boq n
TRANSCRIPT
-
7/26/2019 BOQ n
1/2
SN Description No.Length
(ft)
Breadth
(ft)
Height
(ft)Qty Remark
1 4" Thick Brick Soiling
a
Brick Soiling at Foundation level for
MS Square Pole4 3 3 - 36 per sq. ft.
b
Brick Soiling at Foundation level for
MS Square Pole4 2.5 2.5 - 25 per sq. ft.
c Brick Soiling at Plinth level 1 - 689.83 per sq. ft.
Total 750.83 per sq. ft.
2 5" Thick PCC Work
a
PCC Work at Foundation level for
MS Square Pole4 2.33 2.33 - 21.7156 per sq. ft.
b
PCC Work at Foundation level for
MS Square Pole4 1.83 1.83 - 13.3956 per sq. ft.
c PCC Work at Plinth level 1 - 689.83 per sq. ft.
Total 724.9412 per sq. ft.
3 Punning and screeding 1 - 750.83 per sq. ft.
Deduction
MS Pole 4 1.17 1.17 - 1.17
Concrete Pole 4 1.17 0.75 - 1.17
Total 748.49 per sq. ft.
3 PCC Work
a PCC in concrete Pole 4 0.5 0.5 10.25 10.25 per cum. ft.
b PCC in Square Pole(Lower Level) 4 1 1 2 8 per cum. ft.
c PCC in Square Pole(Lower Level) 4 0.67 0.67 1.33 2.388148 per cum. ft.
PCC in Gutter 1 36.75 55.125 per cum. ft.
Total 75.76315 per cum. ft.
4 Half Brick Work
a
Half Brick Work Around Concrete
Pole 4 3.33 - 10.25 136.53per sq. ft.
b
Half Brick Work in Square
Pole(Lower Level) 4 5.33 - 2 42.64 per sq. ft.
c Half Brick Wall 1 27.5 - 9.25 254.375 per sq. ft.
Total 433.545 per sq. ft.
689.83
1.5
750.83
Nida Hospiata Pvt. Ltd.
BOQ of Outer Temprorary Structure:
689.83
-
7/26/2019 BOQ n
2/2
5 Full Brick Work
a Full Brick Work In Square Pole 4 1.17 - 9 42.12 per sq. ft.
b Full Brick Wall 1 42.5 - 9.25 393.125 per sq. ft.
c Deduction
Door (D1) 1 5.5 - 7 38.5
Door (D2) 1 2.5 - 7 17.5
Window (W1) 1 4.5 - 5 22.5
Window (W2) 1 8 - 5 40MS Pole 4 0.75 - 9 27
Concrete Pole 4 1.17 - 11.5 53.82
Total deduction 199.32
235.925 per sq. ft.
6 Dry Partition Wall 1 48.25 - 7 337.75 per sq. ft.
Deduction
Window (W3) 1 7.5 - 5 37.5
Door (D3) 1 5.5 - 7 38.5
Door (D2) 1 3.5 - 7 24.5
Total Deduction 100.5
Total 237.25 per sq. ft.