Name : Asif Iqbal Current Title : Program Planning Engineer Nationality : Indian Languages : English, Hindi, Urdu, Arabic (Read/Write) Education : Bachelor of Engineering – Electrical & Electronics B.V.B. CET Hubli, Karnataka University Dharwad. Professional Training in Primavera Enterprise at KLG SYSTEL Affiliated to Primavera, Bangalore, India. Professional Training in Advance C Programming, Unix Internals on Unix Platform. Professional Memberships /Certifications : Saudi Council of Engineers CAREER SUMMARY: Asif Iqbal is a Project Controls professional specializing in Estimation, Costing and Planning Engineering with more than 16 years’ experience years in the planning of Heavy and Light Industries. He demonstrates expertise in the areas including Industrial City Infrastructure development, Oil & Gas, Petrochemicals, Power Generation, Desalination, Industrial Water Treatment, 1 Permanent Contact Details: Email: [email protected] India: +91-95359-88373 [email protected]

Upload: asif-iqbal

Post on 14-Jan-2017

390 views

Category:

Documents


1 download

TRANSCRIPT

Page 1: Asif Iqbal2016

Name : Asif Iqbal

Current Title : Program Planning Engineer

Nationality : Indian

Languages : English, Hindi, Urdu, Arabic (Read/Write)

Education : Bachelor of Engineering – Electrical & ElectronicsB.V.B. CET Hubli, Karnataka University Dharwad.

Professional Training in Primavera Enterprise at KLG SYSTEL Affiliated to Primavera, Bangalore, India.

Professional Training in Advance C Programming, Unix Internals on Unix Platform.

Professional Memberships /Certifications

: Saudi Council of Engineers

CAREER SUMMARY:Asif Iqbal is a Project Controls professional specializing in Estimation, Costing and Planning Engineering with more than 16 years’ experience years in the planning of Heavy and Light Industries. He demonstrates expertise in the areas including Industrial City Infrastructure development, Oil & Gas, Petrochemicals, Power Generation, Desalination, Industrial Water Treatment, and Sewage Water Treatment. Asif Iqbal has worked on projects with construction values exceeding $1 Billion USD in Kazakhstan, Qatar, Ireland and Saudi Arabia. He is experienced in developing baseline schedules, assembling/updating/managing multi-project master program schedules, and measuring contractor performance through key cost and performance indicators. Asif understands construction work practices for all disciplines, manages cost and resource-loaded CPM schedules, and produces monthly progress reports for multiple projects running concurrently. He works interactively with contractors in planning resources, defining program requirements, and mapping interdependencies through CPM networks. With proficiency using both P6 and Microsoft Excel, Asif adheres strictly to documentation protocol in accordance with client expectations and industry best practices.

1

Permanent Contact Details: Email: [email protected] India: +91-95359-88373 [email protected]

Permanent resident: Current Location:Karnataka, India. India: +91-9535988373

Page 2: Asif Iqbal2016

REPRESENTATIVE PROJECT EXPERIENCE:

2

Page 3: Asif Iqbal2016

Program Management Office at MODON, Dammam 2 Industrial City 2/2015 – 11/2016Program Planning Engineer

To Assist Programme Manager in his daily activities of managing the infrastructure development projects and help generate periodic reports. Liaise with Consultants/Contractors and MODON for smooth transition of Executed projects and their handing over.

To develop a database of roads and infrastructure, affected due the current running projects. To develop a database of Factory’s/Plot’s utilities catered by the current projects and/or Utility companies.

GES+ Projects for ARAMCO, Al-Khobar, KSA 1/2014 – 2/2015Senior Planning Engineer

To Prepare the FEED level schedule and monitor the same for the duration of the Service Order. Gradually a copy of FEED schedule will be converted into EPC schedule based on the information available at that time; this schedule will form the basis to validate the EPC/LSTK contractor’s Schedule submitted during the bidding stage. Key responsibilities and accomplishments include:

Preparing the baseline FEED for the Projects awarded by ARAMCO. Develop the Staffing Plans, Based on the scope requirements during the period of the

project. Evaluating Man-hours Required Vs Availability and aligning detailed project schedules. Tracking performance and highlighting trends through resource curves and narratives. Monitoring and documenting actual and potential changes in the work. Measuring current performance against established baseline work plans. Assessing and communicating delay impacts and proposing mitigation alternatives.

Sea Water RO4 & East Pumping Station, Marafiq (Power & Water Utility Company), Jubail. 7/2013–12/2013Project Controls Manager

This $(Confidential) SWRO4 & EPS Projects where aimed at expanding and doubling the sea water desalintion and pumping capacity to cater the needs of new industries like SADARA in the Easter Province. Duties & Responsibilities:

To monitor and control the three phases of the project namely, Engineering, Procurement and Construction & Commissioning on-site and off-site for two projects Sea Water Reverse Osmosis - 4 and East Pumping Station Expansion.

Follow up with EPC Contractors, sub-contractors, vendors and suppliers for delivering the required resources and materials on site to execute the scheduled activities as per original baseline.

Contractually reviewing Contractor’s submittals for Concession/Deviation/Claims as per the protocol set up in the Change Management System by the program team.

Privacy of Personal Information: The personal information contained in this document is provided for use by (client) for purposes related to this document only. The information should not be shared with those who do not have a need for it, and shall not be used for any other purpose.Jacobs ZATE is a trademark of Jacobs Engineering Group Inc. 3

Page 4: Asif Iqbal2016

To coordinate with the contractor and team to generate the data and made available the information for management reporting.

Following up the Planning, Scheduling & Progress Monitoring with both EPC Contractors. In the event of any delays, advising a recovery plan and implementing on the current to get the project back on track ASAP.

Advising Contractor if there are any conceptual changes necessary because of obstacles discovered during the execution of the project. Meeting the original schedule without negotiating the integrity of the process and the plant and above all Safety of our work force.

Initial Cost Breakdown preparation against each activity and then preparing Cash Flow for the duration of each projects.

Verifying the Project Progress against the Cash Flow for periodic invoicing. Conducting and participating in every project progress review meetings. Participating in daily internal meetings and discussing/finding out the solutions for the

hurdles if any. Reviewing sub-contractors work plan on site for all disciplines. Preparing Weekly & Monthly Progress Reports for submission to client. Assisting Client to generate Corporate Reports and follow up with regular updates.

Jacobs Engineering India Pvt Ltd. (2/2013 to 6/2013)Project Controls Manager

Duties & Responsibilities: Initiation, Planning, Execution, Controlling & Closing of Projects.

2Nos Power Generation Units STG 5 & 6), Industrial Water Treatment Plant, Sewage Water treatment Plant and Multi Effect Distillation Desalination Plant at Marafiq (Power & Water Utility Company), Yanbu. 9/2011–1/2013

Scheduling Supervisor (Project Controls Manager)

Duties & Responsibilities: Same as below with additional projects of Multi Effective Distillation Desalination Plant and Sewage Water Treatment Plant.

2Nos Power Generation Units STG 5 & 6), Industrial Water Treatment Plant, Light Industrial Pipeline at Marafiq (Power & Water Utility Company), Yanbu.Lead Planning & Scheduling Engineer (2/2010–11/2011)

Duties & Responsibilities: To Monitor and Review the activities of EPC Contractors on site and their Schedules. Two new units of Steam Turbine Generator (More than 2.750 Billion Saudi Riyals) A new unit of Industrial Waste Water Treatment Plant (More than 400 Million Saudi

Riyals) Sales Gas Network Pipeline(More than 30 Million Saudi Riyal) All these projects are for Marafiq -Yanbu. Following up the Planning, Scheduling & Progress Monitoring with all EPC Contractors.

In the event of any delays, advising a recovery plan and implementing on the current to get the project back on track ASAP.

Advising Contractor if there are any conceptual changes necessary because of obstacles, discovered during the execution of the project. Meeting the original schedule

4

Page 5: Asif Iqbal2016

without negotiating the integrity of the process and the plant and above all Safety of theirs and our people.

Initial Cost Breakdown preparation against each activity and then preparing Cash Flow for the duration of each projects.

Verifying the Project Progress against the Cash Flow for periodic invoicing. Participating in every project review meetings. Participating in daily construction Meetings and discussing/finding out the solutions for

the hurdles if any. Reviewing their sub-contractors work plan on site for all disciplines. Preparing Weekly & Monthly Progress Reports for submission to client. Preparing In-House monthly Cost-Sheet to be submitted to our Head-Office at Al-Khobar

Branch. Preparing the Forecast and updating the actual Man-hours spent on the projects by our

each billable Individual working for Jacobs. Monitoring Monthly Cost Report produced and submitted to the higher Management.

Seconded to Fluor Arabia by Sepam Group, for a shutdown project at TASNEE Petrochemicals. (8/2008 to 12/2009)Planning & Scheduling Engineer / Quantity Surveyor

Projects: Polypropylene Expansion (Green & Brown Field Projects) @ TASNEEDuties & Responsibilities: Planning & Scheduling, Quantity Surveying. Allocating Resources and Detail Progress monitoring of: Civil Works (Excavations, Leaning, Rebars, Forms, Concrete & Backfilling, Pre-Casting,

Structural works like Fabrication of miscellaneous supports for Piping, Electrical, Equipments Etc.

Piping works (Installation of Piping, Inline Instruments, Fit-Ups, Welding in Dia-Inches testing the line as per the Test Packs, Insulation & Painting),

Mechanical (Equipment Erection, Internals Installations Cleaning, Final Alingment, Testing & Insulation)

Electrical (Equipment Installation, Cable Tray Installation, Cable Pulling, Cable Testing / Meggering / High pot Test, Cable Termination, Electric Heat Tracing)

Instrumentation (Instrument Calibration, Instrument Tray Installation, Supports & Instrument Installation, Instrument Cable Pulling, Meggering, Cable Termination, Loop Checking

Pre-commissioning (Identifying Systems of process and allocate the activity codes according to area and priorities, then dividing the available resource to the activities like, Flushing/Blowing, Chemical Cleaning, Inspections, Instrumentation Function Checks, Run-in Test of Electrical Equipments, Leak Tests, Volume Loading Drying, Inerting Etc of the identified systems, in order to get best progress and timely finish to achieve Mechanical Completion or Commissioning.

Contract Administration/Quantity Surveying works for 4 months on site. My responsibility is to reconcile the claim from subcontractors billing and approve their Invoices. For that I need to do my own take-off to compare with.

Sepam Group – Ireland/Saudi Arabia/Qatar (6/2006 to 8/2008)

5

Page 6: Asif Iqbal2016

Estimation, Cost & Planning Engineer

Projects: During the period proposals prepared for CB&I(Germany), British Telecom(UK), Tee’s Valley(UK), Fluor(Qatar, Saudi Arabia), KBR(Qatar), Agip(Kazakhstan), Worley Parson( Ma’aden, KSA), Indevar(Meath, Ireland) All these were multi-discipline project and my scope was Electrical & Instrumentation for Estimation & Proposal. Duties & Responsibilities (Same as above mentioned in summary): Responsible for all three levels of Cost Management. Mainly Estimating, Budgeting &

Controlling. Estimating the total cost & manpower required for the projects, through calculating total

man-hours required for executing the job on the basis of bid level drawings. Clarifying client’s technical and commercial queries. Approaching suppliers & OEMs for materials & equipment’s supply if in our scope. After award Budgeting. The Expected Cash Flow is generated for the duration of the project and controlling the

same for that duration. Cost Planning & Management by breaking down the cost structure & their respective

codes. Chalk out the expenditure Vs earned to show the expected Break-even point & Profit

margin over the period of project. Cost Management on Site by updating the daily returns and issuing the reports of actual

figures Vs Planned to show whether on track, if deviating, then corrective measures after finding the cause.

Handling all kinds of Cost activities on site, like Invoicing from contractors & to Client. New cost items due to design change, hence change order & like.

Designed a Cost Management system for my company which is now being used in several Projects at several locations in Saudi Arabia, Qatar, Kuwait and in Ireland.

Sepam Group – Kazakhstan (1/2006 to 4/2006)Estimator & Proposal Engineer (E&I)

Project: Kashagan Development Experimental Project Client: AGIP KCODuties & Responsibilities: Responsibilities includes, Project controlling, progress monitoring, Planning, Procurement, and preparation of final measurement in line with pricing preambles to measure the total cost of the project. Measurement of Electrical & Instrumentation equipment at the starting of project. Project Controls works, includes arrangement of Materials and equipment for

construction Dept on site. Preparing Week, Month & 3 month look ahead Plan for construction, based on which

Materials are procured and requested from Client. Daily Job allocation for each area to concern area construction Engineer. Chasing the construction to achieve the planed output for the week on the basis of daily

progress. Reporting Progress Every week to the Head Office, and request of materials to be

procured and manpower if required to achieve the target.

6

Page 7: Asif Iqbal2016

At the beginning of the project, material take-off for building Bill Of Quantities (BOQ) for comparing the first level of BOQ from Client at bidding level. Reporting new line Items if any and proposing the Manhours & their Unit rates.

Handling Progress Monitoring, Variation Order, Validations, Field Design Changes During the construction.

Working in conjunction with client’s Planning & Cost Control to keep track of monthly Progress and billing.

Building Cost Control System (CCS) for the whole Project. Clarifying Technical Queries of Client/Consultants. Preparing Bids for new Packages from Client’s tender documents, and following up for

any Technical & Commercial queries. Scrutinizing Bids from subcontractors for technical & commercial details. Monitoring Commercial & Financial matters.

Yusuf Bin Ahmed Kanoo Saudi Arabia (11/2005 to 12/2006)Electrical & Instrumentation Engineer (Estimation & Proposals)

Projects Handled: Installation & Commissioning of three units of Steam Turbine Control System for controlling speed by Woodward 505 at SAMREF (Saudi Aramco Mobil Refinery, Yanbu, K.S.A), Duration 3 Months, Bided for Yokogawa Centum CS3000 R3 to Shoiba Power Plant, Target & Acquired the Digital AVR Installation & Commissioning project, Working on CO2 plant’s total automation (under evaluation). Duties & Responsibilities: From Designing the of control systems, preparing the proposals (Technical &

Commercial) for the best available systems for retrofitting & up gradation in the field of Instrumentation & Controls till the commissioning & Punch list of the same.

CCIC (Consolidated Contractors International Conpany, Qatar) (3/2003 to 6/2005)Quantity Surveyor (Electrical & Instrumentation)

Project: Ras-Laffan On-Shore Expansion Project. Client: Chiyoda, Snamprogetti, Mitsui & Al-ManaDuties & Responsibilities: Responsibilities include the preparation of final measurement in line with pricing

preambles. Building of Bill Of Quantity for all the works in Electrical & Instrumentation from the layout

drawings & PIDs with actual site reports. Bid verification from Sub- Contractors. Estimation of all heavy & light Electrical & Instrumentation equipments in the project. Costing of the total Project, Progress Monitoring. Working in conjunction with Planning & Cost Control to keep track of monthly Progress. Compare the Actual Progress for an area (Work done) with the drawings quantities in that

area. Clarifying Technical Queries of Client/Consultants. Handling the Confirmation of verbal instructions by client for speedy execution of work on

site, in case of any design change. Handling the Field Design Change & Identifying various work involved in executing the

Design change.

7

Page 8: Asif Iqbal2016

Coordinating with Construction & Engineering to maintain up to date quantities prior to claiming.

CCIC/SAIPEM Consortium, Kazakhstan (5/2002 to 3/2003)Quantity Surveyor (Electrical & Instrumentation)

Project: Karachaganak Main Works Contract, North West Kazakhstan (KMWC). The scope of work comprises a Gross root Gas Processing & Condensate Plant, an Oil & Condensate Processing Plant with Gas Compression/Reinjection Facilities & a Well Production Gathering System & Gas Reinjection Trunk line & Flow line (approximately 300KMs) as well as an Oil Export Pipeline of approximately 600KMs. The final output of the plant will be 300,000 barrels/day of oil & 883 Billion Cube Feet of gas annually.Contract Value: US$ 800 MillionClient: Karachaganak Petroleum Operating BV (Karachaganak Integrated Organization, a consortium of Agip, British Petroleum, Luke Oil, Texaco and Kazak Oil).Duties and Responsibilities: Responsibilities include the preparation of final measurement in line with pricing

preambles. Measurement of Electrical & Instrumentation equipment. Building of Bill Of Quantity for all the works in Electrical & Instrumentation from the layout

drawings & PIDs with actual site reports. Bid verification from Sub- Contractors. Estimation of all heavy & light Electrical & Instrumentation equipments in the project. Progress Monitoring & Costing of the total Project. Clarifying Technical Queries of Client/Consultants. Finalization of all Technical specification for procurement.

Computer System/Application Trainer, Digicom Computers (GOA) (2001 to 2002)Duties & Responsibilities: To train the candidates in Basic computer applications for their daily professional needs on Windows Platform.

Contractor, Karnataka Power Transmission Corporation Limited. (Govt of State undertaking, India) (2001)Duties & Responsibilities: To Survey the newly installed Substation of capacity 33KV Receiving Station at Nalwar and its Distribution lines stretch over 20 KM Radius. The aim was to represent the Distribution lines graphically on the computer system, we were the small unit in the large automation program of the Organization. These small time contracts helped the government in building the complete computerized representation of the electrical Distribution system in the state. We are proud to be a part of this advancement of the state supervisory body.

Trainee Engineer (Electrical), Operation & Maintenance dept., Karnataka Power Transmission Corporation Limited. (Govt of State undertaking, India) (12/1999 to 12/2000)Duties & Responsibilities: Received intensive training in maintenance of all transmission & distribution equipment at 220KV receiving sub-station. The power is being fed from the thermal power plant at Raichur, India. Preliminary training involved preparation of Energy Auditing, & Intensive Energy Auditing. After the training I was deputed for supervising and controlling the transmission and distribution of 220KV S/S. The Job involved hourly surveying the sub-station for load checking of 2 No of 100MVA transformers & the Feeders Fed from transformers. The job also involved manually transmission of Data to the Load Distribution

8

Page 9: Asif Iqbal2016

Control Center at Bangalore. Later the system was automated and the Data Acquisition system was installed and the signals being sent to Load center via satellite. The SCADA operator now can supervise the system from 660Km Bangalore, India.

Qualifications in Full: B.E. in Electrical & Electronics with First Class from BVB College of Engineering &

Technology, Hubli affiliated to the Karnatak University, Dharwar, Recognized by “All India Council of Technical Education”, in Karnataka from 1995 to 1999

Operating Systems: UNIX, LINUX, WINDOWS 2000, WINDOWSXP Packages : MS-Office 2007, MS-Access, Oracle8, Developer 2000, Primavera

Project Planner 3.1/ P3e 5.0 / P6 V7.0, Knowledge of Microsoft Projects, Primavera Expedition for (Contract, Cost, & Project

Management), Time Management Software’. Languages: Advance C (on UNIX PLATFORM), C++, ForTran77, Assembly Level

Languages, 8085, 8086. Industrial Automation: PLC (ALLEN BRADLEY, SIEMENS & MODICON) / SCADA

(InTouch from Wonder Ware), Basic Knowledge of Distributed Control Systems. Woodward Diesel/Steam Turbine control systems, Digital AVRs.

Primavera at KLG (EXCLUSIVE Primavera Trainer in India for Primavera - Certified primavera project planner with P3e 5.0 (Primavera Enterprise) from KLG, Bangalore (Exclusive partner with Primavera).

Primavera Expedition (In-House Training, Head-Office, Ireland) - In house training on Expedition for the newly added projects. Our training involves the activities from the initiation till the buildup of system. Like adding information to the expedition database for the particular project related to the Budget, Documents, Organization hierarchy and setting their privileges to access the expedition project in order to modify and control the info on the expedition.

Primavera P6 V7.0 - In house training at Head Office of Jacobs ZATE @ AL-Khobar Automation Training @ Prolific Systems & Technologies PVT. LTD, Chennai.

o Programmable Logic Controllers: ALLEN BRADLEY, SIEMENS & MODICON PLCs Hardware Configuration. Creating and Editing Programs, Monitoring & Modifying data table values, Forcing I/P & O/P on, Interfacing with SCADA & Sample Application Development.

o SCADA: Software by WONDERWARE Intouch 7.0 Package. In SCADA we covered Installation of Software, Creating new application & database of Tags, Creating & editing of graphic displays with animation, Creating Real-Time & Historical trending, Creating Alarms & Events, Connectivity with PLC & DAS, Trouble the application.

o Intelligent Data Acquisition System: Model: NuDAM Module, Company: Ad link Singapore. Analog input, Digital input, Digital output modules, Communication with PC, Two wire and multi drop communication, Network configuration of module on RS 485 Bus, Communication with SCADA.

o Drives: Company: MODICON. DriveName: Altivar Drives. Programming of Drives, Communication of PLC & SCADA with Drive.

o Field Instrumentation: Conversion of Electrical Diagram to Ladder Logic Diagram, Implementing a PID Block in a PLC system, Integration of PLC & SCADA with filed Instruments. Loop checking of the system of Flow Control Valve & control it by generating commands manually.

9

Page 10: Asif Iqbal2016

UNIX Internals & System Programming:

o Undergone training in UNIX internals, at Uttara Computers, Bangalore. The training involved intensive course in Unix shell programming, generating shell scripts, make file utility, generating client server models with UNIX TCP/IP/IPV6 stack, customizing the stack for different hardware platforms. The Training also involved working on the special features of ‘C’ language, TCP/IP. (File Buffer, Process, Memory management, Interprocess communication, Message queues, Shared memory, Pipes, FIFOs, Semaphores).

o Assembly language programming 8085, 8086, familiar with 8051.

ASIF IQBAL - REFERENCES:1) Graham Rothwell, Country Planning Manager

Jacobs ZATE Engineering, Saudi Arabia

Reference for – GES+ ARAMCO Projects

2) Gareth Jones, Regional Project Controls Manager

Jacobs ZATE Engineering, Saudi Arabia

Reference for – Marafiq (Yanbu & Jubail), GES+ ARAMCO Projects

3) Mr. Conor Doyle, Group Vice President, Jacobs

Jacobs Group Engineering (UK & Ireland)

Reference for – Marafiq Projects, Yanbu.

4) Mr. Michael Smurl, Program Manager, Jacobs

Jacobs ZATE Engineering, Saudi Arabia (Current)

Contact details for the above personnel will be provided when needed.