AREALUX is the ultimate Led flood lighting for illuminating large areas. AREALUX is a retrofit solution for mast height of 12 to 45 metres. This publication gives you insight in how to use the Arealux Light Manament System. Aplication: container terminals, parking lots, industrial plants, factories, airports, harbours, marshaliing yards. Its an energy efficient solution fully controllable by a light management system, that improves safety and productivity. By continous luminaire monitoring efficient and efffective manintenance planning of maintenace and execution reduces the Total Cost of Ownership of the facility lighting. Reducing stray light, maintenance and improving safety makes is a sustainable and cost effective retrofit solution.TRANSCRIPT
TVD
Tp T
Mw
Tentative informaVersion: 0.9 Date: 10 July 20
This documeparties who
The AAA‐LU
‐ Spec‐ Insta‐ User‐ Spec‐ Insta‐ User
More informwww.AAA‐L
ation
12
AAA‐LS
ent is part ouse and/or
X documen
cification AAallation guidr manual AAcification AAallation guidr manual AA
mation abouLUX.nl
INSLUX LigSwitchbox
of the AAA‐Lr work with
ntation cons
AA‐LUX LEDde AAA‐LUXAA‐LUX LED AA‐LUX Lighde AAA‐LUXAA‐LUX Ligh
ut the AAA‐
-
STALLght Conx for SP3 a
LUX documthe AAA‐LU
sists of:
luminaireX LED luminaluminaire
ht Control MX Light Cont Control M
LUX produc
- 1 -
LATIOntrol Mand SP4 AA
entation wUX Products
aire
Managementrol Manag
Managemen
cts and syst
ON GUManageAA‐LUX LE
hich is desigs and System
nt System gement Systt System
ems can be
UIDE ementED lumina
gned to infoms.
tem
found on t
t Systeaires
orm and sup
the website
m
pport all
.
Tentative information Version: 0.9 Date: 10 July 2012 - 2 -
Introduction The AAA‐LUX LED luminaire is a high quality product which is designed for the illumination of sport fields and other large surfaces. The luminaire is dimmable and wirelessly controlled via the Light Control Management System. The switchbox is part of this system. This guide contains information about how to install the AAA‐LUX switchbox in a safe and correct way. It is important to carefully read this guide and preserve it afterwards. In case of doubt contact the manufacturer or the installer. To safely install the AAA‐LUX switchbox make sure you also read and understand the “Installation guide AAA‐LUX LED luminaire”.
Table of contents The “Installation guide AAA‐LUX Switchbox” is a guideline for the installer and shows the important steps in the installation process. The guide is divided in the following chapters: 1.0 Safety 2.0 Product overview and parts 3.0 Before getting started ‐ Mechanical ‐ Electrical 4.0 Mounting and connecting 5.0 Final words
Tentative information Version: 0.9 Date: 10 July 2012 - 3 -
1.0 SAFETY
Safety instructions Always follow the safety instructions of this guide. Failing to follow the instructions can cause serious injury or death to persons and/or damage the installation.
400V Electrical voltage AAA‐LUX components can be under dangerously high voltage. This applies to both the parts in the power supply box as well as the light generating parts. When an electrical fault occurs be aware of the fact that a luminaire that doesn’t work can still be under high voltage. A luminaire can produce little or no light because of electrical dimming. This luminaire can also still be under high voltage. So always switch off the power before installation.
TVD
Tentative informaVersion: 0.9 Date: 10 July 20
Switchbox
ation
12
x and transfo
2.0
rmer
-
PRODUC
- 4 -
CT OVERV
VIEW ANDD PARTS
TVD
PT
Nt M
Tentative informaVersion: 0.9 Date: 10 July 20
Packaging The delivery
Image
Not includedhe type of p
Minimum toTools
‐ ‐ ‐ ‐
Mate‐ ‐ ‐ ‐ ‐
ation
12
y consists of
1
d in the delpole) the in
ooling and ms:
Drill ScrewdrWire cutCrimp pl
erials: MountinBolts andElectricaCord endSilicone
3
f 2 parts: Sw
ivery is a mstaller has t
materials
ivers tter iers for end
ng material d nuts al wire (suitad terminals sealant
-
3.0 BEFO
witchbox an
ounting systo bring the
d sleeves
able for out
- 5 -
ORE GETT
MECHANIC
nd transform
stem. Whene materials f
tside use fo
TING STAR
CAL
mer (image
Image 2
n a mountinfor that.
r connectin
RTED
1 and 2).
ng system is
ng 400V and
s needed (d
d 12V)
epending on
TVD
L
ETwos
Tentative informaVersion: 0.9 Date: 10 July 20
Location ‐ ‐
Example eleThe switchbway the powon/off. See tswitchbox a
ation
12
The switThe locaAAA‐LUX
ectrical conbox needs tower to the sthe electricnd transfor
Im
tchbox needtion of the X.
nection diao be connecswitchbox isal diagram rmer.
mage 3: Exam
-
ds to be in “switchbox i
agram cted within s switched o(See image
ple electrical
- 6 -
“line of sighis defined in
ELECTRICA
the same eon/off when 3) for more
connection d
t” with the n dialogue w
AL
electrical sysn the main e informatio
iagram
LED luminawith the spo
stem as all tpower to thon on how t
aires. orts club, in
the LED lumhe luminaireto electrica
nstaller and
minaires. In es is switchlly connect
this ed the
TVD
TuB
Tentative informaVersion: 0.9 Date: 10 July 20
The switchbup with a strBest positio
ation
12
box is preferrong and san for the sw
Im
4.0
rably mountafe mountinwitchbox is a
mage 4
-
MOUN
ted on oneng solution. at the inner
- 7 -
NTING AN
of the pole r side of the
D CONNE
es (See imag
e pole facing
CTING
ge 4). It is up
g towards t
p to the inst
the field.
taller to comme
TVD
MU‐ sc‐ mTo6
Tentative informaVersion: 0.9 Date: 10 July 20
Mounting syUsually therWith a hex
some bolts acase. With a circ
mounted onTry to makeon the moun6) but other
Imag
ation
12
ystem re are 2 typexagonal poleand nuts. A
cular pole a nto. use of the nting systemr solutions a
ge 5
es of poles:e the switchdditional m
mounting s
existing hom. As an exaare also pos
-
hexagonalhbox can eamounting co
system is ne
les in the baample 2 mossible.
- 8 -
l and circulaasily be moumponents b
eeded to cre
ack of the sounting fram
Image
ar. unted on onbesides bolt
eate a flat s
switchbox (smes are use
e 6
ne of the flats and nuts
surface whe
see image 5ed as a mou
at sides of tare not nee
ere the swit
5) to mountunting syste
he pole witeded in this
tchbox can b
the switchm (see ima
h s
be
box ge
TVD
MDhb P
Tentative informaVersion: 0.9 Date: 10 July 20
Make wiringDrill a hole iholes as closbetween the
Precautiona‐
‐
Image 7
ation
12
g holes n the back se as possibe box and th
ry measureAlways mpole. In tTry to munforesetransform
of the switcble to each ohe pole (see
ements: make sure tthis way raiount the treen reason mer.
-
chbox and iother to mae image 8).
hat the holenwater is gansformer arainwater g
- 9 -
n the pole fake sure tha
e in the bacguided awayat higher legets into the
for the wirinat as little a
ck of the boy from the sevel than thee hole it wil
I
ng (see imas possible w
ox is a bit higswitchbox. e hole in thl never hav
mage 8
ge 7). Try towire will be
gher than t
e pole. If fove the chang
o keep the 2visible
he hole in t
or some ge to reach
2
he
the
TVD
M
‐ ‐ t
Tentative informaVersion: 0.9 Date: 10 July 20
Mount and
Mount the
Put the wirhe switchbo
ation
12
connect the
Image 9
e back of the
re through tox with silic
e switchbox
e switchbox
the hole in con sealant
-
x
x to the pole
the pole an(see image
10 -
e (see imag
nd the back 10).
Ima
ge 9).
of the switc
age 10
chbox and sseal the hol
e in the bacck of
TVD
‐ t ‐
‐ r
Tentative informaVersion: 0.9 Date: 10 July 20
Im
Guide the whe plus and
Use the 4 b
Connect thubber seali
ation
12
mage 11
wire alongsd minus (see
bolts and rin
Image 13
he switch‐plng of the fr
side the insie image 11)
ngs to tight
lug of the frront is in pla
-
de as can b.
en the insid
ront to the iace (see ima
11 -
been seen in
de to the ba
inside. Wheage 13).
n image 11.
ack of the sw
en closing th
Image 12
Connect th
witchbox (se
he switchbo
he 2 phases
ee image 1
ox check wh
according t
2).
hether the
to
TVD
‐ g
Tentative informaVersion: 0.9 Date: 10 July 20
Close the sget in.
ation
12
switchbox a
nd tighten t
-
Image
the plastic b
12 -
14
bolts very w
well (see image 14). Maake sure thaat no waterr can
TVD
M
‐ wDttp
‐
Tentative informaVersion: 0.9 Date: 10 July 20
Mount and
Mount thewires of the Depending oo the powehe LED lumpower is sw
Seal the wi
ation
12
connect the
Image 15: Us
e transforme switchbox on whetherer lines. In thinares are titched off b
iring hole in
e transform
ing 400V
er in the poto the transr 400V (see his way it isturned on wbefore you c
n the pole w
-
mer
ole (preferabsformer (seimage 15) os guaranteewith the maconnect the
with a silicon
13 -
bly at a highee image 15or 230V (seed that the sin switch ine transform
ne sealant o
Image 16: U
her level tha5 or 16). e image 16)switchbox sn the canteeer.
or a rubber
Using 230V
an the wirin
) is used youwitches on en or dressi
ring.
ng hole) and
u connect tat the samng room. M
d connect th
he transfore moment a
Make sure th
he
rmer as he
Tentative information Version: 0.9 Date: 10 July 2012 - 14 -
5.0 FINAL WORDS
‐ Once you are done with mounting and connecting you should test the system. All settings
should work properly. ‐ Detailed description of the use of the switchbox can be found in the “User manual Light