apu anden y rampa

4
 AGTF07 OBRA: URBANISMO EXTERNO ROSABLANCA FECHA: 26-05-14 ITEM Y DESCRIPCIÓN N E CAPÍTULO UNIDAD  1 Ml MATERIALES UN CANTIDAD DESPERD. P. UNITARIO PARCIAL Subbase Granular SBG e=0.50 m M3 1.50  48,189  72,284 Concreto 3000 PSI Grava Comun (Anden) M3 0.08  301,613  24,022 Cintas en concreto e=0,10 M3 0.01  301,613  3,203 Bordillo de Confinamiento Prefabricado Tipo IDU A-80 UN 2.50  21,344  53,360 Sardinel Achaflanado A-10 UN 1.25  29,232  36,540 Loseta Tactil Guia 6 Franjas 40x40x6cms A-56 UN 2.50  5,220  13,050 Loseta Lisa Amarilla 40x40x6cms UN 0.27  6,032  1,601 Loseta Toperol 6 Taches 40x40x6cms A-55 UN 0.29  5,220  1,501 Loseta Bicapa 40x40x6 Tipo IDU A-50 UN 0.27  5,220  1,386 Malla Electrosoldada Estandar (Sidenal Villavicencio - 2014) Kg 3.33  2,296  7,640 SUB - TOTAL MATERIALES 214,587  HERRAMIENTA Y /O EQUIPO UN RENDIMIENTO VR. DIA PARCIAL  EQUIPO BASICO ( Herramienta menor ) glb 0.13 2,256 299.5 Vibro-Compactadora TIPO RANA UN 0.09 30,000 2,655 - - - - SUB - TOTAL HERRAMIENTA Y/O EQUIPO 2,954  MANO DE OBRA UN CANTIDAD P. UNITARIO PARCIAL  Instalacion de Sardinel Prefabricado Tipo A-10 Ml 1.000 27,104 27,104 Instalacion de Bordillo Prefabricado Tipo IDUA A-80 ML 2.000 25,104 50,208 Instalacion Loseta Tactil Guia 6 Franjas Ml 1.000  19,600  19,600 Instalacion Loseta Lisa y Toperol M2 0.111  28,000  3,097 Cesped M2 1.500  7,500  11,250 Cintas en concreto ML 0.106  12,500  1,327 Concreto Andenes M2 0.796  23,125  18,418 SUB - TOTAL MANO DE OBRA 131,005  COSTO DIRECTO 348,546 COSTO TOTAL 348,546 Vo.Bo. Director de obra Vo.Bo. Gerente de Construcciones Recibido - Coordinador Técnico Fecha Recibido  6.020-Adoquin en arcilla ANDEN (2.0 m) - VIA LOCAL 1  ANALISIS DE PRECIOS UNITARIOS Versión: 1

Upload: jessica-brown

Post on 15-Oct-2015

384 views

Category:

Documents


0 download

TRANSCRIPT

Hoja1 ANALISIS DE PRECIOS UNITARIOSVersin: 1AGTF07 ANALISIS DE PRECIOS UNITARIOSVersin: 1AGTF07 ANALISIS DE PRECIOS UNITARIOSVersin: 1AGTF07

OBRA: URBANISMO EXTERNO ROSABLANCAFECHA:08-04-14OBRA: URBANISMO EXTERNO ROSABLANCAFECHA:08-04-14OBRA: URBANISMO EXTERNO ROSABLANCAFECHA:01-04-14ITEM Y DESCRIPCINNECAPTULOUNIDADITEM Y DESCRIPCINNECAPTULOUNIDADITEM Y DESCRIPCINNECAPTULOUNIDAD6.020-Adoquin en arcilla ANDEN (2.0 m) - VIA LOCAL 1 1 Ml6.020-Adoquin en arcilla ANDEN (2.0 m) - VIA LOCAL 1 11,30 MlRAMPA VIA EJE 1UNIDADMATERIALESUNCANTIDADDESPERD.P. UNITARIOPARCIALMATERIALESUNCANTIDADDESPERD.P. UNITARIOPARCIALMATERIALESUNCANTIDADDESPERD.P. UNITARIOPARCIALSubbase Granular SBG e=0.50 mM31.5048,18972,28472,2841.50Subbase Granular SBG e=0.50 mM316.9548,189816,80416.95Rampa en Concreto (Incluye agujas, concreto dilataciones espina de pescado)M31.497301,613451,514Concreto 3000 PSI Grava Comun (Anden)M30.08301,61324,02224,0220.08Concreto 3000 PSI Grava Comun (Anden)M30.90301,613271,4510.9Concreto 3000 PSI Grava Comun (Anden)M30.476301,613143,568Cintas en concreto e=0,10M30.01301,6133,2033,2030.01Cintas en concreto e=0,10M30.120301,61336,1940.12Bordillo de Confinamiento Prefabricado Tipo IDU A-80UN14.5021,344309,488Bordillo de Confinamiento Prefabricado Tipo IDU A-80UN2.5021,34453,36053,3602.50Bordillo de Confinamiento Prefabricado Tipo IDU A-80UN28.2521,344602,96828.25Sardinel Bajo Rampa A-85UN13.7532,636448,745Sardinel Achaflanado A-10UN1.2529,23236,54036,5401.25Sardinel Achaflanado A-10UN14.1329,232412,90214.125Sardinel Achaflanado A-10UN11.7829,232344,207Loseta Tactil Guia 6 Franjas 40x40x6cms A-56 UN2.505,22013,05013,0502.50Loseta Tactil Guia 6 Franjas 40x40x6cms A-56 UN28.255,220147,46528.25Loseta Tactil Guia 6 Franjas 40x40x6cms A-56 UN15.005,22078,300Loseta Lisa Amarilla 40x40x6cmsUN0.276,0321,6011,6010.27Loseta Lisa Amarilla 40x40x6cmsUN3.006,03218,0963Acero 1/2Kg72.001,948140,256Loseta Toperol 6 Taches 40x40x6cms A-55UN0.295,2201,5011,5010.29Loseta Toperol 6 Taches 40x40x6cms A-55UN3.255,22016,9653.25Acero 3/8Kg33.711,99567,258Loseta Bicapa 40x40x6 Tipo IDU A-50UN0.275,2201,3861,3860.27Loseta Bicapa 40x40x6 Tipo IDU A-50UN3.005,22015,660Malla Electrosoldada Estandar (Sidenal Villavicencio - 2014)Kg22.562,29651,798Malla Electrosoldada Estandar (Sidenal Villavicencio - 2014)Kg3.332,2967,6407,6403.33Malla Electrosoldada Estandar (Sidenal Villavicencio - 2014)kg37.602,29686,330SUB - TOTAL MATERIALES2,035,134SUB - TOTAL MATERIALES214,587SUB - TOTAL MATERIALES2,424,834HERRAMIENTA Y /O EQUIPOUNRENDIMIENTOVR. DIAPARCIALHERRAMIENTA Y /O EQUIPOUNRENDIMIENTOVR. DIAPARCIALHERRAMIENTA Y /O EQUIPOUNRENDIMIENTOVR. DIAPARCIALEQUIPO BASICO ( Herramienta menor )glb1.502,2563,384EQUIPO BASICO ( Herramienta menor )glb0.132,256299.5EQUIPO BASICO ( Herramienta menor )glb1.502,2563,384Vibro-Compactadora TIPO RANAUN1.0030,00030,000Vibro-Compactadora TIPO RANAUN0.0930,0002,655Vibro-Compactadora TIPO RANAUN1.0030,00030,0000.00.00.00.00.00.00.00.00.00.00.00.00.0SUB - TOTAL HERRAMIENTA Y/O EQUIPO33,384SUB - TOTAL HERRAMIENTA Y/O EQUIPO2,954$ 33,383.97SUB - TOTAL HERRAMIENTA Y/O EQUIPO33,384MANO DE OBRAUNCANTIDADP. UNITARIOPARCIALMANO DE OBRAUNCANTIDADP. UNITARIOPARCIALMANO DE OBRAUNCANTIDADP. UNITARIOPARCIALInstalacion de Sardinel Prefabricado Tipo A-10Ml9.4227,104255,320Instalacion de Sardinel Prefabricado Tipo A-10Ml1.00027,10427,1041.00Instalacion de Sardinel Prefabricado Tipo A-10Ml11.3027,104306,275Instalacion de Bordillo Prefabricado Tipo IDUA A-80ML11.6025,104291,206Instalacion de Bordillo Prefabricado Tipo IDUA A-80ML2.00025,10450,2082.00Instalacion de Bordillo Prefabricado Tipo IDUA A-80ML22.6025,104567,350Instalacion Loseta Tactil Guia 6 Franjas Ml6.0019,600117,600Instalacion Loseta Tactil Guia 6 Franjas Ml1.00019,60019,6001.00Instalacion Loseta Tactil Guia 6 Franjas Ml11.3019,600221,480Instalacion Sardinel Bajo Rampa A-85ML11.0027,104298,144Instalacion Loseta Lisa y ToperolM20.11128,0003,0970.11Instalacion Loseta Lisa y ToperolM21.2528,00035,000Rampa en ConcretoM28.0745,000363,150Cesped M21.5007,50011,2501.50Cesped ( Suministro e Instalacion)M216.957,500127,125Concreto AndenesM24.7623,125110,075Cintas en concreto ML0.10612,5001,3270.11Cintas en concreto ML1.2012,50015,000SUB - TOTAL MANO DE OBRA1,435,495Concreto AndenesM20.79623,12518,4180.80Concreto AndenesM29.0023,125208,125COSTO DIRECTO3,504,013SUB - TOTAL MANO DE OBRA131,005$ 1,480,355.6SUB - TOTAL MANO DE OBRA1,480,356COSTO DIRECTO348,546 COSTO DIRECTO3,938,574 COSTO TOTAL3,504,013

COSTO TOTAL348,546 COSTO TOTAL3,938,574

Vo.Bo. Director de obraVo.Bo. Gerente de Construcciones

Vo.Bo. Director de obraVo.Bo. Gerente de ConstruccionesVo.Bo. Director de obraVo.Bo. Gerente de ConstruccionesRecibido - Coordinador TcnicoFecha Recibido

Recibido - Coordinador TcnicoFecha RecibidoRecibido - Coordinador TcnicoFecha Recibido