NATIONAL INSTITUTE OF TECHNOLOGY,UTTARAKHAND
PRESENTATION ON
PROCESS DECISION PROGRAM CHART
Presented to Presented by Mr. Hitesh Sharma Ashwani Kumar
Assistant Professor Roll No. MT16MEC012
(Department of Mechanical Engg.)
CONTENT
Introduction Process How to construct PDPC Examples of PDPC Advantages Applications Figure references References
PROCESS DECISION PROGRAM CHART
INTRODUCTION
Originated as one of Japan’s Seven new control tools for management and planning.
The PDPC extends the tree diagram a couple of levels to identify risks and countermeasures for the bottom level tasks.
The PDPC is similar to the Failure Modes and Effects Analysis (FMEA) in that both identify risks, consequences of failure, and contingency actions.
continued
PROCESS DECISION PROGRAM CHART
The process decision program chart systematically identifies what might go wrong in a plan under development.
By using PDPC, you can either revise the plan to avoid the problems or be ready with the best response when a problem occurs.
It may be vertical or horizontal.
PROCESS DECISION PROGRAM CHART
Process
From the bottom level of some activity box, the PDPC adds levels for: identifying what can go wrong (failure mode or risks) consequences of that failure (effect or consequence) possible countermeasures (risk mitigation action plan)
HOW TO CONSTRUCT PDPC
Develop a tree diagram of the proposed plan.
For each task on the third level, brainstorm what could go wrong.
Review all the potential problems and eliminate any that are improbable or whose consequences would be insignificant.
For each potential problem , brainstorm possible countermeasures.
Fig.1-Model of PDPC
PROCESS DECISION PROGRAM CHART
For producing the desired result from many possible outcomes
Used to plan various contingencies. Used for getting activities back on track. Steers events in required direction if unanticipated
problems occur. Find feasible counter measures to overcome problems.
EXAMPLE OF PDPC (VACATION PLANNING)
Fig.2
EXAMPLE(Cont.)
Fig.3.
ADVANTAGES OF PDPC
Facilitates forecasting. Uses past to anticipate contingencies. Illustrates how events will be directed to successful
conclusion. Enables those involved to understand decision-makers
intentions. Cooperation and communication in group. Easily modified and easily understood.
APPLICATIONS
This tool has the widest range of applications from the simplest to the most complex.
This tool can be used to prevent problems by identifying opportunities for error and devising measures to avoid failure.
It can be used during the implementation of solutions for predicting resistance for planning measures to overcome the resistance.
FIGURE REFERENCES
Fig.1. Picture-risk diagram (pdpc)-template.png.google images
Fig.2. Strategy and management diagrams-seven management and planning tools process decision program chart(vacation planning).png.google images .
Fig.3. Picture-risk diagram-health care.png.google images
REFERENCES
Tague, Nancy (2004). The Quality Toolbox, ASQ Quality Press. pp. 428-430. ISBN 0-87389-639-4.
Goal QPC, David (1994). The Memory Jogger II…, Goal QPC Press. pp. 160-162. ISBN 1-879364-44-1.
Process decision program chart.Quality new tools .wikipedia.com. 7 Advanced QC TOOLS, comiled from DL Shah Trust publication
by B.Girish,Dy.Director National Productivity Council,Chennai.
THANK YOU