bhel hrd seminar (ishant gautam)
TRANSCRIPT
05/01/20231
TRANSLAM INSTITUTE OF TECHNOLOGY & MANAGEMENT,
MEERUT
SEMINAR ON- BHEL, HARIDWAR
SUBMITTED TO- SUBMITTED BY-DEPARTMENT OF MECHANICAL ISHANT GAUTAMENGINEERING TITM, MEERUT B.TECH (M.E) ROLL NO. 1232140025
05/01/20232
ABOUTBHELABOUT BHEL
• BHEL- BHARAT HEAVY ELECTRICALS LIMITED
• BHEL is the largest engineering and manufacturing enterprise in India.
• Type: PSU, Maharatna Company• Industry: Electrical equipments• Founded: 1964• Founder: Government of India• Headquarters: New Delhi, India• Key people: B Prasad Rao, (Chairman & MD)• Products: Gas and Steam Turbines, Boilers, Electric Motors,
Generators, Heat Exchangers.
05/01/20233
• BHEL, Bhopal (Madhya Pradesh)• BHEL, Hyderabad (Andhra Pradesh)• Transformer Plant, BHEL Jhansi(Uttar Pradesh) • Boiler Auxiliaries Plant, Ranipet (Tamil Nadu)• BHEL, Jagdishpur (Uttar Pradesh)• BHEL, Rudrapur (Uttrakhand)• BHEL Ranipur, Haridwar (Uttarakhand) • Bharat Heavy Plates and Vessels Limited (Vizag)
MAIN MANUFACTURING UNITS
05/01/20234
• Boiler• Steam turbine• Gas turbine• Hydro turbine• Transportation Equipments• Transformer• Switchgear• Oil field Equipments (OFE)• Boiler drum• Wind mill• Valve
PRODUCTS RANGE
05/01/20235
TRAINING AREA: MACHINING & CRITICAL ASSEMBLIES OF STEAM TURBINE (BL-3).
VOCATIONAL TRAININGAT
BHEL RANIPUR, HARIDWAR
05/01/20236
BHEL, HARIDWAR UNIT
HEEP, GATE BHEL RANIPUR, HARIDWAR (UK)
05/01/20237
1. BLOCK-1: Electrical Machine Shop
2. BLOCK-2: Heavy Fabrication Shop
3. BLOCK-3: Turbine Manufacturing Shop
4. BLOCK-4: CIM (Coils & Insulation Manufacturing)
5. BLOCK-5: Condenser Fabrication & Forge Shop
6. BLOCK-6: Fabrication Shop & Die Shop
7. BLOCK-7: Carpentry & Heat Treatment Shop
8. BLOCK-8: Heat Exchanger Shop
HEAVY ELECTRICAL EQUIPMENT PLANT (HEEP),HARIDWAR
05/01/20238
• Started in 1960s with the help of Russia.• BHEL, Ranipur has two plants:• HEEP: Heavy Electrical Equipment Plant.• CFFP: Central Foundry Forge Plant.
• Spread in about 5000 Acres.
BHEL, RANIPUR
05/01/20239
LAYOUT OF BLOCK-3
BAY- 1 BAY- 2 BAY- 3 BAY- 4
HEAVY MACHINE SHOP (HMS)
HMS BEARING SECTION
BLADE SHOP
ASSEMBLY SECTION
ASSEMBLY SECTION
TURNING SECTION
TURNING SECTION
OSBT ASSEMBLY SECTION
HEAT TREATMENT SECTION
GOVERNING SECTION
BLOCK- 3
05/01/202310
• A steam turbine works on the principle of conversion of High pressure & temperature steam into high Kinetic energy, thereby giving torque to a moving rotor.
STEAM TURBINE
05/01/202311
HIGH PRESSURE
(H.P)TURBINE
INTERMEDIATE
PRESSURE (I.P)
TURBINE
LOW PRESSURE
(L.P) TURBINE
STEAMTURBINE
05/01/202312
Specification of HP Turbine(500 MW):
• Main Steam Temp- 537˚C• main steam pressure- 170 kg/cm2
• Reheat steam temp- 537˚C• Length of Rotor- 4.61m• Height- 2.15m • Weight- 86400kg
1. H.P TURBINE-
05/01/202313
The blades are responsible for extracting energy from the high temperature, high pressure steam produced by the boiler.
H.P Turbine Blades:
05/01/202314
I.P Turbine have more pressure than L.P Turbine but less than H.P Turbine. Specifications of I.P Turbine:
• Length- 4425 mm • Width- 5000 mm• Height- 4800 mm• Steam pressure- 41 Kg/cm• Steam temperature- 537˚C
2. I.P TURBINE-
05/01/202315
The size of blades of I.P steam turbine is larger than H.P steam turbine, but smaller than L.P steam turbine.
I.P Turbine Blades:
05/01/202316
Specification of LP Turbine(500 MW):
• Main Steam Temp- 320˚C• Main steam pressure- 8 kg/cm2
• Reheat steam temp- 320˚C • Length of Rotor - 8.71m• Height -10.7m• Weight-345000kg.
3. L.P TURBINE-
05/01/202317
The blades of I.P turbine are made up of Titanium alloys which offer high strength to bear the steam temperature.
L.P Turbine Blades:
05/01/202318
Vocational Training gives the idea of general awareness in steam turbine manufacturing, & its process. Its provides practical idea to manufacturing several components of turbine.
CONCLUSION
05/01/202319