    TEMU NASIONAL MASYARAKAT STANDARDISASI INDONESIA,

    PERAN STANDAR MENUJU EFISIENSI ENERGIJAKARTA, 14 NOPEMBER 2012 Semen Gresik Group

  • 8/12/2019 Bagaimana Industri Berperan

    2/45

    Semen Gresik Group

    1. Company Profile

    2. Supply Overview & Energy Consumption

    3. Energy Management Roadmap

    4. Energy Management & WHRPG*

    5. Tantangan & Dukungan yang Diharapkan

    OUTLINE

    *) Waste Heat Recovery Power Generation

    http://localhost/var/www/apps/conversion/tmp/scratch_7/Pending%20Matters%20Rapat%20Korporasi,%209%20Agustus%202011.pptxhttp://localhost/var/www/apps/conversion/tmp/scratch_7/Pending%20Matters%20Rapat%20Korporasi,%209%20Agustus%202011.pptx
  • 8/12/2019 Bagaimana Industri Berperan

    3/45

    Semen Gresik Group

    Site Indarung, Padang, West Sumatra

    Establishe

    d

    Year 1910 (firts Cement Plant in Indonesia)

    Capacity 6.000.000 ton cement perannum

    Share

    Holder

    99,99 % : PT cement Gresik, Tbk.

    0,01 % : Employee Corporative cement Padang

    Limestone (LS)Quarry

    PlantInd. II and III

    PlantInd. IV

    PlantInd V

    GuestHouse

    Silica

    Quarry

    WHRPG

    Terminated PlantInd I

    Indarung VIProject

    Belt Conveyor, LS

    transport to Plant

    Head Office

    PLANT LOCATION: INDARUNG, PADANG

    Semen Gresik Group

  • 8/12/2019 Bagaimana Industri Berperan

    4/45

    Semen Gresik Group

    PLANT CAPACITY

    (Tons)REMARKS

    Indarung II 660.000 Operation since 1979

    Indarung III 660.000 Operation since 1983

    Indarung IV 1.620.000 Operation since 1993

    Indarung V 2.300.000 Operation since 1998

    Optimation 1.260.000

    Total 6.500.000

    COMPANY PROFILE

    Note : Indarung I (wet process) was terminated in 1999 due to

    inefficiency and unacceptable dust emmission level

    Site Indarung, Padang, West Sumatra

    Indarung is the name of the area where the

    company is located

    Established Year 1910 (Pioneer of Cement Plant in Indonesia),

    Operation since 1913

    Capacity 6.500.000 ton cement per annum

    Share

    Holder

    99,99 % : PT Semen Gresik, Tbk.

    0,01 % : Corporative of Semen Padang

    Employee

    MENJADI PERUSAHAAN PERSEMENANYANG ANDAL, UNGGUL DAN

    BERWAWASAN LINGKUNGAN DI

    INDONESIA BAGIAN BARAT DAN ASIA

    TENGGARA

    VISI

  • 8/12/2019 Bagaimana Industri Berperan

    5/45

    SUSTAINABLE AND GROWTH OF THE TRIPLE BOTTOM LINE

    STAKEHOLDERS

    REQUIREMENT

    Shareholders

    Customers

    Employees

    GovernmentSupplier

    Creditor

    Society

    Auditor

    1. Effectiveness

    & Efficiency

    BUSINESS

    PROCESS

    2. Sustainibility

    & Innovation

    3. Quality

    4. OHS

    5. Environment6. Security

    7. Legal

    8. Data

    Reliability

    9. CSR

    Sustainable

    & Balance

    Share

    Holders

    Employees

    BOD & BOC

    Profit Planet

    People

    INTEGRATED MANAGEMENT SYSTEM (SMSP) ENERGY ASPECT

    ALMOST COVERED

    ALL SECTIONS

    Semen Gresik Group

  • 8/12/2019 Bagaimana Industri Berperan

    6/45

    Semen Gresik Group

    BUSINESS & CORE COMPETENCY

    MINING

    GENERAL

    TRADING

    MANUFACTURING

    SERVICE

    ENERGY

    Cement Plant Operation

    Cement Trading and Distribution

    Workshop & Engineering

    DISTRIBUTION

    TRANSPORT

    PACKAGING

    CEMENT

    PRODUCER &

    TRADER

    Coal

    Electricity

    Fuel

    Iron Sand/

    Copper Slag Gypsum

    Clay

    Sparepart

    Machinery

    Craft Paper

    Consultancy

    Workshop &

    Engineering

    Distributor

    Sea Transporter

    Land Transporter

    TRANSPORTATION

    PLN

    PELINDO II

    KAI

    Various Sources

  • 8/12/2019 Bagaimana Industri Berperan

    7/45

    Semen Gresik Group

    1. Company Profile

    2. Supply Overview & Energy Consumption

    3. Energy Management Roadmap

    4. Energy Management & WHRPG*

    5. Tantangan & Dukungan yang Diharapkan

    OUTLINE

    *) Waste Heat Recovery Power Generation

    http://localhost/var/www/apps/conversion/tmp/scratch_7/Pending%20Matters%20Rapat%20Korporasi,%209%20Agustus%202011.pptxhttp://localhost/var/www/apps/conversion/tmp/scratch_7/Pending%20Matters%20Rapat%20Korporasi,%209%20Agustus%202011.pptx
  • 8/12/2019 Bagaimana Industri Berperan

    8/45

    Semen Gresik Group

    ENERGY SOURCE AND CONSUMPTION

    COAL (MANY SOURCES), 2 GROUPS

    FUEL OIL (PERTAMINA)

    PS : 200,000 liter/month

    Plant : 730,000 liter/month

    ELECTRICITY, Mainly from PLN Grid

    PRIMER

    ENERGY

    SOURCES

    Quantity: 1,2 Mio ton/year

    Minimum Stock : 250,000 ton

    Specification to Plant after Mixing the 2 Groups (ADB): CV 5.300 - 5.400 kcal/kg;

    TM 24 Max (2013) sd 30% (sd 2015)

    Sulfur 1 Max;

    Ash 18 Max.

    Consumption: 96-97 kWh/ton cement

    Energy Cost (Fuel and Electricity): More than 40% of COGM

    Consumption: 3.68 MJ/kg clinker

    Low Calorie Medium Calorie

    Coal 4500 - 5600 5600 - 6000

    PLN PS

    Supply Power 90 MVA 8 - 10 MW

    Cost Structure

  • 8/12/2019 Bagaimana Industri Berperan

    9/45

    Semen Gresik Group

    1. Company Profile

    2. Supply Overview & Energy Consumption

    3. Energy Management Roadmap

    4. Energy Management & WHRPG*

    5. Tantangan & Dukungan yang Diharapkan

    OUTLINE

    *) Waste Heat Recovery Power Generation

    http://localhost/var/www/apps/conversion/tmp/scratch_7/Pending%20Matters%20Rapat%20Korporasi,%209%20Agustus%202011.pptxhttp://localhost/var/www/apps/conversion/tmp/scratch_7/Pending%20Matters%20Rapat%20Korporasi,%209%20Agustus%202011.pptx
  • 8/12/2019 Bagaimana Industri Berperan

    10/45

    Semen Gresik Group

    ENERGY MANAGEMENT

    COAL AND FUEL OILOPTIMATION OF INBOUND (SUPLY) SIDE:

    PROCUREMENT. MANY ASPECTS SHOULD BE CONSIDERED, PARTICULARLY FORCOAL SUPLY: VENDOR SELECTION (WITH PREREQUISITES),

    TENDER,

    LONG-TERM CONTRACT,

    CONSIGNMENT,

    SPOT PURCHASING

    DELIVERY (TRANSPORTATION),

    HANDLING AND STOCKPILING COST.

    OPTIMATION OF USAGE (ENERGY CONSUMPTION MANAGEMENT): COAL MIXING AND PROPORTION OF VARIOUS COAL RESORCES AND SPECIFICATION

    METERING AMOUNT OF CONSUMPTION FOR EVERY PLANT/SECTION

    COMPARE TO TARGET AND BENCHMARKING SETTING NEW TARGET

    EVALUATION AND ENERGY AUDIT: SEEKING FOR POTENTIAL SAVING AND

    CONSERVATION ENERGY ALTERNATIVE

    MAXIMIZE ENERGY-EFFICICIENT PRODUCT (PPC = PORTLAND COMPOSITE CEMENT)

    ENERGY-SAVING BEHAVIOUR CAMPAIGN

  • 8/12/2019 Bagaimana Industri Berperan

    11/45

    Semen Gresik Group

    ENERGY MANAGEMENT

    ELECTRICITY

    OPTIMATION OF SUPLY SIDE: PROCUREMENT: PLN IS A SINGLE SOURCE TARIFF NEGOSIATION

    DELIVERY FROM THE GRID TO SUBSTATION DISTRIBUTION TO THE

    PLANT (MCC) . MINIMATION OF LOSSES: OPTIMATION OF POWER FACTOR

    OPTIMATION OF USAGE (ENERGY CONSUMPTION

    MANAGEMENT): METERING AMOUNT OF CONSUMPTION FOR EVERY PLANT/SECTION

    COMPARE TO TARGET AND BENCHMARKING SETTING NEW TARGET

    EVALUATION AND ENERGY AUDIT: SEEKING FOR POTENTIAL SAVING

    AND CONSERVATION

    MAXIMATION OF RUNNING HOURS, AVOID FREQUENT MACHINERIES

    BREAKDOWN AND START-STOP MAXIMIZE ENERGY-EFFICICIENT PRODUCT (PPC = PORTLAND

    COMPOSITE CEMENT)

    ENERGY-SAVING BEHAVIOUR CAMPAIGN

  • 8/12/2019 Bagaimana Industri Berperan

    12/45

    PT SEMEN PADANG TOWARDS GREEN INDUSTRY(Green Proper Approach

    Utilization ofNatural

    Resources

    ComDev

    EnvironmentManagement

    System(EMS)

    Energy and Water Management Hazard Waste Management

    3R Solid (Non Hazard Waste) Management

    Air Pollution Management Biodiversity

    PDCA Cycle

    Audit (Internal, External)

    Social Mapping

    CSR Programs Implementation

    TOWARDS

    GREEN INDUSTRY

    (All Aspects of Environment and

    Resources Management)

    Semen Gresik Group

  • 8/12/2019 Bagaimana Industri Berperan

    13/45

    URGENCY OF ENERGY MANAGEMENT

    Compliance: UU No 32 Tahun 2007 tentang Energy

    PP No 70 Tahun 2009 Tentang Manajemen Energy Inpress No 13 Tahun 2011, tentang kewajiban perusahaan untuk penghematan

    energy

    Increase Competitive Advantage

    Support Image of Environment Management PROPER:

    Permen LH No 6 Tahun 2011, Kriteria PROPER

    PP 61 Tahun 2011 RAN GRK, CO2 reduction

    Semen Gresik Group

  • 8/12/2019 Bagaimana Industri Berperan

    14/45

    Semen Gresik Group

    ENERGY MANAGEMENT

    Pengguna sumber energi dan pengguna energi yang menggunakan sumber energi

    dan/atau energi lebih besar atau sama dengan 6.000 (enam ribu) setara ton minyak per

    tahun wajib melakukan konservasi energi melalui manajemen energi.

    Menunjuk manajer energi;

    Menyusun program konservasi energi;

    Melaksanakan audit energi secara berkala; Melaksanakan rekomendasi hasil audit energi; dan

    Melaporkan pelaksanaan konservasi energi setiap tahun kepada Menteri, gubernur,atau bupati/walikota sesuai dengan kewenangannya masing-masing.

    PTSP telah melaksanakan dan telah:

    o

    Menyusun Program Manajemen Energi dan Evaluasinyao Koordinasi Manajemen Energi SP terkait:program, evaluasi dan pelaporan

  • 8/12/2019 Bagaimana Industri Berperan

    15/45

    PT Semen Padang

    Semen Gresik Group

  • 8/12/2019 Bagaimana Industri Berperan

    16/45

    2012 2013 2014

    ENERGYMANAG

    EMENT

    Power

    Consumption,

    target 96,2

    kWh/ton

    ELECTRICITY ENERGY MANAGEMENT

    2015Baseline 2011: 96,6

    kWh/ton cement

    PT Semen Padang

    Power Consumption, target:

    96,0 kWh/ton

    Power

    Consumption,

    target: 95,8

    kWh/ton

    Electricity Efficiency Campaign

    Shifting Paradigm of Energy Usage

    Maximation production of Portland Composite Cement (PCC)

    Semen Gresik Group

  • 8/12/2019 Bagaimana Industri Berperan

    17/45

    2012 2013 2014

    ENERGYMANAG

    EMENT

    Power

    Consumption, target

    91,5 kWh/ton

    ELECTRICITY ENERGY MANAGEMENT

    2015

    Establish WHRPG

    Ind V

    Implementation of

    Energy Audit

    Reccommendation

    Detail Energy Audit

    Baseline 2011: 91,6

    kWh/ton cement

    Indarung V

    WHRPGOptimation

    Power Consumption,

    target: 91,2 kWh/ton

    Pozzoland Dryer

    Installation

    Power

    Consumption,

    target: 90,8

    kWh/ton

    Keep False Air to Minimum Level

    Variable speed or

    fixing/resizing oversize

    Fan Semen Gresik Group

  • 8/12/2019 Bagaimana Industri Berperan

    18/45

    2012 2013 2014

    ENERGYMANAGEMENT

    Maintain PowerConsumption: 97,2

    kWh/ton

    ELECTRICITY ENERGY MANAGEMENT

    2015

    Installation of WHRPG

    Baseline 2011: 97,3

    kWh/ton cement

    Indarung IV

    Power Consumption,

    target: 97,0 kWh/ton

    Pozzoland Dryer

    Installation

    Power Consumption,

    target: 96,0 kWh/ton

    Keep False Air to Minimum Level

    Variable speed or

    fixing/resizing oversize Fan

    Detail Energy

    AuditTechnical Audit of

    Plant Indarung IV

    Instalation of Inline-Calciner and

    Increase SLC Dimension

    Improvement of PH Fan ILC Capacity

    Replacement of Grate Cooler

    CM (Z1) Liner

    Replacement

    IncreaseGrinding

    Capacity inside

    Mill

  • 8/12/2019 Bagaimana Industri Berperan

    19/45

    2012 2013 2014

    ENERGYMANAGEMENT

    Maintain PowerConsumption:

    106,8 kWh/ton

    ELECTRICITY ENERGY MANAGEMENT

    2015Baseline 2011: 106,8

    kWh/ton cement

    Indarung III

    Power Consumption,target: 106,4

    kWh/ton

    Pozzoland

    Dryer

    Installation

    Power Consumption,

    target: 106,0 kWh/ton

    Keep False Air to Minimum Level

    Variable speed orfixing/resizing oversize Fan

    Plant Technical Audit

    Detail Energy Audit

    Cement Mill

    LinerReplacement

    Semen Gresik Group

  • 8/12/2019 Bagaimana Industri Berperan

    20/45

    2012 2013 2014

    ENERGYMANAGEMENT

    Maintain PowerConsumption:

    108,1 kWh/ton

    ELECTRICITY ENERGY MANAGEMENT

    2015Baseline 2011: 108,1

    kWh/ton cement

    Indarung II

    Power Consumption,target: 107,0

    kWh/ton

    Pozzoland

    Dryer

    Installation

    Power Consumption,

    target: 106,0 kWh/ton

    Keep False Air to Minimum Level

    Variable speed or

    fixing/resizing oversize Fan

    Plant technical Audit

    Detail Energy Audit

    Installation

    of High

    Effeciency

    Separator Installation of Pre-

    Grinder/Roller Press

    Liner

    Replacement

    Semen Gresik Group

  • 8/12/2019 Bagaimana Industri Berperan

    21/45

    130 130127,9

    122 120

    114 114110

    108 107

    98,5 96,6 9691,67

    85

    79

    65

    0

    10

    20

    30

    40

    50

    60

    70

    80

    90

    100

    110

    120

    130

    140

    kWh/

    tonsemen

    Spesific Power Consumption (kWh/ton semen )Sri Lanka (1993)

    Philippines (1993)

    USA (1990)

    UK (1989)

    India (1993)

    Malaysia (1993)

    Indonesia (1993)

    China (1993)

    Taiwan (1993)

    Korea (1993)

    PTST (2011)

    PTSP (2011)

    Jepang (1993)

    PTSG (2011)

    Thailand (1993)

    India (2009)

    Best in the World

    ELECTRICITY ENERGY BENCHMARK

    *) Source : Technology, Energy Efficiency & Environmental Externalities In The Cement Industry School of Environment,

    Resources & Development, Asian Inst. Of Tech. Thailand

    *) Source : Best Practices & Technologies for Energy Efficiency in Indian Cement Industry

    SriLanka(1993

    )

    Philippines(1993)

    USA

    (1990)

    UK

    (1989)

    India(1993)

    Malaysia(1993)

    Indonesia(1993

    )

    China(1993)

    Taiwan(1993)

    Korea(1993)

    PTST(2011)

    PTSP

    (2011)

    Jepang(1993)

    PTSG

    (2011)

    Thailand(1993)

    india(2009)

    Bestintheworld

    PTSP

    Semen Gresik Group

    S d

  • 8/12/2019 Bagaimana Industri Berperan

    22/45

    2012 2013 2014

    ENERGYMANAGEMENT

    Heat Consumption,

    target: 3,68 GJ/ton

    Eq kcal/kg cl

    THERMAL ENERGY MANAGEMENT

    2015Baseline 2011: 3,68

    GJ/ton Clinker

    PT Semen Padang

    Heat Consumption:

    target: 3,66 GJ/ton

    Heat Consumption,

    target: 3,64 GJ/ton

    Energy Efficient Campaign

    Thermal Energy Usage Shifting Paradigm

    Improvement of Coal Supply

    & Procurement

    Extend / Increase

    Coal Mixing & coal

    mill Capacity

    Controlling of Coal Mixing and Optimization

    Firebricks and Refractrories (heat resistance increase)

    H AL N GY ANAG N I d V

  • 8/12/2019 Bagaimana Industri Berperan

    23/45

    2012 2013 2014

    ENERGYMANAGEMENT

    Heat Consumption,

    target: 3,3 GJ/ton

    THERMAL ENERGY MANAGEMENT

    2015

    Implementation/Execu

    tion of FLS PlantTechnical Audit

    Detail Energy Audit

    Replacement of

    Existing Burner to

    Duoflex

    Baseline 2011: 3,31

    GJ/ton Clinker

    Indarung V

    Implementation ofEnergy and Technical

    Plant Audit (Medium

    Scale)

    Heat Consumption,

    target: 3,29 GJ/ton

    Implementation of Energy

    and Technical Plant Audit

    (Larger Scale)

    Heat Consumption,

    target: 3,28 GJ/ton

    Keep False Air to Minimum Level

    Grate Cooler

    Modification

    Completion of

    New Coal Mill

    Completion of

    Alternative Fuel

    Facility (Liquid)

    THERMAL ENERGY MANAGEMENT d

  • 8/12/2019 Bagaimana Industri Berperan

    24/45

    2012 2013 2014

    ENERGYMANAGEMENT

    Maintain Heat

    Consumption: 3,39

    GJ/ton

    THERMAL ENERGY MANAGEMENT

    2015Baseline 2011: 3,40

    GJ/ton Clinker

    Indarung IV

    Heat Consumption,target 3,38 GJ/ton

    Heat Consumption, target:3,37 GJ/ton

    Keep False Air to Minimum Level. Maximize of Waste Derived Fuel

    Detail Energy

    Audit

    Plant

    technical

    Audit

    Instalation of Inline-Calciner and

    Increase SLC Dimension

    Improvement of PH Fan Capacity

    Replacement of Grate Cooler

    Completion of

    Alternative Fuel

    Facility (Solid)

    Completion of

    Alternative Fuel

    Facility (Liquid)

    Replacement of Existing

    Burner to Duoflex

    Inlet Seal Installation

    Completion of

    Alternative Fuel

    Facility (Liquid)

    Installation of Coal

    Dryer Indarung IV

    THERMAL ENERGY MANAGEMENT I d III

  • 8/12/2019 Bagaimana Industri Berperan

    25/45

    2012 2013 2014

    ENERGYMANAGEMENT

    Maintain HeatConsumption: 3,98

    GJ/ton

    THERMAL ENERGY MANAGEMENT

    2015Baseline 2011: 3,99

    GJ/ton Clinker

    Indarung III

    Heat Consumption,

    target: 3,97 GJ/ton

    Heat Consumption,

    target: 3,96 GJ/ton

    Keep False Air to Minimum Level

    Plant Technical

    Audit

    Detail Energy Audit

    Installation of Waste Derived Fuel (preparation)

    Semen Gresik Group

    THERMAL ENERGY MANAGEMENT I d II

  • 8/12/2019 Bagaimana Industri Berperan

    26/45

    2012 2013 2014

    ENERGYMANAGEMENT

    Maintain HeatConsumption: 4,0

    GJ/ton

    THERMAL ENERGY MANAGEMENT

    2015Baseline 2011: 4,02

    GJ/ton Clinker

    Indarung II

    Heat Consumption,

    target: 3,99 GJ/ton

    Heat Consumption,

    target: 3,98 GJ/ton

    Keep False Air to Minimum Level

    Plant Technical

    Audit

    Detail Energy Audit

    Maximize of Waste Derived Fuel

    Semen Gresik Group

    THERMAL ENERGY BENCHMARK

  • 8/12/2019 Bagaimana Industri Berperan

    27/45

    4,85

    4,354,2 4,1

    3,68 3,61

    3,04 32,72

    0,0

    0,5

    1,0

    1,5

    2,0

    2,5

    3,0

    3,5

    4,0

    4,5

    5,0

    5,5

    MJ/kgclinker

    Thermal Energy (MJ/kg clinker)

    China (1993)

    Sri Lanka (1993)

    Philippines (1993)

    India (1993)

    PTSP (2011)

    PTSG (2011)

    India (2009)

    Jepang (1993)

    Best in the World

    THERMAL ENERGY BENCHMARK

    *) Source: Technology, Energy Efficiency & Environmental Externalities In The Cement Industry School of Environment,

    Resources & Development, Asian Inst. Of Tech. Thailand

    *) Source : Best Practices & Technologies for Energy Efficiency in Indian Cement Industry

    China(1993)

    SriLanka(1993)

    Philippines(199

    3)

    India(1993)

    PTSP

    (2011)

    PTSG

    (2011)

    India(2009)

    Jepang(1993)

    BestintheWorld

    PTSP

    Semen Gresik Group

    OUTLINE

  • 8/12/2019 Bagaimana Industri Berperan

    28/45

    Semen Gresik Group

    1. Company Profile

    2. Supply Overview & Energy Consumption

    3. Energy Management Roadmap

    4. Energy Management & WHRPG*

    5. Tantangan & Dukungan yang Diharapkan

    OUTLINE

    *) Waste Heat Recovery Power Generation

    ENERGY MANAGEMENT & WHRPG

    http://localhost/var/www/apps/conversion/tmp/scratch_7/Pending%20Matters%20Rapat%20Korporasi,%209%20Agustus%202011.pptxhttp://localhost/var/www/apps/conversion/tmp/scratch_7/Pending%20Matters%20Rapat%20Korporasi,%209%20Agustus%202011.pptx
  • 8/12/2019 Bagaimana Industri Berperan

    29/45

    ENERGY MANAGEMENT & WHRPG

    To increase its competitive advantage and comply to the regulations, PT cement Padang

    having high commitment to become an environmental friendly cement industry through

    PROPERs activities where green PROPER is the minimum target

    Major initiative of PROPER is Energy management (Energy Conservation).

    Energy Management has double positive impacts to the Corporation which will reduce

    Energy Cost (most significant component of COGM) and decrease of CO2 emission.

    One of the most successful program has been implemented is WHRPG

    Energy Alternatif is the most upcoming and sustain program. Development Phase and

    need to speed up the programs in PT Semen Padang.

    *) Waste Heat Recovery Power Generation

    Semen Gresik Group

    T k l i

  • 8/12/2019 Bagaimana Industri Berperan

    30/45

    Semen Gresik Group

    Temperatur

    cerobong cooler

    (AQC) WHRPG

    di SemenPadang

    Teknologi yangdipakai :

    Pemanfaatan gaspanas buang diPabrik Semen

    untukmembangkitkan

    listrik Kapasitasproyek : Daya

    listrikBruto/Net =8.5 MW/7.6

    MW

    Creditingperiode : 10

    tahun

    Pemanfaatanproyek :

    Pengurangankonsumsi

    listrik melaluiPLN dan CER

    Jumlah CO2yang akan

    berkurang :43.117 tonCo2/tahun

    Bahan Baku : Panasbuang di Pabrik Semen

    Panas buang di SP:265.000 Nm3/h & 360 C

    Panas buang di AQC :400.000 Nm3/h & 310 C

    WHRPG (Waste Heat Recovery Power Generation)

  • 8/12/2019 Bagaimana Industri Berperan

    31/45

    WHRPG (Waste Heat Recovery Power Generation)

    Waste Heat Recovery Power Generation

    (WHRPG)Project is a Power Plant pilot project

    that utilize residual hot gasses in Indarung V

    Plant. It is a cooperation project between

    Japan Government through NEDO with

    Indonesian Government thorugh Industrial

    Ministry

    Inaugurated on October 2011 by the Minister

    of Industry Republic Indonesia

    The advantages of WHRPG for PT Semen Padang

    Having a Power Plant that can produce 8,5 MW and the reduction the use of ectricity from PLN

    around 57.600.000 kWh/year (Assumming the operation is 7.680 hours/year). Participating to reduce Global Warming through the reduction of CO2s emmission around

    47.000 tons/year.

    Semen Gresik Group

    Work Sharing Model WHRPG Project

  • 8/12/2019 Bagaimana Industri Berperan

    32/45

    Work Sharing Model WHRPG Project

    Item of work

    Steel structure, ducting, Coolingtower, electrical

    Survey, planning and engineering Turbin, Generator, Boiler,

    Piping, electricalidem Design and Manufacturing idem

    Construction Management Civil work, construction, installation,commissioning

    Supervising

    Executor Demonstration Supervising & Consultating

    Executor Operation & Maintenance Supporting

    Executor Technology Dissemination Supporting

    Investment Cost Sharing 40% Investasi Investment Cost Sharing 60%

    Semen Gresik Group

    ROAD MAP MENUJU INDUSTRI HIJAU

    Supply Jepang

    Keteranganwarna

  • 8/12/2019 Bagaimana Industri Berperan

    33/45

    Supply Indonesia

    Equipments Arrangement

    Main EquipmentA. Boiler (SP Boiler & AQC

    Boiler

    B. Turbin, 8.6 MW capacityC. Generator

    D. Condenser

    E. Cooling Tower & Pump

    F. Flasher; Separating

    working fluid between gas

    and with liquid. The Gas

    Product distributed to

    turbin at low pressure,

    otherwise the liquid

    returned backto Boiler

    (economizer)

    G. Demineralizer

    H. Dust Settling Chamber

    I. Transporting equipment,

    ducting, piping

    J. Makeup water: 115m3/h

    capacity

    Semen Gresik Group

    Simple Flow Diagram of Cement Plant and WHRPG

  • 8/12/2019 Bagaimana Industri Berperan

    34/45

    Simple Flow Diagram of Cement Plant and WHRPG

    Semen Gresik Group

    Documentation of WHRPG

  • 8/12/2019 Bagaimana Industri Berperan

    35/45

    Documentation of WHRPG

    Semen Gresik Group

    Documentation of WHRPG (2)

  • 8/12/2019 Bagaimana Industri Berperan

    36/45

    Documentation of WHRPG (2)

    Semen Gresik Group

    OUTLINE

  • 8/12/2019 Bagaimana Industri Berperan

    37/45

    Semen Gresik Group

    1. Company Profile

    2. Supply Overview & Energy Consumption

    3. Energy Management Roadmap

    4. Energy Management & WHRPG*

    5. Tantangan & Dukungan yang Diharapkan

    OU

    *) Waste Heat Recovery Power Generation

    TANTANGAN INDUSTRI

    http://localhost/var/www/apps/conversion/tmp/scratch_7/Pending%20Matters%20Rapat%20Korporasi,%209%20Agustus%202011.pptxhttp://localhost/var/www/apps/conversion/tmp/scratch_7/Pending%20Matters%20Rapat%20Korporasi,%209%20Agustus%202011.pptx
  • 8/12/2019 Bagaimana Industri Berperan

    38/45

    Semen Gresik Group

    TANTANGAN INDUSTRI

    INTERNAL

    Merubah dan memperbaiki mindset setiap anggota organisasi untuk

    berperilaku hemat energi

    Kecukupan biaya investasi Parameter investasi yang ekonomis dan layak untuk energi alternatif

    EKSTERNAL:

    Memahamkan semua stake holder energi untuk berpartisipasi aktif dalam

    menghemat energi (rentang pengaruh perusahaan terhadap stake holder),

    Mendorong penaatan regulasi oleh semua pihak untuk memanfaatkan waste

    to energy dan limbah B3 dan disuplai ke industri semen,

    Membentuk mata rantai dengan masyarakat dan industri (CSR) untuk suplai

    energi terbarukan (biomass, jarak dll),

    Segera membuat PP Pengelolaan sampah, menerapkannya sehingga Industri

    Semen dapat menjadikannya sebagai sumber energi sekaligus menjawabmasalah lingkungan

    HARAPAN INDUSTRI

  • 8/12/2019 Bagaimana Industri Berperan

    39/45

    Semen Gresik Group

    HARAPAN INDUSTRI

    Pemerintah pusat maupun daerah secara konsisten

    menerapkan regulasi sampah komunitas dan dimusnahkan di

    Industri,

    Pemerintah/KLH mempermudah, mempersingkat perizinan

    untuk memanfaatkan limbah industri (Limbah B3) yang

    mempunyai nilai kalor untuk dijadikan sumber energi (seperti

    limbah oli bekas, sludge oil) dll

    Pemerintah bersama industri menjadi stimulan masyarakat

    agar aktif untuk pembukaan lahan untuk energi terbarukan

    berbasis CSR (biomass dan biofuel)

    Menetapkan industri (pabrik semen) sebagai pemusnah

    (insinerator) dan pemanfaat limbah industri serta penampung

    energi alternatif biofuel dan biomass dari komunitas/penghasil

    BANTUAN/DUKUNGAN PEMERINTAH

  • 8/12/2019 Bagaimana Industri Berperan

    40/45

    Semen Gresik Group

    /

    Bantuan pendanaan dan insentif untuk industri yang

    melakukan konservasi dan efisiensi energi dengan aktif dan

    berhasil sesuai parameter keberhasilan

    Perumusan pengamanan manajemen dalam pendanaan

    serta regulasi dalam memperoleh pendanaan dengan

    payung instansi pemerintah (yang terkait)

    Insentif untuk industri yang mengimplementasikan regulasi

    dan memanfaatkan Limbah B3 untuk bahan bakar.

  • 8/12/2019 Bagaimana Industri Berperan

    41/45

    www.semenpadang.co.idSemen Gresik Group

    Kebutuhan SP (Kuantitas

    2 4

  • 8/12/2019 Bagaimana Industri Berperan

    42/45

    Semen Gresik Group

    Jumlah: 1,2 Juta ton; 1,8 Juta ton/tahun

    (2015/2016)

    Stok Minimum: 250-300ribu ton

    Target spesifikasi ke pabrik (ADB): CV 5.300 - 5.400 kkal;

    TM 24 Max (2013) sd 30% (sd 2015) Sulfur 1 Max;

    Ash 18 Max.

    Ketahun, Bengkulu

    Lahat, Sumsel

    Cirenti-Betung, Riau-

    Jambi-Sumsel

    1 Resources

    Kebutuhan SP (Kuantitas

    dan Kualitas)

    2

    Target Harga Perolehan:(harga beli, handling cost, inventory cost)

    4

    Sumber 2012 2013

    Muaro Bungo 20. 000 30.000

    Lahat 15. 000 15.000

    Bengkulu 30. 000 30.000

    Sumbar 35. 000 25.000TOTAL 100.000 100.000

    4 0 0 , 0 00

    5 0 0 , 0 00

    6 0 0 , 0 00

    7 0 0 , 0 00

    8 0 0 , 0 00

    2010 2011 2012 2013 2014 2015

    I D R / T o n

    H a r ga P e r ol e h a n B a t ub a r a T a h u n an

    3

    Permasalahan yang Potensil: Resources dan jaraknya ke Plant Site

    Angkautan Darat Pembatasan Tonase dan penggunaan BBM no subsidi

    untuk angkutan truck

    Angkutan Laut Congesty di Pelabuhan Teluk Bayur

    POLA PENGADAAN

    80% dari kebutuhan batubara, dipenuhi dengan pola tender/konsinyasi untuk (long term

    contract) untuk 5-10 tahun (dengan cadangan yang cukup)

    20% sisanya dilakukan dengan pembelian spot. Jika prestasi vendor dengan pembelian

    spot bagus selama 1 tahun dinominasi menjadi long term

    6

    Pembelian bulanan (ton)

    5

    Upaya menurunkan harga: Tender

    Konsinyasi

    Aplikasi HBA

    Cadangan coal di Sumbar sudah menipis

    Untuk ke PTSP, suplai dari Sumbar tidak

    dapat diandalkan lagi

    Suplai ke SP, diplot dari Riau, Jambi,

    Sumsel dan Bengkulu

  • 8/12/2019 Bagaimana Industri Berperan

    43/45

    Semen Gresik Group

    Unloading di Teluk Bayur, langsung dengan truck ke Plant Site

    Untuk menghindari congesty Pelindo akan bangun pelabuhan khusus bulk

    material di Teluk Bayur

    Sebelumnya kualitas sudah diperiksa dan sudah harus in-spec saat loading ke

    tongkang/barge di pelabuhan muat

    Lahan untuk stock pile di Plant Site terbatas

    Sebelum masuk ke Stockpile (Storage) di

    pabrik, coal ditumpuk di Stockpile.di luar

    pabrik untuk pemeriksaan kualitas

    Hanya coal yang in-spec yang akan

    ditumpuk

    Kualitas harus sudahconfirmed terlebih

    dahulu sebelum diangkut ke Plant Site

    Ketahun, Bengkulu

    Lahat, Sumsel Moda Laut:

    2014: 60%

    Cirenti-Betung, Riau-

    Jambi-Sumsel

    1

    Plant Site

    Teluk Bayur(permasalahan

    congesty)

    Pile Tempat

    Quality Check

    2

    5

    Moda Darat:

    2014:40%

    Jarak dari resources ke Plant Site

    Pembatasan muatan truck (via

    darat)

    3

    4

    Pengembangan Alternatif Fuel (AF)/Energi Alternatif/Listrik WHRPG;PTSP 2012-2025

  • 8/12/2019 Bagaimana Industri Berperan

    44/45

    Energi terbarukan(Biomass, Biofuel)

    Kewajiban KonserEnergi

    Batubara 75% dari TotalBahan Bakar

    Total Bahan Bakar Alternatif25% pada 2025 di PTSP

    Untuk dapat mencapai 25% butuhpendanaan di luar PTSP: Kemitraan,ESCO dll

    2015

    10%

    Listrik PLN dijaga padalevel maksimum 90%: Setiap pabrik baru harus

    dilengkapi dengan WHRPG

    Joint Coal QuarOperation

    Upgrading low-rank coal

    Coal Dryer

    Optimasi suplai

    2025

    25%

    2013

    3%

    Shredder

    Upaya Peningkatan

    Pemakaian AF/Energy

    Lahan AF, Storage

    Pemanfaatan Limbah

    Fasilitas AFR

    Biomass dan Sludge

    Oil :

    Ind 4 selesai 2012

    Ind 5 selesai 2013

    Baseline

    2012

    Energi terbaruk

    Listrik Produksi Sendiri(including WHRPG), 10% daritotal konmsumsi

    15%

    2020

    Minyak solar seminimum mungkin,konversi Coal ke Gas (penggantisolar)

    Tambahan Lahan,

    Storage , Shredder,

    Waste to Energy

    BahanBakar

    10%8%Listrik

    Coal Gasificatio

    Indikator 2025

    ManajemenEnergi

    WHRPG dapatdilakukan dengakemitraan ataupendanaan lain

    WHRG, Ind

    II/III/IV/VIMilestone: Sesuai Energy Mix PolicyIndonesia 2025, 25% dari totalkonsumsi energi adalah energiterbarukan

    10% 10%

    Tahun

    2016: 12%

    Semen Gresik Group

  • 8/12/2019 Bagaimana Industri Berperan