FUNDAMENTALS OF TORQUE DOWN PILES October 24, 2017 Presentation to ASCE Orange County Geo‐Institute

Upload: american-society-of-civil-engineers-orange-county-branch

Post on 22-Jan-2018

71 views

Category:

Engineering


7 download

TRANSCRIPT

Page 1: ASCE OC Branch - Geo-Institute Dinner Presentation: Fundamentals of Torque Down Piles

FUNDAMENTALS OF TORQUE DOWN PILESOctober 24, 2017 Presentation to ASCE Orange County Geo‐Institute

Page 2: ASCE OC Branch - Geo-Institute Dinner Presentation: Fundamentals of Torque Down Piles

• WHAT IS A TORQUE DOWN PILE?• General Description• History• Installation Procedures• Typical Capacities

• HOW DO TDPs WORK?• ADVANTAGES OF THE TDP• CASE HISTORIES

TORQUE DOWN PILES

Page 3: ASCE OC Branch - Geo-Institute Dinner Presentation: Fundamentals of Torque Down Piles

• 12.75‐INCH‐DIAMETER STEEL PIPE (TYPICAL)

• CAN GO TO LARGER DIAMETER (NORTHRIDGE HOSPITAL)

• 3/8‐INCH WALL THICKNESS (TYPICAL)• CONCRETE‐FILLED STEEL PIPE PILE (CFSP) – CALTRANS DESIGNATION

WHAT IS A TORQUE DOWN PILE?

Page 4: ASCE OC Branch - Geo-Institute Dinner Presentation: Fundamentals of Torque Down Piles

• 12.75‐INCH‐DIAMETER STEEL PIPE (TYPICAL)

• 3/8‐INCH WALL THICKNESS• PATENTED TIP DESIGN

WHAT IS A TORQUE DOWN PILE?

Page 5: ASCE OC Branch - Geo-Institute Dinner Presentation: Fundamentals of Torque Down Piles

• 12.75‐INCH‐DIAMETER STEEL PIPE (TYPICAL)

• 3/8‐INCH WALL THICKNESS• PATENTED TIP DESIGN• INSTALLED USING TORQUE AND CROWD

WHAT IS A TORQUE DOWN PILE?

Page 6: ASCE OC Branch - Geo-Institute Dinner Presentation: Fundamentals of Torque Down Piles

• DEVELOPED FOR A PROJECT IN SOUTHERN CALIFORNIA

• PROJECT REQUIREMENTS:• ALTERNATIVE TO DRIVEN PILES• LOW NOISE AND VIBRATION• NO SPOILS• EQUIVALENT CAPACITY• EQUIVALENT PRODUCTION RATES• COST

DEVELOPMENT OF THE TDP

Page 7: ASCE OC Branch - Geo-Institute Dinner Presentation: Fundamentals of Torque Down Piles

HOW THE TDP IS INSTALLED

Page 8: ASCE OC Branch - Geo-Institute Dinner Presentation: Fundamentals of Torque Down Piles

• PILE HOOKUP

INSTALLATION PROCEDURES

Page 9: ASCE OC Branch - Geo-Institute Dinner Presentation: Fundamentals of Torque Down Piles

• PILE HOOKUP• LOFT PILE

INSTALLATION PROCEDURES

Page 10: ASCE OC Branch - Geo-Institute Dinner Presentation: Fundamentals of Torque Down Piles

• PILE HOOKUP• LOFT PILE• POSITION AND PLUMB PILE

INSTALLATION PROCEDURES

Page 11: ASCE OC Branch - Geo-Institute Dinner Presentation: Fundamentals of Torque Down Piles

• PILE HOOKUP• LOFT PILE• POSITION AND PLUMB PILE• INSTALL

INSTALLATION PROCEDURES

Page 12: ASCE OC Branch - Geo-Institute Dinner Presentation: Fundamentals of Torque Down Piles

• PILE HOOKUP• LOFT PILE• POSITION AND PLUMB PILE• INSTALL• WELDED SPLICE

INSTALLATION PROCEDURES

Page 13: ASCE OC Branch - Geo-Institute Dinner Presentation: Fundamentals of Torque Down Piles

• PILE HOOKUP• LOFT PILE• POSITION AND PLUMB PILE• INSTALL• WELDED SPLICE• INSTALL REBAR

INSTALLATION PROCEDURES

Page 14: ASCE OC Branch - Geo-Institute Dinner Presentation: Fundamentals of Torque Down Piles

• PILE HOOKUP• LOFT PILE• POSITION AND PLUMB PILE• INSTALL• WELDED SPLICE• INSTALL REBAR• FILL WITH CONCRETE

INSTALLATION PROCEDURES

Page 15: ASCE OC Branch - Geo-Institute Dinner Presentation: Fundamentals of Torque Down Piles

• DESIGN CAPACITY TYPICALLY CONFIRMED THROUGH STATIC LOAD TESTING

• TYPICAL ULTIMATE CAPACITIES:• DENSE SANDS: 400 – 800 KIPS• STIFF CLAYS: 200 – 400 KIPS• WEAK ROCK: TESTED TO 1000 KIPS

• CALCULATED LATERAL CAPACITY SIMILAR TO 14‐INCH‐SQUARE CONCRETE PILE

CAPACITY OF THE TDP

Page 16: ASCE OC Branch - Geo-Institute Dinner Presentation: Fundamentals of Torque Down Piles

• FULL DISPLACMENT PILE• PILE IS SCREWED/TORQUED INTO PLACE

• GENERATES HIGH LATERAL STRESSES IN SURROUNDING SOIL

• IN GRANULAR SOIL, DENSIFIES SURROUNDING SOIL

• HIGH LATERAL STRESSES FROM DISPLACEMENT INCREASES ADHESION/SKIN FRICTION

HOW DOES THE TDP WORK?

Page 17: ASCE OC Branch - Geo-Institute Dinner Presentation: Fundamentals of Torque Down Piles

• ABLE TO PENETRATE INTO DENSE GRANULAR SOIL LAYERS, WHICH INCREASES CAPACITY

• CAPACITY THROUGH SIDE FRICTION AND END BEARING

HOW DOES THE TDP WORK?

Page 18: ASCE OC Branch - Geo-Institute Dinner Presentation: Fundamentals of Torque Down Piles

• LOW VIBRATION• LOW NOISE• FLEXIBILITY• OBSTRUCTIONS ARE MANAGEABLE – CAN UNSCREW PILE IF NEEDED

• LITTLE TO NO SPOILS• SAFETY• LARGE AMOUNT OF LOAD TEST DATA (100+ PROJECTS) AVAILABLE FOR DIFFERENT SOIL CONDITIONS

ADVANTAGES OF THE TDP

Page 19: ASCE OC Branch - Geo-Institute Dinner Presentation: Fundamentals of Torque Down Piles

LOW NOISE AND VIBRATION

Page 20: ASCE OC Branch - Geo-Institute Dinner Presentation: Fundamentals of Torque Down Piles

CAN CONFIRM SUBSURFACE DATA

Page 21: ASCE OC Branch - Geo-Institute Dinner Presentation: Fundamentals of Torque Down Piles

FLEXIBILITY OF INSTALLATION

Page 22: ASCE OC Branch - Geo-Institute Dinner Presentation: Fundamentals of Torque Down Piles

OBSTRUCTIONS ARE MANAGEABLE

Page 23: ASCE OC Branch - Geo-Institute Dinner Presentation: Fundamentals of Torque Down Piles

LITTLE TO NO SPOILS

Page 24: ASCE OC Branch - Geo-Institute Dinner Presentation: Fundamentals of Torque Down Piles

PREDRILLING

Page 25: ASCE OC Branch - Geo-Institute Dinner Presentation: Fundamentals of Torque Down Piles

CASE HISTORIES

• Los Angeles International Airport, Modernization of Terminals 1 and 6

• Northridge Hospital Medical CenterService Elevator Tower

• Building 45 at Boeing Facility in Huntington Beach

Page 26: ASCE OC Branch - Geo-Institute Dinner Presentation: Fundamentals of Torque Down Piles

• DESIGN‐BUILD OF NEW AIRPORT TENANT IMPROVEMENTS, INCLUDING PASSENGER BRIDGES

• MINIMAL IMPACT ON AIRPORT OPERATIONS

• ALTERNATIVE TO LARGE‐DIAMETER DRILLED SHAFTS

• DENSE TO VERY DENSE NATIVE SAND AT GROUND SURFACE

LAX TERMINAL 6

Page 27: ASCE OC Branch - Geo-Institute Dinner Presentation: Fundamentals of Torque Down Piles

LAX TERMINAL 6

Page 28: ASCE OC Branch - Geo-Institute Dinner Presentation: Fundamentals of Torque Down Piles

• CHALLENGE TO INSTALL PILES IN DENSE TO VERY DENSE SANDS TO ACHIEVE REQUIRED COMPRESSION AND TENSION CAPACITIES

• TEST PILE WAS INSTALLED IN CORED HOLES THROUGH EXISTING CONCRETE APRON

• REACTION PILES FOR LOAD TEST USED AS “INDICATOR PILES”

• R‐1 ATTEMPTED WITHOUT PREDRILLING – MET REFUSAL AT 16 FEET.  

• R‐2 LOCATION PREDRILLED TO 25 FEET – HOLE CAVED TO 10 FEET

LAX TERMINAL 6

Page 29: ASCE OC Branch - Geo-Institute Dinner Presentation: Fundamentals of Torque Down Piles

• R‐2 MET REFUSAL AT 19 FEET – VERY HIGH TORQUE BELOW A DEPTH OF 15 FEET

• PREDRILL DEPTH FOR R‐3 REDUCED TO 15 FEET –PILE INSTALLED TO DEPTH OF 17.7 FT

• TP‐1 PREDRILLED TO 15 FEET.  HOLE CAVED TO 10 FEET.  AFTER INITIAL REFUSAL AT 16 FEET, PILE INSTALLED TO DEPTH OF 17.9 FEET

• SOIL REMOVED TO DEPTH OF 5.4 FEET AROUND PILE, RESULTING IN TEST PILE LENGTH OF 12.5 FEET

LAX TERMINAL 6

Page 30: ASCE OC Branch - Geo-Institute Dinner Presentation: Fundamentals of Torque Down Piles

LAX TERMINAL 6

Page 31: ASCE OC Branch - Geo-Institute Dinner Presentation: Fundamentals of Torque Down Piles

LAX TERMINAL 6

Page 32: ASCE OC Branch - Geo-Institute Dinner Presentation: Fundamentals of Torque Down Piles

LAX TERMINAL 6

Page 33: ASCE OC Branch - Geo-Institute Dinner Presentation: Fundamentals of Torque Down Piles

LAX TERMINAL 6

• ULTIMATE COMPRESSION CAPAPACTY – 365 KIPS• ULTIMATE TENSION CAPACITY – 180 KIPS• USED COYLE & CASTELLO (1982) TO COMPUTE CAPACITIES• COMPUTED ULTIMATE END‐BEARING OF 225 KSF• COMPUTED ULTIMATE SKIN FRICTION OF 3.82 KSF USING 

BACK‐CALCULATED K VALUE OF 5.0 AND FRICTION ANGLE BETWEEN PILE AND SAND OF 29 DEGREES

• RECOMMENDED LATERAL CAPACITIES OF 21 KIPS FOR FREE‐HEAD CONDITION AND 45 KIPS FOR FIXED‐HEAD @ 0.25 INCHES OF PILE‐HEAD DEFLECTION

• RECEIVED APPROVAL FROM CITY OF LOS ANGELES DEPARTMENT OF BUILDING & SAFETY

Page 34: ASCE OC Branch - Geo-Institute Dinner Presentation: Fundamentals of Torque Down Piles

• TORQUE DOWN PILES AS ALTERNATIVE TO DRILLED SHAFTS• LADBS REQUIRED COMPRESSION, TENSION AND LATERAL LOAD TESTS AT 2 

LOCATIONS – NORTH AND SOUTH CONCOURSES• 15 FEET OF UNDOCUMENTED FILL WAS TO BE IGNORED IN DETERMINING 

VERTICAL AND LATERAL CAPACITIES

LAX TERMINAL 1

Page 35: ASCE OC Branch - Geo-Institute Dinner Presentation: Fundamentals of Torque Down Piles

LAX TERMINAL 1

Page 36: ASCE OC Branch - Geo-Institute Dinner Presentation: Fundamentals of Torque Down Piles

TEST PILE PROGRAM• TEST PILE 1:• INSTALLED WITHOUT PREDRILLING• REFUSAL MET AT DEPTH OF 33.7 FT

• TEST PILE 2:• INITIALLY INSTALLED WITHOUT 

PREDRILLING – MET REFUSAL AT 25 FT• REINSTALLED TO DEPTH OF 31.6 FEET 

AFTER PREDRILLING TO 30 FEET WITH 12‐INCH‐DIAMETER AUGER – AUGER REVERSED TO LEAVE CUTTINGS IN HOLE

LAX TERMINAL 1

Page 37: ASCE OC Branch - Geo-Institute Dinner Presentation: Fundamentals of Torque Down Piles

LAX TERMINAL 1

• TEST PILE 1:• ULTIMATE COMPRESSION CAPACITY OF 

580 KIPS (510 KIPS – DAVISSON)• ULTIMATE TENSION CAPACITY OF 400  

KIPS (360 KIPS – DAVISSON)• LATERAL LOAD OF 58 KIPS FOR 0.5 INCH 

OF PILE‐HEAD DEFLECTION

• TEST PILE 2:• COMPRESSION LOAD OF 700 KIPS 

APPLIED WITHOUT REACHING FAILURE• TENSION LOAD OF 400 KIPS APPLIED 

WITHOUT REACHING FAILURE• LATERAL LOAD OF 50 KIPS FOR 0.5 INCH 

OF PILE‐HEAD DEFLECTION

COMPRESSION LOAD TEST SET‐UP

Page 38: ASCE OC Branch - Geo-Institute Dinner Presentation: Fundamentals of Torque Down Piles

LAX TERMINAL 1

Page 39: ASCE OC Branch - Geo-Institute Dinner Presentation: Fundamentals of Torque Down Piles

LAX TERMINAL 1

GAUGES SUPPORTED WITH FORK LIFT

Page 40: ASCE OC Branch - Geo-Institute Dinner Presentation: Fundamentals of Torque Down Piles

• AFTER DISCOUNTING CONTRIBUTION FROM SKIN FRICTION IN FILL (ESTIMATED TO BE 130 KIPS) – RECOMMENDED ULTIMATE CAPACITIES OF 405 KIPS FOR COMPRESSION AND 195 KIPS FOR TENSION

• LATERAL CAPACITY OF 28 KIPS FOR FREE‐HEAD CONDITION AND 0.25 INCH OF PILE‐HEAD DEFLECTION

• NO REDUCTION FOR PREDRILLING ‐PRODUCTION PILES PREDRILLED TO 30 FEET

• BACK‐CALCULATED ULTIMATE END BEARING OF 238 KSF FOR TEST PILE 1 (WEAKER PILE)

• COMPUTED (ESTIMATED) SKIN FRICTION VALUES RANGING FROM 3 TO 4 KSF IN DENSE SAND AND 5 KSF IN VERY DENSE SAND

LAX TERMINAL 1

GAP REMAIING AFTER LATERAL LOAD TEST

Page 41: ASCE OC Branch - Geo-Institute Dinner Presentation: Fundamentals of Torque Down Piles

NORTHRIDGE HOSPITAL –SERVICE ELEVATOR TOWER

• SERVICE ELEVATOR TOWER ADJACENT TO EXISTING HOSPITAL BUILDING

• BOTTOM OF SERVICE ELEVATOR CAP IS 18‐24 FEET BELOW GROUND SURFACE

• NO ACCESS FOR TEST PILE PROGRAM AT PROPOSED TOWER LOCATION

• OSHPD REVIEW• LARGER‐DIAMETER TORQUE 

DOWN PILES REQUIRED TO MEET PILE DEFORMATION CRITERIA

Page 42: ASCE OC Branch - Geo-Institute Dinner Presentation: Fundamentals of Torque Down Piles

NORTHRIDGE HOSPITAL –SERVICE ELEVATOR TOWER

TEST PILE PROGRAM• MODIFIED TORQUE DOWN PILES –

16‐INCH O.D. (.375‐INCH WALL THICKNESS) WITH TAPER AT END TO FIT NORMAL TIP

• TO DETERMINE THE IMPACT OF REMOVING 24 FEET OF SOIL, AMEC CALLED FOR TESTING TWO SETS OF PILES AT LENGTHS OF 24 AND 74 FEET (4 PILES TOTAL) IN BOTH COMPRESSION AND TENSION

• LATERAL LOAD TESTING OF BOTH 74‐FOOT‐LONG TEST PILES

• ACCEPTANCE CRITERIA FOR BOTH LOAD AND DEFLECTION 

Page 43: ASCE OC Branch - Geo-Institute Dinner Presentation: Fundamentals of Torque Down Piles

NORTHRIDGE HOSPITAL –SERVICE ELEVATOR TOWER

175 KIPS @ 0.15 INCHES

Page 44: ASCE OC Branch - Geo-Institute Dinner Presentation: Fundamentals of Torque Down Piles

NORTHRIDGE HOSPITAL –SERVICE ELEVATOR TOWER

SOIL CONDITIONS• 0‐7 FT – CLAYEY SAND FILL (N = 17)• 7 – 17 FT – CLAYEY SAND/CLAYEY 

GRAVEL (N = 8 – 17)• 17 – 30 FT – LEAN CLAY (N = 0 – 6) –

MOISTURE CONTENTS – 28‐35%• 30 – 61 FT – INTERBEDDED CLAY, 

SANDY CLAY & CLAYEY SAND (N = 4 –20)

• 63 – 81 FT – CLAYEY SAND AND CLAY WITH SAND (N = 26 – 42)

• GROUNDWATER AT APPROX. 30 FT 

Page 45: ASCE OC Branch - Geo-Institute Dinner Presentation: Fundamentals of Torque Down Piles

NORTHRIDGE HOSPITAL –SERVICE ELEVATOR TOWER

Page 46: ASCE OC Branch - Geo-Institute Dinner Presentation: Fundamentals of Torque Down Piles

NORTHRIDGE HOSPITAL –SERVICE ELEVATOR TOWER

REFUSAL MET AT 69 FEET FOR BOTH 74A AND 74B

Page 47: ASCE OC Branch - Geo-Institute Dinner Presentation: Fundamentals of Torque Down Piles

NORTHRIDGE HOSPITAL –SERVICE ELEVATOR TOWER

24‐FOOT‐LONG PILE – TESTED IN COMPRESSION 12 DAYS AFTER INSTALLATION 

69‐FOOT‐LONG PILE – TESTED IN COMPRESSION12 DAYS AFTER INSTALLATION

Page 48: ASCE OC Branch - Geo-Institute Dinner Presentation: Fundamentals of Torque Down Piles

NORTHRIDGE HOSPITAL –SERVICE ELEVATOR TOWER

TEST PILE 74A – FIRST TENSION TEST PERFORMED 2 DAYS AFTER COMPRESSION TEST

TEST PILE 74A – SECOND TENSION TEST PERFORMED ON 12/10/11 ‐ 19 DAYS AFTER FIRST TENSION TEST

200 KIPS @ 0.3 INCH

200 KIPS @ 0.15 INCH

Page 49: ASCE OC Branch - Geo-Institute Dinner Presentation: Fundamentals of Torque Down Piles

NORTHRIDGE HOSPITAL –SERVICE ELEVATOR TOWER

LATERAL LOAD TEST RESULTS –TEST PILE 74B

12.6 KIPS ‐ .044 INCH OF DEFLECTION

Page 50: ASCE OC Branch - Geo-Institute Dinner Presentation: Fundamentals of Torque Down Piles

NORTHRIDGE HOSPITAL –SERVICE ELEVATOR TOWER

SUMMARY OF PILE LOAD TEST PROGRAM• COMPRESSION TESTS MET CAPACITY AND DEFORMATION REQUIREMENTS• TENSION TESTS MET CAPACITY BUT NOT DEFORMATION REQUIREMENTS FOR 

INITIAL TENSION TESTS (PERFORMED 2 DAYS AFTER COMPRESSION TESTING OF SAME PILE)

• TENSION TESTS MET CAPACITY AND DEFORMATION REQUIREMENTS USING SECOND SET OF TENSION TESTS

• LATERAL CAPACITY GREATLY EXCEEDED ESTIMATED CAPACITY• AMEC CONSERVATIVELY USED INITIAL TENSION PILE LOAD TEST RESULTS AND 

REANALYZED PILE GROUP BEHAVIOR

Page 51: ASCE OC Branch - Geo-Institute Dinner Presentation: Fundamentals of Torque Down Piles

NORTHRIDGE HOSPITAL –SERVICE ELEVATOR TOWER

Page 52: ASCE OC Branch - Geo-Institute Dinner Presentation: Fundamentals of Torque Down Piles

NORTHRIDGE HOSPITAL –SERVICE ELEVATOR TOWER

PRODUCTION PILE TEST RESULTS• PRODUCTION PILES INSTALLED 

PRIOR TO EXCAVATION• COMPRESSION PILE INSTALLED ON 

6/3/14 AND TESTED ON 8/16/14 –TESTED LENGTH OF 51.5 FEET

• COMPRESSION PILE LOADED TO 705 KIPS WITH 0.53 INCH OF DEFLECTION

• TENSION PILE INSTALLED ON 5/29/14 AND TESTED ON 8/16/14 –TESTED LENGTH OF 51.5 FEET

• TENSION PILE LOADED TO 492 KIPS WITH 0.45 INCH OF DEFLECTION

204 k ‐ .097 inch

313 k ‐ .134 inch

Page 53: ASCE OC Branch - Geo-Institute Dinner Presentation: Fundamentals of Torque Down Piles

• RESEARCH FACILITY BUILT WITHIN EXISTING WAREHOUSE

• PROJECT COMPONENTS:• VERTICAL PILES• BATTERED PILES• SHORING• STATIC LOAD TEST

BOEING ‐ BUILDING 45

Page 54: ASCE OC Branch - Geo-Institute Dinner Presentation: Fundamentals of Torque Down Piles

BOEING – BUILDING 45

Page 55: ASCE OC Branch - Geo-Institute Dinner Presentation: Fundamentals of Torque Down Piles

BOEING – BUILDING 45

Page 56: ASCE OC Branch - Geo-Institute Dinner Presentation: Fundamentals of Torque Down Piles

BOEING – BUILDING 45

Page 57: ASCE OC Branch - Geo-Institute Dinner Presentation: Fundamentals of Torque Down Piles

BOEING – BUILDING 45

Page 58: ASCE OC Branch - Geo-Institute Dinner Presentation: Fundamentals of Torque Down Piles

BOEING – BUILDING 45

Page 59: ASCE OC Branch - Geo-Institute Dinner Presentation: Fundamentals of Torque Down Piles

BOEING – BUILDING 45

Page 60: ASCE OC Branch - Geo-Institute Dinner Presentation: Fundamentals of Torque Down Piles

BOEING – BUILDING 45

Page 61: ASCE OC Branch - Geo-Institute Dinner Presentation: Fundamentals of Torque Down Piles

BOEING – BUILDING 45

TESTED AFTER 2 DAYS OF SET‐UP

TESTED AFTER 26 DAYS OF SET‐UP

Page 62: ASCE OC Branch - Geo-Institute Dinner Presentation: Fundamentals of Torque Down Piles

• NO VIBRATION, LOW NOISE, DRIVEN OR DRILLED PILE ALTERNATIVE

• TYPICAL ULTIMATE COMPRESSION CAPACITIES OF 300 TO 600 KIPS

• TYPICAL ULTIMATE TENSION CAPACITIES OF 200 TO 400 KIPS

• SIMPLE – INSTALLED USING CONVENTIONAL EQUIPMENT• FLEXIBLE – PILE LENGTHS ARE EASILY MODIFIED IN FIELD• SAFETY• LARGE AMOUNT OF LOAD TEST DATA AVAILABLE

SUMMARY

Page 63: ASCE OC Branch - Geo-Institute Dinner Presentation: Fundamentals of Torque Down Piles

THANK YOU/QUESTIONS?