BILL OF QUANTITY
NAMA PROYEK : JAKARTA EYE CENTER ( JEC )PEKERJAAN : LISTRIK
MATERIAL UPAH
Rp Rp Rp
II PEKERJAAN ELEKTRIKAL 220,198,747 807,219,352
A PERALATAN UTAMA 32,460,004 125,202,872
1 PENYAMBUNGAN DAYA PLN
a. Biaya Penyambungan (BP) 147 kva by owner
b. Uang Jaminan Langganan (UJL) 147 kva by owner
c. Biaya Administrasi 147 kva by owner
2 GENSET
a Genset Kapasitas 250 kVA 1 unit by owner
b Panel Genset 1 unit by owner
3 KABEL
a. Dari KWH Meter ke Panel Utama
NYY 4x240 mm2 + BC 95 mm2 29 m' 969,644 9,841,890 37,961,575
b. Dari Genset ke Panel Utama
NYY 4x240 mm2 19 m' 961,400 6,393,310 24,659,910
4 GROUNDING SYSTEM
a. Grounding sistim Panel Utama 1 lot 5,496,425 1,923,749 7,420,174
b. Grounding sistim Genset 1 lot 5,496,425 1,923,749 7,420,174
c Anti petir radius 100 m sesuai gambar 1 lot 29,595,333 10,358,366 39,953,699
5 MATERIAL BANTU
a. Support 1 lot 2,024,000 708,400 2,732,400
b. Hanger 1 lot 3,238,400 1,133,440 4,371,840
c. Accessories 1 lot 506,000 177,100 683,100
B KABEL FEEDER 16,404,873 63,275,940
1 Dari Panel Utama ke PP/Plumbing
NYY 4 x 6 mm2 + BC 4 mm2 28 m 45,439 445,300 1,717,587
2 Dari Panel Utama ke PP/Lt. Basement
NYY 4 x 4 mm2 + BC 4 mm2 8 m 34,307 96,059 370,513
3 Dari Panel Utama ke KWH meter Cafe Lt. 1
NYY 4 x 4 mm2 + BC 4 mm2 37 m 34,307 444,273 1,713,625
4 Dari Panel Utama ke KWH Meter Optik Lt. 1
NYY 4 x 4 mm2 + BC 4 mm2 39 m 34,307 468,288 1,806,253
5 Dari Panel Utama ke PP. Lt. 1
NYY 4 x 10 mm2 + BC 6 mm2 23 m 68,310 549,896 2,121,026
6 Dari Panel Utama ke PP. Operasi Lt. 4
NYY 4 x 6 mm2 + BC 4 mm2 36 m 45,439 572,529 2,208,326
7 Dari Panel Utama ke PP. Lt. 2
NYY 4 x 16 mm2 + BC 10 mm2 27 m 101,200 956,340 3,688,740
8 Dari Panel Utama ke PP. Lt. 3
NYY 4 x 16 mm2 + BC 10 mm2 31 m 101,200 1,098,020 4,235,220
9 Dari Panel Utama ke PP. Lt. 4
NYY 4 x 6 mm2 + BC 4 mm2 35 m 45,439 556,625 2,146,983
10 Dari Panel Utama ke PP. Utama UPS
NYY 4 x 10 mm2 + BC 6 mm2 37 m 68,310 884,615 3,412,085
11 Dari Panel Utama ke PP. Lt. Atap
NYY 4 x 25 mm2 + BC 16 mm2 39 m 148,764 2,030,629 7,832,425
12 Dari PP. Basement ke pompa Sumppit 1
NYY 4 x 4 mm2 + BC 2,5 mm2 dalam conduit PVC 3/4" 14 m 44,477 217,939 840,623
13 Dari PP. Plambing ke pompa Jet Pump 1 (750 Watt)
NYY 4x4 mm2 dalam conduit PVC 3/4" 14 m 39,923 195,625 754,552
14 Dari PP. Plambing ke pompa Jet Pump 2 (750 Watt)
NYY 4x4 mm2 dalam conduit PVC 3/4" 16 m 39,923 223,571 862,345
15 Dari PP. Plambing ke PP. Control STP
NYY 4x4 mm2 + BC 4 mm2 20 m 34,307 240,148 926,284
16 Dari Termination unit ke WLC di GWT
NYAF 2x1,5 mm2 (2x) 12 m 16,799 70,557 272,147
17 Dari PP. Lt. 4 ke Power Water Heater
NYY 4x4 mm2 dlm conduit PVC 3/4" 29 m 39,923 167,678 646,759
JML
HARGA SATUAN
NO URAIAN SAT
TOTAL HARGABIAYA
CME Contractor& Supplier
Page 1 LISTRIK
![Page 2: BoQ Listrik RS](https://reader036.vdocuments.pub/reader036/viewer/2022071709/55cf9196550346f57b8ec5ba/html5/thumbnails/2.jpg)
MATERIAL UPAH
Rp Rp Rp
JML
HARGA SATUAN
NO URAIAN SAT
TOTAL HARGABIAYA
18 Dari PP. Lt. Atap ke Logo gedung JEC
NYY 4 x 4 mm2 + BC 4 mm2 dlm conduit PVC 3/4" 25 m 44,882 392,719 1,514,774
19 Dari PP. Lt. Atap ke Panel Control Booster pump
NYY 4 x 6 mm2 + BC 4 mm2 dlm conduit PVC 3/4" 33 m 56,014 646,964 2,495,433
20 Dari PP. Lt. Atap ke Panel Lift 1
NYY 4 x 16 mm2 + BC 10 mm2 dlm conduit PVC 3/4" 10 m 111,775 391,214 1,508,968
21 Dari PP. Lt. Atap ke Panel Lift 2
NYY 4 x 16 mm2 + BC 10 mm2 dlm conduit PVC 3/4" 23 m 111,775 899,792 3,470,626
22 Dari PP. Lt. Atap ke Panel Compressor
NYY 4 x 4 mm2 + BC 4 mm2 dlm conduit PVC 3/4" 7 m 44,882 109,961 424,137
23 Dari PP. Lt. Atap ke Pompa Ozonisasi
NYY 4 x 4 mm2 + BC 4 mm2 dlm conduit PVC 3/4" 33 m 44,882 518,389 1,999,502
24 Dari PP. Lt. Atap ke STK Ozonisasi
NYM 3x2,5 mm2 dlm conduit PVC 3/4" 36 m 14,413 181,598 700,451
25 Dari PP. Utama UPS ke PP. UPS Lt. Basement
NYY 4 x 4 mm2 lewat jalur tray 35 m 71,548 876,468 3,380,662
26 Dari PP. Utama UPS ke PP. UPS Lt. 1
NYY 4 x 4 mm2 lewat jalur tray 25 m 71,548 626,049 2,414,759
27 Dari PP. Utama UPS ke PP. UPS Lt. 2
NYY 4 x 4 mm2 lewat jalur tray 23 m 71,548 575,965 2,221,578
28 Dari PP. Utama UPS ke PP. UPS Lt. 4
NYY 4 x 4 mm2 lewat jalur tray 20 m 71,548 500,839 1,931,807
29 Dari PP. Lift 1 ke PP. Control Lift 1
NYY 4 x 6 mm2 + BC 4 mm2 8 m 45,439 127,229 490,739
30 Dari PP. Lift 1 ke Lighting & Signal
NYM 3x2,5 mm2 dlm conduit PVC 3/4" 10 m 14,413 50,444 194,570
31 Dari PP. Lift 1 ke Elevator Group Control
NYY 4 x 4 mm2 11 m 29,348 112,990 435,818
32 Dari PP. Lift 2 ke PP. Control Lift 2
NYY 4 x 6 mm2 + BC 4 mm2 8 m 45,439 127,229 490,739
33 Dari PP. Lift 1 ke Lighting Group Control
NYM 3x2,5 mm2 dlm conduit PVC 3/4" 10 m 14,413 50,444 194,570
34 Dari PP. Lift 1 ke Elevator Group Control
NYY 4 x 4 mm2 11 m 29,348 112,990 435,818
35 Material bantu 1 lot 2,530,000 885,500 3,415,500
C PANEL 87,174,996 336,246,412
1 PANEL UTAMA 1 unit 59,748,480 20,911,968 80,660,448
2 PP. PLUMBING 1 unit 9,038,172 3,163,360 12,201,532
3 PP. LT. BASEMENT 1 unit 9,077,640 3,177,174 12,254,814
4 PP. LT. 1 1 unit 9,867,000 3,453,450 13,320,450
5 PP. LT. 2 1 unit 10,247,208 3,586,523 13,833,731
6 PP. LT. 3 1 unit 10,380,084 3,633,029 14,013,113
7 PP. LT. 4 1 unit 9,998,560 3,499,496 13,498,056
8 PP. POWER STP 1 unit 1,302,444 455,855 1,758,299
9 PP. CAFÉ 1 unit 17,721,132 6,202,396 23,923,528
10 PP. OPTIK 1 unit 17,234,360 6,032,026 23,266,386
11 PP. OPERASI 1 unit 25,127,960 8,794,786 33,922,746
12 PP. LIFT 1 1 unit 17,234,360 6,032,026 23,266,386
13 PP. LIFT 2 1 unit 17,168,580 6,009,003 23,177,583
14 PP. BOOSTER PUMP 1 unit 1,737,908 608,268 2,346,175
15 PP. UTAMA UPS 1 unit 10,432,708 3,651,448 14,084,156
16 MCB Box UPS 1 unit 1,518,000 531,300 2,049,300
17 MCB Box UPS Lt. Basement 1 unit 1,973,400 690,690 2,664,090
18 MCB Box UPS Lt. 1 1 unit 1,973,400 690,690 2,664,090
19 MCB Box UPS Lt. 2 1 unit 2,226,400 779,240 3,005,640
20 MCB Box UPS Lt. 4 1 unit 2,074,600 726,110 2,800,710
21 PP. LT. ATAP 1 unit 10,459,020 3,660,657 14,119,677
22 Material Bantu 1 set 2,530,000 885,500 3,415,500
Page 2 LISTRIK
![Page 3: BoQ Listrik RS](https://reader036.vdocuments.pub/reader036/viewer/2022071709/55cf9196550346f57b8ec5ba/html5/thumbnails/3.jpg)
MATERIAL UPAH
Rp Rp Rp
JML
HARGA SATUAN
NO URAIAN SAT
TOTAL HARGABIAYA
D INSTALASI PENERANGAN & STOP KONTAK 76,658,875 274,994,129
1 Lantai Basement
a Lampu TKO LED 2x20 Watt tanpa Louver 24 bh 194,810 1,636,404 6,311,844
b Lampu Downlight CRD 150 (14 Watt) 2 bh 211,508 148,056 571,072
c Lampu Dak LED 9 Watt 10 bh 67,804 237,314 915,354
e Saklar Tunggal 2 bh 14,168 9,918 38,254
f Saklar serie 9 bh 22,264 70,132 270,508
g Stop Kontak 1 ph 200 W 13 bh 27,830 126,627 488,417
h Stop Kontak UPS Peralatan Elektronik Tata suara 100 watt 1 bh 27,830 9,741 37,571
i Stop Kontak UPS Peralatan Elektronik Fire Alarm 100 watt 1 bh 27,830 9,741 37,571
j Stop Kontak TV 100 watt 2 bh 31,676 22,173 85,524
k Instalasi penerangan d/kabel 36 ttk 38,000 972,000 2,340,000
NYM 3x2.5 mm2 di dalam pipa PVC 3/4"
l Instalasi Stop kontak 100 watt 1 phase d/kabel 17 ttk 35,000 459,000 1,054,000
NYM 3x2.5 mm2 di dalam pipa PVC 3/4"
m Kabel Leader : 600 x 100 4 m 150,788 211,103 814,255
n Kabel Tray : 300 x 100 22 m 141,680 1,090,936 4,207,896
: 400 x 100 18 m 138,644 873,457 3,369,049
o Material Bantu 1 lot 1,518,000 531,300 2,049,300
2 Lantai 1
a Lampu TKO LED 2x20 Watt tanpa Louver 5 bh 194,810 340,918 1,314,968
b Lampu Gantung 200 Watt 4 bh 1,330,780 1,863,092 7,186,212
c Lampu Downlight Halogen LED 5 Watt 2 bh 211,508 148,056 571,072
d Lampu Downlight PLS LED SRD 150 (14 Watt) 46 bh 383,548 6,175,123 23,818,331
e Lampu Downlight PLS LED SRD 150 (14 Watt) c/w Battery 11 bh 383,548 1,476,660 5,695,688
f Lampu Downlight spot LED 20 Watt 16 bh 298,540 1,671,824 6,448,464
g Lampu Display 250 Watt 1 bh 1,062,600 371,910 1,434,510
h Lampu Ceilling 250 Watt 1 bh 687,148 240,502 927,650
i Lampu indirect 13 Watt / meter 2 m 55,660 38,962 150,282
j Saklar Tunggal 3 bh 14,168 14,876 57,380
k Saklar Dimmer 1 bh 182,160 63,756 245,916
l Saklar serie 23 bh 22,264 179,225 691,297
m Stop Kontak 1 ph 100 W 44 bh 27,830 428,582 1,653,102
n Stop Kontak inbow 2x 1 phase 100 Watt 5 bh 38,051 66,590 256,846
o Stop Kontak UPS 100 Watt 3 bh 27,830 29,222 112,712
v Stop Kontak TV 100 Watt 9 bh 27,830 87,665 338,135
q Stop Kontak UPS Peralatan Elektronik Tata suara 100 watt 1 bh 27,830 9,741 37,571
r Stop Kontak UPS Peralatan Elektronik Fire Alarm 100 watt 1 bh 27,830 9,741 37,571
s Instalasi penerangan d/kabel 86 ttk 38,000 1,235,591 4,503,591
NYM 3x2.5 mm2 di dalam pipa PVC 3/4"
t Instalasi Lampu Indirect d/kabel 1 ttk 39,000 14,367 53,367
NYM 3x2.5 mm2 di dalam pipa PVC 3/4"
u Instalasi Stop kontak d/kabel 63 ttk 35,000 1,229,088 3,434,088
NYM 3x2.5 mm2 di dalam pipa PVC 3/4"
v Kabel Leader : 600 x 100 4 m 150,788 211,103 814,255
w Kabel Tray : 300 x 100 35 m 141,680 1,735,580 6,694,380
x Material Bantu 1 lot 1,518,000 531,300 2,049,300
3 Lantai 2
a Lampu Downlight Halogen LED 5 Watt 2 bh 211,508 148,056 571,072
b Lampu Dimmer 3 bh 99,176
c Lampu Downlight PLS LED SRD 150 (14 Watt) 58 bh 383,548 7,786,024 30,031,808
d Lampu Downlight PLS LED SRD 150 (14 Watt) c/w Battery 11 bh 399,740 1,538,999 5,936,139
e Lampu Downlight spot LED 20 Watt 12 bh 298,540 1,253,868 4,836,348
f Lampu Dak LED 9 Watt 1 bh 67,804 23,731 91,535
g Lampu indirect 13 Watt / meter 2 m 55,660 38,962 150,282
h Saklar Tunggal 8 bh 14,168 39,670 153,014
i Saklar Dimmer 3 bh 182,160 191,268 737,748
j Saklar serie 20 bh 22,264 155,848 601,128
k Stop Kontak 1 ph 100 W 40 bh 27,830 389,620 1,502,820
l Stop Kontak UPS 100 Watt 17 bh 27,830 165,589 638,699
m Stop Kontak TV 100 Watt 2 bh 31,676 22,173 85,524
n Stop Kontak Lantai UPS 250 Watt 4 bh 42,504 59,506 229,522
o Instalasi penerangan d/kabel 87 ttk 38,000 2,349,000 5,655,000
NYM 3x2.5 mm2 di dalam pipa PVC 3/4"
p Instalasi Lampu Indirect d/kabel 1 ttk 39,000 29,000 68,000
NYM 3x2.5 mm2 di dalam pipa PVC 3/4"
q Instalasi Stop kontak d/kabel 63 ttk 35,420 1,701,000 3,932,460
NYM 3x2.5 mm2 di dalam pipa PVC 3/4"
r Kabel Leader : 600 x 100 4 m 150,788 211,103 814,255
Page 3 LISTRIK
![Page 4: BoQ Listrik RS](https://reader036.vdocuments.pub/reader036/viewer/2022071709/55cf9196550346f57b8ec5ba/html5/thumbnails/4.jpg)
MATERIAL UPAH
Rp Rp Rp
JML
HARGA SATUAN
NO URAIAN SAT
TOTAL HARGABIAYA
s Kabel Tray : 300 x 100 32 m 141,680 1,586,816 6,120,576
t Material Bantu 1 lot 2,530,000 885,500 3,415,500
4 Lantai 3
a Lampu Downlight PLS LED CRD 150 (14 Watt) 36 bh 383,548 4,832,705 18,640,433
b Lampu Downlight PLS LED SRD 150 (14 Watt) c/w Battery 9 bh 399,740 1,259,181 4,856,841
c Lampu Downlight spot LED 20 Watt 12 bh 298,540 1,253,868 4,836,348
d Lampu TKO LED 2x20 Watt 20 bh 194,810 1,363,670 5,259,870
e Lampu TKO LED 2x20 Watt tanpa Louver 2 bh 141,680 99,176 382,536
f Lampu Indirect 13 W/Meter 12 m 55,660 233,772 901,692
g Saklar Tunggal 3 bh 14,168 14,876 57,380
h Saklar serie 2 bh 22,264 15,585 60,113
i Stop Kontak 1 ph 100 W 43 bh 27,830 418,842 1,615,532
j Stop Kontak UPS 100 Watt 2 bh 31,676 22,173 85,524
k Stop Kontak TV 100 Watt 4 bh 31,676 44,346 171,048
l Instalasi penerangan d/kabel 79 ttk 38,000 2,133,000 5,135,000
NYM 3x2.5 mm2 di dalam pipa PVC 3/4"
m Instalasi Lampu Indirect d/kabel 1 ttk 39,000 29,000 68,000
NYM 3x2.5 mm2 di dalam pipa PVC 3/4"
n Instalasi Stop kontak d/kabel 49 ttk 35,000 1,323,000 3,038,000
NYM 3x2.5 mm2 di dalam pipa PVC 3/4"
o Kabel Leader : 600 x 100 4 m 150,788 211,103 814,255
p Kabel Tray : 300 x 100 30 m 141,680 1,487,640 5,738,040
q Material Bantu 1 lot 2,530,000 885,500 3,415,500
5 Lantai 3
a Lampu Downlight PLS LED CRD 150 (14 Watt) 44 bh 383,548 5,906,639 22,782,751
b Lampu Downlight PLS LED SRD 150 (14 Watt) c/w Battery 11 bh 399,740 1,538,999 5,936,139
c Lampu Downlight spot LED 20 Watt 5 bh 298,540 522,445 2,015,145
d Lampu Hallogen LED 5 Watt 3 bh 211,508 222,083 856,607
e Lampu RM M5 2x20 Watt 8 bh 300,564 841,579 3,246,091
g Saklar Tunggal 5 bh 14,168 24,794 95,634
h Saklar serie 19 bh 22,264 148,056 571,072
i Stop Kontak 1 ph 100 W 42 bh 27,830 409,101 1,577,961
j Stop Kontak Oksigen 100 Watt 7 bh 46,552 114,052 439,916
k Stop Kontak UPS 100 Watt 4 bh 27,830 38,962 150,282
l Stop Kontak Lantai UPS 250 Watt 4 bh 42,504 59,506 229,522
m Instalasi penerangan d/kabel 71 ttk 38,000 1,917,000 4,615,000
NYM 3x2.5 mm2 di dalam pipa PVC 3/4"
n Instalasi Lampu Indirect d/kabel 1 ttk 39,000 29,000 68,000
NYM 3x2.5 mm2 di dalam pipa PVC 3/4"
o Instalasi Stop kontak d/kabel 57 ttk 35,000 1,539,000 3,534,000
NYM 3x2.5 mm2 di dalam pipa PVC 3/4"
p Kabel Leader : 600 x 100 4 m 150,788 211,103 814,255
q Kabel Tray : 300 x 100 35 m 141,680 1,735,580 6,694,380
r Material Bantu 1 lot 2,530,000 885,500 3,415,500
Page 4 LISTRIK
![Page 5: BoQ Listrik RS](https://reader036.vdocuments.pub/reader036/viewer/2022071709/55cf9196550346f57b8ec5ba/html5/thumbnails/5.jpg)
MATERIAL UPAH
Rp Rp Rp
JML
HARGA SATUAN
NO URAIAN SAT
TOTAL HARGABIAYA
6 Lantai Atap
Lampu TKO LED 2x20 Watt tanpa louvre 2 bh 141,680 99,176 382,536
a Lampu Dak LED 9 Watt 4 bh 67,804 94,926 366,142
b Lampu indirect 13 Watt / meter 13 m 55,660 253,253 976,833
c Saklar serie 3 bh 22,264 23,377 90,169
d Stop Kontak 1 ph 100 Watt 5 bh 27,830 48,703 187,853
e Instalasi penerangan d/kabel 6 ttk 38,000 162,000 390,000
NYM 3x2.5 mm2 di dalam pipa PVC 3/4"
f Instalasi Lampu Indirect d/kabel 1 ttk 39,000 29,000 68,000
NYM 3x2.5 mm2 di dalam pipa PVC 3/4"
g Instalasi Stop kontak d/kabel 5 ttk 35,000 135,000 310,000
NYM 3x2.5 mm2 di dalam pipa PVC 3/4"
7 Material Bantu 1 lot 2,530,000 885,500 3,415,500
E TESTING & COMMISSIONING 1 lot - 7,500,000 7,500,000
Page 5 LISTRIK