REKAPITULASI ANGGARAN BIAYA EMBUNG GODO NO I 1 2 3 4 5 II 1 2 3 4 5 6 7 III URAIAN PEKERJAAN PEKERJAAN PERSIAPAN Uitset Bouwplank Barak kerja Air kerja Papan nama proyek Mobilisasi dan demobilisasi PEKERJAAN EMBUNG Galian tanah biasa Timbunan tanah biasa Pasangan beton bertulang 1 : 2 : 3 Pasangan batu belah 1Pc : 4Pasir Timbunan sirtu Pintu penguras dan instalasinya Pasangan batu kosong PEMBEBASAN LAHAN Jumlah PPN (10%) TOTAL Pembulatan JUMLAH HARGA (Rp)

6,526,682.40 2,000,000.00 1,000,000.00 250,000.00 25,000,000.00

317,996,727.27 934,051,068.15 875,125,307.99 264,166,240.00 123,369,000.00 200,000,000.00 60,052,350.00 22,745,100,000.00 25,554,637,375.81 2,555,463,737.58 28,110,101,113.39 28,110,101,000.00

RENCANA ANGGARAN BIAYA DAM EMBUNG GODOPEKERJAAN : STUDI KELAYAKAN PEMBANGUNAN EMBUNG DI KABUPATEN PATI LOKASI : EMBUNG GUNUNGPANTI DESA GODO TAHUN ANGGARAN : 2008 NO. I 1 2 3 4 5 URAIAN PEKERJAAN PEKERJAAN PERSIAPAN Uitset Bouwplank Brak kerja Air kerja Papan nama proyek Mobilisasi dan demobilisasi VOLUME SATUAN ANALISIS HARGA SATUAN PEKERJAAN (Rp) JUMLAH HARGA (Rp) JUMLAH (Rp)

276.00 1.00 1.00 1.00 1.00

m' ls ls bh ls

Dihit

Dihit

23,647.40 2,000,000.00 1,000,000.00 250,000.00 25,000,000.00

6,526,682.40 2,000,000.00 1,000,000.00 250,000.00 25,000,000.00 Jumlah I =

34,776,682.40

II 1 2 3 4 5 6 7

PEKERJAAN EMBUNG Galian tanah biasa / striping Timbunan tanah biasa Pasangan beton bertulang 1 : 2 : 3 Pasangan batu belah 1Pc : 4Pasir Timbunan sirtu Pintu penguras dan instalasinya Pasangan batu kosong

6,779.00 9,951.33 273.46 520.00 1,230.00 2.00 361.00

m3 m3 m3 m3 m3 buah m3

A1+A7 A.18.b Sup.V.2 G.32.h A.18.a ls G.31

46,909.09 93,861.90 3,200,241.75 508,012.00 100,300.00 100,000,000.00 166,350.00

317,996,727.27 934,051,068.15 875,125,307.99 264,166,240.00 123,369,000.00 200,000,000.00 60,052,350.00 Jumlah II = 22,745,100,000.00 Jumlah III =

2,774,760,693.41

III

Pembebasan Lahan

909,804.00

m2

Dihit

25,000.00

22,745,100,000.00

Jumlah I + II PPN 10% Total Pembulatan

25,554,637,375.81 2,555,463,737.58 28,110,101,113.39 28,110,101,000.00

Terbilang

: " Dua Puluh Delapan Milyar Seratus Sepuluh Juta Seratus satu Ribu Rupiah "

ANALISA HARGA SATUAN PEKERJAAN ( BOW )PEKERJAAN LOKASI TAHUN ANGGARAN

: : :

STUDI KELAYAKAN EMBUNG KECAMATAN WINONG KABUPATEN PATI 2008 HARGA BAHAN & UPAH KERJA (Rp) 3 JUMLAH HAR.SAT.PEK. (Rp) 4

ANALISA 1 I Dihit.

URAIAN PEKERJAAN 2 PEKERJAAN TANAH & PERSIAPAN PENGUKURAN / PASANG BOUWPLANK PER m' : 3 0.004 m Kayu hutan 0.020 kg Paku 0.005 0.050 0.050 0.050 hr hr hr hr Mandor Kepala tukang kayu Tukang kayu Pekerja

JUMLAH (Rp) 5

4,452,000.00 14,470.00 35,000.00 45,000.00 35,000.00 27,500.00 Jumlah 35,000.00 27,500.00 Jumlah 35,000.00 27,500.00 Jumlah 35,000.00 27,500.00 Jumlah 35,000.00 27,500.00 Jumlah = =

17,808.00 289.40 18,097.40 175.00 2,250.00 1,750.00 1,375.00 = 875.00 20,625.00 = 35,000.00 907.50 = 1,750.00 41,250.00 = 350.00 9,075.00 = 25,409.09 46,909.09 9,425.00 43,000.00 35,907.50 21,500.00 5,550.00 23,647.40

A.1

GALIAN TANAH BIASA , PER M3 : 0.025 hr Mandor 0.750 hr Pekerja GALIAN TANAH KERAS , PER M 3 : 1.000 hr Mandor 0.033 hr Pekerja GALIAN TANAH LUMPUR , PER M 3 : 0.050 hr Mandor 1.500 hr Pekerja TANAH DIANGKUT SEJAUH LEBIH DARI 30 M', PER M 3 : 0.010 hr Mandor 0.330 hr Pekerja TANAH DIANGKUT LEBIH DARI 250 M', PER M 3 : K.a/275(L + 75) 18.080 / 275 (250+75) 1 M3 Tanah urugan diangkut lebih dari 250 M' (A1 + A7) = Rp. 21.500,00 + Rp. 25.409.09

A.2

A.4

A.6

A.7

A.18

URUGAN PASIR PER M 1.200 m3 0.300 hr 0.010 hr

3

Pasir urug Pekerja Mandor

61,400.00 27,500.00 35,000.00 Jumlah

73,680.00 8,250.00 350.00 = 79,200.00 350.00 8,250.00 12,500.00 = 48,000.00 350.00 12,178.57 33,333.33 =

82,280.00

A.18.a

URUGAN SIRTU PER M3 3 1.200 m 0.010 hr 0.300 hr 0.167 hr

Sirtu Mandor Pekerja Pemadatan dengan stamper

66,000.00 35,000.00 27,500.00 75,000.00 Jumlah

100,300.00

A.18.b

URUGAN TANAH INTI DIPADATKAN PER M 3 1.200 m3 Tanah pilihan 0.010 hr Mandor 0.443 hr Pekerja 0.167 hr Pemadatan dengan stamper

40,000.00 35,000.00 27,500.00 200,000.00 Jumlah

93,861.90

1 Dihit.

2 PANCANG DOLKEN KAYU JATI, PER BATANG : Dolken ky.jati f 15 cm, L = 3,00 m' 1.000 bt 0.004 hr Kep.Tukang 0.040 hr Tukang 1.800 hr Pekerja 0.045 hr Mandor 1.000 taksir Alat bantu pancang PEKERJAAN PASANGAN, PLESTERAN DAN BONGKARAN PASANGAN BATU BELAH DENGAN 1PC : 4 PS PER M 3 1.200 m3 Batu belah 4.075 zak PC 3 0.522 m Pasir Pasang 0.180 hr 0.120 hr 1.200 hr 3.600 hr Mandor Kepala Tukang batu Tukang batu Pekerja

3

4

5

35,000.00 45,000.00 35,000.00 27,500.00 35,000.00 250,000.00 Jumlah

35,000.00 180.00 1,400.00 49,500.00 1,575.00 250,000.00 =

337,655.00

G.32.h

75,000.00 40,000.00 196,000.00 35,000.00 45,000.00 35,000.00 27,500.00 Jumlah

90,000.00 163,000.00 102,312.00 355,312.00 6,300.00 5,400.00 42,000.00 99,000.00 = 195,000.00 125,000.00 79,576.00 399,576.00 7,875.00 6,750.00 52,500.00 123,750.00 190,875.00 Jumlah = 6,500.00 3,802.40 10,302.40 700.00 900.00 7,000.00 11,000.00 Jumlah = 5,200.00 1,666.00 6,300.00 540.00 4,200.00 9,900.00 Jumlah = 90,000.00 6,300.00 5,400.00 42,000.00 99,000.00 152,700.00 = 20,940.00 27,806.00 90,000.00 19,600.00 29,902.40 590,451.00 152,700.00 508,012.00

G.33.I

PASANGAN BATU MERAH 1Pc : 4Ps PER M 500.000 bj batu merah kwalitas I 3.125 zak 3 0.406 m 0.225 hr 0.150 hr 1.500 hr 4.500 hr PC Pasir Pasang Mandor Kepala Tukang batu Tukang batu Pekerja

3

390.00 40,000.00 196,000.00 35,000.00 45,000.00 35,000.00 27,500.00

G.50.i

PLESTERAN TEBAL 2 cm 1PC ; 3PS PER M 2 0.1625 zak 0.0194 m3 0.020 hr 0.020 hr 0.200 hr 0.400 hr PC Pasir pasang Mandor Kepala Tukang batu Tukang batu Pekerja 40,000.00 196,000.00 35,000.00 45,000.00 35,000.00 27,500.00

G.50.ib

SIAR PASANGAN / VOOG 1Pc : 2Ps PER M 2 0.1300 zak PC 0.0085 m3 Pasir pasang 0.1800 0.0120 0.1200 0.3600 Oh Oh Oh Oh Mandor Kepala Tukang batu Tukang batu Pekerja

40,000.00 196,000.00 35,000.00 45,000.00 35,000.00 27,500.00

6,866.00

G.31

PASANGAN BATU KOSONG PER M3 1.2000 m3 Batu belah 0.1800 0.1200 1.2000 3.6000 Oh Oh Oh Oh Mandor Kepala Tukang Batu Tukang Batu Pekerja Diambil 50 %

75,000.00 35,000.00 45,000.00 35,000.00 27,500.00 Jumlah

76,350.00 166,350.00

Dihit.

BONGKAR PASANGAN LAMA PER M 3 0.0750 Oh Mandor 0.1500 Oh Kepala Tukang batu 1.5000 Oh Tukang batu 4.0000 Oh Pekerja 1.0000 taksir Alat bantu PIPA BESI DIGALVANIS DIA. 2", PER M'. : 1.000 bh Pipa besi galvanis dia.2",pj =1.0 m' Ongkos pasang = 0.10 x G.32.h BRONJONG DARI KAWAT GALVANIC DIISI BATU BELAH PER M 3 : 45.0000 2.2000 1.8000 0.0800 3.0000 4.5000 0.0750 Kg Oh Oh Oh m3 Oh Oh Kawat dia.4 mm Tukang Penganyam Pekerja Penganyam Mandor Batu belah Pekerja Pengisi Mandor =1/3 x Rp. 867,666,00

35,000.00 45,000.00 35,000.00 27,500.00 25,000.00 Jumlah

2,625.00 6,750.00 52,500.00 110,000.00 25,000.00 = 30,000.00 30,540.00 =

196,875.00

Dihit.

30,000.00 Jumlah

60,540.00

G.5

20,000.00 45,000.00 27,500.00 35,000.00 75,000.00 27,500.00 35,000.00 Jumlah Jumlah

Jadi 1 m3 membuat bronjong

900,000.00 99,000.00 49,500.00 2,800.00 225,000.00 123,750.00 2,625.00 = =

1,402,675.00 467,558.33

1 Dihit.

2 PIPA PENGERING DIA. 2", PER bh. : 1.000 bh Pipa PVC dia.2",panjang = 0.5 m' Ongkos pasang = 0.10 x G.32.h PEKERJAAN BETON 3 PEKERJAAN BETON DENGAN 1PC:2PS:3KR PER M 8.400 zak 3 0.820 m 0.540 m3 0.300 Oh 0.100 Oh 1.000 Oh 6.000 Oh PC Batu pecah 1 - 2 cm Pasir beton Mandor Kepala tukang batu Tukang batu Pekerja3

3

4

5

28,875.00 Jumlah

28,875.00 15,270.00 =

44,145.00

G.41

40,000.00 156,000.00 196,000.00 35,000.00 45,000.00 35,000.00 27,500.00

336,000.00 127,920.00 105,840.00 569,760.00 10,500.00 4,500.00 35,000.00 165,000.00 A = 169,600.00 156,000.00 98,000.00 10,500.00 2,250.00 17,500.00 165,000.00 Jumlah = 195,250.00 618,850.00 215,000.00 784,760.00

G.44

PEK.LANTAI KERJA BETON DENGAN 1PC:3PS:5KR PER M 4.240 zak PC 1.000 m3 Batu pecah 1 - 2 cm 0.500 m3 Pasir beton 0.300 0.050 0.500 6.000 Oh Oh Oh Oh Mandor Kepala tukang batu Tukang batu Pekerja

40,000.00 156,000.00 196,000.00 35,000.00 45,000.00 35,000.00 27,500.00

423,600.00

1

2

3

4

5

SNI 03-3435- PEKERJAAN BETON SIKLOP 1PC : 2PS : 3KRC PER M 3 : 2002 8.400 zak PC 0.810 m3 Batu pecah 1 - 2 cm 0.540 m3 Pasir beton 1.000 0.035 0.350 2.000 Oh Oh Oh Oh Mandor Kepala tukang batu Tukang batu Pekerja

40,000.00 156,000.00 196,000.00 35,000.00 45,000.00 35,000.00 27,500.00 Jumlah

336,000.00 126,360.00 105,840.00 568,200.00 35,000.00 1,575.00 12,250.00 55,000.00 = 103,825.00 672,025.00

PEKERJAAN TULANGAN BESI /KG 1.050 kg Besi beton 0.015 kg Kawat bendrat 0.0007 hr 0.0070 hr 0.0070 hr 0.0003 hr Kepala tukang besi Tukang besi Pekerja Mandor

13,950.00 15,250.00 45,000.00 35,000.00 27,500.00 35,000.00 Jumlah

14,647.50 228.75 14,876.25 31.50 245.00 192.50 10.50 = 178,080.00 4,341.00 1,800.00 184,221.00 175.00 1,170.00 9,100.00 8,250.00 18,695.00 202,916.00 479.50 15,355.75

CETAKAN BETON /M2 3 0.040 m 0.300 kg 0.100 lt 0.005 hr 0.026 hr 0.260 hr 0.300 hr

Kayu sengon Paku Minyak Bekisting Mandor Kepala Tukang kayu Tukang kayu Pekerja

4,452,000.00 14,470.00 18,000.00 35,000.00 45,000.00 35,000.00 27,500.00

1

2 BETON BERTULANG 1PC : 2PS : 3KR DENGAN BESI 125 KG PER M Beton cor 1:2:3 1 m3 Besi tulangan 125 kg Cetakan beton 3 m23

3

4

5

672,025.00 15,355.75 202,916.00 Jumlah

672,025.00 ( A ) 1,919,468.75 ( B ) 608,748.00 ( C ) =

3,200,241.75

K.23

PEKERJAAN CAT-CATAN PENGECATAN TEMBOK LAMA (1lapis plamir, 2lapis cat penutup) PER M 2 : 0.100 Kg 0.100 Kg 0.180 Kg 0.003 Oh 0.004 Oh 0.042 Oh 0.028 Oh Plamir Cat dasar Cat penutup 2 kali Mandor Kepala tukang batu Tukang batu Pekerja 9,000.00 12,400.00 40,700.00 35,000.00 45,000.00 35,000.00 27,500.00 Jumlah = 12,402.00 1,566.00 1,200.00 600.00 900.00 1,240.00 7,326.00 9,466.00 87.50 189.00 1,470.00 770.00 2,516.50 11,982.50

K.23+9

MENGECAT BESI 3 KALI PER M : 0.2600 Kg Cat besi 0.1740 Lt Afduner 0.0750 Kg Cat meni besi 0.2000 lb Ampelas 0.0750 Oh 0.0075 Oh 0.0500 Oh 0.0025 Oh Tukang Cat Kepala Tukang Cat Pekerja Mandor

2

47,700.00 9,000.00 16,000.00 3,000.00 35,000.00 45,000.00 27,500.00 35,000.00 Jumlah

15,768.002,625.00 337.50 1,375.00 87.50 = 4,425.00 20,193.00

HARGA SATUAN BAHAN / MATERIAL

No

PEKERJA

SATUAN

HARGA SATUAN (Rp.)

KETERANGAN

1 2 3 4 5 6

Portland Semen Pasir urug / timbun Pasir pasang ( Lokal ) Pasir beton Pasir batu (Sirtu)

zak m3 m m m3 3 3 3

40,000.00 61,400.00 196,000.00 196,000.00 66,000.00 40,000.00 75,000.00 151,000.00 156,000.00 370.00 390.00 13,950.00 14,200.00 15,250.00 20,000.00 14,470.00 4,070,000.00 4,452,000.00 4,500,000.00 4,550,000.00 35,000.00 30,000.00 20,910.00 116,330.00 55,000.00 40,700.00 12,400.00 9,000.00 16,000.00 47,700.00 9,000.00 3,000.00 10,000,000.00 15,000,000.00 21,000,000.00 50,000.00 500,000.00 44,000.00 200,000.00 18,000.00

isi 50 kg

Tanah urug padas 8 Batu belah 15 - 20 cm9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 42

m m3 m3 m bj bj kg kg kg kg kg m3 m m3 3 3 3

Batu pecah 2 - 3 cm Batu pecah 3/5 Batu merah Klas II Batu merah Klas I Besi beton polos Besi / baja profil Kawat Bendrat Kawat digalvanis dia 4 mm Paku 1" s/d 4" Kayu perancah dengan meranti Kayu hutan Kayu Kruing eks Banjar merah Kayu Kruing eks Banjar merah > 4 m' Dolken kayu jati f 15 cm, L = 3,00 m' Pipa besi digalvanis f 2" Pipa PVC f 2" Pipa PVC f 6" Pipa buis beton f 0.40 m Cat Tembok untuk luar ruangan Cat Tembok untuk dasar Plameer Cat Meni Cat Besi Afduner Ampelas Pintu sorong besi 50 x 60 cm Pintu sorong besi 60 x 80 cm Pintu Sorong Kayu 120 x 200 cm Nomen Klatur 20 x 20 cm dari marmer Papan Eksploitasi

Paving block tebal 8 cm' K.200 Sewa Stamper 43 Minyak bekisting

m bt m' m' m' m' Kg Kg Kg Kg Kg Lt Lb unit unit unit bh unit m2 hari lt

TABEL 7A

RINGKASAN LUAS PANEN, PRODUKTIVITAS DAN INTENSITAS PANEN AREAL IRIGASI EMBUNG GODONo. Jenis Bentuk Hasil A. 1 2 3 Tanpa Proyek Padi (MT.1) Padi (MT.2) Palawija (MT.3) : - Kacang Hijau - Jagung - Kacang Tanah - Ubi Kayu - Kangkung Ose/Wos Kering Pipil Kering Ose/Wos Kering Umbi Basah 77.81 122.41 2.42 13.31 1.38 20.70 106.70 17.82 326.93 169.50 8.26 13.00 0.26 1.41 0.15 Intensitas Panen (rata-rata) MT.1 = MT.2 = MT.3 = TOTAL B 1 2 3 Dengan Proyek Padi (MT.1) Padi (MT.2) Palawija (MT.3) : - Kacang Hijau - Jagung - Kacang Tanah - Ubi Kayu - Ubi Jalar Ose/Wos Kering Pipil Kering Ose/Wos Kering Umbi Basah Umbi Basah 168.62 265.29 5.25 28.85 3.00 20.70 106.70 17.82 326.93 169.50 17.90 28.16 0.56 3.06 0.32 Intensitas Panen (rata-rata) MT.1 = MT.2 = MT.3 = TOTAL 1,601.40 170.00 75.00 45.00 50.00 170.00 % % % - GKP = Gabah Kering Panen/Pungut GKP GKP 706.50 423.90 57.00 57.00 75.00 45.00 - Luar areal irigasi baru = 942.00 ha 744.34 79.02 35.46 20.49 23.07 79.02 % % % - GKP = Gabah Kering Panen/Pungut GKP GKP 333.99 193.02 49.06 49.06 35.46 20.49 - Luar areal irigasi lama = 942.00 ha Luas Panen (Ha) (Kw/Ha) Produktifitas Intensitas Panen (%) Keterangan

HARGA SATUAN (Rp.) FINANSIAL & EKONOMI PRODUK (OUTPUT) DAN INPUT PERTANIANNo. JENIS SATUAN HARGA SATUAN (Rp) FINANSIAL EKONOMI KETERANGAN

A. 1 2 3 4 5 6 7 8 B. 1

HASIL PRODUKSI PERTANIAN Padi (IR 64) Kacang Hijau Kedelai Jagung Kacang Tanah Ubi Kayu Ubi Jalar Kacang Panjang INPUT PERTANIAN Bibit : l Padi l Kacang Hijau l Kedelai l Jagung l Kacang Tanah l Ubi Kayu l Ubi Jalar l Kacang Panjang

Kg Kg Kg Kg Kg Kg Kg Kg

2,800 6,500 5,000 1,500 6,000 450 650 1,200

996.70 3,965.00 3,355.00 1,215.00 4,615.00 364.50 526.50 972.00

Kg Kg Kg Kg kg Batang Batang Kg

2,500 7,000 5,000 2,000 5,000 80 90 22,000

1,125 4,270 3,350 1,540 4,050 65 73 17,820

2

PUPUK Urea l TSP l ZA l KCL l NPK l Pupuk Kandang / Komposl

Kg Kg Kg Kg Kg Kg

1,200 1,500 950 1,600 2,200 100

1,080 1,350 855 1,440 1,980 90

3

OBAT-OBATAN - PESTISIDA

l l l l l

- RODENTISIDA

l l l l

Decis Dursban Buldox Topsoil Matador Regent Furadan Mansate Atracol

80 mm Lt Lt Lt 80 ml Kg Kg Kg Kg

15,000 52,000 130,000 20,000 14,000 15,000 8,000 50,000 90,000

13,500 46,800 117,000 18,000 12,600 13,500 7,200 45,000 81,000

4

TENAGA KERJA - KELUARGA

l l

Laki-laki Perempuan Laki-laki Perempuan

HKP HKW HKP HKW Unit

15,000 10,000 15,000 10,000 250,000

10,500 7,000 10,500 7,000 175,000

- UPAHAN

l l

- TRAKTOR / BAJAK

Tabel 7C

ANGGARAN USAHA TANI (per ha) Tahun 2008(Tanpa Proyek) Padi Beririgasi (MT.1) NO. JENIS Satuan Vol. Hrg Satuan (Rp.) 2,500.00 1,200.00 1,500.00 1,600.00 950.00 100.00 15,000.00 52,000.00 15,000.00 8,000.00 15,000.00 10,000.00 250,000.00 2,000,000.00 Total (Rp.) 62,500.00 300,000.00 180,000.00 96,000.00 0.00 0.00 15,000.00 52,000.00 45,000.00 40,000.00 1,350,000.00 1,380,000.00 250,000.00 2,000,000.00 5,770,500.00 Vol. Padi Beririgasi (MT.2) Hrg Satuan (Rp.) 2,500.00 1,200.00 1,500.00 1,600.00 950.00 100.00 15,000.00 52,000.00 15,000.00 8,000.00 15,000.00 10,000.00 250,000.00 2,000,000.00 Total (Rp.) 62,500.00 300,000.00 150,000.00 80,000.00 95,000.00 0.00 45,000.00 104,000.00 60,000.00 16,000.00 1,350,000.00 1,380,000.00 250,000.00 2,000,000.00 5,892,500.00 Vol. Padi Beririgasi (MT.3) Hrg Satuan (Rp.) 2,500.00 1,200.00 1,500.00 1,600.00 950.00 100.00 15,000.00 52,000.00 15,000.00 8,000.00 15,000.00 10,000.00 0.00 2,000,000.00 Total (Rp.) 62,500.00 300,000.00 172,500.00 40,000.00 47,500.00 0.00 45,000.00 104,000.00 60,000.00 16,000.00 1,350,000.00 1,380,000.00 200,000.00 2,000,000.00 5,777,500.00

1 2

3 4 5

Benih/bibit Pupuk anorganik l Urea (pril) l TSP (SP. 36) l KCl l ZA Pupuk organik (pupuk kandang) Pestisida : l Decis l Dursban Rodentisida : l Regent l Furadan Tenaga kerjal l

kg kg kg kg kg kg 80 mm lt kg kg HKP HKW Unit -

25 250 120 60 0 0 3 2 3 5 90 138 1 LS

25 250 100 50 100 0 3 2 4 2 90 138 1 LS

25 250 115 25 50 3 2 4 2 90 138 1 LS

6 7 8

Pria Wanita

Traktor/bajak Biaya lain-lain /a TOTAL BIAYA ( Rp. / Ha )Keterangan

: /a : biaya lain-lain, terdiri dari : pajak lahan, sewa tanah dan iuran P3A per musim tanam

(Dengan Proyek) Padi Beririgasi (MT.1) NO. JENIS Satuan Vol. Hrg Satuan (Rp.) 2,500.00 1,200.00 1,500.00 1,600.00 950.00 100.00 15,000.00 52,000.00 15,000.00 8,000.00 15,000.00 10,000.00 250,000.00 2,000,000.00 Total (Rp.) 62,500.00 300,000.00 187,500.00 96,000.00 95,000.00 0.00 15,000.00 52,000.00 45,000.00 40,000.00 1,350,000.00 1,380,000.00 250,000.00 2,000,000.00 5,873,000.00 Vol. Padi Beririgasi (MT.2) Hrg Satuan (Rp.) 2,500.00 1,200.00 1,500.00 1,600.00 950.00 100.00 15,000.00 52,000.00 15,000.00 8,000.00 15,000.00 10,000.00 250,000.00 2,000,000.00 Total (Rp.) 62,500.00 300,000.00 187,500.00 120,000.00 95,000.00 0.00 30,000.00 104,000.00 15,000.00 120,000.00 1,350,000.00 1,380,000.00 250,000.00 2,000,000.00 6,014,000.00 Vol. Padi Beririgasi (MT.3) Hrg Satuan (Rp.) 2,500.00 1,200.00 1,500.00 1,600.00 950.00 100.00 15,000.00 52,000.00 15,000.00 8,000.00 15,000.00 10,000.00 250,000.00 2,000,000.00

Lembar : 4/6

Total (Rp.) 62,500.00 300,000.00 187,500.00 120,000.00 95,000.00 0.00 30,000.00 104,000.00 15,000.00 120,000.00 1,350,000.00 1,380,000.00 200,000.00 2,000,000.00 5,964,000.00

1 2

3 4 5

Benih/bibit Pupuk anorganik l Urea (pril) l TSP (SP. 36) l KCl l ZA Pupuk organik (pupuk kandang) Pestisida : l Decis l Dursban Rodentisida : l Regent l Furadan Tenaga kerjal l

kg kg kg kg kg kg 80 mm lt kg kg HKP HKW Unit -

25 250 125 60 100 0 3 2 3 5 90 138 1 LS

25 250 125 75 100 0 2 2 1 15 90 138 1 LS

25 250 125 75 100 2 2 1 15 90 138 1 LS

6 7 8

Pria Wanita

Traktor/bajak Biaya lain-lain /a TOTAL BIAYA ( Rp. / Ha )Keterangan

: /a : biaya lain-lain, terdiri dari : pajak lahan, sewa tanah dan iuran P3A per musim tanam

ANGGARAN USAHA TANI (per ha) Tahun 2008(Tanpa Proyek) Kacang Hijau NO. JENIS Satuan Vol. Hrg Satuan (Rp.) 7,000.00 1,200.00 1,500.00 1,600.00 950.00 100.00 130,000.00 52,000.00 14,000.00 20,000.00 8,000.00 15,000.00 10,000.00 250,000.00 750,000.00 Total (Rp.) 140,000.00 60,000.00 150,000.00 80,000.00 0.00 0.00 390,000.00 104,000.00 182,000.00 0.00 0.00 645,000.00 1,290,000.00 125,000.00 750,000.00 3,916,000.00 Vol. Jagung Hrg Satuan (Rp.) 2,000.00 1,200.00 1,500.00 1,600.00 950.00 100.00 130,000.00 52,000.00 14,000.00 20,000.00 8,000.00 15,000.00 10,000.00 250,000.00 750,000.00 Total (Rp.) 60,000.00 300,000.00 150,000.00 80,000.00 0.00 0.00 0.00 104,000.00 0.00 0.00 0.00 1,260,000.00 1,440,000.00 0.00 750,000.00 4,144,000.00 Vol. Kedelai Hrg Satuan (Rp.) 5,000.00 1,200.00 1,500.00 1,600.00 950.00 100.00 130,000.00 52,000.00 14,000.00 20,000.00 8,000.00 15,000.00 10,000.00 0.00 750,000.00 Total (Rp.) 150,000.00 60,000.00 150,000.00 80,000.00 0.00 0.00 390,000.00 156,000.00 0.00 30,000.00 0.00 1,290,000.00 1,540,000.00 0.00 750,000.00 4,596,000.00

1 2

3 4

5 6 7 8

Benih/bibit Pupuk anorganik l Urea (pril) l TSP (SP. 36) l KCl l ZA Pupuk organik (pupuk kandang) Pestisida : l Buldox l Dursban l Matador l Topsoil Rodentisida (Furadan) Tenaga kerja l Pria l Wanita Traktor/bajak Biaya lain-lain /a TOTAL BIAYA ( Rp. / Ha )Keterangan

kg kg kg kg kg kg lt lt 80 ml lt kg HKP HKW Unit -

20 50 100 50 0 0 3 2 13 0 0 43 129 0.5 LS

30 250 100 50 0 0 0 2 0 0 0 84 144 0 LS

30 50 100 50 0 0 3 3 0 1.5 0 86 154 0 LS

: /a : biaya lain-lain, terdiri dari : pajak lahan, sewa tanah dan iuran P3A per musim tanam

(Dengan Proyek) Kacang Hijau NO. JENIS Satuan Vol. Hrg Satuan (Rp.) 7,000.00 1,200.00 1,500.00 1,600.00 950.00 100.00 130,000.00 52,000.00 14,000.00 20,000.00 8,000.00 15,000.00 10,000.00 250,000.00 750,000.00 Total (Rp.) 140,000.00 120,000.00 187,500.00 96,000.00 0.00 0.00 390,000.00 104,000.00 182,000.00 0.00 0.00 645,000.00 1,290,000.00 125,000.00 750,000.00 4,029,500.00 Vol. Jagung Hrg Satuan (Rp.) 2,000.00 1,200.00 1,500.00 1,600.00 950.00 100.00 130,000.00 52,000.00 14,000.00 20,000.00 8,000.00 15,000.00 10,000.00 250,000.00 750,000.00 Total (Rp.) 60,000.00 300,000.00 150,000.00 160,000.00 0.00 0.00 0.00 104,000.00 0.00 0.00 0.00 1,260,000.00 1,440,000.00 0.00 750,000.00 4,224,000.00 Vol. Kedelai Hrg Satuan (Rp.) 5,000.00 1,200.00 1,500.00 1,600.00 950.00 100.00 130,000.00 52,000.00 14,000.00 20,000.00 8,000.00 15,000.00 10,000.00 250,000.00 750,000.00

Lembar : 5/6

Total (Rp.) 150,000.00 90,000.00 187,500.00 96,000.00 0.00 0.00 390,000.00 156,000.00 0.00 30,000.00 0.00 1,290,000.00 1,540,000.00 0.00 750,000.00 4,679,500.00

1 2

3 4

5 6 7 8

Benih/bibit Pupuk anorganik l Urea (pril) l TSP (SP. 36) l KCl l ZA Pupuk organik (pupuk kandang) Pestisida : l Buldox l Dursban l Matador l Topsoil Rodentisida (Furadan) Tenaga kerja l Pria l Wanita Traktor/bajak Biaya lain-lain /a TOTAL BIAYA ( Rp. / Ha )Keterangan

kg kg kg kg kg kg lt lt 80 ml lt kg HKP HKW Unit -

20 100 125 60 0 0 3 2 13 0 0 43 129 0.5 LS

30 250 100 100 0 0 0 2 0 0 0 84 144 0 LS

30 75 125 60 0 0 3 3 0 1.5 0 86 154 0 LS

: /a : biaya lain-lain, terdiri dari : pajak lahan, sewa tanah dan iuran P3A per musim tanam

ANGGARAN USAHA TANI (per ha) Tahun 2008(Tanpa Proyek) Kacang Tanah NO. JENIS Satuan Vol. Hrg Satuan (Rp.) 5,000.00 1,200.00 1,500.00 1,600.00 2,200.00 100.00 26,000.00 52,000.00 50,000.00 90,000.00 15,000.00 10,000.00 0.00 750,000.00 Total (Rp.) 400,000.00 60,000.00 112,500.00 80,000.00 0.00 0.00 260,000.00 156,000.00 0.00 0.00 570,000.00 840,000.00 0.00 750,000.00 3,228,500.00 Vol. Ubi Kayu Hrg Satuan (Rp.) 80.00 1,200.00 1,500.00 1,600.00 2,200.00 100.00 15,000.00 52,000.00 50,000.00 90,000.00 15,000.00 10,000.00 0.00 750,000.00 Total (Rp.) 1,440,000.00 240,000.00 150,000.00 80,000.00 0.00 0.00 0.00 0.00 0.00 0.00 3,060,000.00 720,000.00 0.00 750,000.00 6,440,000.00 Vol. Ubi Jalar Hrg Satuan (Rp.) 90.00 1,200.00 1,500.00 1,600.00 2,200.00 100.00 15,000.00 52,000.00 50,000.00 90,000.00 15,000.00 10,000.00 0.00 750,000.00 Total (Rp.) 1,620,000.00 240,000.00 150,000.00 80,000.00 0.00 0.00 0.00 0.00 0.00 0.00 3,060,000.00 720,000.00 0.00 750,000.00 6,620,000.00 Lembar : 3/6

1 2

3 4 5

Benih/bibit Pupuk anorganik l Urea (pril) l TSP (SP. 36) l KCl l ZA Pupuk organik (pupuk kandang) Pestisida /a l Biolan l Dursban l Furadan Rodentisidal

kg kg kg kg kg kg lt lt kg kg HKP HKW Unit -

80 50 75 50 0 0 10 3 0 0 38 84 0 LS

18000 bt 200 100 50 0 0 0 0 0 0 204 72 0 LS

18000 bt 200 100 50 0 0 0 0 0 0 204 72 0 LS

6 7 8

Tenaga kerja

l l

Atracol Pria Wanita

Traktor/bajak Biaya lain-lain /b TOTAL BIAYA ( Rp. / Ha )Keterangan

: /a : Pestisida : Biolan dan Dursban untuk Kacang tanah /b : biaya lain-lain, terdiri dari : pajak lahan, sewa tanah dan iuran P3A per musim tanam

(Dengan Proyek) Kacang Tanah NO. JENIS Satuan Vol. Hrg Satuan (Rp.) 5,000.00 1,200.00 1,500.00 1,600.00 950.00 100.00 26,000.00 52,000.00 8,000.00 81,000.00 15,000.00 10,000.00 250,000.00 750,000.00 Total (Rp.) 400,000.00 60,000.00 150,000.00 80,000.00 0.00 0.00 260,000.00 156,000.00 0.00 0.00 570,000.00 840,000.00 0.00 750,000.00 3,266,000.00 Vol. Ubi Kayu Hrg Satuan (Rp.) 80.00 1,200.00 1,500.00 1,600.00 950.00 100.00 26,000.00 52,000.00 8,000.00 81,000.00 15,000.00 10,000.00 250,000.00 750,000.00 Total (Rp.) 1,440,000.00 240,000.00 187,500.00 96,000.00 0.00 0.00 0.00 0.00 0.00 0.00 3,060,000.00 720,000.00 0.00 750,000.00 6,493,500.00 Vol. Ubi Jalar Hrg Satuan (Rp.) 90.00 1,200.00 1,500.00 1,600.00 950.00 100.00 26,000.00 52,000.00 8,000.00 81,000.00 15,000.00 10,000.00 250,000.00 750,000.00

Lembar : 6/6

Total (Rp.) 1,620,000.00 240,000.00 187,500.00 96,000.00 0.00 0.00 0.00 0.00 0.00 0.00 3,060,000.00 720,000.00 0.00 750,000.00 6,673,500.00

1 2

3 4 5

Benih/bibit Pupuk anorganik l Urea (pril) l TSP (SP. 36) l KCl l ZA Pupuk organik (pupuk kandang) Pestisida /a l Biolan l Dursban l Furadan Rodentisidal

kg kg kg kg kg kg lt lt kg kg HKP HKW Unit -

80 50 100 50 0 0 10 3 0 0 38 84 0 LS

18000 bt 200 125 60 0 0 0 0 0 0 204 72 0 LS

18000 200 125 60 0 0 0 0 0 0 204 72 0 LS

6 7 8

Tenaga kerja

l l

Atracol Pria Wanita

Traktor/bajak Biaya lain-lain /b TOTAL BIAYA ( Rp. / Ha )Keterangan

: /a : Pestisida Biolan dan Dursban untuk Kacang tanah /b : biaya lain-lain, terdiri dari : pajak lahan, sewa tanah dan iuran P3A per musim tanam

BIAYA EKONOMI PRODUKSI PERTANIAN (Rp./Ha)TANPA PROYEK (1) Padi beririgasi MT.1 Biaya Finansial (1) 62,500 576,000 0 152,000 2,730,000 250,000 2,000,000 5,770,500 CF (2) 0.90 1.00 0.90 0.90 0.70 0.70 0.80(Tanpa Proyek)

JENIS

Biaya Ekonomi (3) = (1) X (2) 56,250 576,000 0 136,800 1,911,000 175,000 1,600,000 4,455,050

a. b. c. d. e. f. g.

Benih/bibit Pupuk an-organik (Urea, TSP, KCl, ZA) Pupuk organik (pupuk kandang) Obat kimia (Pestisida + Rodentisida) Tenaga kerja Traktor/bajak Biaya lain-lain TOTAL

(2) Padi beririgasi MT.2 Biaya Finansial (1) 62,500 625,000 0 225,000 2,730,000 250,000 2,000,000 5,892,500 CF (2) 0.90 1.00 0.90 0.90 0.70 0.70 0.80

(Tanpa Proyek)

JENIS

Biaya Ekonomi (3) = (1) X (2) 56,250 625,000 0 202,500 1,911,000 175,000 1,600,000 4,569,750

a. b. c. d. e. f. g.

Benih/bibit Pupuk an-organik (Urea, TSP, KCl, ZA) Pupuk organik (pupuk kandang) Obat kimia (Pestisida + Rodentisida) Tenaga kerja Traktor/bajak Biaya lain-lain TOTAL

Keterangan : 1). Pengadaan lokal, harga pasar lokal termasuk 10 % pajak penjualan, faktor konversi = 1/1,10 = 0,90 2). Peralatan import, harga pasar lokal termasuk 40 % tarip import, faktor konversi = 1/1,40 = 0,70 3). Opportunity cost dari tenaga kerja/buruh diperkirakan = 0,70 4). Lain-lain termasuk 20 % penyusutan dan pajak hukum, faktor konversi = 1/1,20 = 0,80

(3) Padi beririgasi MT.3 Biaya Finansial (1) 62,500 560,000 0 225,000 2,730,000 200,000 2,000,000 5,777,500 CF (2) 0.90 1.00 0.90 0.90 0.70 0.70 0.80

(Tanpa Proyek)

JENIS

Biaya Ekonomi (3) = (1) X (2) 56,250 560,000.0 0 202,500 1,911,000 140,000 1,600,000 4,469,750.0

a. b. c. d. e. f. g.

Benih/bibit Pupuk an-organik (Urea, TSP, KCl, ZA) Pupuk organik (pupuk kandang) Obat kimia (Pestisida + Rodentisida) Tenaga kerja Traktor/bajak Biaya lain-lain TOTAL

(4) Kacang Hijau Biaya Finansial (1) 140,000 290,000 0 676,000 1,935,000 125,000 750,000 3,916,000 CF (2) 0.90 1.00 0.90 0.90 0.70 0.70 0.80

(Tanpa Proyek)

JENIS

Biaya Ekonomi (3) = (1) X (2) 126,000 290,000 0 608,400 1,354,500 87,500 600,000 3,066,400

a. b. c. d. e. f. g.

Benih/bibit Pupuk an-organik (Urea, TSP, KCl, ZA) Pupuk organik (pupuk kandang) Obat kimia (Pestisida + Rodentisida) Tenaga kerja Traktor/bajak Biaya lain-lain TOTAL

(5) Jagung Biaya Finansial (1) 60,000 530,000 0 104,000 2,700,000 0 750,000 4,144,000 CF (2) 0.90 1.00 0.90 0.90 0.70 0.70 0.80

(Tanpa Proyek)

JENIS

Biaya Ekonomi (3) = (1) X (2) 54,000 530,000 0 93,600 1,890,000 0 600,000 3,167,600

a. b. c. d. e. f. g.

Benih/bibit Pupuk an-organik (Urea, TSP, KCl, ZA) Pupuk organik (pupuk kandang) Obat kimia (Pestisida + Rodentisida) Tenaga kerja Traktor/bajak Biaya lain-lain TOTAL

(6) Kedelai Biaya Finansial (1) 150,000 290,000 0 576,000 2,830,000 0 750,000 4,596,000 CF (2) 0.90 1.00 0.90 0.90 0.70 0.70 0.80

(Tanpa Proyek)

JENIS

Biaya Ekonomi (3) = (1) X (2) 135,000 290,000 0 518,400 1,981,000 0 600,000 3,524,400

a. b. c. d. e. f. g.

Benih/bibit Pupuk an-organik (Urea, TSP, KCl, ZA) Pupuk organik (pupuk kandang) Obat kimia (Pestisida + Rodentisida) Tenaga kerja Traktor/bajak Biaya lain-lain TOTAL

(7) Kacang Tanah Biaya Finansial (1) 400,000 252,500 0 416,000 1,410,000 0 750,000 3,228,500 CF (2) 0.90 1.00 0.90 0.90 0.70 0.70 0.80

(Tanpa Proyek) Biaya Ekonomi (3) = (1) X (2) 360,000 252,500 0 374,400 987,000 0 600,000 2,573,900

JENIS

a. b. c. d. e. f. g.

Benih/bibit Pupuk an-organik (Urea, TSP, KCl, ZA) Pupuk organik (pupuk kandang) Obat kimia (Pestisida + Rodentisida) Tenaga kerja Traktor/bajak Biaya lain-lain TOTAL

(8) Ubi Kayu Biaya Finansial (1) 1,440,000 470,000 0 0 3,780,000 0 750,000 6,440,000 CF (2) 0.90 1.00 0.90 0.90 0.70 0.70 0.80

(Tanpa Proyek) Biaya Ekonomi (3) = (1) X (2) 1,296,000 470,000 0 0 2,646,000 0 600,000 5,012,000

JENIS

a. b. c. d. e. f. g.

Benih/bibit Pupuk an-organik (Urea, TSP, KCl, ZA) Pupuk organik (pupuk kandang) Obat kimia (Pestisida + Rodentisida) Tenaga kerja Traktor/bajak Biaya lain-lain TOTAL

(9) Ubi Jalar Biaya Finansial (1) 1,620,000 470,000 0 0 3,780,000 0 750,000 6,620,000 CF (2) 0.90 1.00 0.90 0.90 0.70 0.70 0.80

(Tanpa Proyek) Biaya Ekonomi (3) = (1) X (2) 1,458,000 470,000 0 0 2,646,000 0 600,000 5,174,000

JENIS

a. b. c. d. e. f. g.

Benih/bibit Pupuk an-organik (Urea, TSP, KCl, ZA) Pupuk organik (pupuk kandang) Obat kimia (Pestisida + Rodentisida) Tenaga kerja Traktor/bajak Biaya lain-lain TOTAL

BIAYA EKONOMI PRODUKSI PERTANIAN (Rp./Ha)RENCANA / DENGAN PROYEK (1) Padi beririgasi MT.1 Biaya Finansial (1) 62,500 678,500 0 152,000 2,730,000 250,000 2,000,000 5,873,000 CF (2) 0.90 1.00 0.90 0.90 0.70 0.70 0.80(Dengan Proyek)

JENIS

Biaya Ekonomi (3) = (1) X (2) 56,250 678,500 0 136,800 1,911,000 175,000 1,600,000 4,557,550

a. b. c. d. e. f. g.

Benih/bibit Pupuk an-organik (Urea, TSP, KCl, ZA) Pupuk organik (pupuk kandang) Obat kimia (Pestisida + Rodentisida) Tenaga kerja Traktor/bajak Biaya lain-lain TOTAL

(2) Padi beririgasi MT.2 Biaya Finansial (1) 62,500 702,500 0 269,000 2,730,000 250,000 2,000,000 6,014,000 CF (2) 0.90 1.00 0.90 0.90 0.70 0.70 0.80

(Dengan Proyek)

JENIS

Biaya Ekonomi (3) = (1) X (2) 56,250 702,500 0 242,100 1,911,000 175,000 1,600,000 4,686,850

a. b. c. d. e. f. g.

Benih/bibit Pupuk an-organik (Urea, TSP, KCl, ZA) Pupuk organik (pupuk kandang) Obat kimia (Pestisida + Rodentisida) Tenaga kerja Traktor/bajak Biaya lain-lain TOTAL

Keterangan : 1). Pengadaan lokal, harga pasar lokal termasuk 10 % pajak penjualan, faktor konversi = 1/1,10 = 0,90 2). Peralatan import, harga pasar lokal termasuk 40 % tarip import, faktor konversi = 1/1,40 = 0,70 3). Opportunity cost dari tenaga kerja/buruh diperkirakan = 0,70 4). Lain-lain termasuk 20 % penyusutan dan pajak hukum, faktor konversi = 1/1,20 = 0,80

(3) Padi beririgasi MT.3 Biaya Finansial (1) 62,500 702,500 0 269,000 2,730,000 200,000 2,000,000 5,964,000 CF (2) 0.90 1.00 0.90 0.90 0.70 0.70 0.80

(Dengan Proyek)

JENIS

Biaya Ekonomi (3) = (1) X (2) 56,250 702,500.0 0 242,100 1,911,000 140,000 1,600,000 4,651,850.0

a. b. c. d. e. f. g.

Benih/bibit Pupuk an-organik (Urea, TSP, KCl, ZA) Pupuk organik (pupuk kandang) Obat kimia (Pestisida + Rodentisida) Tenaga kerja Traktor/bajak Biaya lain-lain TOTAL

(4) Kacang Hijau Biaya Finansial (1) 140,000 403,500 0 676,000 1,935,000 125,000 750,000 4,029,500 CF (2) 0.90 1.00 0.90 0.90 0.70 0.70 0.80

(Dengan Proyek)

JENIS

Biaya Ekonomi (3) = (1) X (2) 126,000 403,500 0 608,400 1,354,500 87,500 600,000 3,179,900

a. b. c. d. e. f. g.

Benih/bibit Pupuk an-organik (Urea, TSP, KCl, ZA) Pupuk organik (pupuk kandang) Obat kimia (Pestisida + Rodentisida) Tenaga kerja Traktor/bajak Biaya lain-lain TOTAL

(5) Jagung Biaya Finansial (1) 60,000 610,000 0 104,000 2,700,000 0 750,000 4,224,000 CF (2) 0.90 1.00 0.90 0.90 0.70 0.70 0.80

(Dengan Proyek)

JENIS

Biaya Ekonomi (3) = (1) X (2) 54,000 610,000 0 93,600 1,890,000 0 600,000 3,247,600

a. b. c. d. e. f. g.

Benih/bibit Pupuk an-organik (Urea, TSP, KCl, ZA) Pupuk organik (pupuk kandang) Obat kimia (Pestisida + Rodentisida) Tenaga kerja Traktor/bajak Biaya lain-lain TOTAL

(6) Kedelai Biaya Finansial (1) 150,000 373,500 0 576,000 2,830,000 0 750,000 4,679,500 CF (2) 0.90 1.00 0.90 0.90 0.70 0.70 0.80

(Dengan Proyek)

JENIS

Biaya Ekonomi (3) = (1) X (2) 135,000 373,500 0 518,400 1,981,000 0 600,000 3,607,900

a. b. c. d. e. f. g.

Benih/bibit Pupuk an-organik (Urea, TSP, KCl, ZA) Pupuk organik (pupuk kandang) Obat kimia (Pestisida + Rodentisida) Tenaga kerja Traktor/bajak Biaya lain-lain TOTAL

(7) Kacang Tanah Biaya Finansial (1) 400,000 290,000 0 416,000 1,410,000 0 750,000 3,266,000 CF (2) 0.90 1.00 0.90 0.90 0.70 0.70 0.80

(Dengan Proyek)

JENIS

Biaya Ekonomi (3) = (1) X (2) 360,000 290,000 0 374,400 987,000 0 600,000 2,611,400

a. b. c. d. e. f. g.

Benih/bibit Pupuk an-organik (Urea, TSP, KCl, ZA) Pupuk organik (pupuk kandang) Obat kimia (Pestisida + Rodentisida) Tenaga kerja Traktor/bajak Biaya lain-lain TOTAL

(8) Ubi Kayu Biaya Finansial (1) 1,440,000 523,500 0 0 3,780,000 0 750,000 6,493,500 CF (2) 0.90 1.00 0.90 0.90 0.70 0.70 0.80

(Dengan Proyek)

JENIS

Biaya Ekonomi (3) = (1) X (2) 1,296,000 523,500 0 0 2,646,000 0 600,000 5,065,500

a. b. c. d. e. f. g.

Benih/bibit Pupuk an-organik (Urea, TSP, KCl, ZA) Pupuk organik (pupuk kandang) Obat kimia (Pestisida + Rodentisida) Tenaga kerja Traktor/bajak Biaya lain-lain TOTAL

(9) Ubi Jalar Biaya Finansial (1) 1,620,000 523,500 0 0 3,780,000 0 750,000 6,673,500 CF (2) 0.90 1.00 0.90 0.90 0.70 0.70 0.80

(Dengan Proyek)

JENIS

Biaya Ekonomi (3) = (1) X (2) 1,458,000 523,500 0 0 2,646,000 0 600,000 5,227,500

a. b. c. d. e. f. g.

Benih/bibit Pupuk an-organik (Urea, TSP, KCl, ZA) Pupuk organik (pupuk kandang) Obat kimia (Pestisida + Rodentisida) Tenaga kerja Traktor/bajak Biaya lain-lain TOTAL

MANFAAT EKONOMI PROYEK(PERTANIAN)No. Jenis Produktivitas (kw/ha) (3) Harga Satuan (Rp/Kw) (4) Manfaat Kotor (Rp/Ha) (5) (3)*(4) 13,736,800 13,736,800 13,455,000 16,005,000 10,689,000 14,711,625 11,017,500 Biaya Produksi (Rp/Ha) (6) Manfaat Bersih (Rp/Ha) (7) (5)-(6) 9,281,750 9,167,050 10,388,600 12,480,600 8,115,100 9,699,625 5,843,500 Luas Panen (Ha) (8) (8) 333.99 193.02 84.31 132.64 2.62 14.43 1.50 Total Manfaat (Rp) (9) (7)*(8) 3,099,990,448 1,769,395,953 875,840,800 1,655,481,591 21,285,191 139,926,929 8,758,277 7,570,679,189

(1) A. 1 2 3

(2) Tanpa Proyek Padi (MT.1) Padi (MT.2) Palawija (MT.3) : - Kacang Hijau - Jagung - Kacang Tanah - Ubi Kayu - Ubi Jalar

49.06 49.06 20.70 106.70 17.82 326.93 169.50

280,000 280,000 650,000 150,000 600,000 45,000 65,000

4,455,050 4,569,750 3,066,400 3,524,400 2,573,900 5,012,000 5,174,000

B. 1 2 3

Dengan Proyek Padi (MT.1) Padi (MT.2) Palawija (MT.3) : - Kacang Hijau - Jagung - Kacang Tanah - Ubi Kayu - Ubi Jalar

57.00 57.00 20.70 106.70 17.82 326.93 169.50

280,000 280,000 650,000 150,000 600,000 45,000 65,000

15,960,000 15,960,000 13,455,000 16,005,000 10,689,000 14,711,625 11,017,500

4,557,550 4,686,850 3,179,900 3,607,900 2,611,400 5,065,500 5,227,500

11,402,450 11,273,150 10,275,100 12,397,100 8,077,600 9,646,125 5,790,000

706.50 423.90 168.62 265.29 5.25 28.85 3.00

8,055,830,925 4,778,688,285 1,732,543,711 3,288,811,569 42,373,663 278,310,275 17,356,181 18,193,914,610

Tambahan Manfaat Bersih = Rp.

10,623,235,421

ANALISA BIAYA EKONOMI DAN BENEFITKeadaan 1 : Kondisi Normal (Juta Rp.)(Belum dengan biaya pembebasan tanah) Tahun ke (1) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 TOTAL EIRR 2,809.537 150.16% Investasi Saluran (2) 2,809.537 (3) 0.000 0.000 39.029 39.029 39.029 39.029 39.029 39.029 39.029 195.146 39.029 39.029 39.029 39.029 39.029 39.029 39.029 39.029 39.029 39.029 858.641 Biaya O&P Bangunan (4) 0.000 0.000 16.057 16.057 16.057 16.057 16.057 16.057 16.057 80.285 16.057 16.057 16.057 16.057 16.057 16.057 16.057 16.057 16.057 16.057 353.254 Jalan Inspeksi (5) 0.000 0.000 14.096 14.096 14.096 14.096 14.096 14.096 14.096 70.480 14.096 14.096 14.096 14.096 14.096 14.096 14.096 14.096 14.096 14.096 310.113 Manfaat Irigasi (6) 0.000 0.000 10,623.235 10,623.235 10,623.235 10,623.235 10,623.235 10,623.235 10,623.235 10,623.235 10,623.235 10,623.235 10,623.235 10,623.235 10,623.235 10,623.235 10,623.235 10,623.235 10,623.235 10,623.235 191,218.238 Faktor Pv (7) 0.400 0.160 0.064 0.026 0.010 0.004 0.002 0.001 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 Pv. Cost (8) = 7x[2+3+4+5] 1,123.095 0.000 4.419 1.767 0.706 0.282 0.113 0.045 0.018 0.036 0.003 0.001 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 1,130.486 Pv. Benefit (9) = (7) x (6) 0.000 0.000 678.581 271.259 108.434 43.346 17.327 6.926 2.769 1.107 0.442 0.177 0.071 0.028 0.011 0.005 0.002 0.001 0.000 0.000 1,130.486 (Juta Rp.) NPV

(10)=(9)-(8) -1,123.095 0.000 674.162 269.492 107.728 43.064 17.214 6.881 2.751 1.071 0.440 0.176 0.070 0.028 0.011 0.004 0.002 0.001 0.000 0.000 0.000

Asumsi : l Umur ekonomis untuk bendung dan jaringan irigasi 20 th l Full development untuk manfaat irigasi dimulai tahun ke-4 l Biaya O&P untuk bendung dan jaringan irigasi pada tahun ke-10 akan naik menjadi 500%

ANALISA BIAYA EKONOMI DAN BENEFITKeadaan 2 : Biaya Naik 20 %, Manfaat Normal (Juta Rp.)(Belum dengan biaya pembebasan tanah) Tahun ke (1) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 TOTAL EIRR 3,371.445 133.86% Investasi Saluran (2) 3,371.445 (3) 0.000 0.000 39.029 39.029 39.029 39.029 39.029 39.029 39.029 195.146 39.029 39.029 39.029 39.029 39.029 39.029 39.029 39.029 39.029 39.029 858.641 Biaya O&P Bangunan (4) 0.000 0.000 16.057 16.057 16.057 16.057 16.057 16.057 16.057 80.285 16.057 16.057 16.057 16.057 16.057 16.057 16.057 16.057 16.057 16.057 353.254 Jalan Inspeksi (5) 0.000 0.000 14.096 14.096 14.096 14.096 14.096 14.096 14.096 70.480 14.096 14.096 14.096 14.096 14.096 14.096 14.096 14.096 14.096 14.096 310.113 Manfaat Irigasi (6) 0.000 0.000 10,623.235 10,623.235 10,623.235 10,623.235 10,623.235 10,623.235 10,623.235 10,623.235 10,623.235 10,623.235 10,623.235 10,623.235 10,623.235 10,623.235 10,623.235 10,623.235 10,623.235 10,623.235 191,218.238 Faktor Pv (7) 0.428 0.183 0.078 0.033 0.014 0.006 0.003 0.001 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 Pv. Cost (8) = 7x[2+3+4+5] 1,441.676 0.000 5.409 2.313 0.989 0.423 0.181 0.077 0.033 0.071 0.006 0.003 0.001 0.000 0.000 0.000 0.000 0.000 0.000 0.000 1,451.183 Pv. Benefit (9) = (7) x (6) 0.000 0.000 830.638 355.192 151.885 64.948 27.773 11.876 5.078 2.172 0.929 0.397 0.170 0.073 0.031 0.013 0.006 0.002 0.001 0.000 1,451.183 (Juta Rp.) NPV

(10)=(9)-(8) -1,441.676 0.000 825.228 352.879 150.896 64.525 27.592 11.799 5.045 2.101 0.923 0.394 0.169 0.072 0.031 0.013 0.006 0.002 0.001 0.000 0.000

Asumsi : l Umur ekonomis untuk bendung dan jaringan irigasi 20 th l Full development untuk manfaat irigasi dimulai tahun ke-4 l Biaya O&P untuk bendung dan jaringan irigasi pada tahun ke-10 akan naik menjadi 500%

ANALISA BIAYA EKONOMI DAN BENEFITKeadaan 3 : Biaya Proyek Normal, Manfaat Turun 10 % (Juta Rp.)(Belum dengan biaya pembebasan tanah) Tahun ke (1) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 TOTAL EIRR 2,809.537 140.48% Investasi Saluran (2) 2,809.537 (3) 0.000 0.000 39.029 39.029 39.029 39.029 39.029 39.029 39.029 195.146 39.029 39.029 39.029 39.029 39.029 39.029 39.029 39.029 39.029 39.029 858.641 Biaya O&P Bangunan (4) 0.000 0.000 16.057 16.057 16.057 16.057 16.057 16.057 16.057 80.285 16.057 16.057 16.057 16.057 16.057 16.057 16.057 16.057 16.057 16.057 353.254 Jalan Inspeksi (5) 0.000 0.000 14.096 14.096 14.096 14.096 14.096 14.096 14.096 70.480 14.096 14.096 14.096 14.096 14.096 14.096 14.096 14.096 14.096 14.096 310.113 Manfaat Irigasi (6) 0.000 0.000 9,560.912 9,560.912 9,560.912 9,560.912 9,560.912 9,560.912 9,560.912 9,560.912 9,560.912 9,560.912 9,560.912 9,560.912 9,560.912 9,560.912 9,560.912 9,560.912 9,560.912 9,560.912 172,096.414 Faktor Pv (7) 0.416 0.173 0.072 0.030 0.012 0.005 0.002 0.001 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 Pv. Cost (8) = 7x[2+3+4+5] 1,168.303 0.000 4.975 2.069 0.860 0.358 0.149 0.062 0.026 0.053 0.004 0.002 0.001 0.000 0.000 0.000 0.000 0.000 0.000 0.000 1,176.861 Pv. Benefit (9) = (7) x (6) 0.000 0.000 687.482 285.879 118.878 49.434 20.556 8.548 3.555 1.478 0.615 0.256 0.106 0.044 0.018 0.008 0.003 0.001 0.001 0.000 1,176.861 (Juta Rp.) NPV

(10)=(9)-(8) -1,168.303 0.000 682.507 283.810 118.018 49.076 20.407 8.486 3.529 1.425 0.610 0.254 0.106 0.044 0.018 0.008 0.003 0.001 0.001 0.000 0.000

Asumsi : l Umur ekonomis untuk bendung dan jaringan irigasi 20 th l Full development untuk manfaat irigasi dimulai tahun ke-4 l Biaya O&P untuk bendung dan jaringan irigasi pada tahun ke-10 akan naik menjadi 500%

ANALISA BIAYA EKONOMI DAN BENEFITKeadaan 4 : Biaya Proyek Naik 20 %, Manfaat Turun 10 % (Juta Rp.)(Belum dengan biaya pembebasan tanah) Tahun ke (1) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 TOTAL EIRR 3,371.445 125.08% Investasi Saluran (2) 3,371.445 (3) 0.000 0.000 39.029 39.029 39.029 39.029 39.029 39.029 39.029 195.146 39.029 39.029 39.029 39.029 39.029 39.029 39.029 39.029 39.029 39.029 858.641 Biaya O&P Bangunan (4) 0.000 0.000 16.057 16.057 16.057 16.057 16.057 16.057 16.057 80.285 16.057 16.057 16.057 16.057 16.057 16.057 16.057 16.057 16.057 16.057 353.254 Jalan Inspeksi (5) 0.000 0.000 14.096 14.096 14.096 14.096 14.096 14.096 14.096 70.480 14.096 14.096 14.096 14.096 14.096 14.096 14.096 14.096 14.096 14.096 310.113 Manfaat Irigasi (6) 0.000 0.000 9,560.912 9,560.912 9,560.912 9,560.912 9,560.912 9,560.912 9,560.912 9,560.912 9,560.912 9,560.912 9,560.912 9,560.912 9,560.912 9,560.912 9,560.912 9,560.912 9,560.912 9,560.912 172,096.414 Faktor Pv (7) 0.444 0.197 0.088 0.039 0.017 0.008 0.003 0.002 0.001 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 Pv. Cost (8) = 7x[2+3+4+5] 1,497.912 0.000 6.067 2.696 1.198 0.532 0.236 0.105 0.047 0.104 0.009 0.004 0.002 0.001 0.000 0.000 0.000 0.000 0.000 0.000 1,508.913 Pv. Benefit (9) = (7) x (6) 0.000 0.000 838.513 372.546 165.520 73.539 32.673 14.516 6.450 2.866 1.273 0.566 0.251 0.112 0.050 0.022 0.010 0.004 0.002 0.001 1,508.913 (Juta Rp.) NPV

(10)=(9)-(8) -1,497.912 0.000 832.445 369.850 164.322 73.007 32.437 14.411 6.403 2.762 1.264 0.562 0.249 0.111 0.049 0.022 0.010 0.004 0.002 0.001 0.000

Asumsi : l Umur ekonomis untuk bendung dan jaringan irigasi 20 th l Full development untuk manfaat irigasi dimulai tahun ke-4 l Biaya O&P untuk bendung dan jaringan irigasi pada tahun ke-10 akan naik menjadi 500%

ANALISA BIAYA EKONOMI DAN BENEFITKeadaan 5 : Pelaksanaan Konstruksi Mundur 2 Tahun (Juta Rp.)(Belum dengan biaya pembebasan tanah) Tahun ke (1) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 TOTAL EIRR 2,809.537 150.16% Investasi Saluran (2) 0.000 0.000 2,809.537 (3) 0.000 0.000 0.000 0.000 39.029 39.029 39.029 39.029 39.029 39.029 39.029 195.146 39.029 39.029 39.029 39.029 39.029 39.029 39.029 39.029 39.029 39.029 858.641 Biaya O&P Bangunan (4) 0.000 0.000 0.000 0.000 16.057 16.057 16.057 16.057 16.057 16.057 16.057 80.285 16.057 16.057 16.057 16.057 16.057 16.057 16.057 16.057 16.057 16.057 353.254 Jalan Inspeksi (5) 0.000 0.000 0.000 0.000 14.096 14.096 14.096 14.096 14.096 14.096 14.096 70.480 14.096 14.096 14.096 14.096 14.096 14.096 14.096 14.096 14.096 14.096 310.113 Manfaat Irigasi (6) 0.000 0.000 0.000 0.000 10,623.235 10,623.235 10,623.235 10,623.235 10,623.235 10,623.235 10,623.235 10,623.235 10,623.235 10,623.235 10,623.235 10,623.235 10,623.235 10,623.235 10,623.235 10,623.235 10,623.235 10,623.235 191,218.238 Faktor Pv (7) 1.000 0.160 0.064 0.026 0.010 0.004 0.002 0.001 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 Pv. Cost (8) = 7x[2+3+4+5] 0.000 0.000 179.465 0.000 0.706 0.282 0.113 0.045 0.018 0.007 0.003 0.006 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 180.646 Pv. Benefit (9) = (7) x (6) 0.000 0.000 0.000 0.000 108.434 43.346 17.327 6.926 2.769 1.107 0.442 0.177 0.071 0.028 0.011 0.005 0.002 0.001 0.000 0.000 0.000 0.000 180.646 (Juta Rp.) NPV

(10)=(9)-(8) 0.000 0.000 -179.465 0.000 107.728 43.064 17.214 6.881 2.751 1.100 0.440 0.171 0.070 0.028 0.011 0.004 0.002 0.001 0.000 0.000 0.000 0.000 0.000

Asumsi : l Umur ekonomis untuk bendung dan jaringan irigasi 20 th l Full development untuk manfaat irigasi dimulai tahun ke-4 l Biaya O&P untuk bendung dan jaringan irigasi pada tahun ke-10 akan naik menjadi 500%

ANALISA BIAYA EKONOMI DAN BENEFITKeadaan 6 : Biaya Proyek Normal, Manfaat Naik 10 % (Juta Rp.)(Belum dengan biaya pembebasan tanah) Tahun ke (1) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 TOTAL EIRR 2,809.537 159.39% Investasi Saluran (2) 2,809.537 (3) 0.000 0.000 39.029 39.029 39.029 39.029 39.029 39.029 39.029 195.146 39.029 39.029 39.029 39.029 39.029 39.029 39.029 39.029 780.583 Biaya O&P Bangunan (4) 0.000 0.000 16.057 16.057 16.057 16.057 16.057 16.057 16.057 80.285 16.057 16.057 16.057 16.057 16.057 16.057 16.057 16.057 321.140 Jalan Inspeksi (5) 0.000 0.000 14.096 14.096 14.096 14.096 14.096 14.096 14.096 70.480 14.096 14.096 14.096 14.096 14.096 14.096 14.096 14.096 281.921 Manfaat Irigasi (6) 0.000 0.000 11,685.559 11,685.559 11,685.559 11,685.559 11,685.559 11,685.559 11,685.559 11,685.559 11,685.559 11,685.559 11,685.559 11,685.559 11,685.559 11,685.559 11,685.559 11,685.559 186,968.943 Faktor Pv (7) 0.386 0.149 0.057 0.022 0.009 0.003 0.001 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 Pv. Cost (8) = 7x[2+3+4+5] 1,083.120 0.000 3.964 1.528 0.589 0.227 0.088 0.034 0.013 0.025 0.002 0.001 0.000 0.000 0.000 0.000 0.000 0.000 1,089.591 Pv. Benefit (9) = (7) x (6) 0.000 0.000 669.537 258.117 99.508 38.362 14.789 5.701 2.198 0.847 0.327 0.126 0.049 0.019 0.007 0.003 0.001 0.000 1,089.591 (Juta Rp.) NPV

(10)=(9)-(8) -1,083.120 0.000 665.573 256.589 98.919 38.135 14.702 5.668 2.185 0.822 0.325 0.125 0.048 0.019 0.007 0.003 0.001 0.000 0.000

Asumsi : l Umur ekonomis untuk bendung dan jaringan irigasi 20 th l Full development untuk manfaat irigasi dimulai tahun ke-4 l Biaya O&P untuk bendung dan jaringan irigasi pada tahun ke-10 akan naik menjadi 500%

ANALISA EKONOMIFS EMBUNG GODO

EIRR Tanpa Pembebasan Tanah Keadaan 1 Keadaan 2 Keadaan 3 Keadaan 4 Keadaan 5 Keadaan 6 150.16% 133.86% 140.48% 125.08% 150.16% 159.39%

KETERANGAN : Keadaan 1 : Kondisi Normal Keadaan 2 : Biaya Proyek Naik 20 %, Manfaat Normal Keadaan 3 : Biaya Proyek Normal, Manfaat Turun 10 % Keadaan 4 : Biaya Proyek Naik 20 %, Manfaat Turun 10 % Keadaan 5 : Pelaksanaan Konstruksi Mundur 2 (Dua) Tahun Keadaan 6 : Biaya Proyek Normal, Manfaat Naik 10 %