BILL OF QUANTITY NAMA PROYEK : JAKARTA EYE CENTER ( JEC ) PEKERJAAN : LISTRIK MATERIAL UPAH Rp Rp Rp II PEKERJAAN ELEKTRIKAL 220,198,747 807,219,352 A PERALATAN UTAMA 32,460,004 125,202,872 1 PENYAMBUNGAN DAYA PLN a. Biaya Penyambungan (BP) 147 kva by owner b. Uang Jaminan Langganan (UJL) 147 kva by owner c. Biaya Administrasi 147 kva by owner 2 GENSET a Genset Kapasitas 250 kVA 1 unit by owner b Panel Genset 1 unit by owner 3 KABEL a. Dari KWH Meter ke Panel Utama NYY 4x240 mm2 + BC 95 mm2 29 m' 969,644 9,841,890 37,961,575 b. Dari Genset ke Panel Utama NYY 4x240 mm2 19 m' 961,400 6,393,310 24,659,910 4 GROUNDING SYSTEM a. Grounding sistim Panel Utama 1 lot 5,496,425 1,923,749 7,420,174 b. Grounding sistim Genset 1 lot 5,496,425 1,923,749 7,420,174 c Anti petir radius 100 m sesuai gambar 1 lot 29,595,333 10,358,366 39,953,699 5 MATERIAL BANTU a. Support 1 lot 2,024,000 708,400 2,732,400 b. Hanger 1 lot 3,238,400 1,133,440 4,371,840 c. Accessories 1 lot 506,000 177,100 683,100 B KABEL FEEDER 16,404,873 63,275,940 1 Dari Panel Utama ke PP/Plumbing NYY 4 x 6 mm2 + BC 4 mm2 28 m 45,439 445,300 1,717,587 2 Dari Panel Utama ke PP/Lt. Basement NYY 4 x 4 mm2 + BC 4 mm2 8 m 34,307 96,059 370,513 3 Dari Panel Utama ke KWH meter Cafe Lt. 1 NYY 4 x 4 mm2 + BC 4 mm2 37 m 34,307 444,273 1,713,625 4 Dari Panel Utama ke KWH Meter Optik Lt. 1 NYY 4 x 4 mm2 + BC 4 mm2 39 m 34,307 468,288 1,806,253 5 Dari Panel Utama ke PP. Lt. 1 NYY 4 x 10 mm2 + BC 6 mm2 23 m 68,310 549,896 2,121,026 6 Dari Panel Utama ke PP. Operasi Lt. 4 NYY 4 x 6 mm2 + BC 4 mm2 36 m 45,439 572,529 2,208,326 7 Dari Panel Utama ke PP. Lt. 2 NYY 4 x 16 mm2 + BC 10 mm2 27 m 101,200 956,340 3,688,740 8 Dari Panel Utama ke PP. Lt. 3 NYY 4 x 16 mm2 + BC 10 mm2 31 m 101,200 1,098,020 4,235,220 9 Dari Panel Utama ke PP. Lt. 4 NYY 4 x 6 mm2 + BC 4 mm2 35 m 45,439 556,625 2,146,983 10 Dari Panel Utama ke PP. Utama UPS NYY 4 x 10 mm2 + BC 6 mm2 37 m 68,310 884,615 3,412,085 11 Dari Panel Utama ke PP. Lt. Atap NYY 4 x 25 mm2 + BC 16 mm2 39 m 148,764 2,030,629 7,832,425 12 Dari PP. Basement ke pompa Sumppit 1 NYY 4 x 4 mm2 + BC 2,5 mm2 dalam conduit PVC 3/4" 14 m 44,477 217,939 840,623 13 Dari PP. Plambing ke pompa Jet Pump 1 (750 Watt) NYY 4x4 mm2 dalam conduit PVC 3/4" 14 m 39,923 195,625 754,552 14 Dari PP. Plambing ke pompa Jet Pump 2 (750 Watt) NYY 4x4 mm2 dalam conduit PVC 3/4" 16 m 39,923 223,571 862,345 15 Dari PP. Plambing ke PP. Control STP NYY 4x4 mm2 + BC 4 mm2 20 m 34,307 240,148 926,284 16 Dari Termination unit ke WLC di GWT NYAF 2x1,5 mm2 (2x) 12 m 16,799 70,557 272,147 17 Dari PP. Lt. 4 ke Power Water Heater NYY 4x4 mm2 dlm conduit PVC 3/4" 29 m 39,923 167,678 646,759 JML HARGA SATUAN NO URAIAN SAT TOTAL HARGA BIAYA CME Contractor& Supplier Page 1 LISTRIK

Upload: meghan-vaughn

Post on 23-Dec-2015

24 views

Category:

Documents


7 download

DESCRIPTION

contoh

TRANSCRIPT

Page 1: BoQ Listrik RS

BILL OF QUANTITY

NAMA PROYEK : JAKARTA EYE CENTER ( JEC )PEKERJAAN : LISTRIK

MATERIAL UPAH

Rp Rp Rp

II PEKERJAAN ELEKTRIKAL 220,198,747 807,219,352

A PERALATAN UTAMA 32,460,004 125,202,872

1 PENYAMBUNGAN DAYA PLN

a. Biaya Penyambungan (BP) 147 kva by owner

b. Uang Jaminan Langganan (UJL) 147 kva by owner

c. Biaya Administrasi 147 kva by owner

2 GENSET

a Genset Kapasitas 250 kVA 1 unit by owner

b Panel Genset 1 unit by owner

3 KABEL

a. Dari KWH Meter ke Panel Utama

NYY 4x240 mm2 + BC 95 mm2 29 m' 969,644 9,841,890 37,961,575

b. Dari Genset ke Panel Utama

NYY 4x240 mm2 19 m' 961,400 6,393,310 24,659,910

4 GROUNDING SYSTEM

a. Grounding sistim Panel Utama 1 lot 5,496,425 1,923,749 7,420,174

b. Grounding sistim Genset 1 lot 5,496,425 1,923,749 7,420,174

c Anti petir radius 100 m sesuai gambar 1 lot 29,595,333 10,358,366 39,953,699

5 MATERIAL BANTU

a. Support 1 lot 2,024,000 708,400 2,732,400

b. Hanger 1 lot 3,238,400 1,133,440 4,371,840

c. Accessories 1 lot 506,000 177,100 683,100

B KABEL FEEDER 16,404,873 63,275,940

1 Dari Panel Utama ke PP/Plumbing

NYY 4 x 6 mm2 + BC 4 mm2 28 m 45,439 445,300 1,717,587

2 Dari Panel Utama ke PP/Lt. Basement

NYY 4 x 4 mm2 + BC 4 mm2 8 m 34,307 96,059 370,513

3 Dari Panel Utama ke KWH meter Cafe Lt. 1

NYY 4 x 4 mm2 + BC 4 mm2 37 m 34,307 444,273 1,713,625

4 Dari Panel Utama ke KWH Meter Optik Lt. 1

NYY 4 x 4 mm2 + BC 4 mm2 39 m 34,307 468,288 1,806,253

5 Dari Panel Utama ke PP. Lt. 1

NYY 4 x 10 mm2 + BC 6 mm2 23 m 68,310 549,896 2,121,026

6 Dari Panel Utama ke PP. Operasi Lt. 4

NYY 4 x 6 mm2 + BC 4 mm2 36 m 45,439 572,529 2,208,326

7 Dari Panel Utama ke PP. Lt. 2

NYY 4 x 16 mm2 + BC 10 mm2 27 m 101,200 956,340 3,688,740

8 Dari Panel Utama ke PP. Lt. 3

NYY 4 x 16 mm2 + BC 10 mm2 31 m 101,200 1,098,020 4,235,220

9 Dari Panel Utama ke PP. Lt. 4

NYY 4 x 6 mm2 + BC 4 mm2 35 m 45,439 556,625 2,146,983

10 Dari Panel Utama ke PP. Utama UPS

NYY 4 x 10 mm2 + BC 6 mm2 37 m 68,310 884,615 3,412,085

11 Dari Panel Utama ke PP. Lt. Atap

NYY 4 x 25 mm2 + BC 16 mm2 39 m 148,764 2,030,629 7,832,425

12 Dari PP. Basement ke pompa Sumppit 1

NYY 4 x 4 mm2 + BC 2,5 mm2 dalam conduit PVC 3/4" 14 m 44,477 217,939 840,623

13 Dari PP. Plambing ke pompa Jet Pump 1 (750 Watt)

NYY 4x4 mm2 dalam conduit PVC 3/4" 14 m 39,923 195,625 754,552

14 Dari PP. Plambing ke pompa Jet Pump 2 (750 Watt)

NYY 4x4 mm2 dalam conduit PVC 3/4" 16 m 39,923 223,571 862,345

15 Dari PP. Plambing ke PP. Control STP

NYY 4x4 mm2 + BC 4 mm2 20 m 34,307 240,148 926,284

16 Dari Termination unit ke WLC di GWT

NYAF 2x1,5 mm2 (2x) 12 m 16,799 70,557 272,147

17 Dari PP. Lt. 4 ke Power Water Heater

NYY 4x4 mm2 dlm conduit PVC 3/4" 29 m 39,923 167,678 646,759

JML

HARGA SATUAN

NO URAIAN SAT

TOTAL HARGABIAYA

CME Contractor& Supplier

Page 1 LISTRIK

Page 2: BoQ Listrik RS

MATERIAL UPAH

Rp Rp Rp

JML

HARGA SATUAN

NO URAIAN SAT

TOTAL HARGABIAYA

18 Dari PP. Lt. Atap ke Logo gedung JEC

NYY 4 x 4 mm2 + BC 4 mm2 dlm conduit PVC 3/4" 25 m 44,882 392,719 1,514,774

19 Dari PP. Lt. Atap ke Panel Control Booster pump

NYY 4 x 6 mm2 + BC 4 mm2 dlm conduit PVC 3/4" 33 m 56,014 646,964 2,495,433

20 Dari PP. Lt. Atap ke Panel Lift 1

NYY 4 x 16 mm2 + BC 10 mm2 dlm conduit PVC 3/4" 10 m 111,775 391,214 1,508,968

21 Dari PP. Lt. Atap ke Panel Lift 2

NYY 4 x 16 mm2 + BC 10 mm2 dlm conduit PVC 3/4" 23 m 111,775 899,792 3,470,626

22 Dari PP. Lt. Atap ke Panel Compressor

NYY 4 x 4 mm2 + BC 4 mm2 dlm conduit PVC 3/4" 7 m 44,882 109,961 424,137

23 Dari PP. Lt. Atap ke Pompa Ozonisasi

NYY 4 x 4 mm2 + BC 4 mm2 dlm conduit PVC 3/4" 33 m 44,882 518,389 1,999,502

24 Dari PP. Lt. Atap ke STK Ozonisasi

NYM 3x2,5 mm2 dlm conduit PVC 3/4" 36 m 14,413 181,598 700,451

25 Dari PP. Utama UPS ke PP. UPS Lt. Basement

NYY 4 x 4 mm2 lewat jalur tray 35 m 71,548 876,468 3,380,662

26 Dari PP. Utama UPS ke PP. UPS Lt. 1

NYY 4 x 4 mm2 lewat jalur tray 25 m 71,548 626,049 2,414,759

27 Dari PP. Utama UPS ke PP. UPS Lt. 2

NYY 4 x 4 mm2 lewat jalur tray 23 m 71,548 575,965 2,221,578

28 Dari PP. Utama UPS ke PP. UPS Lt. 4

NYY 4 x 4 mm2 lewat jalur tray 20 m 71,548 500,839 1,931,807

29 Dari PP. Lift 1 ke PP. Control Lift 1

NYY 4 x 6 mm2 + BC 4 mm2 8 m 45,439 127,229 490,739

30 Dari PP. Lift 1 ke Lighting & Signal

NYM 3x2,5 mm2 dlm conduit PVC 3/4" 10 m 14,413 50,444 194,570

31 Dari PP. Lift 1 ke Elevator Group Control

NYY 4 x 4 mm2 11 m 29,348 112,990 435,818

32 Dari PP. Lift 2 ke PP. Control Lift 2

NYY 4 x 6 mm2 + BC 4 mm2 8 m 45,439 127,229 490,739

33 Dari PP. Lift 1 ke Lighting Group Control

NYM 3x2,5 mm2 dlm conduit PVC 3/4" 10 m 14,413 50,444 194,570

34 Dari PP. Lift 1 ke Elevator Group Control

NYY 4 x 4 mm2 11 m 29,348 112,990 435,818

35 Material bantu 1 lot 2,530,000 885,500 3,415,500

C PANEL 87,174,996 336,246,412

1 PANEL UTAMA 1 unit 59,748,480 20,911,968 80,660,448

2 PP. PLUMBING 1 unit 9,038,172 3,163,360 12,201,532

3 PP. LT. BASEMENT 1 unit 9,077,640 3,177,174 12,254,814

4 PP. LT. 1 1 unit 9,867,000 3,453,450 13,320,450

5 PP. LT. 2 1 unit 10,247,208 3,586,523 13,833,731

6 PP. LT. 3 1 unit 10,380,084 3,633,029 14,013,113

7 PP. LT. 4 1 unit 9,998,560 3,499,496 13,498,056

8 PP. POWER STP 1 unit 1,302,444 455,855 1,758,299

9 PP. CAFÉ 1 unit 17,721,132 6,202,396 23,923,528

10 PP. OPTIK 1 unit 17,234,360 6,032,026 23,266,386

11 PP. OPERASI 1 unit 25,127,960 8,794,786 33,922,746

12 PP. LIFT 1 1 unit 17,234,360 6,032,026 23,266,386

13 PP. LIFT 2 1 unit 17,168,580 6,009,003 23,177,583

14 PP. BOOSTER PUMP 1 unit 1,737,908 608,268 2,346,175

15 PP. UTAMA UPS 1 unit 10,432,708 3,651,448 14,084,156

16 MCB Box UPS 1 unit 1,518,000 531,300 2,049,300

17 MCB Box UPS Lt. Basement 1 unit 1,973,400 690,690 2,664,090

18 MCB Box UPS Lt. 1 1 unit 1,973,400 690,690 2,664,090

19 MCB Box UPS Lt. 2 1 unit 2,226,400 779,240 3,005,640

20 MCB Box UPS Lt. 4 1 unit 2,074,600 726,110 2,800,710

21 PP. LT. ATAP 1 unit 10,459,020 3,660,657 14,119,677

22 Material Bantu 1 set 2,530,000 885,500 3,415,500

Page 2 LISTRIK

Page 3: BoQ Listrik RS

MATERIAL UPAH

Rp Rp Rp

JML

HARGA SATUAN

NO URAIAN SAT

TOTAL HARGABIAYA

D INSTALASI PENERANGAN & STOP KONTAK 76,658,875 274,994,129

1 Lantai Basement

a Lampu TKO LED 2x20 Watt tanpa Louver 24 bh 194,810 1,636,404 6,311,844

b Lampu Downlight CRD 150 (14 Watt) 2 bh 211,508 148,056 571,072

c Lampu Dak LED 9 Watt 10 bh 67,804 237,314 915,354

e Saklar Tunggal 2 bh 14,168 9,918 38,254

f Saklar serie 9 bh 22,264 70,132 270,508

g Stop Kontak 1 ph 200 W 13 bh 27,830 126,627 488,417

h Stop Kontak UPS Peralatan Elektronik Tata suara 100 watt 1 bh 27,830 9,741 37,571

i Stop Kontak UPS Peralatan Elektronik Fire Alarm 100 watt 1 bh 27,830 9,741 37,571

j Stop Kontak TV 100 watt 2 bh 31,676 22,173 85,524

k Instalasi penerangan d/kabel 36 ttk 38,000 972,000 2,340,000

NYM 3x2.5 mm2 di dalam pipa PVC 3/4"

l Instalasi Stop kontak 100 watt 1 phase d/kabel 17 ttk 35,000 459,000 1,054,000

NYM 3x2.5 mm2 di dalam pipa PVC 3/4"

m Kabel Leader : 600 x 100 4 m 150,788 211,103 814,255

n Kabel Tray : 300 x 100 22 m 141,680 1,090,936 4,207,896

: 400 x 100 18 m 138,644 873,457 3,369,049

o Material Bantu 1 lot 1,518,000 531,300 2,049,300

2 Lantai 1

a Lampu TKO LED 2x20 Watt tanpa Louver 5 bh 194,810 340,918 1,314,968

b Lampu Gantung 200 Watt 4 bh 1,330,780 1,863,092 7,186,212

c Lampu Downlight Halogen LED 5 Watt 2 bh 211,508 148,056 571,072

d Lampu Downlight PLS LED SRD 150 (14 Watt) 46 bh 383,548 6,175,123 23,818,331

e Lampu Downlight PLS LED SRD 150 (14 Watt) c/w Battery 11 bh 383,548 1,476,660 5,695,688

f Lampu Downlight spot LED 20 Watt 16 bh 298,540 1,671,824 6,448,464

g Lampu Display 250 Watt 1 bh 1,062,600 371,910 1,434,510

h Lampu Ceilling 250 Watt 1 bh 687,148 240,502 927,650

i Lampu indirect 13 Watt / meter 2 m 55,660 38,962 150,282

j Saklar Tunggal 3 bh 14,168 14,876 57,380

k Saklar Dimmer 1 bh 182,160 63,756 245,916

l Saklar serie 23 bh 22,264 179,225 691,297

m Stop Kontak 1 ph 100 W 44 bh 27,830 428,582 1,653,102

n Stop Kontak inbow 2x 1 phase 100 Watt 5 bh 38,051 66,590 256,846

o Stop Kontak UPS 100 Watt 3 bh 27,830 29,222 112,712

v Stop Kontak TV 100 Watt 9 bh 27,830 87,665 338,135

q Stop Kontak UPS Peralatan Elektronik Tata suara 100 watt 1 bh 27,830 9,741 37,571

r Stop Kontak UPS Peralatan Elektronik Fire Alarm 100 watt 1 bh 27,830 9,741 37,571

s Instalasi penerangan d/kabel 86 ttk 38,000 1,235,591 4,503,591

NYM 3x2.5 mm2 di dalam pipa PVC 3/4"

t Instalasi Lampu Indirect d/kabel 1 ttk 39,000 14,367 53,367

NYM 3x2.5 mm2 di dalam pipa PVC 3/4"

u Instalasi Stop kontak d/kabel 63 ttk 35,000 1,229,088 3,434,088

NYM 3x2.5 mm2 di dalam pipa PVC 3/4"

v Kabel Leader : 600 x 100 4 m 150,788 211,103 814,255

w Kabel Tray : 300 x 100 35 m 141,680 1,735,580 6,694,380

x Material Bantu 1 lot 1,518,000 531,300 2,049,300

3 Lantai 2

a Lampu Downlight Halogen LED 5 Watt 2 bh 211,508 148,056 571,072

b Lampu Dimmer 3 bh 99,176

c Lampu Downlight PLS LED SRD 150 (14 Watt) 58 bh 383,548 7,786,024 30,031,808

d Lampu Downlight PLS LED SRD 150 (14 Watt) c/w Battery 11 bh 399,740 1,538,999 5,936,139

e Lampu Downlight spot LED 20 Watt 12 bh 298,540 1,253,868 4,836,348

f Lampu Dak LED 9 Watt 1 bh 67,804 23,731 91,535

g Lampu indirect 13 Watt / meter 2 m 55,660 38,962 150,282

h Saklar Tunggal 8 bh 14,168 39,670 153,014

i Saklar Dimmer 3 bh 182,160 191,268 737,748

j Saklar serie 20 bh 22,264 155,848 601,128

k Stop Kontak 1 ph 100 W 40 bh 27,830 389,620 1,502,820

l Stop Kontak UPS 100 Watt 17 bh 27,830 165,589 638,699

m Stop Kontak TV 100 Watt 2 bh 31,676 22,173 85,524

n Stop Kontak Lantai UPS 250 Watt 4 bh 42,504 59,506 229,522

o Instalasi penerangan d/kabel 87 ttk 38,000 2,349,000 5,655,000

NYM 3x2.5 mm2 di dalam pipa PVC 3/4"

p Instalasi Lampu Indirect d/kabel 1 ttk 39,000 29,000 68,000

NYM 3x2.5 mm2 di dalam pipa PVC 3/4"

q Instalasi Stop kontak d/kabel 63 ttk 35,420 1,701,000 3,932,460

NYM 3x2.5 mm2 di dalam pipa PVC 3/4"

r Kabel Leader : 600 x 100 4 m 150,788 211,103 814,255

Page 3 LISTRIK

Page 4: BoQ Listrik RS

MATERIAL UPAH

Rp Rp Rp

JML

HARGA SATUAN

NO URAIAN SAT

TOTAL HARGABIAYA

s Kabel Tray : 300 x 100 32 m 141,680 1,586,816 6,120,576

t Material Bantu 1 lot 2,530,000 885,500 3,415,500

4 Lantai 3

a Lampu Downlight PLS LED CRD 150 (14 Watt) 36 bh 383,548 4,832,705 18,640,433

b Lampu Downlight PLS LED SRD 150 (14 Watt) c/w Battery 9 bh 399,740 1,259,181 4,856,841

c Lampu Downlight spot LED 20 Watt 12 bh 298,540 1,253,868 4,836,348

d Lampu TKO LED 2x20 Watt 20 bh 194,810 1,363,670 5,259,870

e Lampu TKO LED 2x20 Watt tanpa Louver 2 bh 141,680 99,176 382,536

f Lampu Indirect 13 W/Meter 12 m 55,660 233,772 901,692

g Saklar Tunggal 3 bh 14,168 14,876 57,380

h Saklar serie 2 bh 22,264 15,585 60,113

i Stop Kontak 1 ph 100 W 43 bh 27,830 418,842 1,615,532

j Stop Kontak UPS 100 Watt 2 bh 31,676 22,173 85,524

k Stop Kontak TV 100 Watt 4 bh 31,676 44,346 171,048

l Instalasi penerangan d/kabel 79 ttk 38,000 2,133,000 5,135,000

NYM 3x2.5 mm2 di dalam pipa PVC 3/4"

m Instalasi Lampu Indirect d/kabel 1 ttk 39,000 29,000 68,000

NYM 3x2.5 mm2 di dalam pipa PVC 3/4"

n Instalasi Stop kontak d/kabel 49 ttk 35,000 1,323,000 3,038,000

NYM 3x2.5 mm2 di dalam pipa PVC 3/4"

o Kabel Leader : 600 x 100 4 m 150,788 211,103 814,255

p Kabel Tray : 300 x 100 30 m 141,680 1,487,640 5,738,040

q Material Bantu 1 lot 2,530,000 885,500 3,415,500

5 Lantai 3

a Lampu Downlight PLS LED CRD 150 (14 Watt) 44 bh 383,548 5,906,639 22,782,751

b Lampu Downlight PLS LED SRD 150 (14 Watt) c/w Battery 11 bh 399,740 1,538,999 5,936,139

c Lampu Downlight spot LED 20 Watt 5 bh 298,540 522,445 2,015,145

d Lampu Hallogen LED 5 Watt 3 bh 211,508 222,083 856,607

e Lampu RM M5 2x20 Watt 8 bh 300,564 841,579 3,246,091

g Saklar Tunggal 5 bh 14,168 24,794 95,634

h Saklar serie 19 bh 22,264 148,056 571,072

i Stop Kontak 1 ph 100 W 42 bh 27,830 409,101 1,577,961

j Stop Kontak Oksigen 100 Watt 7 bh 46,552 114,052 439,916

k Stop Kontak UPS 100 Watt 4 bh 27,830 38,962 150,282

l Stop Kontak Lantai UPS 250 Watt 4 bh 42,504 59,506 229,522

m Instalasi penerangan d/kabel 71 ttk 38,000 1,917,000 4,615,000

NYM 3x2.5 mm2 di dalam pipa PVC 3/4"

n Instalasi Lampu Indirect d/kabel 1 ttk 39,000 29,000 68,000

NYM 3x2.5 mm2 di dalam pipa PVC 3/4"

o Instalasi Stop kontak d/kabel 57 ttk 35,000 1,539,000 3,534,000

NYM 3x2.5 mm2 di dalam pipa PVC 3/4"

p Kabel Leader : 600 x 100 4 m 150,788 211,103 814,255

q Kabel Tray : 300 x 100 35 m 141,680 1,735,580 6,694,380

r Material Bantu 1 lot 2,530,000 885,500 3,415,500

Page 4 LISTRIK

Page 5: BoQ Listrik RS

MATERIAL UPAH

Rp Rp Rp

JML

HARGA SATUAN

NO URAIAN SAT

TOTAL HARGABIAYA

6 Lantai Atap

Lampu TKO LED 2x20 Watt tanpa louvre 2 bh 141,680 99,176 382,536

a Lampu Dak LED 9 Watt 4 bh 67,804 94,926 366,142

b Lampu indirect 13 Watt / meter 13 m 55,660 253,253 976,833

c Saklar serie 3 bh 22,264 23,377 90,169

d Stop Kontak 1 ph 100 Watt 5 bh 27,830 48,703 187,853

e Instalasi penerangan d/kabel 6 ttk 38,000 162,000 390,000

NYM 3x2.5 mm2 di dalam pipa PVC 3/4"

f Instalasi Lampu Indirect d/kabel 1 ttk 39,000 29,000 68,000

NYM 3x2.5 mm2 di dalam pipa PVC 3/4"

g Instalasi Stop kontak d/kabel 5 ttk 35,000 135,000 310,000

NYM 3x2.5 mm2 di dalam pipa PVC 3/4"

7 Material Bantu 1 lot 2,530,000 885,500 3,415,500

E TESTING & COMMISSIONING 1 lot - 7,500,000 7,500,000