    SN Description No.Length

    (ft)

    Breadth

    (ft)

    Height

    (ft)Qty Remark

    1 4" Thick Brick Soiling

    a

    Brick Soiling at Foundation level for

    MS Square Pole4 3 3 - 36 per sq. ft.

    b

    Brick Soiling at Foundation level for

    MS Square Pole4 2.5 2.5 - 25 per sq. ft.

    c Brick Soiling at Plinth level 1 - 689.83 per sq. ft.

    Total 750.83 per sq. ft.

    2 5" Thick PCC Work

    a

    PCC Work at Foundation level for

    MS Square Pole4 2.33 2.33 - 21.7156 per sq. ft.

    b

    PCC Work at Foundation level for

    MS Square Pole4 1.83 1.83 - 13.3956 per sq. ft.

    c PCC Work at Plinth level 1 - 689.83 per sq. ft.

    Total 724.9412 per sq. ft.

    3 Punning and screeding 1 - 750.83 per sq. ft.

    Deduction

    MS Pole 4 1.17 1.17 - 1.17

    Concrete Pole 4 1.17 0.75 - 1.17

    Total 748.49 per sq. ft.

    3 PCC Work

    a PCC in concrete Pole 4 0.5 0.5 10.25 10.25 per cum. ft.

    b PCC in Square Pole(Lower Level) 4 1 1 2 8 per cum. ft.

    c PCC in Square Pole(Lower Level) 4 0.67 0.67 1.33 2.388148 per cum. ft.

    PCC in Gutter 1 36.75 55.125 per cum. ft.

    Total 75.76315 per cum. ft.

    4 Half Brick Work

    a

    Half Brick Work Around Concrete

    Pole 4 3.33 - 10.25 136.53per sq. ft.

    b

    Half Brick Work in Square

    Pole(Lower Level) 4 5.33 - 2 42.64 per sq. ft.

    c Half Brick Wall 1 27.5 - 9.25 254.375 per sq. ft.

    Total 433.545 per sq. ft.

    689.83

    1.5

    750.83

    Nida Hospiata Pvt. Ltd.

    BOQ of Outer Temprorary Structure:

    689.83

  • 7/26/2019 BOQ n

    2/2

    5 Full Brick Work

    a Full Brick Work In Square Pole 4 1.17 - 9 42.12 per sq. ft.

    b Full Brick Wall 1 42.5 - 9.25 393.125 per sq. ft.

    c Deduction

    Door (D1) 1 5.5 - 7 38.5

    Door (D2) 1 2.5 - 7 17.5

    Window (W1) 1 4.5 - 5 22.5

    Window (W2) 1 8 - 5 40MS Pole 4 0.75 - 9 27

    Concrete Pole 4 1.17 - 11.5 53.82

    Total deduction 199.32

    235.925 per sq. ft.

    6 Dry Partition Wall 1 48.25 - 7 337.75 per sq. ft.

    Deduction

    Window (W3) 1 7.5 - 5 37.5

    Door (D3) 1 5.5 - 7 38.5

    Door (D2) 1 3.5 - 7 24.5

    Total Deduction 100.5

    Total 237.25 per sq. ft.