry coal shack: a day
coal shack of 2500m2Coal dust
A barricade and spray method are used as
dust falling measures.
Lime ash yard: the ash
yard is equipped with
dust remover, the ash is
directly moved outside at
the outlet of yard after
temporary storage.
Dust Move ash outside in time to reduce the
discharge of dust.
Water
treatment
station
A suit of 25 t/d water
softening device is
equipped at soda
recycling workshop;
another suit of 49 t/h
water treatment device is
equipped at boiler room.
The technique of ion-
exchange resin tower is
used.
Waste water from boiler,
and waste water from
resin regeneration
Sent to waste water station
air
compression
station
There is a suit of
compressed air
preparation device to
provide instrument air in
paper making workshop.
Equipment noise Sound insulation and shock absorption
transformer
substation
Power supply facilities/ /
Waste water
station
Treat medium waste
water, cool waste water
from black liquor
evaporation, excessive
white water from paper
machine, household waste
water and floor wash
water
Tail water, sludge,
odorous pollutants
Waste water is discharged after meeting
the requirements “Discharge standard of
water pollutants for pulp and paper
industry” (GB3544—2008). Sludge is
moved outside and a sanitary protection
zone of 100m wide is set.
White
sludge yard
There is a ash yard at
Huangnipo village which
is 4 km from the project
for white sludge landfill.
Risk of underground
water pollution.Seepage-proofing.
Storage
facilities
Liquid
chlorine
storage
There is a storage to store
50 liquid chlorine steel
bottle of 1 t/bottle
Risk of chlorine leakageThere is an emergency soda pool and
positive-pressure gas mask
Finished
product
storage
Storage room for finished
paper rolls and bleached
pulping paper board
/ /
6
Staffs in plant Workshop and officeHousehold waste water
and garbage
Household waste water is sent to waste
water station and household garbage is sent
to dumping sites designated by
environmental protection departments
Refer to table 1.2 for current pollutants discharge of Jinfu.Table 1.2 current discharge situation of “three wastes” of Jinfu
Item Source intensity at generation Source intensity at discharge
Waste
water
Medium waste waterAmount of waste water: 8797.5t/d
CODCr:1100mg/L、3290t/a
Amount of waste water: 11017t/d
CODCr:150mg/L、562t/a
BOD5:30mg/L、112.4t/a
SS:50mg/L、187.3t/a
NH3-N:10mg/L、37.5t/a
Cool waste water from soda
recycling
Amount of waste water: 1071t/d
CODCr:1000mg/L、364t/a
White water from paper
machine (left after recycling)
Amount of waste water: 994.5t/d
CODCr:150mg/L、51t/a
Waste water from boiler room
and resin regeneration waterAmount of discharged water: 29t/d
householdwaste water and floor
wash water
Amount of waste water: 125t/d
CODCr:350mg/L、15t/a
Waste
gas
Smoke from 49 t/h coal-fired
boiler (discharge through
exhaust-funnel of 50 m)
Amount of smoke: 55 thousand
m3/h
SO2:1080mg/m3,485.2t/a
Dust:13000mg/m3, 5834.4t/a
Amount of smoke: 55 thousand
m3/h
SO2:700mg/m3,314.2t/a
Dust:130mg/m3, 58.3t/a
Smoke from soda furnace
(discharge through exhaust-
funnel of 80 m)
Amount of smoke: 54 thousand
m3/h
Dust: 15500mg/m3,6833t/a
SO2:4.5mg/m3、2t/a
Amount of smoke: 54 thousand
m3/h
Dust: 155mg/m3,68.3t/a
SO2:4.5mg/m3、2.0t/a
Total SO2:487.5t/a
Dust:12667.4t/a
SO2:316.2t/a
Dust:126.6t/a
Solid
waste
White sludge and lime slag 52 thousand t/a(50% wate) Slag yard for landfill
Coal ash from boiler 38500t/a Sold to cement plant for
comprehensive utility Bamboo slag from material preparation
3276t/a Sold to fibre-board plant for
comprehensive utilityLime slag 2600t/a Moved outside for landfillSludge from waste water station
2000t/a Slag yard for landfillSection slag from cooking 1600t/a Sent back for cookingPulp slag from screening 1590t/a Combusted in boilerDamaged paper 500t/a Recycled at the same workshopWaste package material 200t/a Recycled by supplierHouseholdgarbage 50t/a Moved outside for landfill
Total 102346t/a44.7% is utilized
comprehensively and the other
55.3% is treatment s landfill
7
3.1 The production situation after technology upgrading
The production techniques of Jinfu shall be as following after these two technology upgrading projects are finished:Pulp making will applies wet material preparation, low energy consumption Intermittent Displacement Digester System, medium concentration section removal, vacuum pulp washer suite for pulp washing, medium concentration sealed screening and medium concentration and chlorine dioxide three stage bleaching system.
The preparation of chlorine dioxide applies SVP-LITE (R8 method).Jinfu uses a multi-cylinder long mesh paper machine with breadth of 1760 mm and working speed of 200 m/min to produce cultural paper, and 11 tissue paper machines with breadth of 2200 mm and working speed of 180 m/min to produce bathroom tissue paper.
As of soda recycling, Jinfu uses 225tds/d medium-pressure and low-odor soda furnace equipped with excessive heat power generator. It uses five-part five-effect all board evaporator equipped with cool waste water steam collection tower for black liquor concentration. Facilities including green liquor clarifier, continuous causticizer, white liquor clarifier, white sludge washer are used fro soda recycling. The white sludge is sent to slag yard of the enterprise for landfill.There is a 50 t/h medium-pressure circulating fluidized bed coal-fired boiler in boiler room.The waste water station uses “ABR + contact oxidation +deep treatment” three-stage biochemical treatment technique. The treated waste water is reused partly and the remaining is discharged to Dadu River through pipelines after meeting the requirements in table 2 “pulp and paper enterprise” of “Discharge standard of water pollutants for pulp and paper industry” (GB3544—2008).The smoke from boiler is discharged through chimney of 80 m after furnace desulfuration and electrostatic precipitation of 4-electric field. The smoke from soda furnace is discharged together with boiler chimney after electrostatic precipitation of 4-electric field. High-concentration odorous pollutants are discharged after treatment of light and oxygen waste gas purifier. Low-concentration odorous pollutants and waste gas from washing, screening and bleaching are discharged after treatment of Washing spray tower. The enterprise set a sanitary protection zone of 100m wide for the non-organized discharge of odorous pollutant from pulp making.
Refer to table 1.3 for project composition and major environmental problems after technology upgrading.
Table 1.3 project composition and major environmental problems after technology upgrading
Item Name Content
Major environmental
problems during
operation
Major environmental protection
measures during operation
8
Pulp
making
worksho
p
Pulp making capacity: 52 thousand
t/a;
1) Wet material preparation
2) Intermittent Displacement
Digester: 4×135 m3;3) medium concentration oxygen
delignification, medium
concentration sealed screening
and purifing
4) ECF elemental chlorine free
bleaching
black liquid from pulp
making, waste water
from bleaching,
waste water from
material preparation
steam from cooking,
material preparation
slag, bamboo slag
Black liquid from pulp making is
sent to soda recycling workshop
for combustion; medium waste
water is sent to waste water station
for treatment and discharged,
steam from cooking is discharged
after collection and treatment,
material preparation slag is boiler
as fuel.
Soda
recycling
workshop
Evaporation: five-part five-effect
all board evaporator equipped
with cool waste water steam
collection tower;
Combustion: combustion capacity
of soda furnace is 225tds/d with
the side product of 3.82MPa
steam. Equipped with excessive
heat power generator and odorous
gas is collected after combustion.
Digestion and causticization:
including green liquor clarifier,
continuous causticizer, white
liquor clarifier, white sludge
washer.
Smoke from soda
furnace combustion,
water vapor from
dissolving tank of soda
furnace, evaporated
noncondensable gas,
white sludge, lime
slag, cool waste water
from black liquor
evaporation, water seal
water at the outlet of
vacuum pump
Smoke from soda furnace
combustion is discharged through
chimney of 80 m after electrostatic
precipitation of 4-electric field,
water vapor from dissolving tank of
soda furnace is discharged through
exhaust-funnel of 35m, evaporated
noncondensable gas is discharge
after absorption of seal water at the
outlet of vacuum pump, white
sludge and lime slag are sent to slag
yard for landfill, cool waste water
from black liquor evaporation is
sent to waste water station for
treatment, water seal water at the
vacuum pump is sent to waste
water station for treatment.
Paper
making
workshop
Production capacity: 57 thousand
t/a, including 14 production lines of
bathroom tissue, pulping paper
board and cultural paper
White water from
paper machine,
damaged paper
White water from paper machine is
largely used for washing and
screening after white water
recycling and treatment, excessive
white water is sent to waste water
station and discharged. Damaged
paper is recycled after changed to
pulp in this workshop.
Chemical
workshop
A suit of 4 t/d R8 method chlorine
dioxide preparation system with the
actual production capacity of 2.75
t/d 10% chlorine dioxide and 3.85
t/d sodium sulfate as side product.
Non-condensable gas
at absorption tower,
cooling water from
vacuum jet, leakage
risk of raw materials
such as sodium
Empty the non-condensable gas at
absorption tower, cooling water
from vacuum jet is sent to waste
water station, side product of
sodium sulfate is sent to soda
furnace as raw material for Sodium
9
Ma
chlorate methyl
alcoholSulphide
Boiler
room
A 50 t/d circulating fluidized bed
boiler, Dry coal shack and Lime
ash yard.
SO2, smoke, boiler
slag, lime ash, noise
of fans, waste water
from boiler
Furnace desulfuration in boiler, the
smoke from boiler is discharged
together with smoke from soda
furnace through chimney of 50 m
after electrostatic precipitation of
4-electric field.
Boiler slag and lime ash are sold
to cement plant
Water
treatme
nt
station
A suit of 30 t/d desalted water
device
waste water from
resin regeneration Sent to waste water station
air
compre
ssion
station
There is a suit of compressed air
preparation device to provide
instrument air in paper making
workshop.
Equipment noiseSound insulation and shock
absorption
transfor
mer
substati
on
Power supply facilities / /
Waste
water
station
Treat medium waste water, cool
waste water from black liquor
evaporation, excessive white water
from paper machine, household
waste water and floor wash water
Tail water, sludge,
odorous pollutants
Waste water is discharged after
meeting the requirements
“Discharge standard of water
pollutants for pulp and paper
industry” (GB3544—2008).
Sludge is moved outside and a
sanitary protection zone of 100m
wide is set.
White
sludge
yard
There is a ash yard at Huangnipo
village which is 4 km from the
project for white sludge landfill.
Risk of underground
water pollution.Seepage-proofing.
Storage facilities
sodium
chlorat
e
storage
Risk of explosionStrengthen management according
to requirements
Finishe
d
product
storage
Storage room for finished paper
rolls and bleached pulping paper
board
/ /
10
Refer to table 1.4 for pollutants discharge situation of Jinfu after technology upgrading.Table 1.4 discharge situation of “three wastes” of Jinfu after technology upgrading
Item Source intensity at generation Source intensity at discharge
W
as
te
w
at
er
Medium waste water Amount of waste water:
6110t/d,CODCr:1000mg/L
All is sent to waste water station for treatment,
part recycled water is reused and the remaining
is discharged into Dadu River.
Amount waste water discharged: 8200m3/d
CODCr:90mg/L、250.9/a
BOD5:20mg/L、55.8t/a
NH3-N:8mg/L、22.3t/a
Waste water from material
preparation
Amount of waste water:
1835t/d,CODCr:150mg/LCooling water from steam
jet pump in ClO2 workshop
Amount of waste water:
157t/d,CODCr:100mg/L
Cool waste water from
soda recycling
Amount of waste water:
1376t/d,CODCr:800mg/L
Excessive white water from
paper machine
Amount of waste water:
764t/d,CODCr:150mg/L
Waste water from boiler
room and desalted water
station
Amount of discharged water: 84 t/d
Householdwaste water and
floor wash water
Amount of waste water:
128t/d,CODCr:350mg/L
Wa
ste
gas
Smoke from coal-fired boilerAmount of smoke: 77.6 thousand m3/h
SO2:335.3mg/m3, dust: 41.4g/m3 SO2:259.1t/a
Dust:94.8t/a
NOx:644t/aSmoke from soda furnace
Amount of smoke: 54 thousand m3/h, dust: 47.5g/m3,SO2 : 106 mg/m3,
High-concentration odorous
gas from cookingAmount of waste gas: 1500m3/h
Discharge through exhaust-funnel of 30 m
after meeting standards
Low-concentration odorous
gas from cooking and Waste
gas from washing, screening
and bleaching
Amount of waste gas: 2000m3/hDischarge through exhaust-funnel of 30 m
after meeting standards
Tail gas at absorption tower
at ClO2workshop
Amount of waste gas: 500m3/h, tiny
amount of ClO2 and methyl alcohol
Discharge through exhaust-funnel of 30 m
after meeting standards
Sol
id
wa
ste
White sludge and lime slag 54.6 thousand t/a Slag yard for landfillCoal ash from boiler 47.2 thousand t/a Sold to cement plant for comprehensive utility Bamboo slag from material preparation
5720t/a Combusted in boiler
Lime slag 2600t/a Slag yard for landfillSludge from waste water station
2000t/a Moved outside for landfillSection slag from cooking 1600t/a Sent back for cookingPulp slag from screening 1060t/a Combusted in boilerDamaged paper 500t/a Recycled at the same workshopWaste package material 200t/a Recycled by supplierHousehold garbage 50t/a Moved outside for landfill
11
2. Aims of and standards of environmental protection
2.1 Enterprise’s aims of environmental protection
Aim of environmental protection concerning surface water: the waste accepting water body is Dadu River. The water environment function of the waste accepting section belongs to Level III water and implements Level III water in “Environmental quality standards for surface water” (GB 3838-2002).
Aim of environmental protection concerning underground water: the regional underground water implements Level III water in “Quality standard for ground water” (GB/T14848-93).Aim of environmental protection concerning air quality: the air quality near plant shall meet the requirements in “Ambient air quality standard” (GB3095-1996). Specific pollutants such as H2S shall meet the requirements of maximum concentration of air hazardous substance for residential areas in “Hygienic standards for the design of industrial enterprises”(GBE 1-2002)Aim of environmental protection concerning sound quality: the sound quality of the areas where the project is located shall meet the requirements level II in “Environmental quality standard for noise” (GB3096-2008).
The air quality in plant and workshops shall meet relevant requirements in “Hygienic standards for the design of industrial enterprises”(GBE 1-2002).
12
Refer to table 2.1 for aims of environmental protection around the enterprise. Table 2.1 list of major aims of environmental protection and social concerns
environmental
elementsName Position Protection aim Protection level
Surface water Dadu River West of this project
Meet the requirements
for Level III water in
GB 3838-2002
Underground
waterWell of farmer
60 m on the east of
waste water station
Protect the underground
water in the well of nearby
farmers from polluting
Meet the requirements
for Level III water in
GB/T14848-93
Air quality
Fulu Town N,4kmApproximately 21 thousand
people
Meet the
requirements for
Level II in GB3095-
1996
Niushi Town W,0.4kmApproximately 10380
people
Tongci Town N,4.5km Approximately 7760 people
Center school of
Niushi TownW,0.4km
Approximately 1000 teacher
and students
Nearby farmers
N,10m Approximately 3 residents
W,30m Approximately 5-7 residents
S,100m 1 residents
S,310m 5 residents
Sound quality 200 m From nearby residents
Meet the requirements
for class II area in
(GB3096-2008)
Environmenta
l risksAir Area within 3 km away from chemical workshop
Ensure that the risks
maintain at
environmentally
acceptable level.
It is can be seen from the above table that except for the scattered residents near enterprise, the main environmentally sensitive target of air pollutants is Niushi Town Chang Town opposite to Dadu River and which is 0.5 km away.
Environmentally sensitive target of discharged waste water is Fulu Town at the downstream of waste discharge outlet, but people at Fulu Town and Niushi Town have never take water from Dadu River.
2.2 Environmental Quality Standard 1) Air qualityThe project implement requirement for level II in GB3095-1996. Refer to table 2.2. Table 2.2 air quality evaluation standard unit: mg/Nm3
Item PM10 SO2
13
Annual mean 0.10 0.06Daily mean 0.15 0.15
Mean for an hour / 0.50Standard implemented Level II in GB3095-1996
2) Surface water quality Dadu River, the surface water accepting waste water of enterprises implements the requirements for Level III water in “Environmental quality standards for surface water” (GB 3838-2002). Refer to table 2.3.
Table 2.3 Environmental quality standards for surface water for Dadu River
Item pH CODcr BOD5 NH3-N SS Total
nitroge
Total
phosphoru
Sulphid
e
Volatil
e
Concentration
limitatio6~9 ≤20 ≤4 ≤1.0 ≤0.05 ≤0.2 ≤0.2 ≤0.2 ≤0.005
Level Level III in “Environmental quality standards for surface water” (GB 3838-2002)
3) Underground water qualityUnderground water implements the requirements for Level III water in “Quality standard for ground water” (GB/T14848-93). Refer to table 2.4.
Table 2.4 regional Quality standard for ground water
Item pHColor
degree
Total
hardnes
Ammonia
nitrogenSulphate
Volatile
phenolChloride
Permanganate
Index
Concentration
limitatio6.5~8.5 ≤15 ≤450 ≤0.2 ≤250 ≤0.002 ≤250 ≤3.0
Level Level III water in “Quality standard for ground water” (GB/T14848-93).
4)Sound Quality Sound quality implements requirements for class II area in “Environmental quality standard for noise” (GB3096-2008). Refer to table 2.5.
Table 2.5 Environmental quality standard for noise ( GB 3096-2008)
Standard and level implementedStandard value dB(A)
Day Night
GB3096-2008 class II area 60 50
2.3 Discharge standard 1) Water pollutants
The discharged water implements the requirements in table 2 of “Discharge standard of water pollutants for pulp and paper industry” (GB3544—2008) (entered into force on July 1st 2011).
14
Refer to table 2.6.
Table 2.6 “Discharge standard of water pollutants for pulp and paper industry” (GB3544—2008) unit mg/L
Discharge
standard
Amount
of
discharge
d water
pHCO
DCr
BO
D5
SS
Ammoni
a
nitrogen
Total
nitroge
n
Total
phosphoru
s
Color
degre
e
AO
X
GB3544-
2008≤60 6~
9≤90 ≤20 ≤5
0≤8 ≤0.8 ≤12 ≤50
times≤12
Note: in above standard, there is no dimension for pH and the unit for amount of discharged water is t/ t of
product (pulp).
2) Air pollutantsSmoke from boiler implements requirements for period II of class II area in “Emission
standard of air pollutants for coal--burning oil- burning gas-fired boilers” (GB13271-2001). Smoke from soda furnace implements the requirements for level II in “Emission standard of air pollutants for industrial kiln and furnace” (GB9078-1996). Waste gas (odorous gas) implements the requirements for level II in table 1 in “Emission Standard for Odor Pollutants” (GB14554-93). Refer to tables 2.7 to 2.9.
Table 2.7 Emission standard of air pollutants for coal--burning oil- burning gas-fired boilersDischarge standard and standard code
Pollutant factorEmission
parameterUnit
Emission
limitation
Standard for period II in
GB13271-2001
Dust Emission
concentrationmg/Nm3 200
SO2
Emission
concentrationmg/Nm3 900
Table 2.8 Emission standard of air pollutants for industrial kiln and furnaceDischarge standard and
standard code
Pollutant
factor
Emission
parameterUnit Emission limitation
Level II in GB9078-1996
Dust Emission
concentration
mg/Nm3 200
SO2
Emission
concentrationmg/Nm3 850
Table 2.9 Emission Standard for Odor PollutantsDischarge standard and
standard code
Pollutant
factor
Emission
parameterUnit
Limitation at plant
boundary
Table 1 (level II) in GB14554-93 H2SEmission
concentrationmg/Nm3 0.1
3)Noise The boundary noise implements requirements for level II in “Emission standard for industrial
15
enterprises noise at boundary” (GB12348-2008). Refer to table 2.10.Table 2.10 Standard for industrial enterprises noise at boundary
Standard and level implemented
Standard value dB(A)Application conditons
Day Night
Level II inGB12348-2008 60 50 /
16
3. Environmental protection management plan
3.1 Environmental management department and its responsibilities For the purpose of supporting the effective and timely implementation of environmental
relief measure, EMP specially describe the arrangement of departments in accordance with the setting and responsibilities of environmental protection departments in environmental impact evaluation report. Refer to table 3.1.Table 3.1 list of setting and responsibilities of environmental protection departments
Action Department responsible Department responsibilities
Monitoring data collection
Construction
period
Construction enterprise
and Jinfu
1) collecting dust data
2) collection noise data
Operation period Jinfu
1) water quality at outlet of waste water station
2) water quality at outlet of pulp making workshop
3) smoke outlet of boiler
4) smoke outlet of soda furnace
5) odorous gas at the boundary
6) monitoring water quality in wells for underground water at white
sludge yard
Data analysis
Construction
period
Local monitoring
station
Based on monitored data, analyze environmental quality situation during
construction period and understand major environmental problems
Operation period Local monitoring
station
Based on monitored data, analyze environmental quality situation during
operation period and understand major environmental problems
Preparation of environmental monitoring report
Construction
period
Local monitoring
station
Based on monitored data, prepare environmental monitoring report
Operation period Local monitoring
station
Based on monitored data, prepare environmental monitoring report
Acceptance/ frequency of environmental monitoring report
Construction
period
Construction enterprise
and Jinfu
Conduct irregular monitoring according to construction progress.
Operation period Jinfu
Construction enterprise accept one environmental monitoring report
three month and responsible for sorting out and maintaining monitored
data and report to local environmental protection department when find
problems and solve them.
Environmental managementConstruction
period
Construction enterprise 1) Designate one or two full-time or part-time staffs responsible for
environmental protection and management during construction and production.
2) Check the progress, quality, operation and test of environmental protection facilities and solve the problems during
17
operation3) Calculate the utility of environmental protection fund
during construction4) Accept the supervision of environmental protection
administration department and environment monitoring department, report the implementation of environmental protection articles in contract.
Operation period Jinfu 1) Set up an environmental management department as safety and environmental protection agency to responsible for implement environmental protection and management work in operation period. Designate five people to conduct environmental protection. Under the leadership of GM, department management shall be responsible for daily work of environmental protection management and clean production. Each workshop shall have two part-time environmental protection management staff responsible for maintenance of environmental protection facilities and contacting with safety and environmental protection agency. There are two staffs committed to professional health management.
2) Implement national and local environmental protection laws, regulations and policies as well as the requirements of environmental protection authorities at all levels.
3) Implement environmental protection measures, and propose environmental management methods and systems during operation period.
4) Implement environmental monitoring during operation period and conduct statistic analysis as well as data management
5) Monitor environmental protection measures and solve the environmental protection problems during operation period.
6) Report regularly to environmental protection authorities.
7) Conduct environmental protection acceptance work upon finish of construction.
8) Be responsible for professional health protection and management of all staffs.
9) Be responsible for proposing, construction and maintaining of risk prevention and implementing emergency response plan during accidents.
18
3.2 Environmental management plan and mitigation measurementEnvironmental protection measures and emergency response plan during operating period refers to Table 3.2.
19
Table 3.2 Environmental protection measures and emergency response plan
Potential environmental
problemsMitigation measures and emergency response plan
Implementatio
n period
Budget
(RMB10,000)Executing unit
Supervision
unit
Monitoring
indicators &
parameters
Frequency
Construction period
Dust
-open storage ground and bare site being covered with geotextile;
-dust throwing being taken into account during construction and
spraying water to control over dust and regularly cleaning;
-regular monitoring.
Construction 1.5Construction
unit
Jinfu Company,
construction
observation
unit,
Environmental
Protection
Bureau of
Shawan, and
Environmental
Monitoring
Station of
Shawan
TSPEvery 2
months
Construction noise
-use low noisy equipment;
-properly arrange construction time and avoid construction in
night time.
Construction 0.5Construction
unit
Jinfu Company,
construction
observation
unit,
Environmental
Protection
Bureau of
Shawan
LeqdB(A)Once a
month
20
Construction waste water
-waste water collection pool being furnished. Waste water will be
sent to waste water station for treatment and discharged together
with production waste water after meeting criteria;
-regular monitoring.
Construction 0.5Construction
unit
Jinfu Company,
construction
observation
unit,
Environmental
Protection
Bureau of
Shawan
COD、NH3-
N、SS
On-line
monitoring
system in
waste water
station
being used
Construction waste
-report to local construction bureau on disposal of construction
waste residue. Small amount of waste spoil and construction
rubble being sent to assigned disposal site in accordance with
requirements issued by municipal administration and planning
agency;
-remaining sandstone, construction materials, steel, packing
materials etc shall be managed and recycled by reponsibel person
and storage ground being cleansed immediately without any
residues.
Construction 1.0Construction
unit
Jinfu Company,
construction
observation
unit,
Environmental
Protection
Bureau of
Shawan, and
Environmental
Monitoring
Station of
Shawan
Construction
waste
Daily
monitoring
household garbage
-household garbage produced on construction site shall be
collected with collection container and sent out to disposal site
together with household garbage produced within the plant.
Construction 0.5Construction
unit
Environmental
Protection
Bureau of
Shawan
household
garbage
Daily
monitoring
Dismantle facilities for -clear underground pipeline and hiding facilities and rejected Construction 2.0 Jinfu Construction Liquefied Timely
21
technological renovation
materials etc;
-obsolete liquefied chlorine steel cylinders shall be recycled by
qualified unit in accordance with relevant requirements;
-obsolete steam ball and other pulping equipment shall not be sold
out to other pulping enterprises;
- preclude environmental pollution caused by dismantling
obsolete facilities.
Company
observation
unit,
Environmental
Protection
Bureau of
Shawan, and
Environmental
Monitoring
Station of
Shawan
chlorine
cylinders,
underground
pipeline, steam
ball and other
pulping
facilities
monitoring
Social environment
-a billboard shall be setup on the construction site that describes
engineering content and construction time as well as narration for
begging public acceptance and understanding of inconvenience
caused by construction. Contact info and complaint hotline etc
shall be provided;
-construction management and training on environmental
projection shall be enhanced.
Construction 0.5
Construction
unit, Jinfu
Company
Construction
observation
unit,
Environmental
Protection
Bureau of
Shawan, and
Environmental
Monitoring
Station of
Shawan
/Daily
monitoring
Soil erosion -properly arrange construction time. Avoid construction in raining
day and shorten stacking time of earth and stone;
-temporary stacking place shall be covered with geotextile;
-original land service functions shall be restored right after finish
Construction 0.5 Construction
unit, Jinfu
Company
Construction
observation
unit,
Environmental
Soil erosion Daily
monitoring
22
of the construction;
-training on ecological and environmental protection shall be
carried out for construction staff.
Protection
Bureau of
Shawan, and
Environmental
Monitoring
Station of
Shawan
Operating period
Smoke from boiler
-circulating fluidized bed coal-fired boiler and low nitrogen
combustion technology shall be adopted;
-low sulfur coal less than 0.5% shall be used;
- the limestone desulfurization inside the furnace shall be
adopted;
-the electrostatic precipitation of 4-electric field shall be
adopted. Smoke will be emitted through 80m chimney after dust
cleansing.
Operating 25
Jinfu
Company,
Safety and
environmental
Protection
Department
Environmental
Protection
Bureau of
Shawan, and
Environmental
Monitoring
Station of
Shawan
SO2、NOx
PM10
Every 3
months
Smoke from caustic
soda furnace
- the electrostatic precipitation of 4-electric field shall be
adopted;
-tail gas after cleansing and boiler smoke being emitted through
the same chimney.
Operating 20
Jinfu
Company,
Safety and
environmental
Protection
Department
Environmental
Protection
Bureau of
Shawan, and
Environmental
Monitoring
Station of
Shawan
SO2、NOx
PM10
Every 3
months
High thick stench -gas skirt being setup to collect waste gas exhausted from the Operating 15 Jinfu Environmental Thickness of Every 6
23
from stewing
process;
-photo-oxidation waste gas purifier being adopted to dispose high
thick stench;
-gas being emitted through 30m chimney after disposal.
Company,
Safety and
environmental
Protection
Department
Protection
Bureau of
Shawan, and
Environmental
Monitoring
Station of
Shawan
stench months
Low thick stench
from stewing and
waste gas from
washing, screening
and bleaching
-waste gas skirts being setup at the waste gas generation points;
-water spray tower being used to cleanse collected waste gas;
-gas being emitted through 30m chimney after disposal;
-waste water from water spray tower being regularly sent to
stripping tower in caustic soda recycle workshop for treatment
together with contaminated cool water. Tail gas from stripping
tower being sent to caustic soda furnace for incineration.
Operating 10
Jinfu
Company,
Safety and
environmental
Protection
Department
Environmental
Protection
Bureau of
Shawan, and
Environmental
Monitoring
Station of
Shawan
Thickness of
stench
Every 6
months
Tail gas from ClO2
production
-the tail gas goes through cooling tank of steam ejection pump
where the gas is absorbed by water and then emitted from 30m
chimney.
Operating /
Jinfu
Company,
Safety and
environmental
Protection
Department
Environmental
Protection
Bureau of
Shawan, and
Environmental
Monitoring
Station of
Shawan
MethanolEvery 6
months
Non-organized
exhausted gas
-exhausted gas collection facility being setup to collect most
stench gas produced in pulping and then emitted in well
Operating 20 Jinfu
Company,
Environmental
Protection
Thickness of
stench
Every 6
months
24
air pollutants
organized form after meeting criteria;
-stripping tower to treat heavy contaminated cool water from
caustic soda recycle workshop shall be furnished. Vaporized gas
being sent to caustic soda furnace for incineration;
-coal yard and ash residue stack yard shall be spray water to
avoid dust blowing. Ash residue shall be timely removed out
from the yards;
-health protection distance shall be setup that keep 100m away
from the center of stewing, black liquid concentration facility
and chemicals workshop;
-100m health protection distance shall be setup from the center
of aero-tank and sludge concentration and filter-pressing
workshop in waste water treatment station;
-green isolation space around the plant boundary shall be setup
where grass, bush and arbor trees shall be planted as a three-
dimension protection forest. Clear space within the plant shall
be planted with vegetation and trees as many as possible so as to
mitigate stench impact to surrounding environment;
-Regularly monitoring.
Safety and
environmental
Protection
Department
Bureau of
Shawan, and
Environmental
Monitoring
Station of
Shawan
Waste water pollutants -black liquid from stewing being sent to caustic soda recycle
facility and concentrated with vaporization, then sent for
incineration. No emission;
-process water from ClO2 is sent to ClO2 liquid and by-product
of saturated Glauber’s salt liquid. No discharge;
-mid-stage waste water, preparation waste water, contaminated
Operating Operating Jinfu
Company,
Safety and
environmental
Protection
Department
Jinfu
Company
pH, SS, CODCr,
ammonia
nitrogen, total
P, total N,
sulfide,
volatile
Every 3
months
25
cool water from black liquor evaporation concentration etc will
be sent to waste water station for disposal, where waste water is
treated with 3 steps of “ABR + contact oxidation + shallow
depth processing/steam float” and discharged into Daduhe River
after meeting the requirements in Table 2 of the “Standard of
Discharged Water Pollutants for Pulp and Paper Industry
(GB3544-2008)”;
-regularly monitoring.
phenol
Working with qualified and
capable monitoring unity to do
sampling and monitoring
Dioxin, AOX /
White sludge Sent to white sludge disposal site Operating
150
Jinfu
Company,
Safety and
environmental
Protection
Department
Environmental
Protection
Bureau of
Shawan, and
Environmental
Monitoring
Station of
Shawan
/Daily
monitoring
Sludge from
wastewater stationSent to white sludge disposal site for separate disposal Operating
Jinfu
Company,
Safety and
environmental
Protection
Department
Environmental
Protection
Bureau of
Shawan, and
Environmental
Monitoring
Station of
Shawan
/Daily
monitoring
Changing trend of dioxin etc in the sludge shall be analyzed
26
and monitored by qualified and capable unit.
Furnace ash residue Sold to cement plant Operating /
Jinfu
Company,
Safety and
environmental
Protection
Department
Environmental
Protection
Bureau of
Shawan, and
Environmental
Monitoring
Station of
Shawan
/Daily
monitoring
White sludge yard
-oozing liquid from white sludge yard being collected and
completely spray back. No discharge;
-collecting basin in white sludge yard being treated with
seepage prevention;
-observation well being setup for regular monitoring.
Operating
period and
after service
lifetime
40
Jinfu
Company,
Safety and
environmental
Protection
Department
Jinfu Company,
Safety and
environmental
Protection
Department
Environmental
Protection
Bureau of
Shawan, and
Environmental
Monitoring
Station of
Shawan
Every 6
months
Environmental risks
-allowance volume of the regulating reservoir in waste water
station will be used as accidental water collection pool;
-leaking prevention treatment shall be completely done at all
possible facilities such as water pool, pulp tower, waste water
station, water tank, pipeline etc. Special treatment shall be done
at bending points, socket connecting points and butt joints etc.
At the same time hiding engineering shall be noted down for
archive.
Operating
period30
Jinfu
Company,
Safety and
environmental
Protection
Department
Jinfu Company,
Safety and
environmental
Protection
Department
Environmental
Protection
Bureau of
Shawan, and
Environmental
Monitoring
Station of
Shawan
/
27
Social environment
-enhance enterprise non-organized emission control measurement
so as to secure standard being met within the plant;
-well communication channel shall be maintained with
surrounding residents and regularly solicit comments and respond
to them in timely manner;
-actively communicate with villagers’ committee of Shawan
Village, Fulu Township and maintain sound and faithful
cooperation relationship with the village on enterprise
development, environmental protection, employment, resource
utilization, village enterprise development etc.
Operating /Jinfu
Company
People’s
Government of
Fulu Township,
Villagers’
Committee of
Shawan
Village, Fulu
Township
/Daily
contact
Occupational health
environment
-the company sets up occupational health control and
management section. 3 professional staff being assigned as
responsible persons. Concurrent posts being assigned in each
workshop and team;
-comprehensive occupational health management regulation and
emergency response plan shall be developed. Occupational health
control and management details being setup in Operation
Specification/Manual. Personal protective equipment and user
manual being provided to every worker;
-entrust qualified occupational disease prevention and control
agency to carry out identification and evaluation of operating
places and occupational-disease-inductive factors and technical
measurement being setup to control over hazards;
-adopt relevant occupational health technology and prevention
measurement, and meet relevant requirements stipulated in
Operating 50 Occupational
health control
and
management
section of
Jinfu
Company
Health Bureau
of Shawan
Dust, noise,
high
temperature,
caustic soda,
sulfuric acid,
H2O2,
hydrogen
sulfide etc
Every 6
months
28
“Health Standard for Process Industry Design (GBE 1-2002)”;
-health examination shall be implemented for all 510 workers
annually. All 62 workers working at 15 points existing
occupational health hazards shall be specially examined for
occupational health (no suspected case infected occupational
disease was found since establishment of the plant);
-environment management status and capacity building plan
being developed;
-construction project will be finished by 2011 and pre-
evaluation of occupational disease hazards and effectiveness
evaluation of occupational disease hazards being implemented
soon afterwards;
-regularly carry out “occupational health management education
and training plan” to enhance awareness of occupational disease
prevention as well as correctly use personal protective
equipment and improve occupational health management ability
of management team;
Regularly monitoring.
3.3 Recommendation for environmental mitigation measurement-actively seeking integral use methods of white sludge so as to mitigate stack volume of newly produced white sludge and remove existing white sludge stack.
29
4. Environmental monitoring plan
4.1 Purpose of monitoringThe environmental monitoring includes two stages: monitoring during construction period
and monitoring during operation period with the purpose of full and timely understanding the pollution trends of proposed project, understanding the impact degree and scope of project on local environmental quality, reporting feedbacks to environmental protection authorities, thus to provide scientific basis for environmental management of project. 4.2 Monitoring implementation
Based on the environmental impact prediction results, sensitive points with potential serious pollution are selected as monitoring point. And based on the pollution situation during construction period and operation period, surface water quality, air quality and sound quality are selected as monitoring contents. The monitoring factors shall be determined based on the specific pollutants in project analysis. The monitoring method shall apply monitoring and analysis method for related project in “Technical specifications of environmental monitoring” issued by Ministry of Environmental Protection. Evaluation standard shall implement national standard in environmental evaluation. Monitoring authority shall be local environmental monitoring station. The responsible agency during construction period is the enterprise signed construction contract with Jinfu and the responsible agency during operation period is Jinfu. The supervision authority is Shawan District environmental protection bureau.
4.2.1 Environmental monitoring plan Refer to table 4 for monitoring plan during construction period and operation period.
4.2.2 Monitoring expense Refer to table 4 for monitoring expense during construction period and operation period.
Table 4 list of monitoring plan during construction period and operationMonitoring
period
Environmental
factorMonitoring point Monitoring item
Monitoring
frequency
Estimated
expense
construction
period(1
year)
Construction dustTwo points as east of
plant boundary
TSPOnce two
months3000
Construction waste
water
/ / / /
Construction noiseOne point at each side of
plant boundary
LeqdB(A) Once two
months2000
Subtotal 5000
Operation
periodWaste water
Outlet of waste water
station
CODCr, NH3-N,
SS, Volatile
phenol
Once three
months10000
30
AOX, dioxin Once a
year when
the
provincial
monitoring
station has
the ability;
must
30000
Surface water100 m downstream
from Outlet of waste
water station
ODCr, NH3-N,
Volatile phenolOnce six
months15000
Underground
water
Well of farmer Color degree,
total hardness,
sulphate,
ammonia
Once three
months15000
Monitoring well of
white sludge slag yard
Once three
months15000
Waste gasExhaust-funnel of boiler
and soda furnace
SO2、NOx、PM10 Once three
months40000
Air
One point at upstream
and three point at
downstream of plant
H2S、NH3
Once six
months10000
noiseOne point at each side
of plant boundary
LeqdB(A) Once three
months2000
Subtotal 137000
Total 142000
5. Staff training
5.1 Training to new full-time and part-time environmental protection staffs during construction period
Construction enterprise shall entrust qualified agency to provide training to new full-time and part-time environmental protection staffs during construction period. Staffs taking part in this training include technical responsible people and full-time management from construction and supervision enterprise. The training contents include national and Sichuan Provincial regulations, documents and relevant requirement concerning environmental protection and soil and water conservation in project management, environmental protection measure and requirements during construction period proposed by Jinfu during project design, and environmental protection guidance during construction period of project. The teachers may be invited from environmental protection bureau, or people responsible for environmental protection design and experts from environmental evaluation agency as well as supervision agency.
5.2 Training to new full-time and part-time environmental protection staffs during operation period
31
Environmental protection authority is responsible for organization and implementation of training to new full-time and part-time environmental protection staffs during operation period. The teachers can be environmental protection experts from universities, research institutes and supervision agency. Refer to table 5.2 for short period training class.
Table 5.2 list of trainees and expense during construction and operation period
Phase Trainee Number of trainee Content time
Expense (10
thousand
RMB)
Construction
period
Responsible people
from construction
enterprise,
environmental
protection and
special people from
Jinfu
4
Laws
regulations, ,
environmental
protection
measures and
requirements
during
construction
period, and
environmental
protection
guidance
3-7 days
before
construction
starts
1
Supervision engineer 2 0.75
Operation
period
Environmental
management staffs1
Laws regulations,
, environmental
protection
measures and
requirements,
environmental
protection
guidance during
operation period
7-14 day
before
operation
0.25
Environmental work
staffs
2 Laws regulations,
, environmental
protection
measures and
requirements,
regular
maintenance of
environmental
protection
facilities,
collection and
analysis of
monitoring data
0.5
32
Emergency response
staff2
Risk impact, risk
prevention
measures and
emergency
response plan
0.5
Total 3
6. Estimated expenses for environmental management plan
After estimation, the environmental management plan of this project shall be 232 thousand RMB.
Table 6-1 list of expense for environmental management plan (10 thousand RMB)Environmental monitoring
expenseProfessional health
management
expense
Safety
management
expense
Training
expense
Total EMP
implementatio
n expenseConstructio
n periodOperation period
0.5 13.7 4.5 1.5 3.0 23.2
33
7. Information Exchange
Environmental management requires not only to exchange necessary information between different departments and position in enterprise, but to report relevant information to outside (related parties and public).
Internal information exchange can be conducted as meetings and internal news, etc. But there must be one official meeting and all exchanged information must he recorded and saved.External information exchange can be conducted once half a year or a year. The information exchange with cooperation agency shall form summary and be saved.
34
8. Record
For the purpose of effective operation of environmental management system, enterprise must set up a complete record system and maintain the record of the following aspects:
1) Requirements of laws, regulations and relevant standards;2) License documents;3) Environmental factors and relevant environmental impact and environmental relief
measures;4) Training5) Project construction progress;6) Monitoring data;7) Information about related parties;8) Examination and approval;9) Review.In addition, above record must be controlled necessarily, including label, collection,
catalogue, saving, storage, management, maintenance, search, saving period and disposal of record.
35
9. Report
Construction enterprise, monitoring agency and Jinfu shall record and report to related authorities regarding project progress, implementation of EMP, and environmental quality monitoring results. Report includes the following three parts:
1) Monitoring agency and Construction enterprise make detailed record on the implementation of EMP and report timely to project office;
2) Jinfu project office prepare the EMP progress necessary for project progress report (month report, quarterly report and annual report), such as the implementation progress and effectiveness of EMP;
3) The EMP implementation report shall report to World Bank once half a year.
The EMP implementation report may include the following:1) Implementation of training plan;2) Project progress, such as technology upgrading construction;3) Carrying out of environmental protection measures, implementation of environmental
monitoring plan as well as monitoring data analysis and evaluation4) In case of public complaint, the content of complaint, solving method and public
satisfaction shall be recorded.5) EMP implementation plan for next year.
36