01 – 04 December 2009 Benchmark Palembang City HCPT-XL Q4 2009
EXECUTIVE SUMMARYKPIs HCPT XL REMARKSNumber of Calls 127 132Successful Call Rate 97.64% 93.18%Call Set-Up Success Rate
97.64% 95.45%
Call Drop Rate 0.00% 2.27%Number of H.O. 349 614Handover Success Rate
99.15% 97.62%
# of Sectors Serving 128 226RX Level >= -80 dBm 98.3% 99.8%RX Quality <= 3 88.1% 83.8%MOS >=3.5 89.5% 76.8%Average Call Set-Up Time
7.29s 5.62s
01 – 04 December 2009 Benchmark Palembang City HCPT-XL Q4 2009
Overview
Benchmark has been performed using SwissQual (SQ) End to End measurement toolDate: 01 - 04.12.2009Area: Palembang CityMeasurements have been performed with 1 mobile for each HCPT and XL:A number: Moving Calling ISDN Fixed Line NumberB number: Stationary Land unit Receiving Unit Call Setup: 120 sec. connected / 10 sec. idleMobiles Used: Nokia 6680
01 – 04 December 2009 Benchmark Palembang City HCPT-XL Q4 2009
Idle Drive Test overview by RxLev Average (HCPT)
01 – 04 December 2009 Benchmark Palembang City HCPT-XL Q4 2009
Idle Drive Test overview by RxLev Average (XL)
01 – 04 December 2009 Benchmark Palembang City HCPT-XL Q4 2009
Connected Drive Test overview by RxLev Average (HCPT)
01 – 04 December 2009 Benchmark Palembang City HCPT-XL Q4 2009
Connected Drive Test overview by RxLev Average (XL)
01 – 04 December 2009 Benchmark Palembang City HCPT-XL Q4 2009
Connected Drive Test overview by RxQual sub (HCPT)
01 – 04 December 2009 Benchmark Palembang City HCPT-XL Q4 2009
Connected Drive Test overview by RxQual sub (XL)
01 – 04 December 2009 Benchmark Palembang City HCPT-XL Q4 2009
Connected Drive Test overview by MOS (HCPT)
01 – 04 December 2009 Benchmark Palembang City HCPT-XL Q4 2009
Connected Drive Test overview by Speech Codec (HCPT)
01 – 04 December 2009 Benchmark Palembang City HCPT-XL Q4 2009
HCPT XLCompleted Completed calls 124 123
Success Rate 97.64% 93.18%Failure Failure 3 6CSSR CSSR 97.64% 95.45%Dropped Number of Drops 0 3
Drop Rate 0.00% 2.27%Total Nr of calls 127 132
Call Statistics
Head to Head comparison
01 – 04 December 2009 Benchmark Palembang City HCPT-XL Q4 2009
HCPT XLNumber of HO 349 614HO Success Rate 99.15% 97.62%Number of Assign. failed 2 3Assignment Failure rate 0.57% 0.48%Number of HO failed 1 12HO failure Rate 0.28% 1.91%
Head to Head comparison
01 – 04 December 2009 Benchmark Palembang City HCPT-XL Q4 2009
Number of different Base Stations (sectors) covered
HCPT XL Number of Sectors 128 226
Call Status Technology Total Test's Rate*
Completed GSM 1800 87 65.91%
GSM 900 36 27.27%
Dropped GSM 1800 0 0.00%
GSM 900 3 2.27%
Failed GSM 1800 0 0.00%
GSM 900 6 4.55%
Total Call Attempts GSM 1800 87 65.91%
Total Call Attempts GSM 900 45 34.09%
Total Call Attempts 132 100.00%
Number of Test Calls by 900 / 1800 Network (XL only)
Percentage of Idle Rx Level Measurement by Band (XL only)Technology Total Samples Rate*GSM 900 4260 89.29%GSM 1800 511 10.71%
01 – 04 December 2009 Benchmark Palembang City HCPT-XL Q4 2009
Head to Head comparison Reason for Drop call
Reason for Call failed
01 – 04 December 2009 Benchmark Palembang City HCPT-XL Q4 2009
Head to Head comparison Idle Received Level
01 – 04 December 2009 Benchmark Palembang City HCPT-XL Q4 2009
Head to Head comparison Connected Received Level
01 – 04 December 2009 Benchmark Palembang City HCPT-XL Q4 2009
01 – 04 December 2009 Benchmark Palembang City HCPT-XL Q4 2009
Average of all setup times from dial command to connect acknowledge in seconds
HCPT Histogram Setup Time
05
101520253035404550
1.2
1.8
2.4 3 3.6
4.2
4.8
5.4 6 6.6
7.2
7.8
8.4 9 9.6
10.2
10.8
11.4 12 12.6
13.2
13.8
14.4 15 15.6
16.2
16.8
17.4 18 18.6
19.2
19.8
Setup Time
Tota
l Tes
t's
XL Histogram Setup Time
0
5
10
15
20
25
30
1.2
1.8
2.4 3 3.6
4.2
4.8
5.4 6 6.6
7.2
7.8
8.4 9 9.6
10.2
10.8
11.4 12 12.6
13.2
13.8
14.4 15 15.6
16.2
16.8
17.4 18 18.6
19.2
19.8
Setup Time
Tota
l Tes
t's
01 – 04 December 2009 Benchmark Palembang City HCPT-XL Q4 2009
Head to Head comparison RxQual
01 – 04 December 2009 Benchmark Palembang City HCPT-XL Q4 2009
Head to Head comparison MOS values
01 – 04 December 2009 Benchmark Palembang City HCPT-XL Q4 2009
Number of Samples Collected
HCPT XL REMARKSIdle RxLevel 4395 4376Connected RxLevel 5057 4882RxQuality 4839 4605MOS 656 762
01 – 04 December 2009 Benchmark Palembang City HCPT-XL Q4 2009
Speech Codec
01 – 04 December 2009 Benchmark Palembang City HCPT-XL Q4 2009
Head to Head comparison Idle Received Level Per Quarter
01 – 04 December 2009 Benchmark Palembang City HCPT-XL Q4 2009
Head to Head comparison Received Quality Per Quarter
01 – 04 December 2009 Benchmark Palembang City HCPT-XL Q4 2009
Head to Head comparison MOS Per Quarter
01 – 04 December 2009 Benchmark Palembang City HCPT-XL Q4 2009