b&i2013 donderdag 15.45_zaal_c_designing and prototyping a new generation of composite sandwich...

32
Company | Rabin Center| Fletcher A2 Hotel Congres Bouwmaterialen & Innovatie De ontwikkeling van glasvezelversterkte polyester componenten voor de bouw in 2 projecten prof. dr. ir. Mick Eekhout 31.10.2013

Upload: bouwmaterialeninnovatie

Post on 21-Jun-2015

214 views

Category:

Documents


1 download

TRANSCRIPT

Page 1: B&i2013 donderdag 15.45_zaal_c_designing and prototyping a new generation of composite sandwich structures for free form architecture

Company | Rabin Center| Fletcher A2 Hotel

C o n g r e s B o u w m a t e r i a l e n & I n n o v a t i e

De ontwikkeling van

glasvezelversterkte polyester

componenten voor de bouw in 2

projecten

prof. dr. ir. Mick Eekhout 31.10.2013

Page 2: B&i2013 donderdag 15.45_zaal_c_designing and prototyping a new generation of composite sandwich structures for free form architecture

Company | Rabin Center| Fletcher A2 Hotel Company | Rabin Center| Fletcher A2 Hotel

Octatube is een combinatie van een technisch ontwerpbureau en een productiebedrijf en levert bijdrage aan bouwprocessen als gespecialiseerde (onder)aannemer. Projecten worden vaak vanaf ontwerp tot realisatie uitgevoerd.

D e s i g n & B u i l d a a n p a k i s b e l a n g r i j k v o o r i n n o v a t i e !

van model tot gebouw

Page 3: B&i2013 donderdag 15.45_zaal_c_designing and prototyping a new generation of composite sandwich structures for free form architecture

Company | Rabin Center| Fletcher A2 Hotel Company | Rabin Center| Fletcher A2 Hotel

Het samenbundelen van ontwerpen, engineering, produceren en monteren in het zogenoemde ‘Design & Build’ concept, levert één verantwoordelijke en aanspreekbare partij. Dit werpt zeker bij onderdelen die zeer specialistisch, nieuw of experimenteel zijn, haar vruchten af voor de klant.

O r g a n i s a t i e o n d e r s t e u n t ‘ D e s i g n & B u i l d i n n o v a t i o n ’

DESIGN ENGINEERING PRODUCTION INSTALLATION

Page 4: B&i2013 donderdag 15.45_zaal_c_designing and prototyping a new generation of composite sandwich structures for free form architecture

Company | Rabin Center| Fletcher A2 Hotel Company | Rabin Center| Fletcher A2 Hotel

Experimenteel project 1: RABIN CENTER, Tel Aviv, 2003-2006, Moshe Safdie Architects

Page 5: B&i2013 donderdag 15.45_zaal_c_designing and prototyping a new generation of composite sandwich structures for free form architecture

Company | Rabin Center| Fletcher A2 Hotel Company | Rabin Center| Fletcher A2 Hotel

DESIGN

3d solid model

library

tender drawing

great hall

Page 6: B&i2013 donderdag 15.45_zaal_c_designing and prototyping a new generation of composite sandwich structures for free form architecture

Company | Rabin Center| Fletcher A2 Hotel Company | Rabin Center| Fletcher A2 Hotel

ENGINEERING OF THE GREAT HALL IN BIM

Page 7: B&i2013 donderdag 15.45_zaal_c_designing and prototyping a new generation of composite sandwich structures for free form architecture

Company | Rabin Center| Fletcher A2 Hotel Company | Rabin Center| Fletcher A2 Hotel

ENGINEERING

structural behaviour of wings

Page 8: B&i2013 donderdag 15.45_zaal_c_designing and prototyping a new generation of composite sandwich structures for free form architecture

Company | Rabin Center| Fletcher A2 Hotel Company | Rabin Center| Fletcher A2 Hotel

Architectural model | Moshe Safdie, Boston

library the great hall

architectural model

YITZHAK RABIN CENTER PROTOTYPING BIJ HOLLAND COMPOSITES EN OCTATUBE

Page 9: B&i2013 donderdag 15.45_zaal_c_designing and prototyping a new generation of composite sandwich structures for free form architecture

Company | Rabin Center| Fletcher A2 Hotel Company | Rabin Center| Fletcher A2 Hotel

PRODUCTION

Page 10: B&i2013 donderdag 15.45_zaal_c_designing and prototyping a new generation of composite sandwich structures for free form architecture

Company | Rabin Center| Fletcher A2 Hotel Company | Rabin Center| Fletcher A2 Hotel

INSTALLATION

Page 11: B&i2013 donderdag 15.45_zaal_c_designing and prototyping a new generation of composite sandwich structures for free form architecture

Company | Rabin Center| Fletcher A2 Hotel Company | Rabin Center| Fletcher A2 Hotel

INSTALLATION

Page 12: B&i2013 donderdag 15.45_zaal_c_designing and prototyping a new generation of composite sandwich structures for free form architecture

Company | Rabin Center| Fletcher A2 Hotel Company | Rabin Center| Fletcher A2 Hotel

INSTALLATION

Page 13: B&i2013 donderdag 15.45_zaal_c_designing and prototyping a new generation of composite sandwich structures for free form architecture

Company | Rabin Center| Fletcher A2 Hotel Company | Rabin Center| Fletcher A2 Hotel

COMPLETED

Page 14: B&i2013 donderdag 15.45_zaal_c_designing and prototyping a new generation of composite sandwich structures for free form architecture

Company | Rabin Center| Fletcher A2 Hotel Company | Rabin Center| Fletcher A2 Hotel

INTERIOR

Page 15: B&i2013 donderdag 15.45_zaal_c_designing and prototyping a new generation of composite sandwich structures for free form architecture

Company | Rabin Center| Fletcher A2 Hotel Company | Rabin Center| Fletcher A2 Hotel

INNOVATIEGRADEN VAN DIT SUPER EXPERIMENTELE PROJECT

1. eerste free form componenten / BIM engineering uit noodzaak

2. Glasvezel versterkt polyester (GVP) 3. Vacuüm injectie methode 4. Werken met one-off mallen 5. Uitvoering in Israel op 5000km afstand 6. Assemblage segmenten onder 40

graden C 7. Beton met >> toleranties 8. GVP met >> toleranties 8 innovatiegraden ontaarden in een

onbeheersbaar Design & Build proces

Page 16: B&i2013 donderdag 15.45_zaal_c_designing and prototyping a new generation of composite sandwich structures for free form architecture

Company | Rabin Center| Fletcher A2 Hotel Company | Rabin Center| Fletcher A2 Hotel

COMPLETED

Liquid material adapted to the desired shape A sensational sculptural roof And a very experimental process

Page 17: B&i2013 donderdag 15.45_zaal_c_designing and prototyping a new generation of composite sandwich structures for free form architecture

Company | Rabin Center| Fletcher A2 Hotel Company | Rabin Center| Fletcher A2 Hotel

Pilot project 2: FLETCHER A2 HOTEL, Amsterdam, 2011-2012, Benthem Crouwel Architecten

Page 18: B&i2013 donderdag 15.45_zaal_c_designing and prototyping a new generation of composite sandwich structures for free form architecture

Company | Rabin Center| Fletcher A2 Hotel Company | Rabin Center| Fletcher A2 Hotel

DESIGN: glasvezelversterkte buitenwanden en glazen tweede huidgevel

Page 19: B&i2013 donderdag 15.45_zaal_c_designing and prototyping a new generation of composite sandwich structures for free form architecture

Company | Rabin Center| Fletcher A2 Hotel Company | Rabin Center| Fletcher A2 Hotel

PROTOTYPING: van buitengevel en glasmonsters

Page 20: B&i2013 donderdag 15.45_zaal_c_designing and prototyping a new generation of composite sandwich structures for free form architecture

Company | Rabin Center| Fletcher A2 Hotel Company | Rabin Center| Fletcher A2 Hotel

ENGINEERING A DOUBLE SKIN FACADE rondom een ronde toren

Page 21: B&i2013 donderdag 15.45_zaal_c_designing and prototyping a new generation of composite sandwich structures for free form architecture

Company | Rabin Center| Fletcher A2 Hotel Company | Rabin Center| Fletcher A2 Hotel

PRODUCTION AT HOLLAND COMPOSITES: vacuüm injectie proces

Page 22: B&i2013 donderdag 15.45_zaal_c_designing and prototyping a new generation of composite sandwich structures for free form architecture

Company | Rabin Center| Fletcher A2 Hotel Company | Rabin Center| Fletcher A2 Hotel

PRODUCTION leverde krimp van de componenten op

Page 23: B&i2013 donderdag 15.45_zaal_c_designing and prototyping a new generation of composite sandwich structures for free form architecture

Company | Rabin Center| Fletcher A2 Hotel Company | Rabin Center| Fletcher A2 Hotel

PRODUCTION na het uitharden werden componenten van folie voorzien

Page 24: B&i2013 donderdag 15.45_zaal_c_designing and prototyping a new generation of composite sandwich structures for free form architecture

Company | Rabin Center| Fletcher A2 Hotel Company | Rabin Center| Fletcher A2 Hotel

PRODUCTION en getransporteerd per bouwlaag

Page 25: B&i2013 donderdag 15.45_zaal_c_designing and prototyping a new generation of composite sandwich structures for free form architecture

Company | Rabin Center| Fletcher A2 Hotel Company | Rabin Center| Fletcher A2 Hotel

INSTALLATION bouwvolgorde was logistiek bepaald

Page 26: B&i2013 donderdag 15.45_zaal_c_designing and prototyping a new generation of composite sandwich structures for free form architecture

Company | Rabin Center| Fletcher A2 Hotel Company | Rabin Center| Fletcher A2 Hotel

INSTALLATION beschadigingen / toleranties in lengte

Page 27: B&i2013 donderdag 15.45_zaal_c_designing and prototyping a new generation of composite sandwich structures for free form architecture

Company | Rabin Center| Fletcher A2 Hotel Company | Rabin Center| Fletcher A2 Hotel

INSTALLATION stalen uithouders en glaspanelen uit China

Page 28: B&i2013 donderdag 15.45_zaal_c_designing and prototyping a new generation of composite sandwich structures for free form architecture

Company | Rabin Center| Fletcher A2 Hotel Company | Rabin Center| Fletcher A2 Hotel

INSTALLATION heldere technische bevestiging

Page 29: B&i2013 donderdag 15.45_zaal_c_designing and prototyping a new generation of composite sandwich structures for free form architecture

Company | Rabin Center| Fletcher A2 Hotel Company | Rabin Center| Fletcher A2 Hotel

COMPLETED technische architectuur

Page 30: B&i2013 donderdag 15.45_zaal_c_designing and prototyping a new generation of composite sandwich structures for free form architecture

Company | Rabin Center| Fletcher A2 Hotel Company | Rabin Center| Fletcher A2 Hotel

COMPLETED

Page 31: B&i2013 donderdag 15.45_zaal_c_designing and prototyping a new generation of composite sandwich structures for free form architecture

Company | Rabin Center| Fletcher A2 Hotel Company | Rabin Center| Fletcher A2 Hotel

INNOVATIEGRADEN VAN DIT TWEEDE (PILOT)PROJECT

1. Krimp vanuit de mal 2. Tussenopslag buiten in winter,

waardoor grotere kromming 3. Toleranties in lengte

Page 32: B&i2013 donderdag 15.45_zaal_c_designing and prototyping a new generation of composite sandwich structures for free form architecture

Company | Rabin Center| Fletcher A2 Hotel Company | Rabin Center| Fletcher A2 Hotel

F l e t c h e r H o t e l A 2 , A m s t e r d a m ( N e t h e r l a n d s ) COMPLETED

Transfer of technology leads to development of application