1/36 Bill of Quantity #1&#2 Boiler FOR STEPC - 2X 600 MW AT CUDDALORE NO. Working Description Unit 单单 ONE Heat Flow Diagram 1 Boiler Steel Structure 1.1 set 2 8890 3200.4 1.2 set 2 2010 785.7 1.3 set 2 668 190.8 1.4 Ceiling girde set 2 760 370.6 1.5 set 2 1600 2007.2 2 Boiler Proper Item BOQ单单单 单单单 Quanti ty weight ( MT) Main Structuresteel framingScope of Works: Installation of column, beamhorizontal & vertical brace and connector etc.. Contents of Works: Foundation cleaning, lining; fabrication of pad block ; manufacturing, installation and removal of temporary facilities; check, calibration, assembly, reinforcement, hoisting, aligning and fixing of steel structure. Stairs, platform, walkway, handrails and the supports for these railing and toe plate belong to the steam generator . Contents of Works: Check, assembly and installation of platform, support, ladder as well as fabrication and installation of railing and toe plate; process calibration of platform, ladder and railing in the Over Roof of boiler &drum house Scope of Works:Roof structure & inclosure , drum house and storm sewer.etc. content of work: Calibration, assembly, installation of skin casing and its framework ,storm sewer erection etc.. Scope of Works:Installation of Boiler ceiling girde. Contents of Works: lining; installation and removal of temporary facilities; check, calibration, assembly, reinforcement, hoisting, aligning and fixing of steel structure. Steel structure for gas & duct,rail beam for electric hoist,furnace inspection system scope of works:steel structure for maintaining gas & duct,rail beam for electric hoist.content of works: assemblage and erection, lifting, accessories device, etc…

Upload: vijay-raj

Post on 24-Nov-2015

95 views

Category:

Documents


4 download

DESCRIPTION

technical list

TRANSCRIPT

results

BOQ Bill of Quantity #1 Boiler FOR STEPC - 2X 600 MW AT CUDDALORENO.Item Working DescriptionUnitBOQMTRemarkQuantityweight ( MT)ONEHeat Flow Diagram1Boiler Steel Structure1.1Main Structuresteel framingScope of Works: Installation of column, beam horizontal & vertical brace and connector etc.. Contents of Works: Foundation cleaning, lining; fabrication of pad block ; manufacturing, installation and removal of temporary facilities; check, calibration, assembly, reinforcement, hoisting, aligning and fixing of steel structure. set288903200.46400.81.2Stairs, platform, walkway, handrails and the supports for theseScope of Works: Installation of platform, ladder, railing and toe plate belong to the steam generator . Contents of Works: Check, assembly and installation of platform, support, ladder as well as fabrication and installation of railing and toe plate; process calibration of platform, ladder and railing in the whole steam generator. .set22010785.71571.41.3Over Roof of boiler &drum house Scope of Works:Roof structure & inclosure , drum house and storm sewer.etc. content of work: Calibration, assembly, installation of skin casing and its framework ,storm sewer erection etc.. set2668190.8381.61.4Ceiling girdeScope of Works:Installation of Boiler ceiling girde. Contents of Works: lining; installation and removal of temporary facilities; check, calibration, assembly, reinforcement, hoisting, aligning and fixing of steel structure. .set2760370.6741.21.5Steel structure for gas & duct,rail beam for electric hoist,furnace inspection systemscope of works:steel structure for maintaining gas & duct,rail beam for electric hoist.content of works: assemblage and erection, lifting, accessories device, etc ,set216002007.24014.42Boiler Proper 2.1Drum (including inner Equipment and accessories)Scope of works: Installation of drum and its internal devices, the underbed and u-type hanger rod etc. Contents of Works: Inspection on internal and external walls of drum; reassembly, hoisting, aligning and fixing of the center line; disassembly and assembly of internal devices; amendment of the underbed and hanger; cleaning up, sealing of access door; installation of expansion indicator and fabrication of the support. set2536259.2518.42.2Water-cool Wall System ( piping, fitting, sealing part etc) and Header Scope of Works: panel welding and erection,sealing welding etc. Contents of Works: 1. Line and regulate the panel arrays on the platform. 2. balls passing of per pipe of totall panel; the internal clean-up, inspection, lining of headers. 3. Assembly and butt welding of pipes and panel; lifting, aligning and fixing of components or panel; the inspection and adjustment of overall dimensions of heaters. 123set21762799.21598.42.3Superheat System (piping, fitting, sealing part etc) and Header Scope of Works: 1.Installation & welding of coil tube arrays, roof tube, exclosure wall tube, header etc. 2. sealing welding of superheat system etc.. Contents of Works: 1. Line and regulate the pipe or tube arrays on the pipe calibration platform. 2.balls passing of all tubes, the internal clean-up,inspection, lining of headers. 3. Assembly and butt welding of pipes and tube arrays; hoisting, aligning and fixing of components or tubes; the inspection and adjustment of overall dimensions of panel.: 123set237301615.453230.92.4Reheat System ( piping, fitting,sealing part etc.) and Header Scope of Works:1. Installation & welding of coil tube arrays and components, header etc..2. sealing welding of reheat system etc. Contents of Works: 1. Line and regulate the pipe or tube arrays on the pipe calibration platform. 2.balls passing of panel , the internal clean-up, inspection, lining of headers. 3. Assembly and butt welding of pipes and tube arrays; hoisting, aligning and fixing of components or tubes; the inspection and adjustment of overall dimensions of panel. 123set2918416.3832.62.5Economizers ( piping, fitting, etc.)Scope of Works: Installation & welding of coil tube arrays and components, hanged pipe, header, wear-preventing device etc. Contents of Works: 1. Line and regulate the pipe or tube arrays on the pipe calibration platform. 2. balls passing of coil tube arrays ; the internal clean-up, inspection, lining of headers. 3. Assembly and butt welding of pipes and tube arrays; hoisting, aligning and fixing of components or tubes; the inspection and adjustment of overall dimensions 4.installation of wear-preventing devices for economizer. 1234set21600848.61697.22.6connection piping between pressure parts(including support and hanger,accessories ) scope of work: welding, erection ,ball passing etc. Content of work:transportation,welding,erection and support etc.set2960277.2554.42.7downcomerscope of work: welding, erection,sand blasting etc. Content of work:transportation,welding,erection and support etc.set2256128.8257.62.8down -comer water header and recirculating pump systemScope of Works: header, support saddle of header etc.. Contents of Works: 1.the internal clean-up, inspection, lining of headers. 2. hoisting, aligning, fixing, inspection and adjustment and hydraulic test etc.. 1. 2.set22103.6177.2342.9Boiler BuckstayScope of Works: buckstays and connectors etc.. Contents of Works: hoisting, welding,placing and fixing of buckstays and connectors. 1set21040361.2722.42.10Hanger and support for pressure partScope and contents of works: Inspection,assemble, installation, adjustment and fixing of rigid support and hanger, spring support and hanger as well as support and hanger of constant force.set2960168.3336.62.11sootblower system instalation of sootblower, piping, including sandblast of pipes, valve, fitting and hangers & supports, hydraulic test steam blowing,commissioning etc.set2520106.1212.22.12Burners,oil gun,ignitor etc.Inspection and installation of burner and its support etc.set2720161.9323.82.13Fuel oil pipes, valves and supports in boiler areascope of work: piping,vavle, fitting and hangers & supports, sandblast of pipes, oil flushing ,hydraulic test, steam blowing etc. oil circulate with pressure, etc..set23824.348.62.14accessories of boiler proper scope of work:installation of silencers,safe valve,drain steam piping of safe valve,hangers & supports,pressure gauge,expansion indicator ,fitting, manhole gate, sealing device,instrument sampling socket for I&C,etc set2200141.97283.942.15Pipes of boiler proper (including pipings ,valves, fitting ,hangers & supports etc)scope of work:sandblasting and installation of drain water pipe ,dozing pipe ,water level gauge and relative pipe ,recycle pipe of economizer ,spray pipe of super heater and reheater ,sampling pipe ,vent pipe ,blowdown pipe and primary isolation valves etc.. set216044.9589.92.16Air PreheaterScope of Works:installation of key body, fitting, auxiliary equipment,sealing device, supports & hangers and sealing adjustment,assemblage and erection the Steam heated airheater , the overall cold trial run. Contents of Works: Clean-up of foundation; assembly of rotor and housing; assembly, installation of heat transfer elements and gearing devices; installation and adjustment of sealing glands, oil system, firefighting soot-blowing or cleaning devices;the overall cold trial run. set42400170334062.17Hydrostatic test for pressure partScope of Works: 1.contractor shall provide temporary booster pump,feeder pump, and piping,fitting,valves etc. 2. Installation and removal of temporary equipment and pipe, and system recovery Contents of Works: 1. Installation and removal of temporary water-feeding, water-draining, pressure-lifting, chemical-dosing and heating pipes, compressed air equipment and piping system. 2. Locking of exit, constant hanger, inspection and cutting off of temporary fixtures; 3. air test and defect treatment. 4. Defect treatment after water feeding, flushing, pressure lifting, pressure regulation, inspecting, pressure relief and pneumatic test. 5. System recovery.12 12345set22.18Chemical cleaning1.The contractor supply all the temporary material, equipment,chemicals, acid trough, water tank, pipes, pump, valves and accessories ect... (including but not limited checking, recover after cleaning, waste liquid treatment and drain), 2. The contractor shall submit to employer necessary qualified test/report and qualification of company as per india relevant regulation or requirement of employer and owner, etc... 3.Chemical cleaning shall meet the india regulation, such as enviromental antipollution, discharge of liquid effluent, treatment of boiler cleaning effluent and monitoring requirements, etcset23Fans3.1Primary fan of axial-flow typescope of work:1. Installation and alignment of the impeller casing, main bearings, rotors, inlet box, diffuser, sealing glands, dynamic blade regulator, motor etc.. 2. Installation of platform, ladder and railing of the fan. 3. Installation of the lubricant system; hydraulic system; internal treatment of lubricant pipings and servo drive device. 4. Test and adjustment of lubricant system etc.. 5. Structural inspection and finishing of fan blades. 12345set412091.7183.43.2Forced draft fan of axial-flow typescope of work:1. Installation and alignment of the impeller casing, main bearings, rotors, inlet box, diffuser, sealing glands, dynamic blade regulator, motor etc.. 2. Installation of platform, ladder and railing of the fan. 3. Installation of the lubricant system; hydraulic system; internal treatment of lubricant pipings and servo drive device. 4. Test and adjustment of lubricant system etc.. 5. Structural inspection and finishing of fan blades. 12345set414052.3104.63.3Induced draft fan of axial-flow typescope of work:1. Installation and alignment of the impeller casing , main bearings, rotors, inlet boxs, diffuser, motor and cooling air fan and assessory etc.. 2. Installation of platform, ladder and railing of the fan. 3. Installation of the lubricant system; internal treatment of lubricant pipings. 4. Test and adjustment of lubricant system. 1345set4260194.9389.83.4Scanner cooling air fan(centrifugal type)scope of work:Sizing block & shims erection, equipment alignment and accessory. set48243.5Seal air fan(centrifugal type)scope of work:1. Hydraulic test of bearing box. 2. sizing block & shims erection, equipment alignment and accessory. 1. 2. set4281428flow 11.52m3/s ,pressure :9000Pa ,including motor 185kw, 415v 4electrostatic precipitator04.1electrostatic precipitatorScope of Works: the ESP proper(include steel structureShell and top capfrom inlet duct to outlet duct, and flange of ash hopper upward, the whole machinery, shaking devices and junction piece)Stairs, platform, walkway, anode system, cathode system, small ash bucket of the ESPaccessories, etc... Contents of Works: Assembly, alignment and installation of equipment, kerosene test and air leakage test etc. set45800475095005Milling system5.1Medium speed mills,Scope of works: type:HP1163/Dyn motor:850KW 11kV(including oil system, motor, dynamic classifier, gear box, sealing device, valvesfix/mobile mill rejects hopper, steel structure, platform , support and hangeretc). Contents of works: installation and alignment of equipment and accessory, internal treatment of lubricant pipings set1435001815.63631.25.2Belt coal feeder,Scope of works:max.conveying capacity:101t/h feeding distance:2.25m inlet/outlet raw coal piping, inlet/outlet gate valves, coal chutesealing device , accessories etc,set1418242846Installation of flues & air duct6.1Assembly and erection of wind boxScope of Works: wind box, expansion joint and supports & hangers etc.. Contents of Works: Assembly, welding and installation of wind box, expansion joint, supports & hangers and kerosene test etc. set419235.871.66.2Steam coil air preheaterScope of Works: Installation of steam coil air pre Heater including drain piping, pump, valve hydraulic test etc. Contents of Works: alignment, installation, welding, hydro-test etc.. set4729186.3Assembly and erection of flue ductScope of Works: inlet & outlet duct of air preheater, inlet and outlet duct of ESP, inlet and outlet duct of IDF ,manhole gate and baffle and support&hanger etc. Contents of Works: Assembly, welding and installation of flue duct, supports and hangers; inspection and installation of various doors;kerosene test etc.. set216001372.82745.66.4Assembly and erection of Primer cold duct and Secondary cold duct1&2Scope of Works: inlet & outlet of PA fan,inlet & outlet of FD fan,silenser, explosion door,manhole gate and baffle ,support & hangers etc. Contents of Works: Assembly, welding and installation of primer cold duct and secondary cold duct, supports and hangers; inspection and installation of various doors;kerosene test etc.. 1&2set2560303.1606.26.5Assembly and erection the ducts of Primary hot duct and Secondary hot air duc1&2Scope of Works: outlet hot duct of APH, explosion doorexpansion joint ,manhole gate and baffle ,support & hangers etc. Contents of Works: Assembly, welding and installation of primary hot duct and secondary hot duct, supports and hangers; inspection and installation of various doors;kerosene test etc.. 1&2set27003547086.6Sealing air duct Scope of Works: pipe ,valve, supports & hangers etc.. Contents of Works: Assembly,weldind and installation of seal Air duct, welding of pipe, support & hanger erection etc..set24822.444.86.7Piping of pulverized coal systemScope of Works: the coal pipe is from outlet of coal mill to burner,include valves, elbows, expansion joint , accessories, supports & hangers etc. Content of Works: installation, welding of pipe, support&hanger erection etc..set2900889.31778.66.8Fabrication and erection of flue&air duct Scope of Works: fabricaiton and erection of square circle node,elbow Content of Works: 1. Blanking, fabrication, inspection and painting of binding, reinforcer, sealing plate at the corners, rectangle flanges and connecting pipe . 2. Rolling of steel plate; inspection on welding and seam of groove; painting of one coat of anticorrosion paint etc..3.kerosene test. 1.2.set212007Steam generator and other auxiliaries7.1intermittent blowdown flash tank and accessories Scope of Works: Installation of the tank and its attachment. Contents of Works: 1. Foundation lining; fabrication of pad block; hoisting, placing and fixing of the tank. 2. Internal cleaning; cushioning and sealing of port lid; grinding installation of valves and glass water gauge ; installation and adjustment of other attachments.12set22435.51871.0367.2continuous blowdown flash tank and accessories Scope of Works: Installation of the tank and its attachment. Contents of Works: 1. Foundation lining; fabrication of pad block; hoisting, placing and fixing of the tank. 2. Internal cleaning; cushioning and sealing of port lid; grinding installation of valves and glass water gauge ; installation and adjustment of other attachments.12set21625.5517.3electric hoistScope of work:1. installation of electric hoist 2. Load test of electric hoist.123465set21007.4Elevator7.4.1Elevator structureScope of Works:Installation of Elevator structure. Contents of Works:Foundation lining; installation and removal of temporary facilities; check, calibration, assembly, welding, reinforcement, hoisting, aligning and fixing of steel structure..set2182741487.4.2EquipmentScope of work: 1.Support and guide rail erection,2.Installation and adjustment of the traction motor,3.The erection of Carrier Safety clamps and guide shoe,4.Installation of car,5.Buffer erection,6.installation of door system, 7.the report of usage etc.12set2150TWOFuel supply system 01mill reject system01.1mill hopperincluding double disc valve of mill, discharge valve of accident etc.set14726.5531.2blow tankincluding feed valve,expansion joint and accessoryset144.201.3mill binincluding proper,structure, platform,pressure relief valve ,indicator etcset21201.4exhaust air filter Inspection, clearing, wrapping with cloth bags, installation of the machine proper etc..set220.91.81.5manual knife gateDismantling inspection, clearing and installation, motor installation set20.80.120.241.6pneumatic knife gateDismantling inspection, clearing and installation, motor installation set20.80.440.881.7diameter of the pipe 57including valve, hanger and support, accessories etc.set2201.8diameter of the pipe 133 and219including valve, hanger and support, accessories etc.set2453.1105.71.9fittings:ceramic-lined set240THREEAsh disposal system01bottom ash system01.1steel band conveyoroutput: 3~14t/h, including belt ,motor structure etc.set4600Drawing no have1.2hydraulically operated isolating gate and oil systemincluding related equipment and piping ,accessory ,etc set2600Drawing no have1.3BA hopperincluding anchor bolt ,steel structure, platform,etcset2700Drawing no have1.4clinker grinderincluding motor and accessory set4120Drawing no have1.5bottom ash binincluding structure, platform, supports, gate,auxiliary equipment, pipe,accessory ,etc.set21600Drawing no have1.6double paddle mixerincluding motor and accessory etc.set2160Drawing no have1.7motor-driven air-lock feederinclude motor and accessory etc.set820Drawing no have1.8pneumatic knife gateset820Drawing no have1.9manual knife gateset820Drawing no have1.10dry ash unloaderinclude motor and accessory etc.set20.60Drawing no have1.11scraper conveyorinclude motor and accessory etc.set480Drawing no have1.12slurry pumpincluding motor , accessory , etc.set411.60Drawing no have1.13water pumpincluding motor , accessory ,etc.set440Drawing no have1.14bottom ash slurry mixerset250Drawing no have1.15bottom slurry sumpset230Drawing no have1.16cast stone -lined steel pipe and valvesincluding pipe,valves, supports and hangers, accessory, etcset2500Drawing no have1.17the other pipeincluding valve,gate and accessoryset260Drawing no haveFourMiscellaneous Piping01.1diameter of the pipe 57including compressed air pipe of boiler house, closed cycle cooling water pipeopen cycle coling water pipeservice water pipeauxiliary steam pipeflush pipe of air preheater ,boiler hall washing water piping, and valves, hanger&support , accessory etc. For cooling water, service water pipe,and compressed air pipe, sandblasting shall be included; For auxiliary steam pipe, sandblasting and steam blowing shall be included;set22001.2diameter of the pipe 57 and133including compressed air pipe of boiler house, closed cycle cooling water pipeopen cycle coling water pipeservice water pipeauxiliary steam pipeflush pipe of air preheater ,boiler hall washing water piping, and valves, hanger&support , accessory etc. For cooling water, service water pipe,and compressed air pipe, sandblasting shall be included; For auxiliary steam pipe, sandblasting and steam blowing shall be included;set27001.3diameter of the pipe 133 and219including compressed air pipe of boiler house, closed cycle cooling water pipeopen cycle coling water pipeservice water pipeauxiliary steam pipeflush pipe of air preheater ,boiler hall washing water piping, and valves, hanger&support , accessory etc. For cooling water, service water pipe,and compressed air pipe, sandblasting shall be included; For auxiliary steam pipe, sandblasting and steam blowing shall be included;set28001.4diameter of the pipe 219 and273including compressed air pipe of boiler house, closed cycle cooling water pipeopen cycle coling water pipeservice water pipeauxiliary steam pipeflush pipe of air preheater ,boiler hall washing water piping, and valves, hanger&support , accessory etc. For cooling water, service water pipe,and compressed air pipe, sandblasting shall be included; For auxiliary steam pipe, sandblasting and steam blowing shall be included;set23401.5diameter of the pipe 273including compressed air pipe of boiler house, closed cycle cooling water pipeopen cycle coling water pipeservice water pipeauxiliary steam pipeflush pipe of air preheater ,boiler hall washing water piping, and valves, hanger&support , accessory etc. For cooling water, service water pipe,and compressed air pipe, sandblasting shall be included; For auxiliary steam pipe, sandblasting and steam blowing shall be included;set22001.6diameter of the pipe 57Buried pipes,valves, accessory, etc Excavation, backfill and anticorrosive layer structure asphalt primer shall be includedand the asphalt ,fabric glass and other paint for the buried pipes are suppiled by subcontractor.set220one layer of bitumen sandwich one layers of fabric glass; the total thickness is 2mm.All work and test should be completed to satify the design requirements1.7diameter of the pipe 57 and133Buried pipes,valves, accessory, etc Excavation, backfill and anticorrosive layer structure asphalt primer shall be includedand the asphalt ,fabric glass and other paint for the buried pipes are suppiled by subcontractor.set2100one layer of bitumen sandwich one layers of fabric glass; the total thickness is 3mm.All work and test should be completed to satify the design requirements1.8diameter of the pipe 133 and219Buried pipes,valves, accessory, etc Excavation, backfill and anticorrosive layer structure asphalt primer shall be includedand the asphalt ,fabric glass and other paint for the buried pipes are suppiled by subcontractor.set2200one layer of bitumen sandwich one layers of fabric glass; the total thickness is 4mm.All work and test should be completed to satify the design requirements1.9diameter of the pipe 219 and273Buried pipes,valves, accessory, etc Excavation, backfill and anticorrosive layer structure asphalt primer shall be includedand the asphalt ,fabric glass and other paint for the buried pipes are suppiled by subcontractor.set240one layer of bitumen sandwich one layers of fabric glass; the total thickness is 5mm.All work and test should be completed to satify the design requirements1.10diameter of the pipe 273Buried pipes,valves, accessory, etc Excavation, backfill and anticorrosive layer structure asphalt primer shall be includedand the asphalt ,fabric glass and other paint for the buried pipes are suppiled by subcontractor.set2400one layer of bitumen sandwich one layers of fabric glass; the total thickness is 6mm.All work and test should be completed to satify the design requirements1.11diameter of the pipe 57including stainless steel piping,argon arc welding,valves, support and hanger etc.set260compressed air pipe & accessories in #1 boiler house1.12diameter of the pipe 57 and133including stainless steel piping,argon arc welding,valves, support and hanger etc.set22001.13diameter of the pipe 133 and219including stainless steel piping,argon arc welding,valves, support and hanger etc.set21001.14diameter of the pipe 219 and273including stainless steel piping,argon arc welding,valves, support and hanger etc.set240FiveBOP area system01Coal-fired system01.1Bucket-wheel stacker reclaimerType: stacking: Q=4000t/h,reclaiming:Q=4000t/h boom length:42m Scope of Works: assembly and installation of running mechanism, door seat frame, rotary disk, cantilever frame, tail lathe, platform, walkway, handrails, conveyor and hydraulic system etc.. set3330075022501.2no.2A,B conveyorB=2000mm,V=3.25m/s,Q=4000t/h,Qmax=4400t/h,L=122.254m,=6-12 set294227.239227.2391. Installation of central nonstandard metal framework, groove-type carrier roller, and parallel roller. 2. Installation of tension apparatus framework, slide groove, roller, trolley, fixed pulley, heavy hammer, steel wire, spring and guard grating.3. Laying and glued jointing of belt, installation of coal guide groove. 4. Installation of clamping roller device and various protection devices, signal device (such as tape fracture protection, tape slip protection, tape off tracking switch, coal flow signal, coal blockage signal, bi-direction pull switch, etc.) 5. Installation of head, tail end, reducer and motor support. Installation of head and tail end guide roller, reducer and motor, breaker, sweeper and dustproof curtain.1.3no.3A,B,C conveyorB=2000mm,V=3.25m/s,Q=4000t/h,Qmax=4400t/h,L=1130m,=0-16 set38661695.4051695.4051.4no.4A,B conveyorB=2000mm,V=3.25m/s,Q=4000t/h,Qmax=4400t/h,L=146.716m,=6-10 set2113247.474247.4741.5no.5A,B conveyorB=2000mm,V=3.25m/s,Q=4000t/h,Qmax=4400t/h,L=146.716m,=6-10 set2113247.474247.4741.6no.6A,B conveyorB=2000mm,V=3.25m/s,Q=4000t/h,Qmax=4400t/h,L=103.80m,=5.5 set281280.66280.661.7no.7A,B conveyorB=2000mm,V=3.25m/s,Q=4000t/h,Qmax=4400t/h,L=227.141m,=4.5 set2175254.1254.11.8no.8A,B conveyorB=1400mm,V=2.5m/s,Q=1275t/h,Qmax=1400t/h,L=187.1513m,=4-10.8 set2101153.641153.6411.9no.9A,B conveyorB=1400mm,V=2.5m/s,Q=1275t/h,Qmax=1400t/h,L=318.023m,=4-10.8 set2171109.653109.6531.10no.10A,B conveyorB=1400mm,V=2.5m/s,Q=1275t/h,Qmax=1400t/h,L=205.4m,=0 set2110109.653109.6531.113-location head moveable deviceB=2000mm,Q=4000t/hset33301.12vibration screenQ=1300t/h,Qmax=1400t/h Installation and alignment of of baasement frame, screen frame, shaft, plate spring, spring seat, bearing seat, rubber bumper and motor. set22616.432.81.13ring hammer crusherQ=1300t/h, Ring-hummer-type coal crusher: 1. Sweeping and checking of rotor bearing seat, hammer, lining board of hammer, and screening bar. 2. Installation of shell, materials loading hopper, bearing coupling, motor, and electric pusher. 12set26833.5671.14belt scaleB=1400mm, V=2.5m/s, Q=1275t/h,=10.8 Checking of shifting frame and carrier roller; installation of shifting frame, underbed, weight roller, cross spring lamination, sensor, standard weight scale, and counterweight block. set21.29.069.061.15dynamic circle chainB=1400mm, V=2.5m/s, Q=1275t/h,=10.8set28.44.38.61.16sampling systemB=1400mm, V=2.5m/s, Q=1275t/h,=10.8 Machanical sampling device:1. Strip inspection of reducer, roller, and chain wheel breaker. 2. Installation of framework, chain, chain wheel, chain hopper, shell, chain wheel breaker device, tension device,reducer, and motor. 12set21114.614.61.17electric drive double- side ploughB=1400mm troughing angle:35 Installation of coal plough and coal drop hopper, and installation of electric pusher. set26781281281.18wiperB=2000mm set6601.19belt-type magnetic separaterB=2000mm Check and installation of electromagnetic iron, motor, reducer, driving (driven) roller, and cooling fan; installation of iron abandon belt, and supporting carrier roller. set74314.2113.61.20hang-type magnetic separaterB=1400mm Checking and installation of singal track crane; installation of separator noumenon. set288.78.71.21metal detectorset20.60.040.041.22electric driven diverter gateB=2000mm 1400mm*1400mm Dismantling inspection, clearing and installation, including motor installation set82001.23electric driven billabong gateB=1400mm 1000mm*1000mm Dismantling inspection, clearing and installation, including motor installation set23.701.24electric driven billabong gateB=2000mm 1400mm*1400mm Dismantling inspection, clearing and installation,including motor installation set51301.25absorberB=2000mm 1400mm*1400mm dismantling inspection, clearing, air-tight test and installation,including motor installation. set143201.26absorberB=1400mm 1000mm*1000mm dismantling inspection, clearing, air-tight test and installation including,motor installation. set69.601.27the other pumpsincluding transporting, erection, alignment etc.set1501.28diameter of the pipe 57including piping ,valves,hanging and support, accessory etc,buried pipes (including antiseptic treatment, welding, elbow, valves, excavation, backfill, accessories, hydraulic test, etc.) set11001.29diameter of the pipe 57 and133including piping ,valves,hanging and support, accessory etc,buried pipes (including antiseptic treatment, welding, elbow, valves, excavation, backfill, accessories, hydraulic test, etc.) set15002Fuel oil system02.1HFO storage tankHFO storage tank V=2000m3 (including fabrication & erction, sandblasting,and testing, platform & handrail, accessories, etc.) set278.421682.2LDO storage tankLDO storage tank V=1000m3 (including fabrication & erction,sandblasting,and testing , platform & handrail, accessories, etc.) set143.2147.462.3centrifugal LDO supply pumpsQ=28m3/h including proper equipment, local gauge, etc. set3939.32.4strainers of LDO supply pumpsfilter screen checking, positioning, and installationset30.630.32.5centrifugal LDO unloading pumpsQ=66m3/h including proper equipment, local gauge, etc. set2421.32.6strainers of unloading pumpsfilter screen checking, positioning, and installationset20.420.32.7screw HFO supply pumpsQ=59m3/h including proper equipment, local gauge,alginment, grouting etc. set3334.982.8strainers of HFO supply pumpsfilter screen checking, positioning, and installationset30.630.62.9screw HFO unloading pumpsQ=66m3/h including proper equipment, local gauge,etc. set31.831.92.10strainers of HFO unloading pumpsfilter screen checking, positioning, and installationset30.630.62.11HFO heatersset21.62722.12centrifugal waste water pumpQ=10m3/h including proper equipment, local gauge, etc. set1110.4282.13strainer of centrifugal waste water pumpfilter screen checking, positioning, and installationset10.210.0562.14drain flash tankV=10m3 including installation alignment ,grouting etc, set1314.52.15centrifugal steam drain pumpsQ=10m3/h including proper equipment, local gauge, etc. set21.220.9442.16gear drain oil pumpQ=2m3/h including proper equipment, local gauge, etc. set10.620.192.17strainers of gear drain oil pumpfilter screen checking, positioning, and installationset10.220.0722.18HFO coolersset21.6242.42.19centrifugal direct-link pumpsQ=90m3/h including proper equipment, local gauge, etc. set21.620.62.20diameter of the pipe 57including sandblasting, argon arc welding,valves, supports & hangers ,accessories, hydraulic test, steam blowing, buried pipes (including antiseptic treatment)etc.set151132.21diameter of the pipe 57 and133including sandblasting, argon arc welding,valves, supports & hangers ,accessories, hydraulic test, steam blowing, etc.set11101492.22diameter of the pipe 133 and219including sandblasting, argon arc welding,valves, supports & hangers ,accessories, hydraulic test, steam blowing, etc.set110167.42.23diameter of the pipe 219 and273including sandblasting, argon arc welding,valves, supports & hangers ,accessories, hydraulic test, steam blowing, etc.set1513.33Diesel Generator system03.1diesel engines and the other equipmentsincluding porper,steel plate, cooling system, start-up system, lubricate system, fule oil system, in/out gas/duct system, daily oil tank, accessory , etcset310003.2relevant pipingincluding piping,valves, supports and hangers, accessory, etcset31.504fly ash system04.1hight efficiency setting tank including porper,structure,plateform, drive device, accessory,etcset19504.2Ash vessel of economizer hopperv=0.5m3 including support ,manual knife gate,expansion joint, feed dome valve,vent valve,opening up valve etc.set12604.3ash vessel of ESP 1&2v=2m3 including support ,manual knife gate,expansion joint, feed dome valve,vent valve,opening up valve etc.set323204.4ash vessel of ESP third& fourth &fifth&sixth field3,4,5,6v=0.5m3 including support ,manual knife gate,expansion joint, feed dome valve,vent valve,opening up valve etc.set643204.5ash vessel of air preheaterv=0.5m3 including support ,manual knife gate,expansion joint, feed dome valve,vent valve,opening up valve etc.set8404.6bottom ash sluicing pumpincluding motor and accessory etc.set2404.7sealing water pumpincluding motor and accessory etc.set20.804.8sewage pump include motor and accessory etc.set5304.9fly ash slurry pumpinclude motor and accessory etc.set41704.10slurrying water pumpinclude motor and accessory etc.set2204.11fly ash slurry mixerincluding motor and accessory etc.set2504.12water pumpincluding motor and accessory etc.set2204.13exhaust fanincluding accessory etc.set1104.14double paddle mixerincluding motor and accessory etc.set1804.15fluidizing blower of ash siloincluding motor and accessory etc.set2204.16electric air heater of ash siloincluding motor and accessory etc.set10.804.17motor-driven air-lock feederinclude motor and accessory set4104.18dry ash unloaderinclude motor and accessory set10.304.19exhaust air filter set11.504.20hopper fluidizing blowerinclude motor and accessory set45.204.21hopper fluidizing air heater include motor and accessory set41.204.22aeration trough Inspection, clearing and installation set921.8404.23discharge boxes set6304.24cast stone -lined steel pipe and valesset113004.25GRP & valveset12304.26the other pipeincluding valve, and accessory etc..set1604.27Pressure relief valve DN500set10.5104.28manhole door set20.3505compressed air system05.1air compressor (including proper equipment, motor, etc.)Q=42Nm /minP=0.80MPa250KW6.6KVset64205.2air compressor (including proper equipment, motor, etc.)Q=50Nm /minP=0.75MPa300KW6.6KVset32105.3conveying air direrQ=50Nm /minP=0.80MPa415V, 9.5KWset3905.4filter Q=50Nm /minP=0.80MPaset18905.5combined dryerQ=40Nm /minP=0.8MPa415V, 7.5KWset3905.6conveying air direrQ=60Nm /minP=0.80MPa415V, 9.5KWset3905.7air storage tankV=30m3 including proper equipment, safety valves, local gauge etc.. set75605.8air storage tankV=15m3 including proper equipment, safety valves, local gauge etc.. set31505.9diameter of the pipe 57including carbon steel piping,valves, support and hanger etc.set110in air compressor house5.10diameter of the pipe 57 and133including carbon steel piping,valves, support and hanger etc.set1205.11diameter of the pipe 133 and219including carbon steel piping,valves, support and hanger etc.set11005.12diameter of the pipe 219 and273including carbon steel piping,valves, support and hanger etc.set1805.13diameter of the pipe 273including carbon steel piping,valves, support and hanger etc.set1805.14diameter of the pipe 57 and133including stainless steel piping,valves, support and hanger etc.set10.50in air compressor house5.15diameter of the pipe 133 and219including stainless steel piping,valves, support and hanger etc.set120SIXCivil Work01Grouting01.160 non shrinking cementProvide and construction, etc..Cu.m2001.240 non shrinking cementProvide and construction, etc..Cu.m2001.3M25-M35 FINA AGGREGATE ,CHIPS DN20MMProvide and construction, etc..Cu.m2001.4HIGH-STRENGTH GROUTING WITHOUT SHRINKAGEProvide and construction, etc..Cu.m2000ERROR:#REF!0Note:1.The QTY in BOQ is temperorary, payment will be calculated according to the work actually completed. The formulate of payment is: payment=quantity actually completed rate in BOQ, inclusive all the costs of Contractor.ERROR:#REF!1+4+7+10993471908ERROR:#REF!2. The Rate in BOQ is firm and final and not liable to any change under QTY change or whatever reasons.ERROR:#REF!2+5+681511606ERROR:#REF!3.Mobilization and demobilization of all necessary manpower and equipments as per specification including shifting & erecting the same from one location to the other.ERROR:#REF!3+820016472ERROR:#REF!4.The above rates are all inclusive unless otherwise specified, firm and final and not liable to any change under any condition whatsoever from the date of Commencement Date. ERROR:#REF!93599960ERROR:#REF!5.The rate includes all the taxes and duties.6.Contractor shall perform the Works according to the related drawings and technical specifications and construction standards. The above working description of the item are subject to approval of the Owner's/Employer's Engineer based on the agreed technical specification,if Owner's/Employer's Engineer doesn't agree about it .the related modifications and related cost incurred will be undertaken by the Contractor,always based on the agreed technical specifications.

&P/&N