boq-01 sabahiya villa

Upload: abobeedo

Post on 07-Jul-2018

229 views

Category:

Documents


3 download

TRANSCRIPT

  • 8/18/2019 BOQ-01 Sabahiya Villa

    1/22

    DIVISION 1 GENERAL REQUIREMENTS

    S.No. Item description Unit Qty.

    DIVISION 1 GENERAL REQUIREMENTS GENERAL REQUIREMENTS

    The Tendered shall include the costs associated withrequirements mentioned hereunder 

    To Collection Kd

  • 8/18/2019 BOQ-01 Sabahiya Villa

    2/22

    DIVISION 2 SITE WORK 

    DIVISION SIT! "O#K 

    $ %& '()*

    + %# &*

    DIVISION 2 EXTERNAL WORK 

    S.No. Item description Unit Qty.

    !,ca-ation includin le-ellin/ radin/ rammin/ and remo-in surplus e,ca-ated materials o00site.

    e,ca-ation in all 1inds o0 soil 0or 0oundation 0rom23(.'4 5e-el include trenches/ etc up to anydepth as per D"6S7 specs includin disposal o0 surplus materials 0rom site o pu8lic dump yardsto the satis0action o0 enineer 

    Desin/ 0urnishin and installation o0 shorin wor1s includin sheet pilin as necessary to protectwor1men/ 8an1s/ ad9acent pa-in/ structures and utilities/ 8racin and sheetin shall 8e ase,ca-ations are 8ac10illed in a manner to pre-ent ca-in 2pro-isional and remeasured as per sitecondition 4

    To Collection Kd

    S.No. Item description Unit Qty.

  • 8/18/2019 BOQ-01 Sabahiya Villa

    3/22

    $ + EXTERNAL WORK 

    The 0ollowin items to 8e priced as provisional andR!as"rd as per site conditionco-er the supply and installation as per tender drawins :

    Cur8 stones 0or the sidewal1s and roads to 8e supplied 8y Kuwait National Industries

    Interloc1 tiles to 8e supplied 8y Kuwait National Industries. ;cm thic1 0or side wal1s

  • 8/18/2019 BOQ-01 Sabahiya Villa

    4/22

    DIVISION # $ON$RETE

    DIVISION # $ON$RETE

    '>

    ?

    &)'

    &&

    DIVISION # $ON$RETE

    S.No. Item description Unit Qty.

    S.No. Item description Unit Qty.

    $ +

    C

    D

    !

    @ 6

    mA

    mA

    mA

    mA

    mA mA mA

    mA

    m mA

    '>

    ?

    &)'

    &&

    >')*?

    '

    >>*

    &('

    %lain insi&" 'on'r& (avin) )rad K 1*+ K),'!-

    "sin) SR$ in'l"din) .or!/or0 '"rin) &' as pr dra/in)s

    )** mm thic1 8lindin concrete under #a0t all as per drawins

    '* mm thic1 sand cement protection screed o-er mem8rane insulation

    Rin.or'd insi&" 'on'r& (avin) )rad #*+ K),'!- "sin)

    SR$ in'l"din) .or!/or0 '"rin) &' as pr dra/in)s

    #ein0orced insitu concrete 0or ra0t S#C 6rade K &'* withsulphat resistance cement/under N.6.5. includin/ 0air 0ace/ 0ormwor1 water proo0in withappro-ed 8itumen paint in three coat/ 0inishin/ and -i8ratin etc all as per drawins.

    Rin.or'd insi&" 'on'r& 3as!n& 2 and 3as!n& 14&rnal pri!&r r&ainin) /alls

    SR$ Grad K #*+ in'l"din) .or!/or0 .inis(in) vi5ra&in) &' all as pr dra/in)s

    +asement retainin wall '*mm thic1 

    Rin.or'd insi&" 'on'r& (avin) )rad K #*+ "sin)

    K),'!- O%$ in'l"din) .or!/or0 '"rin) &' as pr dra/in)s

    #ein0orced insitu concrete solid sla8s/OBC 6rade K &'* includin 0ormwor1/ 0inishin/ -i8ratin etc all as per drawins.)'* mm thic1 );* mm thic1 )

  • 8/18/2019 BOQ-01 Sabahiya Villa

    5/22

    DIVISION 6 7 T8ERMAL AND MOISTURE %ROT

    S.No. Item description Unit Qty.

    I

    DIVISION # $ON$RETE

    #ein0orced insitu concrete columns OBC 6rade K >** includin 0ormwor1/ 0inishin/-i8ratin etc all as per drawins2 iclude parapet column4.

    #ein0orced insitu concrete !le-ator "alls OBC 6rade K &'* includin 0ormwor1/ 0inishin/-i8ratin etc all as per drawins2 iclude parapet column4.

    #ein0orced insitu stairs steps/ landins/ sla8s/ OBC 6rade K &'* includin 0ormwor1/ 0inishin/-i8ratin etc all as per drawins.

    mA mA mA )

    &*

    To Collection Kd

      DIVISION 6 7 T8ERMAL AND MOISTURE %ROT

    6uarantee all waterproo0in wor1s 0or a period o0 ten years 0rom the date o0 su8stantialcompletion. The uarantee to 8e in the 0orm o0 a +an1erEs 6uarantee equal to2 4 K.D.

    !ater proofing for basement "alls and rafts including curing and filling all hone#comps$ holes$ etc and

    to appl# %"o la#ers of appro-ed mem8rane material.

    Brotected %em8rane #oo0in to all #oo0s includin 

    %

    %

    1&60

    '(0

  • 8/18/2019 BOQ-01 Sabahiya Villa

    6/22

  • 8/18/2019 BOQ-01 Sabahiya Villa

    7/22

    To 6rand Summary

  • 8/18/2019 BOQ-01 Sabahiya Villa

    8/22

    $mount

    Kd @ils Kd @ils

    #ate

  • 8/18/2019 BOQ-01 Sabahiya Villa

    9/22

    $mount

    Kd

    ).&'* ?/(?

  • 8/18/2019 BOQ-01 Sabahiya Villa

    10/22

  • 8/18/2019 BOQ-01 Sabahiya Villa

    11/22

    $mount

    Kd

    #ate $mount

    Kd

    #ate

  • 8/18/2019 BOQ-01 Sabahiya Villa

    12/22

    #ate $mount

    Kd

  • 8/18/2019 BOQ-01 Sabahiya Villa

    13/22

    D :ILS

  • 8/18/2019 BOQ-01 Sabahiya Villa

    14/22

  • 8/18/2019 BOQ-01 Sabahiya Villa

    15/22

    Sr Item Unit Qty

    Excavation M3 5910

    Shoring MR 30

    Remeasured & Provisional

    Kerbstone MR

    Interloc M2

    K!150 #lin$ing M3 5%

    50 && 'rotection scree$ M3 2(

    K!350 ) Ra*t M3 315

    K!350 ) #ase&ent 1+2 alls M3 233

    K!350 I Soli$ Slabs150 && thic M3 2%5

    160 && thic M3 10

    180 && thic M3 (

    S-i&&ing 'ool slab + -alls M3 25

    K!300 / or$ 600 && thic M2 %%0

    K!350 / #ea&s M3 395

    K!%00 / ol&ns M3 180K!350 / Elevator alls M3 1%

    K!350 / Stairs M3 30

    ater /roo4ng

    2 laers &e&brane *or ra*t + base&ent -alls M2 1%60

    Roo4ng M2 590

    -et areas 2 laers M2 %51

    *or s-i&&ing 'ool M2 60

  • 8/18/2019 BOQ-01 Sabahiya Villa

    16/22

  • 8/18/2019 BOQ-01 Sabahiya Villa

    17/22

    Rate Amount

    1.3(5 8,126.250

    2(5.000 8,250.000

    0.0000.000

    0.000

    0.000

    0.000

    %0.000 2,160.000

    35.000 9%5.000

    (5.000 23,625.000

    115.000 26,(95.000

    0.000

    0.000115.000 28,1(5.000

    115.000 1,150.000

    115.000 805.000

    0.000

    150.000 3,(50.000

    0.000

    50.000 22,000.000

    110.000 %3,%50.000

    0.000

    120.000 21,600.000120.000 1,680.000

    120.000 3,600.000

    0.000

    0.000

    0.000

    %.500 6,5(0.000

    16.000 9,%%0.000

    9.000 %,059.000

    15.000 900.000

    0.0000.000

    0.000

    217,080.2500.000

    0.000

    0.000

    0.000

    0.000

    0.0000.000

    0.000

  • 8/18/2019 BOQ-01 Sabahiya Villa

    18/22

    0.000

    0.000

    0.000

    0.000

    0.000

    0.000

    0.000

    0.000

    0.000

    0.000

    0.000

    0.000

    0.000

    0.000

    0.000

    0.000

    0.000

    0.000

    0.000

    0.000

    0.000

    0.000

    0.000

    0.000

    0.000

    0.000

    0.000

    0.000

    0.000

    0.000

    0.000

    0.000

    0.000

    0.000

    0.000

    0.000

    0.000

    0.000

    0.000

    0.000

    0.000

    0.000

    0.000

    0.000

    0.000

    0.000

    0.000

  • 8/18/2019 BOQ-01 Sabahiya Villa

    19/22

    Sr Item Unit Qty

    Excavation M3 5910

    Shoring MR 30

    Remeasured & Provisional

    Kerbstone MR

    Interloc M2

    K!150 #lin$ing M3 5%

    50 && 'rotection scree$ M3 2(

    K!350 ) Ra*t M3 315

    K!350 ) #ase&ent 1 + 2 alls M3 233

    K!350 I Soli$ Slabs150 && thic M3 2%5

    160 && thic M3 10

    180 && thic M3 (

    S-i&&ing 'ool slab + -alls M3 25

    K!300 / or$ 600 && thic M2 %%0

    K!350 / #ea&s M3 395

    K!%00 / ol&ns M3 180K!350 / Elevator alls M3 1%

    K!350 / Stairs M3 30

    ater /roo4ng

    2 laers &e&brane *or ra*t + base&ent -alls M2 1%60

    Roo4ng M2 590

    -et areas 2 laers M2 %51

    *or s-i&&ing 'ool M2 60

  • 8/18/2019 BOQ-01 Sabahiya Villa

    20/22

  • 8/18/2019 BOQ-01 Sabahiya Villa

    21/22

    Rate Amount

    1.250 (,38(.500

    250.000 (,500.000

    0.0000.000

    0.000

    0.000

    0.000

    3(.500 2,025.000

    32.500 8((.500

    68.000 21,%20.000

    105.000 2%,%65.000

    0.000

    0.000105.000 25,(25.000

    105.000 1,050.000

    105.000 (35.000

    0.000

    120.000 3,000.000

    0.000

    %(.500 20,900.000

    100.000 39,500.000 85

    0.000 1%8(50

    105.000 18,900.000 %5.(1%286105.000 1,%(0.000

    105.000 3,150.000

    0.000

    0.000

    0.000

    %.500 6,5(0.000

    1%.000 8,260.000

    (.500 3,382.500

    12.000 (20.000

    0.0000.000

    0.000

    17,0!7.500

    0.000

    0.000

    0.000

    0.000

    0.000

    0.0000.000

    0.000

  • 8/18/2019 BOQ-01 Sabahiya Villa

    22/22

    0.000

    0.000

    0.000

    0.000

    0.000

    0.000

    0.000

    0.000

    0.000

    0.000

    0.000

    0.000

    0.000

    0.000

    0.000

    0.000

    0.000

    0.000

    0.000

    0.000

    0.000

    0.000

    0.000

    0.000

    0.000

    0.000

    0.000

    0.000

    0.000

    0.000

    0.000

    0.000

    0.000

    0.000

    0.000

    0.000

    0.000

    0.000

    0.000

    0.000

    0.000

    0.000

    0.000

    0.000

    0.000

    0.000

    0.000