bore pile installation

Upload: oe-tam-bun

Post on 06-Apr-2018

242 views

Category:

Documents


6 download

TRANSCRIPT

  • 8/2/2019 Bore Pile Installation

    1/71

    R.Karlinasari

  • 8/2/2019 Bore Pile Installation

    2/71

    Mobilisasi Mudah

    Tidak mengganggu lingkungan dengan

    getaran yang dapat merusak/ retak

    dinding bangunan sekitar proyek.

    Pengoperasian alat sederhana.

    Memenuhi syarat teknik dan spesifikasi

    bangunan.

  • 8/2/2019 Bore Pile Installation

    3/71

  • 8/2/2019 Bore Pile Installation

    4/71

    Dia 200 mm. Dia 300 mm. Dia 400 mm Dia 600 mm Dia 800 mm. Dia 1000 mm Dia 1200 mm Dia 1500 mm

    Dia 2500 mm, etc

  • 8/2/2019 Bore Pile Installation

    5/71

    Jenis mata bor yang di digunakan ada beberapamacam sesuai dengan kondisi tanah yang akan di borantara lain :

    Mata bor cross bit/ palang untuk segala jenis tanah. Mata bor coring yang terbuat dari pipa sesuai

    dengan diameter lubang dengan di beri batu widya/mata intan pada ujungnya untuk tanah cadas/cemented

    Mata bor ulir untuk tanah berkerikil atau berpasir.

    .

  • 8/2/2019 Bore Pile Installation

    6/71

    FHWA-NHI-10-016 4 - General Construction Methods

    Drilled Shafts Manual 4-13 May 2010

  • 8/2/2019 Bore Pile Installation

    7/71

    FHWA-NHI-10-016 4 - General Construction Methods

    Drilled Shafts Manual 4-13 May 2010

  • 8/2/2019 Bore Pile Installation

    8/71

    FHWA-NHI-10-016 4 - General Construction Methods

    Drilled Shafts Manual 4-13 May 2010

  • 8/2/2019 Bore Pile Installation

    9/71

    FHWA-NHI-10-016 4 - General Construction Methods

    Drilled Shafts Manual 4-13 May 2010

  • 8/2/2019 Bore Pile Installation

    10/71

    FHWA-NHI-10-016 4 - General Construction Methods

    Drilled Shafts Manual 4-13 May 2010

  • 8/2/2019 Bore Pile Installation

    11/71

    FHWA-NHI-10-016 4 - General Construction MethodsDrilled Shafts Manual 4-13 May 2010

  • 8/2/2019 Bore Pile Installation

    12/71

    FHWA-NHI-10-016 4 - General Construction MethodsDrilled Shafts Manual 4-13 May 2010

  • 8/2/2019 Bore Pile Installation

    13/71

    FHWA-NHI-10-016 4 - General Construction Methods

    Drilled Shafts Manual 4-13 May 2010

  • 8/2/2019 Bore Pile Installation

    14/71

  • 8/2/2019 Bore Pile Installation

    15/71

    Setting alat di titik pertama dan pembuatan bak sirkulasi.

    Setelah hal tersebut sudah siap maka pengeboran di lakukan dengan rotary drillingdynamo 20 PK, Pipa bor 3 meteran dia 2,5 inchi dan mata bor sesuai besar lubang yangdi inginkan.

    Proses pengeboran di lakukan dengan memasukkan air dari bak sirkulasi yang dipompa dengan menggunakan pompa sedot 3 inchi ke dalam watersifel yang di alirkan

    ke dalam pipa bor 2,5 kemudian air akan ke luar pada ujung mata bor, air di gunakanuntuk mempermudah proses pengeboran sebagai pelunak tanah.

    Bila lapisan tanah yang di bor adalah pasir , maka air di ganti dengan cairan bentonite.

    Setelah lubang di bor sesuai dengan design atau mencapai tanah keras maka lubangbor di bersihkan dari lumpur pekat atau gumpalangumpalan tanah denganmenggunakan tabung pembersih.

    Setelah lubang bersih maka besi tulangan dapat di masukkan ke dalam lubang denganhati -hati dan di beri cetakan semen pada setiap sisi tulangan untuk menjaga posisitulangan tidak bersentuhan pada dinding tanah.

    Kemudian proses pengecoran beton slump 1618 cm ( sesuai dengan prosedurpengecoran bored pile) dapat di lakukan dengan terlebih dahulu memasukkan pipatremi.

  • 8/2/2019 Bore Pile Installation

    16/71

  • 8/2/2019 Bore Pile Installation

    17/71

    FHWA-NHI-10-016 4 - General Construction Methods

    Drilled Shafts Manual 4-13 May 2010

  • 8/2/2019 Bore Pile Installation

    18/71

    The dry method (Metode kering)

    The casing method (Metode casing)

    The wet method (Metode basah)

    FHWA-NHI-10-016 4 - General Construction Methods

    Drilled Shafts Manual 4-13 May 2010

  • 8/2/2019 Bore Pile Installation

    19/71

    Dry hole construction represents the most favorable conditions foreconomical use of drilled shafts.

    The dry method is applicable to soil and rock that is above the water tableand that will not cave or slump when the hole is drilled to its full depthduring the period required for installation of the drilled shaft.

    A homogeneous, stiff clay can often be drilled in this manner, andsometimes homogeneous stiff clay can be drilled to moderate depths (upto 50 ft) using the dry method regardless of the long term groundwaterlevels because of the extremely low hydraulic conductivity of the soil.

    The dry method can be employed in some instances with sands above thewater table if the sands contain some cementation or cohesive material,

    or if they will stand for a period of time because of apparent cohesion.

    This behavior generally cannot be predicted unless there is priorexperience with the specific formation being excavated or full-sized testexcavations have been made during site characterization.

    FHWA-NHI-10-016 4 - General Construction Methods

    Drilled Shafts Manual 4-13 May 2010

  • 8/2/2019 Bore Pile Installation

    20/71

    The construction process with a dry hole :

    a) The shaft is excavated using augers which will likely have teeth to break

    up the soil.

    b) The base is cleaned using a bucket or flat bottom tool to remove loose

    debris and possibly any small amount of water.

    c) In most projects, a full length reinforcing cage is placed.d) The concrete is placed using a drop chute or centering device.

    FHWA-NHI-10-016 4 - General Construction Methods

    Drilled Shafts Manual 4-13 May 2010

  • 8/2/2019 Bore Pile Installation

    21/71

    Pelaksanaan pengeboran

    pada lokasi pasir kering

    tersementasi.

    Peletakan tulangan yang dilapisi Kaki ke dalamlubang bor

    FHWA-NHI-10-016 4 - General Construction Methods

    Drilled Shafts Manual 4-13 May 2010

  • 8/2/2019 Bore Pile Installation

    22/71

    FHWA-NHI-10-016 4 - General Construction Methods

    Drilled Shafts Manual 4-13 May 2010

  • 8/2/2019 Bore Pile Installation

    23/71

    The casing method is applicable to sites where soil conditions are

    such that caving or excessive soil or rock deformation can occur

    when a shaft is excavated.

    Casing can also be used to extend the shaft excavation through

    water or permeable strata to reach a dry, stable formation.

    Unless the bearing formation into which the casing is sealed is

    stable and dry, it will not be possible to use the casing method

    alone without the addition of drilling fluid or water.

  • 8/2/2019 Bore Pile Installation

    24/71

    Installation of casing is generally accomplished in one of three ways :a) 1st Method : Excavate an oversized hole using the dry method, then

    place the casing into the hole. This method is suitable only forconstruction in soils that are generally dry or have slow seepage andthat will remain stable for the period of time required to advance thehole to the more stable bearing stratum.

    b) 2nd Method : Excavate an oversized hole through the shallow permeablestrata using a drilling fluid, then place and advance the casing into thebearing stratum. After the casing is sealed into the underlying morestable stratum, the drilling fluid can be removed from inside the casingand the hole advanced to the final tip elevation in the dry.

    c) 3rd Method : Advance the casing through the shallow permeable strata

    and into the bearing formation ahead of the shaft excavation, and thenexcavate within the casing in the dry. With this approach, casing may bedriven using impact or vibratory hammers or using a casing oscillatoror rotator with sufficient torque and downward force to advance thecasing through the soil ahead of the excavation. Even larger upwardforce may be required to pull the casing during concrete placement.

  • 8/2/2019 Bore Pile Installation

    25/71

    FHWA-NHI-10-016 4 - General Construction Methods

    Drilled Shafts Manual 4-13 May 2010

  • 8/2/2019 Bore Pile Installation

    26/71

    FHWA-NHI-10-016 4 - General Construction Methods

    Drilled Shafts Manual 4-13 May 2010

  • 8/2/2019 Bore Pile Installation

    27/71

    Pemasangan casing pada kondisi tanah kering/bagus dengan

    Vibro hammer dan twisting bar

    FHWA-NHI-10-016 4 - General Construction Methods

    Drilled Shafts Manual 4-13 May 2010

  • 8/2/2019 Bore Pile Installation

    28/71

    Sebuah Oscillator untuk mendorong casing ke dalam lapisan tanah

    FHWA-NHI-10-016 4 - General Construction Methods

    Drilled Shafts Manual 4-13 May 2010

  • 8/2/2019 Bore Pile Installation

    29/71

    FHWA-NHI-10-016 4 - General Construction Methods

    Drilled Shafts Manual 4-13 May 2010

  • 8/2/2019 Bore Pile Installation

    30/71

    FHWA-NHI-10-016 4 - General Construction Methods

    Drilled Shafts Manual 4-13 May 2010

  • 8/2/2019 Bore Pile Installation

    31/71

  • 8/2/2019 Bore Pile Installation

    32/71

    hb

    hw

    Muka Air Tanah

    Pipa Tremie

    ? b . hb

    ? w. hw

    Casing

  • 8/2/2019 Bore Pile Installation

    33/71

    Jika misalkan hw pada kedalaman -15 m,

    Dasar Bore adalah - 45 meter

    Maka pipa Tremie harus :

    1/10 * (45-15) m = 3 meter

    Jika dasar bore 45 meter, maka pipa tremie harus pada

    kedalaman 42 meter ( minimal)

    SF = hb/hw = 1/10

    hb = 1/10 hw

    Jadi b. hb > w. hw

  • 8/2/2019 Bore Pile Installation

    34/71

    FHWA-NHI-10-016 4 - General Construction Methods

    Drilled Shafts Manual 4-13 May 2010

  • 8/2/2019 Bore Pile Installation

    35/71

    FHWA-NHI-10-016 4 - General Construction Methods

    Drilled Shafts Manual 4-13 May 2010

  • 8/2/2019 Bore Pile Installation

    36/71

    FHWA-NHI-10-016 4 - General Construction Methods

    Drilled Shafts Manual 4-13 May 2010

  • 8/2/2019 Bore Pile Installation

    37/71

    FHWA-NHI-10-016 4 - General Construction Methods

    Drilled Shafts Manual 4-13 May 2010

  • 8/2/2019 Bore Pile Installation

    38/71

    FHWA-NHI-10-016 4 - General Construction Methods

    Drilled Shafts Manual 4-13 May 2010

  • 8/2/2019 Bore Pile Installation

    39/71

  • 8/2/2019 Bore Pile Installation

    40/71

  • 8/2/2019 Bore Pile Installation

    41/71

    When soil conditions do not permit dewatering of the shaft excavation, the excavationand concrete placement operations must be completed in the wet. With this method,the hole is kept filled with afluid during the entire operation of drilling the hole andplacing the reinforcing and concrete. The drilling fluid may consist of water if the hole isstable against collapse, or a prepared slurry designed to maintain stability of the hole.

    Several circumstances in which construction in the wet would be used are described below : The shaft is founded in a sand or permeable stratum which will collapse or become

    unstable during excavation. A drilling slurry is required to maintain the stability of thehole and prevent inflow of groundwater.

    The shaft is founded in a stable formation, but extends through caving or water-bearingsoils of such depth and thickness that the required casing would be very long anddifficult to handle. A drilling slurry is required to maintain the stability of the hole andprevent inflow of groundwater.

    A full length casing is driven in advance of the excavation, but the soil or rock conditions

    at the base are permeable and do not permit dewatering. Because the full length casingprovides a stable hole, plain water can often be used instead of slurry.

    The hole is cased to a stratum of rock which is stable, but groundwater inflow is greaterthan 12 inches per hour. In this case, the hole is kept filled with water to prevent inflowduring concrete placement.

    FHWA-NHI-10-016 4 - General Construction Methods

    Drilled Shafts Manual 4-13 May 2010

  • 8/2/2019 Bore Pile Installation

    42/71

    FHWA-NHI-10-016 4 - General Construction Methods

    Drilled Shafts Manual 4-13 May 2010

  • 8/2/2019 Bore Pile Installation

    43/71

    Gambar 9. Proses Pelaksanaan bore pile dengan metode basah

  • 8/2/2019 Bore Pile Installation

    44/71

  • 8/2/2019 Bore Pile Installation

    45/71

  • 8/2/2019 Bore Pile Installation

    46/71

  • 8/2/2019 Bore Pile Installation

    47/71

  • 8/2/2019 Bore Pile Installation

    48/71

  • 8/2/2019 Bore Pile Installation

    49/71

  • 8/2/2019 Bore Pile Installation

    50/71

    FHWA-NHI-10-016 4 - General Construction Methods

    Drilled Shafts Manual 4-13 May 2010

  • 8/2/2019 Bore Pile Installation

    51/71

  • 8/2/2019 Bore Pile Installation

    52/71

  • 8/2/2019 Bore Pile Installation

    53/71

    When the pore sizes in the formation being excavated are large (as in gravelly soils

    or poorly graded coarse sands) the filter cake may be replaced by a deep zone of

    clay platelet deposition within the pores that may or may not be effective in

    producing a stable borehole.

  • 8/2/2019 Bore Pile Installation

    54/71

    FHWA-NHI-10-016 4 - General Construction Methods

    Drilled Shafts Manual 4-13 May 2010

  • 8/2/2019 Bore Pile Installation

    55/71

    FHWA-NHI-10-016 4 - General Construction Methods

    Drilled Shafts Manual 4-13 May 2010

  • 8/2/2019 Bore Pile Installation

    56/71

    FHWA-NHI-10-016 4 - General Construction Methods

    Drilled Shafts Manual 4-13 May 2010

  • 8/2/2019 Bore Pile Installation

    57/71

    FHWA-NHI-10-016 4 - General Construction MethodsDrilled Shafts Manual 4-13 May 2010

  • 8/2/2019 Bore Pile Installation

    58/71

    FHWA-NHI-10-016 4 - General Construction MethodsDrilled Shafts Manual 4-13 May 2010

  • 8/2/2019 Bore Pile Installation

    59/71

  • 8/2/2019 Bore Pile Installation

    60/71

    FHWA-NHI-10-016 4 - General Construction Methods

    Drilled Shafts Manual 4-13 May 2010

  • 8/2/2019 Bore Pile Installation

    61/71

    FHWA-NHI-10-016 4 - General Construction Methods

    Drilled Shafts Manual 4-13 May 2010

  • 8/2/2019 Bore Pile Installation

    62/71

    FHWA-NHI-10-016 4 - General Construction Methods

    Drilled Shafts Manual 4-13 May 2010

  • 8/2/2019 Bore Pile Installation

    63/71

    FHWA-NHI-10-016 4 - General Construction Methods

    Drilled Shafts Manual 4-13 May 2010

  • 8/2/2019 Bore Pile Installation

    64/71

    FHWA-NHI-10-016 4 - General Construction Methods

    Drilled Shafts Manual 4-13 May 2010

  • 8/2/2019 Bore Pile Installation

    65/71

  • 8/2/2019 Bore Pile Installation

    66/71

  • 8/2/2019 Bore Pile Installation

    67/71

  • 8/2/2019 Bore Pile Installation

    68/71

  • 8/2/2019 Bore Pile Installation

    69/71

  • 8/2/2019 Bore Pile Installation

    70/71

  • 8/2/2019 Bore Pile Installation

    71/71