attsu boilers presentation

Upload: attsu

Post on 03-Apr-2018

224 views

Category:

Documents


0 download

TRANSCRIPT

  • 7/28/2019 ATTSU Boilers Presentation

    1/62

    YOUR TRUSTED PROVIDER

    OF STEAM BOILERS,HOT WATER BOILERS

    AND THERMAL OIL HEATERS

  • 7/28/2019 ATTSU Boilers Presentation

    2/62

    : The power of a group

    The group ATTSU formed by ATTSU Arcones, ATTSU Tecnivap and ATTSU Teyvi, is the none boiler-manufacturing group in Spain.

    Its trajectory began when the three companies, which have long experience in thesector, got together to specialize in the widest range of products to generate andtransform heat, within a great variety of industrial sectors.

    With worldwide references in more than 60 countries: Europe: Euro zone and East

    Mexico, Central and South America

    Africa

    South East of Asia Australia

    All our products and manufacturing facilities, in Madrid, Girona and Valencia, aremanufactured according to the European pressure equipment directive EC 97/23 andbear the CE marking. Quality, safety, innovation and regulations accomplishment are

    our main goals.

  • 7/28/2019 ATTSU Boilers Presentation

    3/62

    Our factory in Girona

  • 7/28/2019 ATTSU Boilers Presentation

    4/62

    ATTSU Quality

    ATTSU is certified ISO 9001:2008 All ATTSU products bear theCE marking in accordancewith the PED 97/23/CE

  • 7/28/2019 ATTSU Boilers Presentation

    5/62

    RL STEAM BOILERS

    Energy savingSafety and reliabilityEasy and economical maintenanceEasy operationQuick start-upEnvironment-friendlyPerfect balance between volume, heatingarea and power rate.

  • 7/28/2019 ATTSU Boilers Presentation

    6/62

    RL BOILERS Main features

    Firetube steam generatorThree passes steam boiler withreverse flame and a fully water cooled furnaceHigh energy efficiencyLow-level contaminationlow-cost maintenanceSteam rates: from 50 to 5000Kg/hourAll types of liquid and gaseous fuels

  • 7/28/2019 ATTSU Boilers Presentation

    7/62

    RL BOILERS Design features

    The combustion takes place in a furnace designed to allow for perfect burner combustion, asuitable temperature within the furnace and a thermal charge within the limits of the mostused international design codes.The circulation of the gases is carried out through a pressure-rise in the furnace and due tothe generators design the gases circulate uniformly and at same speed through the pipesallowing for a constant cession of heat.

  • 7/28/2019 ATTSU Boilers Presentation

    8/62

    RL BOILERS Design features

    Radiation and convection surfaces are designed so that the efficiency is the same whichever of typeof fuel is used. Resistant fast-opening doors allow access to the furnace and fireboxes. The doors are insulated with ceramic fibers and the boiler is wrapped in rockwool protected bySTAINLESS steel plating. The steam boiler is provided with a manhole which allows for a clear vision of the bodys interior

    during cleaning and inspection.

  • 7/28/2019 ATTSU Boilers Presentation

    9/62

    RL BOILERS - optional equipment

    The standard model is equipped with onevertical feed water pump Grundfos withstainless steel impeller, shaft seal and pumphousing and on/off control.

    As an option the boiler can be supplied withone or two electronic pumps for modulatingfeeding (necessary when an economizer isinstalled).

  • 7/28/2019 ATTSU Boilers Presentation

    10/62

    RL BOILERS - optional equipment

    Desalting device:Desalting device with automatic regulationand control, with TDS control by continuousreadout of the boiler water conductivity. Itdrives the opening of the draining valve,realizing only the necessary blowdownoperations and controlling the correct boilerwater salinity without unnecessary waterconsumption. Equipment make Spirax Sarco.

  • 7/28/2019 ATTSU Boilers Presentation

    11/62

    RL BOILERS - optional equipment

    Automatic blowdown:Automatic sludge blowdown withprogrammable setting up of the blowingdown time and the interval timebetween them.Thanks to the automatic blowdown theboiler is blown down regularly and itavoids sludge deposits caused bymanual maintenance oversight.

  • 7/28/2019 ATTSU Boilers Presentation

    12/62

    RL BOILERS - optional equipment

    Complete water softener plant ATTSU WTC,consisting of: Network connecting kid Automatic softener PVC salt tank Feed water and condensate recovery tankmade out of AISI-316L stainless steel Chemical dosing pump Pneumatic valve which controls waterflow from the feeding tank to boilerpump Interconnection piping Draining and emptying piping Supporting structure

  • 7/28/2019 ATTSU Boilers Presentation

    13/62

    RL BOILERS - optional equipment

    Access platform and ladderfor the access to thevalves, manhole andcontroller mounted on thetop of the steam boiler.

  • 7/28/2019 ATTSU Boilers Presentation

    14/62

    RL BOILERS - optional equipment

    ATTSU steam boilers areavailable in many variedforms and in some cases, inorder to avoid theconstruction of a suitableboiler house, they can besupplied in a containerizedboiler room for an outdooroperation, fully installed andready for operation and thusavoid any delay for civilworks.

  • 7/28/2019 ATTSU Boilers Presentation

    15/62

    ATTSU boilers in solar plants

    2 RL-600 kg/h at 8 barg to ensure the operation of a solar thermal plant inAndalucia (PTS Guzmn).

    Equipped with a redundant Siemens PLC, which allows remote access to the

    settings. Touch screen makes it user friendly and easier to operate.

    The boilers also incorporate an electric heater, ensuring up to 290 C

    adjustable steam temperature operating at low or maximum, necessary for

    the smooth operation of the solar plant .

  • 7/28/2019 ATTSU Boilers Presentation

    16/62PTS GUZMN

  • 7/28/2019 ATTSU Boilers Presentation

    17/62

    HH STEAM BOILERS

    Reliability and robustnessHigh performanceHigh thermal efficiency

  • 7/28/2019 ATTSU Boilers Presentation

    18/62

    HH BOILERS Main features

    Horizontal fire-tube steamgeneratorThree-pass designWet back steam boiler with a

    fully water cooled furnace.Efficiency : 92%Steam rates from 2.000 to20.000 kg/h and thermal output

    from 1.304.000 to 13.044.000kcal/hAll types of liquid and gaseousfuels

  • 7/28/2019 ATTSU Boilers Presentation

    19/62

    HH BOILERS Design features

    The combustion takes place in a furnace designed to allow for perfect burner combustion, a suitabletemperature within the furnace and a thermal charge within the limits of the most usedinternational design codes. The circulation of the gases is carried out through a pressure-rise in the furnace and due to thegenerator design the gases circulate uniformly and at same speed through the pipes allowing for aconstant cession of heat.

  • 7/28/2019 ATTSU Boilers Presentation

    20/62

    HH BOILERS Design features

    Radiation and convection surfaces are designed so that the efficiency is the same whichever of type offuel is used. Resistant fast-opening doors allow access to the furnace and fireboxes. The doors are insulated with ceramic fibers and the boiler is wrapped in rockwool protected by stainlesssteel plating. The steam boiler is provided with a manhole which allows for a clear vision of the bodys interior during

    cleaning and inspection.

  • 7/28/2019 ATTSU Boilers Presentation

    21/62

    HH BOILERS - optional equipment

    The standard model is equipped with onevertical feed water pump Grundfos withstainless steel impeller, shaft seal and pumphousing and on/off control.

    As an option the boiler can be supplied withone or two electronic pumps for modulatingfeeding (necessary when an economizer isinstalled).

  • 7/28/2019 ATTSU Boilers Presentation

    22/62

    HH BOILERS - optional equipment

    Desalting device:Desalting device with automatic regulationand control, with salinity control bycontinuous readout of the boiler waterconductivity. It drives the opening of thedraining valve, realizing only the necessaryblowdown operations and controlling thecorrect boiler water salinity withoutunnecessary water consumption. Equipmentmake Spirax Sarco.

  • 7/28/2019 ATTSU Boilers Presentation

    23/62

    HH BOILERS - optional equipment

    Automatic blowdown:Automatic sludge blowdown valves withprogrammable setting up of the blowingdown time and the interval timebetween them.Thanks to the automatic blowdown theboiler is blown down regularly and itavoids sludge deposits caused bymanual maintenance oversight.

  • 7/28/2019 ATTSU Boilers Presentation

    24/62

    HH BOILERS - optional equipment

    Complete water softener plant ATTSU WTC,consisting of: Network connecting kid Automatic softener PVC salt tank Feed water and condensate recoverytank made out of AISI-316L stainlesssteel Chemical dosing pump Pneumatic valve which controls waterflow from the feeding tank to boilerpump Interconnection piping Draining and emptying piping Supporting structure

  • 7/28/2019 ATTSU Boilers Presentation

    25/62

    HH BOILERS - optional equipment

    The economizer (ECO) is designed torecover exhaust heat from Boiler exhaustgases, and transfer this to the incomingBoiler feed water before it is introduced tothe boiler itself, thus increasing the overallBoiler Thermal Efficiency. The economizer consists of compactequipment manufactured from a finnedtube fitted at the flue gases outlet and the

    continuous boiler water feeding. Fuel saving : 5% Boiler efficiency without ECO : 91% +-1 Boiler efficiency with ECO : 95% +-1

  • 7/28/2019 ATTSU Boilers Presentation

    26/62

    More options for the boiler room

  • 7/28/2019 ATTSU Boilers Presentation

    27/62

    HH BOILERS

    HH-8000 steam boilerexported to thepharmaceutical sector

    in Iraq

  • 7/28/2019 ATTSU Boilers Presentation

    28/62

    HH BOILERS

    Installation of threesteam boilers HH-16000 in SEAT

    factory (VW Group)

  • 7/28/2019 ATTSU Boilers Presentation

    29/62

    Thermal deaerator for HH -16000

  • 7/28/2019 ATTSU Boilers Presentation

    30/62

    Economizers for HH-16000

  • 7/28/2019 ATTSU Boilers Presentation

    31/62

    HH-16000 leaving ATTSU factory

  • 7/28/2019 ATTSU Boilers Presentation

    32/62

  • 7/28/2019 ATTSU Boilers Presentation

    33/62

    GE STEAM BOILER

    Electric steam generatorwhich combines theadvantages of the steamproduced in large boilerswith the cleanliness and

    small size of electric units. Suitable for small

    consumptions Heating by encapsulated

    and submerged low-charge

    ohmic resistances Steam rates from 23 Kg/h

    (15 kW) to 2.000 Kg/h(1.500 kW)

  • 7/28/2019 ATTSU Boilers Presentation

    34/62

    GE 1000 BOILER

    GE-1000 front view

    GE-1000 rear view

    Control panel

    1000 Kg/h / 750 kW

  • 7/28/2019 ATTSU Boilers Presentation

    35/62

    GE-250 supplied

    to BekaertMukand WireIndustries Pvt.Ltd - India

    GE-250 BOILER

  • 7/28/2019 ATTSU Boilers Presentation

    36/62

    FT BOILERS

    Thermal Fluid Heater,vertical or horizontal,three-pass design

    High thermal efficiency

    Thermal rates from100000 to 5000000Kcal/h

    Working temperature

    up to 325 CAll types of liquid and

    gaseous fuels

  • 7/28/2019 ATTSU Boilers Presentation

    37/62

    FT BOILERS

  • 7/28/2019 ATTSU Boilers Presentation

    38/62

    FT-3000 BOILER INSTALLED AT THE THERMAL

    SOLAR PLANT OF Ain Beni Mathar - MOROCCO

  • 7/28/2019 ATTSU Boilers Presentation

    39/62

    FT-3000 BOILER: FRONT VIEW

  • 7/28/2019 ATTSU Boilers Presentation

    40/62

    FT-3000 BOILER

    Control devices Control panel inside view

  • 7/28/2019 ATTSU Boilers Presentation

    41/62

    ATTSU supplies a horizontal thermal oilboiler rated 4,070 kW to Iraq

    FT-3500:

    ATTSU FT-3500equipped with dualfuel light & heavyoil burner, heavy oilconditioning

    system (preheaterring line)

    Preassembled andmounted on abaseframe for easy

    transportation andinstallation

    Supplied to KirkukCement factory innorthern Iraq

  • 7/28/2019 ATTSU Boilers Presentation

    42/62

    FTE BOILERS

    Electric thermal fluidboilers ATTSU FTe useselectricity for thermalenergy. It is transformedinto heat by electricalresistances submerged inthe thermal fluid.

    High thermal efficiency

    and very fine workingconditions.

  • 7/28/2019 ATTSU Boilers Presentation

    43/62

    BV BOILERS cogeneration

    BV 5500 BOILER INSTALLED AT

  • 7/28/2019 ATTSU Boilers Presentation

    44/62

    BV-5500 BOILER INSTALLED ATFRIMANCHA FACTORY

  • 7/28/2019 ATTSU Boilers Presentation

    45/62

    BV-5500

  • 7/28/2019 ATTSU Boilers Presentation

    46/62

    CS BOILERS biomass steam boilers

    HHAS / RLAS BOILERS

  • 7/28/2019 ATTSU Boilers Presentation

    47/62

    HHAS / RLAS BOILERS

    SUPERHEATED WATER BOILERS

  • 7/28/2019 ATTSU Boilers Presentation

    48/62

    RLAS SUPERHEATED WATER BOILERS

    Energy savingSafety and reliabilityEasy and economical maintenanceEasy operationQuick start-upEnvironment-friendlyPerfect balance between volume,heating area and power rate.

  • 7/28/2019 ATTSU Boilers Presentation

    49/62

    RLAS BOILERS Main features

    Firetube superheated water generatorThree-pass reverse flame boiler withand a fully water cooled furnaceHigh energy efficiencyLow-level contaminationLw-cost maintenancePower rates: from 38 to 3.793 kWAll types of liquid and gaseous fuels

  • 7/28/2019 ATTSU Boilers Presentation

    50/62

    RLAS BOILERS Design features

    The combustion takes place in a furnace designed to allow for perfect burner combustion, asuitable temperature within the furnace and a thermal charge within the limits of the mostused international design codes.The circulation of the gases is carried out through a pressure-rise in the furnace and due tothe generators design the gases circulate uniformly and at same speed through the pipesallowing for a constant cession of heat.

    RLAS BOILERS D i f

  • 7/28/2019 ATTSU Boilers Presentation

    51/62

    RLAS BOILERS Design features

    Radiation and convection surfaces are designed so that the efficiency is the same whichever of typeof fuel is used.

    Resistant fast-opening doors allow access to the furnace and fireboxes. The doors are insulated with ceramic fibers and the boiler is wrapped in rockwool protected bySTAINLESS steel plating. The steam boiler is provided with a manhole which allows for a clear vision of the bodys interiorduring cleaning and inspection.

  • 7/28/2019 ATTSU Boilers Presentation

    52/62

    RLAS BOILERS - optional equipment

    Access platform and ladderfor the access to thevalves, manhole andcontroller mounted on thetop of the steam boiler.

  • 7/28/2019 ATTSU Boilers Presentation

    53/62

    RLAS BOILERS - optional equipment

    ATTSU steam / water boilersare available in many variedforms and in some cases, inorder to avoid theconstruction of a suitableboiler house, they can besupplied in a containerizedboiler room for an outdooroperation, fully installed andready for operation and thusavoid any delay for civilworks.

    6 x RLAS 3500 ATTSU Boilers

  • 7/28/2019 ATTSU Boilers Presentation

    54/62

    6 x RLAS-3500 ATTSU Boilers

    for Hilla and Karbala Power Plants

    6 superheated waterboilers of 3500 KW eachexported by ATTSU to 2thermal plants of the Iraqi

    Ministry of Electricity .Thanks to the export ofthese boilers, ATTSU hascontributed to thetechnological developmentof two power plants to

    fulfill the industry andpeople energy needs onboth sides of the EuphratesRiver mainly in the cities ofAl-Hilla and Karbala.

    E i f I i Mi i f

  • 7/28/2019 ATTSU Boilers Presentation

    55/62

    Engineers from Iraqi Ministry ofElectricity visiting ATTSU factory

    C i b i i f

  • 7/28/2019 ATTSU Boilers Presentation

    56/62

    Construction beginning ofKarbala power station

    WATER TUBE BOILERS

  • 7/28/2019 ATTSU Boilers Presentation

    57/62

    WATER TUBE BOILERSW-28.000/45 BOILER FOR AQUASOL PROJECT

  • 7/28/2019 ATTSU Boilers Presentation

    58/62

    W-28.000/45 SITE ERECTION WORKS

  • 7/28/2019 ATTSU Boilers Presentation

    59/62

    THE BOILER WAS SUPPLIED BY ATTSU TO ABEGOA

    AQUASOL PROJECT PS 10 AND PS 20

  • 7/28/2019 ATTSU Boilers Presentation

    60/62

    AQUASOL PROJECT: PS 10 AND PS 20SOLAR PLANTS

  • 7/28/2019 ATTSU Boilers Presentation

    61/62

  • 7/28/2019 ATTSU Boilers Presentation

    62/62

    ATTSU Boilers over the world