REKAPPROYEK:BANGUNAN DRC dan BRC BANK MANDIRILOKASI:REMPOA - TANGGERANG SELATANPEKERJAAN:PEKERJAAN MEKANIKAL DAN ELEKTRIKALREKAPITULASI UTAMANOURAIAN PEKERJAANTOTALPEKERJAAN M & E DRCRp28,887,437,040.00PEKERJAAN M & E BRCRp2,583,817,750.00SUB TOTALRp31,471,254,790.00

&LBQ MEKANIKAL ELEKTRIKAL&CREKAP&RPage &P

DRCPROYEK :DRC & BRC BANK MANDIRILOKASI :REMPOA - TANGERANG SELATANPEKERJAAN :BANGUNAN DRCREKAPITULASIPEKERJAAN MEKANIKAL DAN ELEKTRIKALIPEKERJAAN LISTRIK ARUS KUATRp.15,347,532,090.00IIPEKERJAAN PENANGKAL PETIRRp.316,238,450.00IIIPEKERJAAN GENSETRp.5,801,625,610.00IVPEKERJAAN FIRE ALARMRp.293,420,710.00VPEKERJAAN SOUND SYSTEM (PUBLIC ADDRESS)Rp.320,438,690.00VIPEKERJAAN TELEPONRp.283,636,760.00VIIPEKERJAAN MATVRp.214,362,390.00VIIISPARING KABEL PROVIDERRp.132,487,300.00IXPEKERJAAN PLUMBINGRp.1,294,349,430.00XPEKERJAAN FIRE HYDRANT, FIRE SPRINKLER & FIRE EXTINGUISHERRp.1,653,816,340.00XIPEKERJAAN TATA UDARARp.2,540,258,600.00XIIPEKERJAAN SARANA TRANSPORTASI DALAM GEDUNGRp.689,270,670.000.00TOTAL Rp.28,887,437,040.000PROYEK :DRC & BRC BANK MANDIRILOKASI :REMPOA - TANGERANG SELATANPEKERJAAN :BANGUNAN DRCNOURAIAN PEKERJAANSATVOLUMEHARGA SATUAN Rp.JUMLAH HARGA Rp.PEKERJAAN MEKANIKAL DAN ELEKTRIKALIPEKERJAAN LISTRIK ARUS KUATAPekerjaan Tegangan Menengah dan Penyambungan PLN1Pengadaan & Pemasangan Incoming PDTM ( Panel Distribusi Tegangan Menengah)unit2.00188,058,750.00376,117,500.0020 KV / 3 phasa / 50 Hz, Incoming CB, Metal enclosed,- rated Voltage 20 kV, 14,5 kA - 16 kA / 1 sec- DS 3P 630 A 16 kA / 1s Manual- CB SF6 3P 630 A 16 kA / 1s, Motorized- 3 phase busbar 630 A- Protection Relay Sepam 1000 + S20- Power Meter PM 820- 3 CT 100 - 200 / 5A 30VA C.1.0.5 7.5VA 5P15- 3 PT 20V3 - 100V3 50VA C1.0.5 with Fuse- 2 Current Test Terminal + 1 Voltage Test Terminal- Heater, Voltage Indicator, Earthing Switch, Shunt Trip2Pengadaan & Pemasangan Outgoing PDTM ( Panel Distribusi Tegangan Menengah)unit4.00188,058,750.00752,235,000.0020 KV / 3 phasa / 50 Hz, Incoming CB, Metal enclosed,- rated Voltage 20 kV, 14,5 kA - 16 kA / 1 sec- DS 3P 630 A 16 kA / 1s Manual- CB SF6 3P 630 A 16 kA / 1s, Motorized- 3 phase busbar 630 A- Protection Relay Sepam 1000 + S20- 3 CT 100 - 200 / 5A 30VA C.1.0.5 7.5VA 5P15- 3 PT 20V3 - 100V3 50VA C1.0.5 with Fuse- 2 Current Test Terminal + 1 Voltage Test Terminal- Heater, Voltage Indicator, Earthing Switch, Shunt Trip3Pengadaan & Pemasangan Arresterunit2.003,231,250.006,462,500.004Pengadaan dan pemasangan Trafo Cast Resin metal Enclosureunit2.0010,340,000.0020,680,000.00- Capacity: 3.150 KVA / 3 Phase- Voltage primer: 20 KV- Voltage secunder: 400 V- Cos phi: 0,85 / 50 Hz / DYN 55Kabel N2XY 3 x 1 x 120 mm dari PDTM ke Trafo- dari PDTM-1 ke Trafo 1m12.00916,410.0010,996,920.00- dari PDTM-2 ke Trafo 2m12.00916,410.0010,996,920.006Kabel N2XSEFGbY 3 x 120 mm dari PDTM-1 ke PDTM-2m64.001,073,710.0068,717,440.007Biaya Penyambungan & UJL Daya PLNkVA8Grounding Panel TM dan trafom dengan BCC 95 mm termasuk bak knotrolunit4.003,814,580.0015,258,320.0040 x 40 x 40 cm dan tahanan tanah dibawah 1 ohmSub TotalPekerjaan Tegangan Menengah dan Penyambungan PLN1,261,464,600.00BPekerjaan Panel-panelB.1Lantai BasementPP/PL-LT.Bunit1.0014,857,590.0014,857,590.00PP-LUARunit1.0014,883,770.0014,883,770.00PP/AC-LT.Bunit2.006,231,830.0012,463,660.00PP-POMPAunit1.006,231,830.006,231,830.00PP-ABRunit1.0017,337,980.0017,337,980.00PP-HYDRANTunit1.0016,024,250.0016,024,250.00P-SUMPITunit1.0016,900,070.0016,900,070.00Sub totalLantai Basement98,699,150.00B.2Lantai 1PKGunit1.00313,500,000.00313,500,000.00ATS-1unit1.00192,500,000.00192,500,000.00ATS-2unit1.00192,500,000.00192,500,000.00CAPACITOR BANK 1200 KVAR 12 Stepunit4.00275,000,000.001,100,000,000.00SDP (N)unit1.0027,500,000.0027,500,000.00SDP (+1)unit1.0027,500,000.0027,500,000.00SDP (1)unit1.0027,500,000.0027,500,000.00PP/PL-LT.1unit1.0016,375,590.0016,375,590.00PP/AC-LT.1unit1.0016,585,580.0016,585,580.00P-DU-LT.1unit1.0016,262,290.0016,262,290.00P-SK-LT.1unit1.0016,900,070.0016,900,070.00Sub totalLantai 11,947,123,530.00B.3Lantai 2PP/PL-LT.2unit1.0049,399,350.0049,399,350.00PP/AC-LT.2unit1.0013,488,640.0013,488,640.00Sub totalLantai 262,887,990.00B.4Lantai 3PP/PL-LT.3unit1.0018,265,170.0018,265,170.00PP/AC-LT.3unit1.0034,596,980.0034,596,980.00Sub totalLantai 352,862,150.00B.5Lantai AtapP-OU.VRFunit1.0064,012,630.0064,012,630.00P-LIFTunit1.0017,050,000.0017,050,000.00Sub totalLantai Atap81,062,630.00Sub TotalPekerjaan Panel-panel2,242,635,450.00CPekerjaan FeederPengadaan dan Pemasangan kabel Feeder termasuk schoen sertaaksesories lainnya1Kabel dari Trafo 1 :- NYY 4 (12 x 1 x 300) mm2keATS.1 (a-b)mtr10.0022,880,330.00228,803,300.002Kabel dari Trafo 2 :- NYY 4 (12 x 1 x 300) mm2keATS.2 (a-b)mtr10.0022,880,330.00228,803,300.003Kabel dari PKG :- NYY 4 (14 x 1 x 240) mm2keATS.1 (a-b)mtr120.0018,846,850.002,261,622,000.00- NYY 4 (14 x 1 x 240) mm2keATS.2 (a-b)mtr93.0018,846,850.001,752,757,050.004Kabel dari ATS.1 (a-b) :- NYY 4 (10 x 1c x 240) mm2keATS.2 (a-b)mtr56.0018,515,970.001,036,894,320.00- NYY 4 (7 x 1c x240) mm2keSDP (N)mtr54.0018,267,810.00986,461,740.00- FRC 4 x 1c x 240mm2kePP-POMPAmtr96.003,060,420.00293,800,320.00- NYY 4 (5 x 1c x 240) mm2keIN-OUT UPS LANTAI.3 (N)mtr84.007,783,930.00653,850,120.00- NYY 4 (5 x 1c x 240) mm2keIN-OUT UPS LANTA.BASEMENT (+)mtr63.007,783,930.00490,387,590.005Kabel dari ATS.2 (a-b) :- NYY 4 (10 x 1c x 240) mm2keATS.1 (a-b)mtr56.008,197,530.00459,061,680.00- NYY 4 (7 x 1c x240) mm2keSDP (1)mtr16.0018,267,810.00292,284,960.00- FRC 4 x 1c x 240mm2kePP-POMPAmtr24.003,060,420.0073,450,080.00- NYY 4 (5 x 1c x 240) mm2keIN-OUT UPS LANTAI.2 (N)mtr36.007,783,930.00280,221,480.00- NYY 4 (5 x 1c x 240) mm2keIN-OUT UPS LANTA.BASEMENT (+)mtr12.007,783,930.0093,407,160.006Kabel dari SDP-N:- NYY 4 (2 x 1c x 185) mm2keSDP (1)mtr110.002,398,880.00263,876,800.007Kabel dari SDP-(+):- NYY 4 (2 x 1c x 185) mm2keSDP (1)mtr110.002,398,880.00263,876,800.008Kabel dari SDP-1- NYY 4 x 10 mm2kePP/PL-LT.Bmtr8.00130,020.001,040,160.00- NYY 4 x 25 mm2kePP/PL-LT.1mtr13.00172,920.002,247,960.00- NYY 4 x 10 mm2kePP/PL-LT.2mtr18.00130,020.002,340,360.00- NYY 4 x 10 mm2kePP/PL-LT.3mtr23.00130,020.002,990,460.00- NYY 4 x 6 mm2kePP/AC-LT.Bmtr8.0083,490.00667,920.00- NYY 4 x 6 mm2kePP/AC-LT.1mtr13.0083,490.001,085,370.00- NYY 4 x 6 mm2kePP/AC-LT.2mtr18.0083,490.001,502,820.00- NYY 4 x 6 mm2kePP/AC-LT.3mtr23.0083,490.001,920,270.00- NYY 4 x 1c x 185 mm2keP-OU.VRFmtr34.001,138,390.0038,705,260.00- NYY 4 x 10 mm2keP-LIFTmtr32.00130,020.004,160,640.009Kabel dari PP/PL-LT.B :- NYY 4 x 6 mm2kePP-LUARmtr17.0083,490.001,419,330.0010Kabel dari PP-Pompa :- FRC 4 x 1c x 150 mm2kePP-HYDRANTmtr10.001,968,120.0019,681,200.00- NYY 4 x 6 mm2kePP-SUMPITmtr15.0083,490.001,252,350.00- NYY 4 x 6 mm2kePP-AIR BERSIHmtr12.0083,490.001,001,880.00Sub TotalPekerjaan Feeder9,739,574,680.00DPekerjaan Trench kabel, Kabel Tray dan Raised Floor DuctPengadaan dan Pemasangan Trench kabel, Kabel Tray dan Raised Floor Ducttermasuk braket/hanger/gantungan serta aksesories lainnyaD.1Pekerjaan Trench KabelMenggunakan Beton Pracetak Saluran Terbuka Type U ( U- DITCH ) + Tutup Klas H- U-Ditch 1000 x 1000 mm + Tutup U-Ditch 1000 mmmtr160.003,102,000.00496,320,000.00Sub totalPekerjaan Trench Kabel496,320,000.00D.2Pekerjaan Kabel TrayD.2.1Lantai 1aArus Kuat- uk. 800 mm x 100 mmm24.00556,490.0013,355,760.00- uk. 600 mm x 50 mmm42.00438,350.0018,410,700.00- uk. 300 mm x 50 mmm54.00263,890.0014,250,060.00bArus Lemah- uk. 400 mm x 100 mmm54.00380,270.0020,534,580.00- uk. 300 mm x 100 mmm56.00322,080.0018,036,480.00- uk. 200 mm x 100 mmm42.00263,890.0011,083,380.00Sub totalD.2.195,670,960.00D.2.2Lantai 2Arus Kuat- uk. 800 mm x 100 mmm8.00556,490.004,451,920.00- uk. 600 mm x 50 mmm46.00438,350.0020,164,100.00- uk. 300 mm x 50 mmm90.00263,890.0023,750,100.00Arus Lemah- uk. 400 mm x 100 mmm16.00380,270.006,084,320.00- uk. 300 mm x 100 mmm38.00322,080.0012,239,040.00- uk. 200 mm x 100 mmm36.00263,890.009,500,040.00Sub totalD.2.276,189,520.00D.2.3Lantai 3Arus Kuat- uk. 800 mm x 100 mmm8.00556,490.004,451,920.00- uk. 600 mm x 50 mmm46.00438,350.0020,164,100.00- uk. 300 mm x 50 mmm90.00263,890.0023,750,100.00Arus Lemah- uk. 400 mm x 100 mmm16.00380,270.006,084,320.00- uk. 300 mm x 100 mmm38.00322,080.0012,239,040.00- uk. 200 mm x 100 mmm36.00263,890.009,500,040.00Sub totalD.2.376,189,520.00Sub totalPekerjaan Kabel Tray248,050,000.00D.3Raised Floor DuctLantai 1- Under Floor Duct PVC uk. 100 mm x 25 mm x 3.2 mm (listrik)m52.00167,530.008,711,560.00- Under Floor Duct PVC uk. 75 mm x 25 mm x 3.2 mm (telepon)m52.00154,110.008,013,720.00- Under Floor Duct PVC uk. 75 mm x 25 mm x 3.2 mm (kabel data)m52.00154,110.008,013,720.00- Service Outlet Box uk. 258 mm x 258 mm x 80 mm 4 compartmentm66.00113,850.007,514,100.00- Vertical Oultlet uk. 225 mm x 38 mm 4 compartmentbh3.001,223,970.003,671,910.00Sub totalRaised Floor Duct35,925,010.00Sub TotalPekerjaan Trench kabel, Kabel Tray dan Raised Floor Duct780,295,010.00EPekerjaan Pentanahan1BCC 6 mmmtr62.0015,620.00968,440.002BCC 10 mmmtr90.0022,770.002,049,300.003BCC 16 mmmtr13.0031,460.00408,980.004BCC 70 mmmtr78.0082,170.006,409,260.005BCC 95 mmmtr231.00109,340.0025,257,540.006Pentanahan copper clad rod 5/8" x 12 m lengkap bak kontrolunit4.003,814,580.0015,258,320.00dan CU Bar ukuran 40 x 40 x 40 cm dan tahanan tanah dibawah 2 ohmSub TotalPekerjaan Pentanahan50,351,840.00FPek. Lampu / Titik Nyala / Stop KontakF.1Site Plan1Lampu taman Globe 50 Wattbh22.002,291,850.0050,420,700.002Flood Light MH 400 Wattbh20.002,171,070.0043,421,400.003TL 1 x 36 Watt Type Balkbh18.00249,260.004,486,680.004Titik nyala lampu dengan kabel NYM 3 x 2,5 mm di dalam conduittitik18.00316,910.005,704,380.00PVC HI 20 mm5Titik nyala lampu taman NYFGbY 4 x2,5 mm2titik42.00683,760.0028,717,920.00Sub totalSite Plan132,751,080.00F.2Lantai Basement1Recessed Mounted type D-6 TL T-5 2 x 28 Wbh32.00697,620.0022,323,840.002Recessed Mounted type D-6 TL T-5 2 x 28 W + Nicad Batterybh4.001,550,670.006,202,680.003TL 1 x 36 Watt Type Balkbh23.00249,260.005,732,980.004TL 1 x 36 Watt Type Balk + Nicad Batterybh5.001,550,670.007,753,350.005Stop Kontak Dinding 1 ph, 200 Wbh10.0056,760.00567,600.006Saklar Gandabh5.0059,400.00297,000.007Titik nyala lampu dengan kabel NYM 3 x 2,5 mm di dalam conduittitik64.00316,910.0020,282,240.00PVC HI 20 mm8Titik nyala Stop kontak NYM 3 x 2,5 mm didalam conduit PVC HI 20 mmtitik10.000.0Sub totalLantai Basement63,159,690.00F.3Lantai 11Recessed Mounted type I TL T-5 2 x 28 W With Diffuser ACbh44.001,654,070.0072,779,080.002Recessed Mounted type I TL T-5 2 x 28 W With Diffuser AC + Nicad Batterybh1.002,507,120.002,507,120.003Recessed Mounted type D-6 TL T-5 2 x 28 Wbh36.00697,620.0025,114,320.004Recessed Mounted type D-6 TL T-5 2 x 28 W + Nicad Batterybh13.001,550,670.0020,158,710.005TL 1 x 36 Watt Type Balkbh14.00249,260.003,489,640.006TL 1 x 36 Watt Type Balk + Nicad Batterybh6.001,550,670.009,304,020.007Lampu Wastafel Type TL 36 Wattbh2.00249,260.00498,520.008Lampu Wastafel Type TL 18 Wattbh1.00238,590.00238,590.009Down Light PLC 1 x 13 Wattbh10.00213,510.002,135,100.0010Down Light PLC 1 x 13 Watt + Nicad Batterybh2.001,250,040.002,500,080.0011Down Light PLC 2 x 13 Wattbh121.00669,240.0080,978,040.0012Down Light PLC 2 x 13 Watt + Nicad Batterybh19.001,238,490.0023,531,310.0013Lampu Baret 1 x 18 wattbh4.00328,130.001,312,520.0014Lampu Exit 10 W wall mounted+ Nicad Batterybh2.001,237,170.002,474,340.0015Stop Kontak Dinding 1 ph, 200 Wbh33.0056,760.001,873,080.0016Stop Kontak Lantai 1 ph, 200 Wbh62.00326,920.0020,269,040.0017Stop Kontak Dinding Hand Dryer 1 ph, 1000 Wbh2.0056,760.00113,520.0018Stop Kontak Lantai (Data) 1 ph, 450 Wbh66.00326,920.0021,576,720.0019Saklar Tunggalbh23.0050,490.001,161,270.0020Saklar Gandabh14.0059,400.00831,600.0021Grid Switch 8 Gangbh1.00230,560.00230,560.0022Grid Switch 10 Gangbh1.00963,050.00963,050.0023Titik nyala lampu dengan kabel NYM 3 x 2,5 mm di dalam conduittitik275.00316,910.0087,150,250.00PVC HI 20 mm24Titik nyala Stop kontak NYM 3 x 2,5 mm didalam conduit PVC HI 20 mmtitik163.00354,530.0057,788,390.00Sub totalLantai 1438,978,870.00F.4Lantai 21Recessed Mounted type D-6 TL T-5 2 x 28 Wbh127.00697,620.0088,597,740.002Recessed Mounted type D-6 TL T-5 2 x 28 W + Nicad Batterybh16.001,550,670.0024,810,720.003TL 1 x 36 Watt Type Balkbh6.00249,260.001,495,560.004Lampu Indirect TL T5 28 Wattbh96.00249,260.0023,928,960.005Lampu Wastafel Type TL 36 Wattbh2.00249,260.00498,520.006Down Light PLC 1 x 13 Wattbh3.00213,510.00640,530.007Down Light PLC 1 x 13 Watt + Nicad Batterybh2.001,250,040.002,500,080.008Down Light PLC 2 x 13 Wattbh56.00669,240.0037,477,440.009Down Light PLC 2 x 13 Watt + Nicad Batterybh14.001,238,490.0017,338,860.0010Lampu Baret 1 x 18 watt + Nicad Batterybh2.001,238,490.002,476,980.0011Lampu Exit 10 W wall mounted+ Nicad Batterybh4.001,237,170.004,948,680.0012Down Light Halogen 50 Wattbh5.00234,850.001,174,250.0013Stop Kontak Dinding 1 ph, 200 Wbh12.0056,760.00681,120.0014Stop Kontak Dinding Hand Dryer 1 ph, 1000 Wbh2.0056,760.00113,520.0015Saklar Tunggalbh3.0050,490.00151,470.0016Saklar Gandabh15.0059,400.00891,000.0017Saklar Hotelbh2.0089,760.00179,520.0018Grid Switch 6 Gangbh1.00117,040.00117,040.0019Grid Switch 10 Gangbh1.00963,050.00963,050.0020Titik nyala lampu dengan kabel NYM 3 x 2,5 mm di dalam conduittitik333.00316,910.00105,531,030.00PVC HI 20 mm21Titik nyala Stop kontak NYM 3 x 2,5 mm didalam conduit PVC HI 20 mmtitik23.00354,530.008,154,190.00Sub totalLantai 2322,670,260.00F.5Lantai 31Recessed Mounted type D-6 TL T-5 2 x 28 Wbh126.00697,620.0087,900,120.002Recessed Mounted type D-6 TL T-5 2 x 28 W + Nicad Batterybh16.001,550,670.0024,810,720.003TL 1 x 36 Watt Type Balkbh4.00249,260.00997,040.004TL 1 x 36 Watt Type Balk + Nicad Batterybh2.001,550,670.003,101,340.005Lampu Indirect TL T5 28 Wattbh68.00249,260.0016,949,680.006Lampu Wastafel Type TL 36 Wattbh2.00249,260.00498,520.007Down Light PLC 1 x 13 Wattbh3.00213,510.00640,530.008Down Light PLC 1 x 13 Watt + Nicad Batterybh2.001,250,040.002,500,080.009Down Light PLC 2 x 13 Wattbh56.00669,240.0037,477,440.0010Down Light PLC 2 x 13 Watt + Nicad Batterybh14.001,238,490.0017,338,860.0011Lampu Baret 1 x 18 watt + Nicad Batterybh2.001,287,880.002,575,760.0012Lampu Exit 10 W wall mounted+ Nicad Batterybh4.001,237,170.004,948,680.0013Stop Kontak Dinding 1 ph, 200 Wbh12.0056,760.00681,120.0014Stop Kontak Dinding Hand Dryer 1 ph, 1000 Wbh2.0056,760.00113,520.0015Saklar Tunggalbh3.0050,490.00151,470.0016Saklar Gandabh15.0059,400.00891,000.0017Saklar Hotelbh2.0089,760.00179,520.0018Grid Switch 6 Gangbh1.00117,040.00117,040.0019Grid Switch 10 Gangbh1.00963,050.00963,050.0020Titik nyala lampu dengan kabel NYM 3 x 2,5 mm di dalam conduittitik295.00316,910.0093,488,450.00PVC HI 20 mm21Titik nyala Stop kontak NYM 3 x 2,5 mm didalam conduit PVC HI 20 mmtitik39.00354,530.0013,826,670.00Sub totalLantai 3310,150,610.00Sub TotalPek. Lampu / Titik Nyala / Stop Kontak1,267,710,510.00GTesting & CommissioningTesting & Commissioning peralatan dan instalasi elektrikal terpasang termasuk panel - panel, pengkabelan, grounding dan instalasi lampulot1.005,500,000.005,500,000.00Sub TotalTesting & Commissioning5,500,000.00SUB TOTALPEKERJAAN LISTRIK ARUS KUAT15,347,532,090.00IIPEKERJAAN PENANGKAL PETIRII.AAir Terminal & Termination Networks115x500mm alumunium air rodbh16.0012,499,740.00199,995,840.00215 mm Air terminal basebh16.0080,740.001,291,840.00325 x 3mm Bare Alumunium Tapemeter218.0045,980.0010,023,640.004Grey 25x3mm Non-Metallic DC tape clipbh218.0029,040.006,330,720.00525 x 3mm Alumunium Square tape clampbh16.0043,560.00696,960.00Sub TotalAir Terminal & Termination Networks218,339,000.00II.BDown Conductor125x3mm Bare Alumunium Tapemeter352.0018,810.006,621,120.002Grey 25x3mm Non-Metallic DC tape clipbh352.0029,040.0010,222,080.00325 x 3mm Alumunium Square tape clampbh36.0043,560.001,568,160.004Test Connection Linkbh12.00275,000.003,300,000.00Sub TotalDown Conductor21,711,360.00II.CEarthing System1Polymer Inspection Pitbh9.00177,650.001,598,850.0025/8" x 1800 mm Extensible Copperbond Rodbh63.0080,740.005,086,620.0035/8" Rod Couplingbh63.0033,880.002,134,440.0045/8" Driving Studbh9.0058,080.00522,720.005Rod to cable clampbh9.0024,200.00217,800.006Stranded Bar copper conductor 70 mmmeter63.0062,040.003,908,520.00Sub TotalEarthing System13,468,950.00II.DLooping1Stranded Bar copper conductor 70 mmmeter298.0062,040.0018,487,920.00Sub TotalEarthing System18,487,920.00II.EBiaya Instalasi1Alat bantu perancahlot1.001,650,000.001,650,000.002Instalasi grounding/pentanahanrod9.003,814,580.0034,331,220.003Testing & Commissioninglot1.002,750,000.002,750,000.004Biaya Perijinan Depnakerlot1.005,500,000.005,500,000.00Sub TotalBiaya Instalasi44,231,220.00SUB TOTALPEKERJAAN PENANGKAL PETIR316,238,450.00IIIPEKERJAAN GENSET1Diesel Generator Set- Type: Open Typeunit3.001,825,450,000.005,476,350,000.00- Kapasitas: 1500 KVA , 220/380 V / 1500 rpm Prime Rating- Lengkap dengan : Cooling Radiator, Silencer, Engine pad, Battery, BatteryCharger dan accessoriesnya termasuk setting Genset diatas pondasi2Tangki Harian kapasitas 3000 literunit1.0016,479,320.0016,479,320.00lengkap dengan sign glass, inlet outlet dan dudukan dari rangka siku3Tangki Mingguan kapasitas 16000 literunit1.0021,649,320.0021,649,320.00lengkap dengan sign glass dan inlet outlet4Pengadaan dan Pemasangan Pipa Exhaust dari Silincer Residentialmtr18.001,010,570.0018,190,260.00lengkap dengan gantungan/springbahan pipa black steel medium class5Pemipaan Bahan Bakar lengap dengan katup- katup :lot1.003,850,000.003,850,000.006Pompa Solar Listrikunit1.003,554,320.003,554,320.007Pompa Solar Tanganunit1.00303,710.00303,710.008Wall lining sound Proofing dengan Rockwool density 80 kg/cm3 lengkapmtr300.00128,700.0038,610,000.00dengan spindle pin, glass Cloth9Intake Air Air Griileunit3.00839,080.002,517,240.0010Exhaust Air Air Griileunit3.00839,080.002,517,240.0011Intake Sound Attenuatorunit3.0066,886,820.00200,660,460.0012Grounding Body Genset, termasuk rod + bak kontrolunit3.003,814,580.0011,443,740.0013Testing & Commissioning Genset termasuk pengadaan solar selama testinglot1.005,500,000.005,500,000.00SUB TOTALPEKERJAAN GENSET5,801,625,610.00IVPEKERJAAN FIRE ALARMIV.APeralatan Utama1MCFA ( Master Control Fire Alarm ) termasuk Repeat Panel, Nicad Battery,Unit1.00107,019,000.00107,019,000.00Battery ChargerKapasitas : 2 loopsType : Addressable2Power Supply 220 V / 1 Ph / 50 Hz lengkap Arrester dan pengkabelannyaUnit1.002,763,310.002,763,310.003LCD Announciatorunit1.0013,907,300.0013,907,300.004Main Distribution Fire Alarm (MDFA)unit1.00620,400.00620,400.005Module - Module :- Addressable Monitor Module for Detectorpcs3.001,623,380.004,870,140.00- Addressable Control Module for Horn & Strobepcs3.001,623,380.004,870,140.00- Addressable Mini Monitor Module for Break Glasspcs3.001,623,380.004,870,140.00- Addressable Relay Module for P. ACpcs3.001,375,220.004,125,660.006Instalasi Peralatan Utamalot1.001,650,000.001,650,000.00Sub TotalPeralatan Utama144,696,090.00IV.BKabel Utama1Kabel STP AWG # 18 dari MDFA ke TB.FA.1 s/d TB.FA.3 (Loops) dalamm78.0044,000.003,432,000.00conduit PVC HI dia. 20 mm2Kabel ITC 2 x 2 x dia. 0,6 mm dari MDF.FA ke TB. FA.1 s/d TB.FA.3m39.0027,060.001,055,340.00dalam conduit PVC HI dia. 20 mm3Kabel NYA 2 x 1,5 mm2 untuk kabel Power Horn & Strobe TB.FA.1 ~ TB.FA.Lt.3m39.0032,780.001,278,420.00dalam conduit PVC HI dia. 20 mm4Kabel NYA 3 x 1,5 mm2 untuk kabel Power Module TB.FA.1 ~ TB.FA.Lt.3m39.0035,640.001,389,960.00dalam conduit PVC HI dia. 20 mm5Kabel STP #18 2 pair + NYA 2 x 2,5 mm2 dari MCFA ke Sound Systemm8.0043,780.00350,240.00dalam conduit PVC HI dia. 20 mm6Kabel STP #18 2 pair + NYA 2 x 2,5 mm2 dari MCFA ke PDTRm16.0043,780.00700,480.00dalam conduit PVC HI dia. 20 mm7Kabel STP #18 2 pair + NYA 2 x 2,5 mm2 dari MCFA ke Fire Fightingm55.0043,780.002,407,900.00dalam conduit PVC HI dia. 20 mm8Kabel STP #18 2 pair + NYA 2 x 1,5 mm2 dari MCFA ke Annunciatorm8.0040,150.00321,200.00dalam conduit PVC HI dia. 20 mmSub TotalKabel Utama10,935,540.00IV.CPekerjaan Instalasi Fire Alarm dalam BangunanC.1Lantai Basement & 11Terminal Box (TB. FA -1)set1.00200,310.00200,310.002Horn & Strobebh2.001,268,190.002,536,380.003Manual Break Glassbh2.00383,350.00766,700.004Addresable Heat Detectorbh15.00834,680.0012,520,200.005Addresable Smoke Detectorbh41.00914,870.0037,509,670.006Fire Fighting Telephonebh2.00333,190.00666,380.007End off lineset4.0082,390.00329,560.008Titik instalasi untuk Horn & Strobe dengan Kabel NYA 3 x 1,5 mm2titik2.00213,510.00427,020.00dalam conduit PVC HI dia. 20 mm9Titik instalasi untuk Detector& Break Glass dengan kabel STP AWG 18 1 pairtiitk56.00200,090.0011,205,040.00dalam conduit PVC HI dia. 20 mm10Titik nyala jack telephone dengan kabel ITC 2 x dia. 0,6mm dalamtitik2.00149,930.00299,860.00conduit PVC HI dia. 20 mm11Titik instalasi untuk P. AC dengan Kabel NYA 3 x 1.5 mmtitik1.00213,510.00213,510.00dalam conduit PVC HI dia. 20 mm12Titik instalasi untuk Flow Switch dan Tamper Switch dengantitik1.00314,270.00314,270.00Kabel NYA 3 x 1.5 mm dalam conduit PVC HI dia. 20 mmSub totalLantai Basement & 166,988,900.00C.2Lantai 21Terminal Box (TB. FA -2)set1.00200,310.00200,310.002Horn & Strobebh2.001,268,190.002,536,380.003Manual Break Glassbh2.00383,350.00766,700.004Addresable Heat Detectorbh2.00834,680.001,669,360.005Addresable Smoke Detectorbh22.00914,870.0020,127,140.006Fire Fighting Telephonebh2.00333,190.00666,380.007End off lineset4.0082,390.00329,560.008Titik instalasi untuk Horn & Strobe dengan Kabel NYA 3 x 1,5 mm2titik2.00213,510.00427,020.00dalam conduit PVC HI dia. 20 mm9Titik instalasi untuk Detector& Break Glass dengan kabel STP AWG 18 1 pairtiitk24.00200,090.004,802,160.00dalam conduit PVC HI dia. 20 mm10Titik nyala jack telephone dengan kabel ITC 2 x dia. 0,6mm dalamtitik2.00149,930.00299,860.00conduit PVC HI dia. 20 mm11Titik instalasi untuk P. AC dengan Kabel NYA 3 x 1.5 mmtitik1.00213,510.00213,510.00dalam conduit PVC HI dia. 20 mm12Titik instalasi untuk Flow Switch dan Tamper Switch dengantitik1.00314,270.00314,270.00Kabel NYA 3 x 1.5 mm dalam conduit PVC HI dia. 20 mmSub totalLantai 232,352,650.00C.3Lantai 31Terminal Box (TB. FA -3)set1.00200,310.00200,310.002Horn & Strobebh2.001,268,190.002,536,380.003Manual Break Glassbh2.00383,350.00766,700.004Addresable Heat Detectorbh2.00834,680.001,669,360.005Addresable Smoke Detectorbh25.00914,870.0022,871,750.006Fire Fighting Telephonebh2.00333,190.00666,380.007End off lineset4.0082,390.00329,560.008Titik instalasi untuk Horn & Strobe dengan Kabel NYA 3 x 1,5 mm2titik2.00213,510.00427,020.00dalam conduit PVC HI dia. 20 mm9Titik instalasi untuk Detector& Break Glass dengan kabel STP AWG 18 1 pairtiitk27.00200,090.005,402,430.00dalam conduit PVC HI dia. 20 mm10Titik nyala jack telephone dengan kabel ITC 2 x dia. 0,6mm dalamtitik2.00149,930.00299,860.00conduit PVC HI dia. 20 mm11Titik instalasi untuk P. AC dengan Kabel NYA 3 x 1.5 mmtitik1.00213,510.00213,510.00dalam conduit PVC HI dia. 20 mm12Titik instalasi untuk Flow Switch dan Tamper Switch dengantitik1.00314,270.00314,270.00Kabel NYA 3 x 1.5 mm dalam conduit PVC HI dia. 20 mmSub totalLantai 335,697,530.00Sub TotalPekerjaan Instalasi Fire Alarm dalam Bangunan135,039,080.00IV.DTesting & CommissioningTesting & Commissioning peralatan dan instalasi fire alarm terpasanglot1.002,750,000.002,750,000.00Sub TotalTesting & Commissioning2,750,000.00SUB TOTALPEKERJAAN FIRE ALARM293,420,710.00VPEKERJAAN SOUND SYSTEM (PUBLIC ADDRESS)V.APeralatan Utama1Power Amplifier 240 Wunit3.0010,085,790.0030,257,370.002Power Amplifier 60 Wunit1.005,537,400.005,537,400.003Mixer Pre Amplifier / Sistem Controllerunit1.0025,233,230.0025,233,230.00dilengkapi dengan :- Emergency Control Panel- Interface to Fire Alarm- Pre Record Message- Activated by Programable4DVD /CD/MP3/MP4 Playerunit1.002,956,910.002,956,910.005Am/FM Tunerunit1.004,022,480.004,022,480.006Paging Microphone & Chime Tone + Key Padunit1.002,274,250.002,274,250.007Selector Switch 2 zoneunit1.002,975,830.002,975,830.008Main Distibution Frame (MDF) Sound Systemunit1.003,510,650.003,510,650.009Kabinet Rack lengkap blower junction dan aksesories +unit1.0018,443,810.0018,443,810.00Rectifier, Battery charger10Power Supply lengkap dengan surge arresterunit1.001,953,050.001,953,050.0011Instalasi pengkabelan peralatan utama (ruang kontrol) dan pemprogramanlot1.001,650,000.001,650,000.00Sub TotalPeralatan Utama98,814,980.00V.BPengkabelan Utama1Kabel NYMHY 2 (3 x 2.5 mm) di dalam conduit PVC HI dia 20 mm dari MDF ke:- TB. SS - 1m'6.0097,790.00586,740.00- TB. SS - 2m'30.0097,790.002,933,700.00- TB. SS - 3m'45.0097,790.004,400,550.00Sub TotalPengkabelan Utama7,920,990.00V.CPekerjaan Instalasi Sound System Pada BangunanC.1Lantai 11Terminal Box Sound System Lt. 1 (TB. SS. 1)bh1.00348,920.00348,920.002Ceiling Speaker 3 watt dan matching transformerbh65.00481,800.0031,317,000.003Horn Speaker 15 Wattbh4.001,493,030.005,972,120.004Volume Control ( Attenuator )bh11.00292,160.003,213,760.005Instalasi untuk Ceiling & Horn Speaker dengan kabel NYMHY 2 x 1.5 mm2ttk65.00364,320.0023,680,800.00dalam conduit PVC HI dia. 20 mm6Instalasi untuk Volume Control/Attenuator dg kabel NYMHY 3 x 1.5 mm2ttk11.00479,160.005,270,760.00dalam conduit PVC HI dia. 20 mm7Instalasi untuk Horn Speaker dengan kabel NYMHY 2 x 1.5 mm2ttk4.00423,170.001,692,680.00dalam conduit PVC HI dia. 20 mmSub totalLantai 171,496,040.00C.2Lantai 21Terminal Box Sound System Lt. 2 (TB. SS. 2)bh1.00348,920.00348,920.002Ceiling Speaker 3 watt dan matching transformerbh67.00481,800.0032,280,600.003Volume Control ( Attenuator )bh17.00292,160.004,966,720.004Instalasi untuk Ceiling Speaker dengan kabel NYMHY 2 x 1.5 mm2ttk67.00364,320.0024,409,440.00dalam conduit PVC HI dia. 20 mm5Instalasi untuk Volume Control/Attenuator dg kabel NYMHY 3 x 1.5 mm2ttk17.00479,160.008,145,720.00dalam conduit PVC HI dia. 20 mmSub totalLantai 270,151,400.00C.3Lantai 31Terminal Box Sound System Lt. 3 (TB. SS. 3)bh1.00348,920.00348,920.002Ceiling Speaker 3 watt dan matching transformerbh66.00481,800.0031,798,800.003Volume Control ( Attenuator )bh17.00292,160.004,966,720.004Instalasi untuk Ceiling Speaker dengan kabel NYMHY 2 x 1.5 mm2ttk66.00364,320.0024,045,120.00dalam conduit PVC HI dia. 20 mm5Instalasi untuk Volume Control/Attenuator dg kabel NYMHY 3 x 1.5 mm2ttk17.00479,160.008,145,720.00dalam conduit PVC HI dia. 20 mmSub totalLantai 369,305,280.00Sub TotalPekerjaan Instalasi Sound System Pada Bangunan210,952,720.00V.DTesting & CommissioningTesting & Commissioning peralatan dan instalasi sound systemlot1.002,750,000.002,750,000.00Sub TotalPekerjaan Instalasi Sound System Pada Bangunan2,750,000.00SUB TOTALPEKERJAAN SOUND SYSTEM (PUBLIC ADDRESS)320,438,690.00VIPEKERJAAN TELEPONVI.APeralatan Utama & Instalasi Utama1PABX kapasitas 25 line / 300 extention :unit1.00209,274,010.00209,274,010.00PEMBULATANLengkap dengan ;- 1 Unit Operator Console- 1 Unit Biling system- 1 Unit Back up Battery- Surge Arrester2IDF Telepon kap. 300 pairsunit1.00840,070.00840,070.003Instalasi kabel utama- ITC 80 (2 x 0,6 mm2)m6.00107,910.00647,460.00- ITC 20 (2 x 0,6 mm2)m26.0036,740.00955,240.00- ITC 20 (2 x 0,6 mm2)m32.0036,740.001,175,680.00Sub TotalPeralatan Utama & Instalasi Utama212,892,460.00VI.BPekerjaan Instalasi telepon dalam bangunanB.1Lantai 11Telepon Box lantai 1 (TB-TP-1) kap. 80 pairunit1.00646,250.00646,250.002Out Let Teleponbh67.0076,450.005,122,150.003Pesawat Teleponbh66.00195,580.0012,908,280.004Pesawat Faxbh1.00497,530.00497,530.005Instalasi Telepon dengan kabel ITC 2 x 2 x dia. 0,6 mm dalam pipa PVCttk67.00423,170.0028,352,390.00HI dia. 3/4"Sub totalLantai 147,526,600.00B.2Lantai 21Telepon Box lantai 2 (TB-TP-2) kap. 20 pairunit1.00646,250.00646,250.002Out Let Teleponbh15.0076,450.001,146,750.003Pesawat Teleponbh15.00195,580.002,933,700.004Instalasi Telepon dengan kabel ITC 2 x 2 x dia. 0,6 mm dalam pipa PVCttk15.00423,170.006,347,550.00HI dia. 3/4"Sub totalLantai 211,074,250.00B.3Lantai 31Telepon Box lantai3 (TB-TP-3) kap. 20 pairunit1.00646,250.00646,250.002Out Let Teleponbh11.0076,450.00840,950.003Pesawat Teleponbh11.00195,580.002,151,380.004Instalasi Telepon dengan kabel ITC 2 x 2 x dia. 0,6 mm dalam pipa PVCttk11.00423,170.004,654,870.00HI dia. 3/4"Sub totalLantai 38,293,450.00Sub TotalPekerjaan Instalasi telepon dalam bangunan66,894,300.00VI.CTesting & CommissioningTesting & Commissioning peralatan dan instalasi Teleponlot1.003,850,000.003,850,000.00Sub TotalTesting & Commissioning3,850,000.00SUB TOTALPEKERJAAN TELEPON283,636,760.00VIIPEKERJAAN MATVVII.APeralatan Utama1Antena UHF / VHF lengkap dengan tiangset1.00581,570.00581,570.002Modulatorchanel30.00824,120.0024,723,600.003Amplifier Moduleunit1.002,298,450.002,298,450.004Active Combinerunit1.001,917,740.001,917,740.005Boosterunit1.00602,030.00602,030.006Spliter 6 wayunit1.00228,250.00228,250.007Rack Cabinetunit1.0013,388,430.0013,388,430.008Instalasi pengkabelan peralatan utamalot1.00550,000.00550,000.00Sub TotalPeralatan Utama44,290,070.00VII.BPeralatan Utama1Instalasi MATV dari antena UHF/ VHF dengan kabel RG-11 dalam conduitm'42.00423,170.0017,773,140.00PVC HI dia. 20 mm ke peralatan utama2Instalasi dari Tap Off 4 Way Lt.satu dengan kabel RG-11 dalam pipam'336.00423,170.00142,185,120.00conduit PVC HI dia. 20 mm ke masing- masing Spliter tiap lantai :Sub TotalPeralatan Utama159,958,260.00VII.BPekerjaan Instalasi MATV dalam bangunanB.1Lantai 11Splitter 4 waybh2.0092,400.00184,800.002TV Outletbh7.0036,190.00253,330.003Instalasi TV Outlet dengan kabel RG-6 dalam pipa conduit HI dia. 20 mmttk7.00423,170.002,962,190.00Sub totalLantai 13,400,320.00B.2Lantai 21Splitter 4 waybh1.0092,400.0092,400.002Boosterunit1.00602,030.00602,030.003TV Outletbh4.0036,190.00144,760.004Instalasi TV Outlet dengan kabel RG-6 dalam pipa conduit HI dia. 20 mmttk4.00423,170.001,692,680.00Sub totalLantai 22,531,870.00B.3Lantai 31Splitter 4 waybh1.0092,400.0092,400.002Boosterunit1.00602,030.00602,030.003TV Outletbh4.0036,190.00144,760.004Instalasi TV Outlet dengan kabel RG-6 dalam pipa conduit HI dia. 20 mmttk4.00423,170.001,692,680.00Sub totalLantai 32,531,870.00Sub TotalPekerjaan Instalasi MATV dalam bangunan8,464,060.00VII.CTesting & CommissioningTesting & Commissioning peralatan dan instalasi MATVlot1.001,650,000.001,650,000.00Sub TotalTesting & Commissioning1,650,000.00SUB TOTALPEKERJAAN MATV214,362,390.00VIIISPARING KABEL PROVIDER1Jalur kabel provider dengan pipa HDPE ukuran 2 x 8" kedalaman 800 mmmtr390.00334,070.00130,287,300.002Bak kontrolunit8.00275,000.002,200,000.00SUB TOTALSPARING KABEL PROVIDER132,487,300.00IXPEKERJAAN PLUMBINGIX.AAir BersihA.1Peralatan Utama1Pompa Booster type Packagedset1.0062,686,250.0062,686,250.00Debit: 80 liter / menitHead: 40 meterPower: 0.75 KWJumlah pompa: 3 unitType: PackagedSudah lengkap dengan base Frame, Pressure Tank danPanel kontrol otomatis2Pemasangan PDAM lengakp Water Meter dia.40mmunit1.00275,000,000.00275,000,000.003Pompa Jetunit2.0025,850,000.0051,700,000.00Debit: 40 liter / menitHead: 40 meterPower: 0,75 KWSudah lengkap dengan Pressure Tank dan pressure switch4Sumur Pantekunit2.00165,000,000.00330,000,000.00kedalaman 40 meterlengkap dengan casing PVC AW dia. 100 mm dan pipa Suction pompadia 32mm & 25 mm5Ground Tank Air Bersih kapasitas 38,4 munit1.00BY Civil(Bahan struktur beton finish keramik)Sub totalPeralatan Utama719,386,250.00A.2Pemipaan Utama & katup21Instalasi pipa utama air bersih (riser) dengan PPR80 - PN10termasuk gantungan/hanger, support, fitting dan aksesories :- dia. 65 mmm'44.00218,460.009,612,240.00- dia. 50 mmm'12.00142,560.001,710,720.00- dia. 40 mmm'112.0096,470.0010,804,640.00- dia. 32 mmm'20.0069,300.001,386,000.00- dia. 25 mmm'6.0069,300.00415,800.002Gate Valve class 10 K :- dia. 65 mmbh9.001,615,460.0014,539,140.00- dia. 50 mmbh5.001,402,720.007,013,600.00- dia. 40 mmbh2.00362,120.00724,240.00- dia. 32 mmbh1.00296,890.00296,890.00- dia. 25 mmbh2.00192,170.00384,340.003Air Vent- dia. 25 mmbh1.001,670,790.001,670,790.004Foot Valve- dia. 65 mmbh3.002,175,360.006,526,080.005Floater Valve- dia. 50 mmbh4.00637,120.002,548,480.006WLC lengkap dengan pengkabelanset1.00624,360.00624,360.00Sub totalPemipaan Utama & katup258,257,320.00A.3Pekerjaan instalasi pipa air bersih dalam bangunanA.3.1Lantai 11Instalasi pipa air bersih cabang dan toilet dengan PPR80 - PN10termasuk gantungan/hanger, support, fitting dan aksesories :- dia. 65 mmm'20.00218,460.004,369,200.00- dia. 50 mmm'12.00142,560.001,710,720.00- dia. 40 mmm'18.0096,470.001,736,460.00- dia. 32 mmm'48.0069,300.003,326,400.00- dia. 25 mmm'10.0046,640.00466,400.00- dia. 20 mmm'14.0033,990.00475,860.00- dia. 15 mmm'90.0028,490.002,564,100.002Gate Valve- dia. 65 mmbh1.001,615,460.001,615,460.003Fixture unit (WC, Wastafel, Kitchen Sink, Urinoir, Jet & Hand Shower,By ArsitekShower, Janitor, Kran taman)Sub totalA.3.116,264,600.00A.3.2Lantai 21Instalasi pipa air bersih cabang dan toilet dengan PPR80 - PN10termasuk gantungan/hanger, support, fitting dan aksesories :- dia. 40 mmm'8.0096,470.00771,760.00- dia. 32 mmm'6.0069,300.00415,800.00- dia. 20 mmm'16.0033,990.00543,840.00- dia. 15 mmm'44.0028,490.001,253,560.002Gate Valve- dia. 40 mmbh1.00362,120.00362,120.003Fixture unit (WC, Wastafel, Kitchen Sink, Urinoir, Jet & Hand Shower,By ArsitekShower, Janitor, Kran taman)Sub totalA.3.23,347,080.00A.3.3Lantai 31Instalasi pipa air bersih cabang dan toilet dengan PPR80 - PN10termasuk gantungan/hanger, support, fitting dan aksesories :- dia. 40 mmm'8.0096,470.00771,760.00- dia. 32 mmm'6.0069,300.00415,800.00- dia. 20 mmm'16.0033,990.00543,840.00- dia. 15 mmm'44.0028,490.001,253,560.002Gate Valve- dia. 40 mmbh1.00362,120.00362,120.003Fixture unit (WC, Wastafel, Kitchen Sink, Urinoir, Jet & Hand Shower,By ArsitekShower, Janitor, Kran taman)Sub totalA.3.33,347,080.00A.3.4Lantai Atap1Instalasi pipa air bersih cabang dan toilet dengan PPR80 - PN10termasuk gantungan/hanger, support, fitting dan aksesories :- dia. 25 mmm'2.0046,640.0093,280.00- dia. 20 mmm'46.0033,990.001,563,540.00- dia. 15 mmm'62.0028,490.001,766,380.002Gate Valve- dia. 25 mmbh1.00192,170.00192,170.003Fixture unit (WC, Wastafel, Kitchen Sink, Urinoir, Jet & Hand Shower,By ArsitekShower, Janitor, Kran taman)Sub totalA.3.43,615,370.00Sub Total Pekerjaan instalasi pipa air bersih dalam bangunan26,574,130.00A.4Instalasi Kolam Pond1Pompa sirkulasi kolam Pondunit1.0019,904,500.0019,904,500.00Debit: 100 liter / menitHead: 20 meterPower: 0,75 KWlengkap dengan panel kontrol2Filter Kolam Renangunit1.0027,659,500.0027,659,500.00Type: Pressure Sand FilterKapasitas: 100 ltr / menitPengoperasian: Manuallengkap dengan handhole, ARV, Pressure Gauge & 5 Ball Valve3Instasi kolam Pond dengan pipa PPR-PN10 termasuk hanger/support,fitting dan aksesories :- dia. 50 mmm'66.00142,560.009,408,960.00- dia. 40 mmm'12.0096,470.001,157,640.00- dia. 32 mmm'66.0069,300.004,573,800.00- dia. 20 mmm'16.0033,990.00543,840.004Gate Valve :- dia. 40 mmbh2.00362,120.00724,240.005Main Drain- dia. 50 mmbh2.00724,240.001,448,480.006Nozle Inlet- dia. 20 mmbh8.00501,710.004,013,680.007Check Valve- dia. 40 mmbh1.00333,520.00333,520.008Strainer/ Filter- dia. 40 mmbh1.00420,750.00420,750.009Flexible Connection :- dia. 40 mmbh2.00315,260.00630,520.0010WLC + pengkabelanbh1.00624,360.00624,360.00Sub totalInstalasi Kolam Pond71,443,790.00Sub TotalAir Bersih875,661,490.00IX.BAir Kotor, Bekas dan VentB.1Peralatan Utama1Instalasi Pengolahan Air Limbah ( IPAL)unit1.0093,008,300.0093,008,300.00T y p e: BiofiltrationBahan: Fiber GlassKapasitas: 18 m.Kelengkapan STP : Blower , Pompa, Control Panel, Pipa influent dan effluenttidak termasuk pekerjaan struktur2Grease Trap poartable kap. 30 literunit1.0049,436,640.0049,436,640.00Sub totalPeralatan Utama142,444,940.00B.2Pemipaan Utama1Instalasi Pipa Utama Air Kotor dengan Pipa PVC kelas AW 10 kg/cm2termasuk gantungan/hanger, support, fitting dan aksesories :- dia. 150 mmm'14.00151,030.002,114,420.00- dia. 100 mmm'18.0076,890.001,384,020.002Instalasi Pipa Utama Air Bekas dengan Pipa PVC kelas AW 10 kg/cm2termasuk gantungan/hanger, support, fitting dan aksesories :- dia. 100 mmm'14.0076,890.001,076,460.00- dia. 80 mmm'18.0052,800.00950,400.003Instalasi Pipa Vent dengan pipa PVC kelas AW 10 kg/cm2termasuk gantungan/hanger, support, fitting dan aksesories :- dia. 80 mmm'18.0052,800.00950,400.004Vent Out- dia. 100 mmbh1.00129,910.00129,910.005Clean Out :- dia. 150 mmbh1.00478,170.00478,170.00- dia. 80 mmbh1.00117,370.00117,370.00Sub totalPemipaan Utama7,201,150.00B.3Pek. Instalasi Pipa Air Bekas, Kotor & VentB.3.1Lantai 11Instalasi Air Kotor Cabang dan toilet dengan Pipa PVC kelas AW 10 kg/cm2termasuk gantungan/hanger, support, fitting dan aksesories :- dia. 100 mmm26.0076,890.001,999,140.00- dia. 50 mmde4.0033,330.00133,320.00- dia. 40 mmm16.0030,250.00484,000.002Instalasi Air Bekas cabang dan toilet dengan Pipa PVC kelas AW 10 kg/cm2termasuk gantungan/hanger, support, fitting dan aksesories :- dia. 80 mmm14.0052,800.00739,200.00- dia. 50 mmm30.0033,330.00999,900.00- dia. 40 mmm24.0030,250.00726,000.003Instalasi Vent cabang dan toilet dengan pipa PVC AW 10 kg/cm2termasuk gantungan/hanger, support, fitting dan aksesories :- dia. 80 mmm8.0052,800.00422,400.00- dia. 50 mmm18.0033,330.00599,940.00- dia. 40 mmm48.0030,250.001,452,000.004Floor Drain- dia. 50 mmbh7.00180,290.001,262,030.005Clean Out :- dia. 100 mmbh2.00129,470.00258,940.00- dia. 80 mmbh1.00117,370.00117,370.00Sub totalB.3.19,194,240.00B.3.2Lantai 21Instalasi Air Kotor Cabang dan toilet dengan Pipa PVC kelas AW 10 kg/cm2termasuk gantungan/hanger, support, fitting dan aksesories :- dia. 100 mmm16.0076,890.001,230,240.00- dia. 40 mmm10.0030,250.00302,500.002Instalasi Air Bekas cabang dan toilet dengan Pipa PVC kelas AW 10 kg/cm2termasuk gantungan/hanger, support, fitting dan aksesories :- dia. 80 mmm6.0052,800.00316,800.00- dia. 50 mmm12.0033,330.00399,960.00- dia. 40 mmm14.0030,250.00423,500.003Instalasi Vent cabang dan toilet dengan pipa PVC AW 10 kg/cm2termasuk gantungan/hanger, support, fitting dan aksesories :- dia. 50 mmm15.0033,330.00499,950.00- dia. 40 mmm42.0030,250.001,270,500.004Floor Drain- dia. 50 mmbh3.00180,290.00540,870.005Clean Out :- dia. 100 mmbh2.00129,470.00258,940.00- dia. 80 mmbh2.00117,370.00234,740.00Sub totalB.3.25,478,000.00B.3.3Lantai 31Instalasi Air Kotor Cabang dan toilet dengan Pipa PVC kelas AW 10 kg/cm2termasuk gantungan/hanger, support, fitting dan aksesories :- dia. 100 mmm16.0076,890.001,230,240.00- dia. 40 mmm10.0030,250.00302,500.002Instalasi Air Bekas cabang dan toilet dengan Pipa PVC kelas AW 10 kg/cm2termasuk gantungan/hanger, support, fitting dan aksesories :- dia. 80 mmm6.0052,800.00316,800.00- dia. 50 mmm12.0033,330.00399,960.00- dia. 40 mmm14.0030,250.00423,500.003Instalasi Vent cabang dan toilet dengan pipa PVC AW 10 kg/cm2termasuk gantungan/hanger, support, fitting dan aksesories :- dia. 50 mmm15.0033,330.00499,950.00- dia. 40 mmm42.0030,250.001,270,500.004Floor Drain- dia. 50 mmbh3.00180,290.00540,870.005Clean Out :- dia. 100 mmbh2.00129,470.00258,940.00- dia. 80 mmbh2.00117,370.00234,740.00Sub totalB.3.35,478,000.00Sub Total Pek. Instalasi Pipa Air Bekas, Kotor & Vent20,150,240.00Sub TotalAir Kotor, Bekas dan Vent169,796,330.00IX.CInstalasi Saluran dan Air Hujan1Pompa sumpit 1, 2, 3, 4, 5, 6 & 7set7.0025,377,110.00177,639,770.00Type: Submersible Drainage PumpDebit: 2 x 50 liter / menitHead: 10 meterPower: 0,25 KWJumah Pompa: 2 unitKapasitas Sumpit: 1 m3 (scope sipil)lengkap dengan base frame, panel kontrol otomatis dan Level Control2Gate Valve class 10 K :- dia. 50 mmbh14.001,338,150.0018,734,100.003Check Valve 10K- dia. 50 mmbh14.001,295,580.0018,138,120.004Roof Drain :- dia. 100 mmbh17.00142,120.002,416,040.005Instalasi Pemipaan Air Hujan PVC kelas AW (10 kg/cm) termasuk fitting danaksesories :- dia. 100 mmm'306.0076,890.0023,528,340.006Pekerjaan saluran air hujan site planSub TotalInstalasi Saluran dan Air Hujan240,456,370.00IX.DPekerjaan ListrikPengkabelan pompa Booster dari panel Control BoosterPengkabelan pompa transfer dari P.ABRNYY 3 x 4 mm2Pompa Jet Pump 1m'32.0048,180.001,541,760.00NYY 3 x 4 mm2Pompa Jet Pump 2m'36.0048,180.001,734,480.00NYY 4 x 4 mm2ke PC IPALm'50.0048,180.002,409,000.00Sub TotalPekerjaan Listrik5,685,240.00IX.EPekerjaan Testing & CommissioningTesting dan commissioning peralatan dan instalasi plambinglot1.002,750,000.002,750,000.00Sub TotalPekerjaan Testing & Commissioning2,750,000.00SUB TOTALPEKERJAAN PLUMBING1,294,349,430.00XPEKERJAAN FIRE HYDRANT, FIRE SPRINKLER & FIRE EXTINGUISHERX.APeralatan Utama1Hydrant Electric PumpUNIT1.00203,568,750.00203,568,750.00T y p e: Horizontal Split CasingKapasitas: 4550 liter / menit (1.200 usgpm )Total Head: 110 meterElec. Power: 110 KW , 380 V / 3 Ph / 50 HzLengkap dengan Panel Kontrol NFPA Standard,Elektro Motor Mounted On The Baseplate & aksesories dan kabel Power2Hydrant Diesel PumpUNIT1.00343,158,750.00343,158,750.00T y p e: Horizontal Split CasingKapasitas: 4550 liter / menit (1.200 usgpm )Total Head: 110 meterC/W:Heat Exchanger Cooling SystemLead Acid Batteries With Rack and CableStandart Muffer ( Silincer & Flexible Connection)Fuel Oil TankBattery Charge ( Buil In The Controller)Over Speed Shutdown ProtectionDouble Solenoid StaterLengkap dengan Panel Kontrol NFPA Standarddan aksesories3Hydrant Jockey PumpUNIT1.0049,438,070.0049,438,070.00T y p e: Vertikal Multistage In LineKapasitas: 200 liter/menitTotal Head: 120 meterElec. Power: 11 KW, 380 V / 3 Ph / 50 HzC/W: Panel Control , Accessories & kabel PowerSub TotalPeralatan Utama596,165,570.00X.BPemipaan Utama dan katup-katup (Ruang Pompa)1Instalasi pipa utama dengan pipa Black Schedule 40 termasuk fittingdan aksesoriesnya :- dia. 300 mm (header)m'5.0019,407,630.0097,038,150.00- dia. 150 mmm'24.00642,180.0015,412,320.00- dia. 100 mmm'24.00376,310.009,031,440.00- dia. 50 mmm'6.00140,250.00841,500.002Pengadaan dan Pemasangan katup - katup :aGate Valve Rising Steam (OS & Y) class 16 K ( 16 bar) :- dia. 150 mmbh5.004,422,660.0022,113,300.00- dia. 150 mm + Crack Stang (Penghubung Ground Tank)bh2.0015,920,080.0031,840,160.00- dia. 100 mmbh2.008,172,340.0016,344,680.00- dia. 50 mmbh2.004,421,120.008,842,240.00bCheck Valve class 16 K ( 16 bar ) :- dia. 150 mmbh2.006,709,010.0013,418,020.00- dia. 50 mmbh1.001,681,020.001,681,020.00cStrainer 16 K (16 bar) :- dia. 150 mmbh2.005,000,930.0010,001,860.00- dia. 50 mmbh1.001,123,100.001,123,100.00dFleksibel Joint 20K (20 bar) :- dia. 150 mmbh4.002,930,070.0011,720,280.00- dia. 50 mmbh2.00877,250.001,754,500.00eFoot valve + Saringan- dia. 150 mmbh2.001,203,070.002,406,140.00- dia. 50 mmbh1.002,537,370.002,537,370.00fSafety Valve dia. 100 mmbh1.001,203,070.001,203,070.003Flow meter dia. 100 mmbh1.003,545,520.003,545,520.004Pressure Gauge + gate valvebh4.00270,160.001,080,640.005Pressure switchbh3.00643,280.001,929,840.00Sub TotalPemipaan Utama dan katup-katup (Ruang Pompa)253,865,150.00X.CSite Plan Hydrant1Hydrant Pillar bahan Cast Ironunit4.004,217,620.0016,870,480.00type : H - 14 A, two wayLengkap terpasang2Siamese Conection type 2 cabang bahan cast iron lengkapunit1.005,781,600.005,781,600.00terpasang3Hydrant Box Type Outdoor size ( 95 x 66 x 20)unit4.003,992,890.0015,971,560.00lengkap dengan ;- Color : red, oven painted- 1 PC Hose Nozzle dia. 65 mm- 1 roll fire house with machino coupling diameter 65 mm x 30 meterLengkap terpasang4Instalasi dengan pipa Black steel Schedule 40 termasuk fittingdan aksesoriesnya :- dia. 150 mmm'376.00642,180.00241,459,680.00- dia. 100 mmm'12.00376,310.004,515,720.005katup - katup :Gate Valve Rising Steam (OS & Y) class 16 K lengkap dengan bak kontrol:- dia. 100 mmbh4.008,585,940.0034,343,760.006Check Valve 16 K lengkap dengan bak kontrol :- dia. 100 mmbh1.008,903,730.008,903,730.007Galian dan urugan untuk pemasangan pipa dalam tanahm3300.8066,000.0019,852,800.008Wrapping pipa utama dalam tanahm'388.0082,500.0032,010,000.00Sub TotalSite Plan Hydrant379,709,330.00X.DInst. Riser Fire Hydrant (sampai Ruang Pompa)1Instalasi pipa utama dengan pipa Black steel Schedule 40termasuk fitting dan aksesoriesnya :- dia. 150 mmm'80.00642,180.0051,374,400.00- dia. 25 mmm'2.0072,270.00144,540.002katup - katup :aGate Valve Rising Steam (OS & Y) class 16K (16 bar) :- dia. 150 mmbh2.004,422,660.008,845,320.00bGate Valve NRS class 16K (16 bar) :- dia. 25 mmbh2.00335,170.00670,340.00cAir Release Vent (ARV) dia. 25 mmbh2.00530,090.001,060,180.00Sub TotalInst. Riser Fire Hydrant (sampai Ruang Pompa)62,094,780.00X.EInst. Riser Fire Sprinkler (sampai Ruang Pompa)1Instalasi pipa utama dengan pipa Black steel Schedule 40termasuk fitting dan aksesoriesnya :- dia. 150 mmm'40.00642,180.0025,687,200.00- dia. 50 mm (test drain)m'24.00140,250.003,366,000.00- dia. 25 mmm'2.0072,270.00144,540.002katup - katup :aGate Valve Rising Steam (OS & Y) class 16K (16 bar) :- dia. 150 mmbh1.004,422,660.004,422,660.00bGate Valve NRS class 16K (16 bar) :- dia. 25 mmbh1.00335,170.00335,170.00cAir Release Vent (ARV) dia. 25 mmbh1.00530,090.00530,090.00Sub TotalInst. Riser Fire Sprinkler (sampai Ruang Pompa)34,485,660.00X.FInstalasi Fire Hydrant dalam BangunanF.1Lantai 11Hydrant Box Type Indoor lengkap terpasangunit2.005,245,130.0010,490,260.00ukuran : 125 x 75 x 18 cm, Cat Bakar- 1 pc Hose Nozzle dia. 40 mm- 1 pcc Hydrant valve dia. 40 mm- 1 pc Hydrant valve dia. 65 mm- 1 pc Hose rack 600 mm COMB- 1 roll fire hose with Machino Coupling dia. 40 mm x 30 m2Instalasi Pipa Cabang dengan Pipa Black Steel Schedule 40termasuk fitting dan aksesories :- dia. 65 mmm'8.001,450,680.0011,605,440.003Gate Valve NRS class 16K (16 bar) :- dia. 65 mmbh2.001,450,680.002,901,360.00Sub TotalLantai 124,997,060.00F.2Lantai 21Hydrant Box Type Indoor lengkap terpasangunit2.005,245,130.0010,490,260.00ukuran : 125 x 75 x 18 cm, Cat Bakar- 1 pc Hose Nozzle dia. 40 mm- 1 pcc Hydrant valve dia. 40 mm- 1 pc Hydrant valve dia. 65 mm- 1 pc Hose rack 600 mm COMB- 1 roll fire hose with Machino Coupling dia. 40 mm x 30 m2Instalasi Pipa Cabang dengan Pipa Black Steel Schedule 40termasuk fitting dan aksesories :- dia. 65 mmm'10.00218,130.002,181,300.003Gate Valve NRS class 16K (16 bar) :- dia. 65 mmbh2.000.0Sub TotalLantai 212,671,560.00F.3Lantai 31Hydrant Box Type Indoor lengkap terpasangunit2.005,245,130.0010,490,260.00ukuran : 125 x 75 x 18 cm, Cat Bakar- 1 pc Hose Nozzle dia. 40 mm- 1 pcc Hydrant valve dia. 40 mm- 1 pc Hydrant valve dia. 65 mm- 1 pc Hose rack 600 mm COMB- 1 roll fire hose with Machino Coupling dia. 40 mm x 30 m2Instalasi Pipa Cabang dengan Pipa Black Steel Schedule 40termasuk fitting dan aksesories :- dia. 65 mmm'10.00218,130.002,181,300.003Gate Valve NRS class 16K (16 bar) :- dia. 65 mmbh2.000.0Sub TotalLantai 312,671,560.00Sub TotalInstalasi Fire Hydrant dalam Bangunan50,340,180.00X.GInstalasi Sprinkler pada BangunanG.1Lantai 11Instalasi sprinkler dengan Pipa Black Sch. 40 termasuk fitting dan aksesories :- dia. 100 mmm'40.00376,310.0015,052,400.00- dia. 80 mmm'12.00269,720.003,236,640.00- dia. 65 mmm'12.00218,130.002,617,560.00- dia. 50 mmm'64.00140,250.008,976,000.00- dia. 40 mmm'84.00111,430.009,360,120.00- dia. 32 mmm'52.0098,010.005,096,520.00- dia. 25 mmm'385.0072,270.0027,823,950.002Instalasi Pipa Test Drain Black Steel Sch.40 termasuk fitting dan aksessories :- dia. 50 mmm'88.00140,250.0012,342,000.003Gate Valve dia. 50 mmbh4.004,421,120.0017,684,480.004Butterfly Valve With Supervisory Switch dia. 100 mmbh1.001,263,020.001,263,020.005Sight Glass dia. 50 mmbh2.001,358,060.002,716,120.006Flow Switch dia. 100 mmbh1.002,411,310.002,411,310.007Pressure Gauge + Gate Valve 25 mmbh2.00270,160.00540,320.008Head Splinker type Pendantbh127.0080,850.0010,267,950.00Sub TotalLantai 1119,388,390.00G.2Lantai 21Instalasi sprinkler dengan Pipa Black Sch. 40 termasuk fitting dan aksesories :- dia. 80 mmm'10.00269,720.002,697,200.00- dia. 65 mmm'10.00218,130.002,181,300.00- dia. 50 mmm'14.00140,250.001,963,500.00- dia. 40 mmm'8.00111,430.00891,440.00- dia. 32 mmm'11.0098,010.001,078,110.00- dia. 25 mmm'98.0072,270.007,082,460.002Instalasi Pipa Test Drain Black Steel Sch.40 termasuk fitting dan aksessories :- dia. 50 mmm'36.00140,250.005,049,000.003Gate Valve dia. 50 mmbh4.004,421,120.0017,684,480.004Branch Valve / Butterfly Valve With Supervisory Switch dia. 80 mmbh1.009,665,590.009,665,590.005Sight Glass dia. 50 mmbh2.001,358,060.002,716,120.006Flow Switch dia. 80 mmbh1.002,411,310.002,411,310.007Pressure Gauge + Gate Valve 25 mmbh2.00270,160.00540,320.008Head Splinker type Pendantbh33.0080,850.002,668,050.00Sub TotalLantai 256,628,880.00G.3Lantai 31Instalasi sprinkler dengan Pipa Black Sch. 40 termasuk fitting dan aksesories :- dia. 80 mmm'10.00269,720.002,697,200.00- dia. 65 mmm'10.00218,130.002,181,300.00- dia. 50 mmm'14.00140,250.001,963,500.00- dia. 40 mmm'8.00111,430.00891,440.00- dia. 32 mmm'11.0098,010.001,078,110.00- dia. 25 mmm'98.0072,270.007,082,460.002Instalasi Pipa Test Drain Black Steel Sch.40 termasuk fitting dan aksessories :- dia. 50 mmm'36.00140,250.005,049,000.003Gate Valve dia. 50 mmbh4.004,421,120.0017,684,480.004Branch Valve / Butterfly Valve With Supervisory Switch dia. 80 mmbh1.009,665,590.009,665,590.005Sight Glass dia. 50 mmbh2.001,358,060.002,716,120.006Flow Switch dia. 80 mmbh1.002,411,310.002,411,310.007Pressure Gauge + Gate Valve 25 mmbh2.00270,160.00540,320.008Head Splinker type Pendantbh31.0080,850.002,506,350.00Sub TotalLantai 356,467,180.00Sub TotalInstalasi Sprinkler pada Bangunan232,484,450.00X.GFire Extinguisher1Fire Extingusher type Clean Agent kapasitas 5 kgLantai 1bh11.00862,840.009,491,240.00Lantai 2bh8.00862,840.006,902,720.00Lantai 3bh6.00862,840.005,177,040.002Fire Extingusher type Clean Agent kapasitas 25 kgbh3.003,666,740.0011,000,220.00lengkap dengan keretaSub TotalFire Extinguisher32,571,220.00X.HPengkabelanPekerjaan pengkabelan dari P.Hydrant ke PC Hydrant &lot1.008,250,000.008,250,000.00PC Jockey s/d pompaSub TotalPengkabelan8,250,000.00X.ITesting & Commissioning1Testing & Commissioning Peralatan dan Instalasi Fire Hydrant, Sprinklerlot1.003,850,000.003,850,000.00dan extinguisher2Biaya perijinan Pemadam kebakaranlot1.005,500,000.00Sub TotalTesting & Commissioning3,850,000.00SUB TOTALPEKERJAAN FIRE HYDRANT, FIRE SPRINKLER & FIRE EXTINGUISHER1,653,816,340.00XIPEKERJAAN TATA UDARAXI.APeralatan Utama ACPengadaan dan Pemasangan AC Variable Refrigerant Flow termasukpengisian freon, remote controller, braket/hanger/gantungan, dudukandan kabel kontrol sistem VRF sesuai standar pabrikan serta aksesories lainnyaA.1Lantai Basement1OU - Bunit1.00165,547,910.00165,547,910.00- Type: Inverter- Kapasitas: 311.000 BTUH- Motor: 27,7 KW /380 /3ph /50 hz2IU - B.1/2unit2.0080,450,480.00160,900,960.00- Type: Ducting- Kapasitas: min. 95.500 BTUH- Sensible: min. 66.850 BTUH- Air Flow: 2.768 CFM- Motor: 0,76 Kw /220V /1ph /50 hz3IU - B.3/4/5/6unit4.0012,526,580.0050,106,320.00- Type: Wall Mounted- Kapasitas: min. 30.000 BTUH- Sensible: min. 21.000 BTUH- Air Flow: 671 CFM- Motor: 0,05 Kw /220V /1ph /50 hzSub TotalLantai Basement376,555,190.00A.2Lantai 11OU - 1.1unit1.00266,703,360.00266,703,360.00- Type: Inverter- Kapasitas: 380.200 BTUH- Motor: 33,8 KW /380 /3ph /50 hz2OU - 1.2unit1.00313,849,250.00313,849,250.00- Type: Inverter- Kapasitas: 430.500 BTUH- Motor: 40,75 KW /380 /3ph /50 hz3IU - 1.1unit1.0017,698,890.0017,698,890.00- Type: Ducting- Kapasitas: min. 47.300 BTUH- Sensible: min. 33.110 BTUH- Air Flow: 1.369 CFM- Motor: 0,43 Kw /220V /1ph /50 hz4IU - 1.2unit1.0012,849,650.0012,849,650.00- Type: Ducting- Kapasitas: min. 22.700 BTUH- Sensible: min. 15.890 BTUH- Air Flow: 660 CFM- Motor: 0,16 Kw /220V /1ph /50 hz5IU - 1.3unit1.0018,900,860.0018,900,860.00- Type: Ducting- Kapasitas: min. 66.000 BTUH- Sensible: min. 46.200 BTUH- Air Flow: 1.914 CFM- Motor: 0,76 Kw /220V /1ph /50 hz6IU - 1.4unit1.0012,849,650.0012,849,650.00- Type: Ducting- Kapasitas: min. 21.700 BTUH- Sensible: min. 15.190 BTUH- Air Flow: 629 CFM- Motor: 0,16 Kw /220V /1ph /50 hz7IU - 1.5unit1.0016,300,130.0016,300,130.00- Type: Wall Mounted- Kapasitas: min. 58.500 BTUH- Sensible: min. 40.950 BTUH- Air Flow: 1696 CFM- Motor: 0,76 Kw /380V /3ph /50 hz8IU - 1.6unit1.0019,372,980.0019,372,980.00- Type: Wall Mounted- Kapasitas: min. 65.800 BTUH- Sensible: min. 46.060 BTUH- Air Flow: 1908 CFM- Motor: 0,76 Kw /220V /1ph /50 hz9IU - 1.7unit1.0012,655,830.0012,655,830.00- Type: Wall Mounted- Kapasitas: min. 26600 BTUH- Sensible: min. 18.620 BTUH- Air Flow: 771 CFM- Motor: 0,16 Kw /220V /1ph /50 hz10IU - 1.8a/8bunit2.008,213,370.0016,426,740.00- Type: Wall Mounted- Kapasitas: min. 12.000 BTUH- Sensible: min. 8.400 BTUH- Air Flow: 350 CFM- Motor: 0,04 Kw /220V /1ph /50 hz11IU - 1.9unit1.006,519,590.006,519,590.00- Type: Wall Mounted- Kapasitas: min. 9.000 BTUH- Sensible: min. 6.300 BTUH- Air Flow: 282 CFM- Motor: 0,04 Kw /220V /1ph /50 hz12IU - 1.10unit1.0016,720,220.0016,720,220.00- Type: Ducting- Kapasitas: min. 64.000 BTUH- Sensible: min. 44.800 BTUH- Air Flow: 1.854 CFM- Motor: 0,76 Kw /220V /1ph /50 hz13IU - 1.11/15/16unit3.0019,663,820.0058,991,460.00- Type: Ducting- Kapasitas: min. 74.600 BTUH- Sensible: min. 52.220 BTUH- Air Flow: 2.163 CFM- Motor: 0,76 Kw /220V /1ph /50 hz14IU - 1.12/13unit2.0016,720,220.0033,440,440.00- Type: Ducting- Kapasitas: min. 64.000 BTUH- Sensible: min. 44.800 BTUH- Air Flow: 1.854 CFM- Motor: 0,76 Kw /220V /1ph /50 hz15IU - 1.14unit1.0016,623,310.0016,623,310.00- Type: Ducting- Kapasitas: min. 53.300 BTUH- Sensible: min. 37.310 BTUH- Air Flow: 1.545 CFM- Motor: 0,76 Kw /220V /1ph /50 hzSub TotalLantai 1839,902,360.00A.3Lantai 21OU - 2unit1.00199,607,540.00199,607,540.00- Type: Inverter- Kapasitas: 251.700 BTUH- Motor: 20,21 KW /380 /3ph /50 hz2IU - 2.1unit1.0020,859,080.0020,859,080.00- Type: Ducting- Kapasitas: min. 80.500 BTUH- Sensible: min. 56.350 BTUH- Air Flow: 2.334 CFM- Motor: 0,76 Kw /220V /1ph /50 hz3IU - 2.2unit1.0013,189,440.0013,189,440.00- Type: Ducting- Kapasitas: min. 19.600 BTUH- Sensible: min. 13.720 BTUH- Air Flow: 568 CFM- Motor: 0,1 Kw /220V /1ph /50 hz4IU - 2.3unit1.0012,655,830.0012,655,830.00- Type: Ducting- Kapasitas: min. 30.000 BTUH- Sensible: min. 21.000 BTUH- Air Flow: 875 CFM- Motor: 0,16 Kw /380V /3ph /50 hz5IU - 2.4unit1.0016,720,220.0016,720,220.00- Type: Ducting- Kapasitas: min. 60.000 BTUH- Sensible: min. 42.000 BTUH- Air Flow: 1.750 CFM- Motor: 0,76 Kw /220V /1ph /50 hz6IU - 2.5unit1.0012,655,830.0012,655,830.00- Type: Ducting- Kapasitas: min. 28.000 BTUH- Sensible: min. 19.600 BTUH- Air Flow: 816 CFM- Motor: 0,16 Kw /220V /1ph /50 hz7IU - 2.7unit1.0012,785,080.0012,785,080.00- Type: Ducting- Kapasitas: min. 33.600 BTUH- Sensible: min. 23.520 BTUH- Air Flow: 974 CFM- Motor: 0,38 Kw /220V /1ph /50 hzSub TotalLantai 2288,473,020.00A.4Lantai 31OU - 3unit1.00107,353,400.00107,353,400.00- Type: Inverter- Kapasitas: 167.600 BTUH- Motor: 14,73 KW /380 /3ph /50 hz2IU - 3.1unit1.0013,189,440.0013,189,440.00- Type: Ducting- Kapasitas: min. 19.600 BTUH- Sensible: min. 13.720 BTUH- Air Flow: 568 CFM- Motor: 0,1 Kw /220V /1ph /50 hz3IU- 3.2unit1.0012,655,830.0012,655,830.00- Type: Ducting- Kapasitas: min. 30.000 BTUH- Sensible: min. 21.000 BTUH- Air Flow: 875 CFM- Motor: 0,16 Kw /380V /3ph /50 hz4IU - 3.3unit1.0016,720,220.0016,720,220.00- Type: Ducting- Kapasitas: min. 60.000 BTUH- Sensible: min. 42.000 BTUH- Air Flow: 1.750 CFM- Motor: 0,76 Kw /220V /1ph /50 hz5IU - 3.4unit1.0012,655,830.0012,655,830.00- Type: Ducting- Kapasitas: min. 28.000 BTUH- Sensible: min. 19.600 BTUH- Air Flow: 816 CFM- Motor: 0,16 Kw /220V /1ph /50 hz6IU - 3.5unit1.0012,655,830.0012,655,830.00- Type: Ducting- Kapasitas: min. 30.000 BTUH- Sensible: min. 21.000 BTUH- Air Flow: 870 CFM- Motor: 0,38 Kw /220V /1ph /50 hzSub TotalLantai 3175,230,550.00Sub TotalPeralatan Utama AC1,680,161,120.00XI.BPeralatan Utama FanB.1Lantai Basement1EF - B.1unit1.0012,481,040.0012,481,040.00- Type: In Line- Kapasitas: 1500 CFM- Static Pressure: 0.15 In wg- Putaran: 1450 RPM- Power: 0,2 KW / 220V / 1PH / 50 Hz2IF - B2unit1.0012,481,040.0012,481,040.00- Type: In Line- Kapasitas: 1852 CFM- Static Pressure: 0.10 In wg- Putaran: 1450 RPM- Power: 0,2 KW / 220V / 1PH / 50 HzSub TotalLantai Basement24,962,080.00B.2Lantai 11EF - 1.1/2unit2.005,871,800.0011,743,600.00- Type: In Line- Kapasitas: 900 CFM- Static Pressure: 0.15 In wg- Putaran: 1450 RPM- Power: 0,18 KW / 220V / 1PH / 50 Hz2EF - 1.5/ 6/ 7unit3.0024,111,560.0072,334,680.00- Type: Propeler- Kapasitas: 2400 CFM- Static Pressure: - In wg- Putaran: 1450 RPM- Power: 0,2 KW / 220V / 1PH / 50 Hz3IF - 1.1unit1.002,653,420.002,653,420.00- Type: In Line- Kapasitas: 202 CFM- Static Pressure: 0.10 In wg- Putaran: 1250 RPM- Power: 0,1 KW / 220V / 1PH / 50 Hz4IF - 1.2unit1.003,331,570.003,331,570.00- Type: In Line- Kapasitas: 381 CFM- Static Pressure: 0.15 In wg- Putaran: 1450 RPM- Power: 0,18 KW / 220V / 1PH / 50 Hz5IF - 1.3/ 4unit2.004,354,790.008,709,580.00- Type: In Line- Kapasitas: 648 CFM- Static Pressure: 0.15 In wg- Putaran: 1450 RPM- Power: 0,18 KW / 220V / 1PH / 50 Hz6IF - 1.5unit1.004,354,790.004,354,790.00- Type: In Line- Kapasitas: 602 CFM- Static Pressure: 0.10 In wg- Putaran: 1250 RPM- Power: 0,18 KW / 220V / 1PH / 50 Hz7IF - 1.6unit1.004,354,790.004,354,790.00- Type: In Line- Kapasitas: 540 CFM- Static Pressure: 0.10 In wg- Putaran: 1450 RPM- Power: 0,18 KW / 220V / 1PH / 50 HzSub TotalLantai 1107,482,430.00B.3Lantai 21EF - 2.1unit1.005,871,800.005,871,800.00- Type: In Line- Kapasitas: 900 CFM- Static Pressure: 0.15 In wg- Putaran: 1450 RPM- Power: 0,18 KW / 220V / 1PH / 50 Hz2EF - 2.2unit1.004,354,790.004,354,790.00- Type: In Line- Kapasitas: 650 CFM- Static Pressure: 0.10 In wg- Putaran: 1450 RPM- Power: 0,18 KW / 220V / 1PH / 50 Hz3EF - 2.3unit1.003,331,570.003,331,570.00- Type: In Line- Kapasitas: 375 CFM- Static Pressure: 0.10 In wg- Putaran: 1250 RPM- Power: 0,15 KW / 220V / 1PH / 50 Hz4EF - 2.4unit1.0012,481,040.0012,481,040.00- Type: In Line- Kapasitas: 1000 CFM- Static Pressure: 0.15 In wg- Putaran: 1450 RPM- Power: 0,2 KW / 220V / 1PH / 50 Hz5EF - 2.5unit1.004,354,790.004,354,790.00- Type: In Line- Kapasitas: 656 CFM- Static Pressure: 0.15 In wg- Putaran: 1450 RPM- Power: 0,18 KW / 220V / 1PH / 50 Hz6IF - 2.1unit1.005,871,800.005,871,800.00- Type: In Line- Kapasitas: 870 CFM- Static Pressure: 0.10 In wg- Putaran: 1450 RPM- Power: 0,2 KW / 220V / 1PH / 50 Hz7IF - 2.2unit1.002,653,420.002,653,420.00- Type: In Line- Kapasitas: 200 CFM- Static Pressure: 0.10 In wg- Putaran: 1250 RPM- Power: 0,1 KW / 220V / 1PH / 50 Hz8IF - 2.3unit1.003,331,570.003,331,570.00- Type: In Line- Kapasitas: 340 CFM- Static Pressure: 0.10 In wg- Putaran: 1450 RPM- Power: 0,1 KW / 220V / 1PH / 50 HzSub TotalLantai 242,250,780.00B.4Lantai 31EF - 3.1unit1.005,871,800.005,871,800.00- Type: In Line- Kapasitas: 900 CFM- Static Pressure: 0.15 In wg- Putaran: 1450 RPM- Power: 0,18 KW / 220V / 1PH / 50 Hz2EF - 3.2unit1.004,354,790.004,354,790.00- Type: In Line- Kapasitas: 650 CFM- Static Pressure: 0.10 In wg- Putaran: 1450 RPM- Power: 0,18 KW / 220V / 1PH / 50 Hz3EF - 3.3unit1.003,331,570.003,331,570.00- Type: In Line- Kapasitas: 375 CFM- Static Pressure: 0.10 In wg- Putaran: 1250 RPM- Power: 0,15 KW / 220V / 1PH / 50 Hz4EF - 3.4unit1.0012,481,040.0012,481,040.00- Type: In Line- Kapasitas: 1000 CFM- Static Pressure: 0.15 In wg- Putaran: 1450 RPM- Power: 0,2 KW / 220V / 1PH / 50 Hz5EF - 3.5unit1.004,354,790.004,354,790.00- Type: In Line- Kapasitas: 656 CFM- Static Pressure: 0.15 In wg- Putaran: 1450 RPM- Power: 0,18 KW / 220V / 1PH / 50 Hz6IF - 3.1unit1.005,871,800.005,871,800.00- Type: In Line- Kapasitas: 870 CFM- Static Pressure: 0.10 In wg- Putaran: 1450 RPM- Power: 0,2 KW / 220V / 1PH / 50 Hz7IF - 3.2unit1.002,653,420.002,653,420.00- Type: In Line- Kapasitas: 200 CFM- Static Pressure: 0.10 In wg- Putaran: 1250 RPM- Power: 0,1 KW / 220V / 1PH / 50 Hz8IF - 3.3unit1.003,331,570.003,331,570.00- Type: In Line- Kapasitas: 340 CFM- Static Pressure: 0.10 In wg- Putaran: 1450 RPM- Power: 0,1 KW / 220V / 1PH / 50 HzSub TotalLantai 342,250,780.00Sub TotalPeralatan Utama Fan216,946,070.00XI.CPekerjaan PemipaanC.1Lantai Basement1Instalasi Pipa Refrigrant (liquid dan gas) dengan tembaga siamless ASTB B-280lengkap isolasi termasuk fitting dan accessories- dia. 34,9 mmm'48.00251,460.0012,070,080.00- dia. 28,6 mmm'10.00187,990.001,879,900.00- dia. 22,2 mmm'10.00134,860.001,348,600.00- dia. 19,1 mmm'70.00113,630.007,954,100.00- dia. 15,9 mmm'22.0095,920.002,110,240.00- dia. 12,7 mmm'6.0074,250.00445,500.00- dia. 9,5 mmm'48.0057,420.002,756,160.002Pengadaan dan Pemasangan Pipa Drain dengan bahan PVC kelas AW(10 kg/cm2) + isolasi : lengkap dengan hanger dan aksesories pendukung- dia. 1 1/4"m'26.0036,630.00952,380.00- dia. 1"m'17.0033,000.00561,000.00- dia. 3/4"m'16.0030,580.00489,280.00Sub TotalLantai Basement30,567,240.00C.2Lantai 11Instalasi Pipa Refrigrant (liquid dan gas) dengan tembaga siamless ASTB B-280lengkap isolasi termasuk fitting dan accessories- dia. 41,3 mmm'56.00313,610.0017,562,160.00- dia. 34,9 mmm'88.00251,460.0022,128,480.00- dia. 28,6 mmm'48.00187,990.009,023,520.00- dia. 22,2 mmm'22.00134,860.002,966,920.00- dia. 19,1 mmm'172.00113,630.0019,544,360.00- dia. 15,9 mmm'110.0095,920.0010,551,200.00- dia. 12,7 mmm'14.0074,250.001,039,500.00- dia. 9,5 mmm'130.0057,420.007,464,600.002Pengadaan dan Pemasangan Pipa Drain dengan bahan PVC kelas AW(10 kg/cm2) + isolasi : lengkap dengan hanger dan aksesories pendukung- dia. 1 1/4"m'96.0036,630.003,516,480.00- dia. 1"m'66.0033,000.002,178,000.00- dia. 3/4"m'10.0030,580.00305,800.00Sub TotalLantai 196,281,020.00C.3Lantai 21Instalasi Pipa Refrigrant (liquid dan gas) dengan tembaga siamless ASTB B-280lengkap isolasi termasuk fitting dan accessories- dia. 34,9 mmm'14.00251,460.003,520,440.00- dia. 28,6 mmm'18.00187,990.003,383,820.00- dia. 22,2 mmm'26.00134,860.003,506,360.00- dia. 19,1 mmm'32.00113,630.003,636,160.00- dia. 15,9 mmm'46.0095,920.004,412,320.00- dia. 12,7 mmm'14.0074,250.001,039,500.00- dia. 9,5 mmm'70.0057,420.004,019,400.002Pengadaan dan Pemasangan Pipa Drain dengan bahan PVC kelas AW(10 kg/cm2) + isolasi : lengkap dengan hanger dan aksesories pendukung- dia. 1 1/4"m'36.0036,630.001,318,680.00- dia. 1"m'6.0033,000.00198,000.00- dia. 3/4"m'30.0030,580.00917,400.00Sub TotalLantai 225,952,080.00C.4Lantai 31Instalasi Pipa Refrigrant (liquid dan gas) dengan tembaga siamless ASTB B-280lengkap isolasi termasuk fitting dan accessories- dia. 28,6 mmm'8.00187,990.001,503,920.00- dia. 22,2 mmm'10.00134,860.001,348,600.00- dia. 19,1 mmm'36.00113,630.004,090,680.00- dia. 15,9 mmm'64.0095,920.006,138,880.00- dia. 9,5 mmm'76.0057,420.004,363,920.00Pengadaan dan Pemasangan Pipa Drain dengan bahan PVC kelas AW(10 kg/cm2) + isolasi : lengkap dengan hanger dan aksesories pendukung2- dia. 1 1/4"m'14.0036,630.00512,820.00- dia. 1"m'8.0033,000.00264,000.00- dia. 3/4"m'24.0030,580.00733,920.00Sub TotalLantai 318,956,740.00Sub TotalPekerjaan Pemipaan171,757,080.00XI.DPekerjaan Ducting dan GrilleD.1Lantai Basement1Ducting + Isolasi Dalam dengan bahan polyurethane panelTermasuk penggantung/hanger/support & accessoriesBahan: Polyurethane panelm214.00316,910.004,436,740.002Ducting dengan bahan polyurethane panelTermasuk penggantung/hanger/support & accessoriesBahan: Polyurethane panelm281.00316,910.0025,669,710.003Ducting tanpa isolasi finish cat zinkromat lengkap dgngantungan/hanger/support dan aksesories lainnya :- BjLS 80m276.00347,270.0026,392,520.00- BjLS 60m255.00255,090.0014,029,950.00- BjLS 50m27.00224,400.001,570,800.004Supply Air Diffuser (SAD)- 250 mm x 250 mmbh18.00134,750.002,425,500.005Exhaust Air Grille (EAG)- 550 mm x 300 mmbh7.00134,750.00943,250.006Volume Damper (VD)- 200 mm x 200 mmbh2.00198,440.00396,880.00Sub TotalLantai Basement75,865,350.00D.2Lantai 11Ducting + Isolasi Dalam dengan bahan polyurethane panelTermasuk penggantung/hanger/support & accessoriesBahan: Polyurethane panelm270.00316,910.0022,183,700.002Ducting dengan bahan polyurethane panelTermasuk penggantung/hanger/support & accessoriesBahan: Polyurethane panelm2255.00316,910.0080,812,050.003Ducting tanpa isolasi finish cat zinkromat lengkap dgngantungan/hanger/support dan aksesories lainnya :- BjLS 60m266.00255,090.0016,835,940.00- BjLS 50m2117.00224,400.0026,254,800.004Flexible Round Duct- dia. 250 mmm2112.00116,600.0013,059,200.005Supply Air Diffuser (SAD)- 250 mm x 250 mmbh31.00134,750.004,177,250.00- 200 mm x 200 mmbh4.00113,300.00453,200.00- 150 mm x 150 mmbh2.0091,850.00183,700.006Return Air Grille (RAG)- 400 mm x 200 mmbh7.00284,900.001,994,300.00- 300 mm x 200 mmbh1.00199,100.00199,100.00- 150 mm x 150 mmbh1.0091,850.0091,850.007Exhaust Air Grille (EAG)- 300 mm x 200 mmbh1.00156,200.00156,200.00- 200 mm x 200 mmbh1.00113,300.00113,300.00- 150 mm x 150 mmbh15.0091,850.001,377,750.008Exhaust Grille (EG)- 600 mm x 300 mmbh2.00284,900.00569,800.009Fresh Air Grille (FAG)- 600 mm x 300 mmbh2.00284,900.00569,800.00- 500 mm x 300 mmbh2.00199,100.00398,200.00- 450 mm x 300 mmbh1.00220,550.00220,550.00- 350 mm x 300 mmbh1.00177,650.00177,650.00- 300 mm x 250 mmbh2.00156,200.00312,400.0010Volume Damper (VD)- 250 mm x 200 mmbh4.00241,120.00964,480.00- 200 mm x 200 mmbh6.00198,440.001,190,640.00- 200 mm x 150 mmbh1.00198,440.00198,440.00- 150 mm x 150 mmbh3.00155,650.00466,950.00Sub TotalLantai 1172,961,250.00D.3Lantai 21Ducting + Isolasi Dalam dengan bahan polyurethane panelTermasuk penggantung/hanger/support & accessoriesBahan: Polyurethane panelm234.00316,910.0010,774,940.002Ducting dengan bahan polyurethane panelTermasuk penggantung/hanger/support & accessoriesBahan: Polyurethane panelm282.00316,910.0025,986,620.003Ducting tanpa isolasi finish cat zinkromat lengkap dgngantungan/hanger/support dan aksesories lainnya :- BjLS 60m233.00255,090.008,417,970.00- BjLS 50m2102.00224,400.0022,888,800.004Flexible Round Duct- dia. 250 mmm224.00116,600.002,798,400.005Supply Air Diffuser (SAD)- 250 mm x 250 mmbh25.00134,750.003,368,750.006Return Air Grille (RAG)- 500 mm x 250 mmbh4.00199,100.00796,400.00- 400 mm x 200 mmbh9.00199,100.001,791,900.007Exhaust Air Grille (EAG)- 400 mm x 200 mmbh2.00199,100.00398,200.00- 300 mm x 200 mmbh10.00156,200.001,562,000.00- 150 mm x 150 mmbh7.0091,850.00642,950.008Intake Air Grille (IAG)- 400 mm x 200 mmbh3.00199,100.00597,300.009Exhaust Grille (EG)- 500 mm x 350 mmbh2.00242,000.00484,000.00- 500 mm x 300 mmbh1.00242,000.00242,000.00- 400 mm x 350 mmbh1.00199,100.00199,100.00- 350 mm x 300 mmbh1.00177,650.00177,650.0010Fresh Air Grille (FAG)- 500 mm x 350 mmbh1.00242,000.00242,000.00- 350 mm x 300 mmbh1.00177,650.00177,650.00- 300 mm x 300 mmbh1.00156,200.00156,200.00- 300 mm x 250 mmbh1.00156,200.00156,200.00- 250 mm x 250 mmbh1.00134,750.00134,750.0011Volume Damper (VD)- 200 mm x 200 mmbh1.00198,440.00198,440.00- 200 mm x 150 mmbh1.00198,440.00198,440.00- 150 mm x 150 mmbh4.00155,650.00622,600.00Sub TotalLantai 283,013,260.00D.4Lantai 31Ducting + Isolasi Dalam dengan bahan polyurethane panelTermasuk penggantung/hanger/support & accessoriesBahan: Polyurethane panelm222.00316,910.006,972,020.002Ducting dengan bahan polyurethane panelTermasuk penggantung/hanger/support & accessoriesBahan: Polyurethane panelm247.00316,910.0014,894,770.003Ducting tanpa isolasi finish cat zinkromat lengkap dgngantungan/hanger/support dan aksesories lainnya :- BjLS 60m235.00255,090.008,928,150.00- BjLS 50m2102.00224,400.0022,888,800.004Flexible Round Duct- dia. 250 mmm224.00116,600.002,798,400.005Supply Air Diffuser (SAD)- 250 mm x 250 mmbh17.00134,750.002,290,750.006Return Air Grille (RAG)- 400 mm x 200 mmbh9.00199,100.001,791,900.007Exhaust Air Grille (EAG)- 400 mm x 200 mmbh2.00199,100.00398,200.00- 300 mm x 200 mmbh10.00156,200.001,562,000.00- 150 mm x 150 mmbh7.0091,850.00642,950.008Intake Air Grille (IAG)- 400 mm x 200 mmbh3.00199,100.00597,300.009Exhaust Grille (EG)- 500 mm x 350 mmbh2.00242,000.00484,000.00- 500 mm x 300 mmbh1.00242,000.00242,000.00- 400 mm x 350 mmbh1.00199,100.00199,100.00- 350 mm x 300 mmbh1.00177,650.00177,650.0010Fresh Air Grille (FAG)- 350 mm x 300 mmbh1.00177,650.00177,650.00- 300 mm x 250 mmbh1.00156,200.00156,200.00- 250 mm x 250 mmbh1.00134,750.00134,750.0011Volume Damper (VD)- 200 mm x 150 mmbh1.00198,440.00198,440.00- 150 mm x 150 mmbh4.00155,650.00622,600.00Sub TotalLantai 366,157,630.00Sub TotalPekerjaan Ducting dan Grille397,997,490.00XI.EPekerjaan Listrik / PengkabelanE.1Lantai Basement1Pengkabelan unit AC dari PP.AC.LT.B dalam conduit PVC HI 20 mm- NYM 3 x 2,5 mmke IU-B.1m'28.0022,220.00622,160.00- NYM 3 x 2,5 mmke IU-B.2m'19.0022,220.00422,180.00- NYM 3 x 2,5 mmke IU-B.3m'12.0022,220.00266,640.00- NYM 3 x 2,5 mmke IU-B.4m'10.0022,220.00222,200.00- NYM 3 x 2,5 mmke IU-B.5m'19.0022,220.00422,180.00- NYM 3 x 2,5 mmke IU-B.6m'17.0022,220.00377,740.002Pengkabelan kabel Power Indoor AC dari Oudoor dan Kontrolm'107.0022,220.002,377,540.00dengan NYM 3 x 2,5 mm2 dalam conduit PVC HI dia. 20 mm3Pengkabelan Fan dengan NYM 3 x 2,5 mm2 dalam conduit PVC HI dia. 20 mmttk2.00312,840.00625,680.00di sambung dengan titik lampu terdekatSub TotalLantai Basement5,336,320.00E.2Lantai 11Pengkabelan unit AC dari PP.AC.LT.1 dalam conduit PVC HI 20 mm- NYM 3 x 2,5 mmke IU-1.1m'95.0022,220.002,110,900.00- NYM 3 x 2,5 mmke IU-1.2m'91.0022,220.002,022,020.00- NYM 3 x 2,5 mmke IU-1.3m'60.0022,220.001,333,200.00- NYM 3 x 2,5 mmke IU-1.4m'64.0022,220.001,422,080.00- NYM 3 x 2,5 mmke IU-1.5m'40.0022,220.00888,800.00- NYM 3 x 2,5 mmke IU-1.6m'36.0022,220.00799,920.00- NYM 3 x 2,5 mmke IU-1.7m'10.0022,220.00222,200.00- NYM 3 x 2,5 mmke IU-1.8Am'18.0022,220.00399,960.00- NYM 3 x 2,5 mmke IU-1.8Bm'17.0022,220.00377,740.00- NYM 3 x 2,5 mmke IU-1.9m'20.0022,220.00444,400.00- NYM 3 x 2,5 mmke IU-1.10m'23.0022,220.00511,060.00- NYM 3 x 2,5 mmke IU-1.11m'40.0022,220.00888,800.00- NYM 3 x 2,5 mmke IU-1.12m'49.0022,220.001,088,780.00- NYM 3 x 2,5 mmke IU-1.13m'60.0022,220.001,333,200.00- NYM 3 x 2,5 mmke IU-1.14m'46.0022,220.001,022,120.00- NYM 3 x 2,5 mmke IU-1.15m'75.0022,220.001,666,500.00- NYM 3 x 2,5 mmke IU-1.16m'64.0022,220.001,422,080.002Pengkabelan kabel Power Indoor AC dari Oudoor dan Kontrolm'320.0022,220.007,110,400.00dengan NYM 3 x 2,5 mm2 dalam conduit PVC HI dia. 20 mm3Pengkabelan Fan dengan NYM 3 x 2,5 mm2 dalam conduit PVC HI dia. 20 mmttk11.00312,840.003,441,240.00di sambung dengan titik lampu terdekatSub TotalLantai 128,505,400.00E.3Lantai 2Pengkabelan unit AC dari PP.AC.LT.2 dalam conduit PVC HI 20 mm- NYM 3 x 2,5 mmke IU-2.1m'88.0022,220.001,955,360.00- NYM 3 x 2,5 mmke IU-2.2m'82.0022,220.001,822,040.00- NYM 3 x 2,5 mmke IU-2.3m'86.0022,220.001,910,920.00- NYM 3 x 2,5 mmke IU-2.4m'75.0022,220.001,666,500.00- NYM 3 x 2,5 mmke IU-2.5m'80.0022,220.001,777,600.00- NYM 3 x 2,5 mmke IU-2.6m'52.0022,220.001,155,440.00Pengkabelan kabel Power Indoor AC dari Oudoor dan Kontrolm'110.0022,220.002,444,200.00dengan NYM 3 x 2,5 mm2 dalam conduit PVC HI dia. 25 mmPengkabelan Fan dengan NYM 3 x 2,5 mm2 dalam conduit PVC HI dia. 20 mmttk8.00312,840.002,502,720.00di sambung dengan titik lampu terdekatSub TotalLantai 215,234,780.00E.4Lantai 3Pengkabelan unit AC dari PP.AC.LT.3 dalam conduit PVC HI 20 mm- NYM 3 x 2,5 mmke IU-3.1m'82.0022,220.001,822,040.00- NYM 3 x 2,5 mmke IU-3.2m'86.0022,220.001,910,920.00- NYM 3 x 2,5 mmke IU-3.3m'75.0022,220.001,666,500.00- NYM 3 x 2,5 mmke IU-3.4m'80.0022,220.001,777,600.00- NYM 3 x 2,5 mmke IU-3.5m'52.0022,220.001,155,440.00Pengkabelan kabel Power Indoor AC dari Oudoor dan Kontrolm'97.0022,220.002,155,340.00dengan NYM 4 x 2,5 mm2 dalam conduit PVC HI dia. 25 mmPengkabelan Fan dengan NYM 3 x 2,5 mm2 dalam conduit PVC HI dia. 20 mmttk8.00312,840.002,502,720.00di sambung dengan titik lampu terdekatSub TotalLantai 312,990,560.00E.5Lantai AtapPengkabelan unit AC dari P.OU/VRV :- NYY 4 x 25 mmke OU-VRV.1m'10.00172,920.001,729,200.00- NYY 4 x 25 mmke OU-VRV.2m'8.00172,920.001,383,360.00- NYY 4 x 25 mmke OU-VRV.3m'8.00172,920.001,383,360.00- NYY 4 x 16 mmke OU-VRV.4m'10.00135,630.001,356,300.00- NYY 4 x 16 mmke OU-VRV.5m'12.00135,630.001,627,560.00Sub TotalLantai Atap7,479,780.00Sub TotalPekerjaan Listrik / Pengkabelan69,546,840.00XI.FTesting & CommissioningTesting & Commissioning Peralatan dan Instalasi Tata Udaralot1.003,850,000.003,850,000.00Sub TotalTesting & Commissioning3,850,000.00SUB TOTALPEKERJAAN TATA UDARA2,540,258,600.00XIIPEKERJAAN SARANA TRANSPORTASI DALAM GEDUNG1Lift Barangunit1.00558,101,500.00558,101,500.00Spesifikasi :- Type: Traction Drive Pasanger Elevator- Car Finishing: Standard- Kapasitas: 2.000 kg / 25 orang- Kecepatan: 60 Mpm- Jumlah pemberhentian: 4 bh- Jumlah Pintu: 6 bh- Type Pintu: 2 - panel side opening door- Lebar Pintu: 1.400 mm- Tinggi Pintu: 2100 mm- Kontrol: AC Gearred (OHT) VVVF Control- Cara Operasi: Group Control Selective Collective- Penggerak: Traction Drive AC - Gearless- Power: 11 KW / 380 V / 3P / 50 Hztermasuk interfacing dengan General Fire Alarm2ARD berikut Kelengkapannyaunit1.0033,605,000.0033,605,000.003Instalasi pengkabelan dari Panel Lift ke mesin dan panel kontrollot1.0029,131,080.0029,131,080.004Supervisory panel lengkap terpasang di R. Kontrol (Lift)unit1.0026,083,090.0026,083,090.005Biaya pemasangan Lift dan Transportasiunit1.0027,500,000.0027,500,000.006Biaya Perijinan Depnakerlot1.005,500,000.005,500,000.007Testing dan Comissioninglot1.003,850,000.003,850,000.008Biaya scapolding / perancahlot1.005,500,000.005,500,000.00SUB TOTALPEKERJAAN SARANA TRANSPORTASI DALAM GEDUNG689,270,670.00

&LBQ MEKANIKAL ELEKTRIKAL&C&A&RPage &P

BRCPROYEK :DRC & BRC BANK MANDIRILOKASI :REMPOA - TANGERANG SELATANPEKERJAAN :BANGUNAN BRCREKAPITULASIPEKERJAAN MEKANIKAL DAN ELEKTRIKALIPEKERJAAN LISTRIK ARUS KUATRp.958,928,630.00IIPEKERJAAN PENANGKAL PETIRRp.130,482,440.00IIIPEKERJAAN GENSETRp.Masuk Gedung DRCIVPEKERJAAN FIRE ALARMRp.50,316,420.00VPEKERJAAN SOUND SYSTEM (PUBLIC ADDRESS)Rp.65,439,770.00VIPEKERJAAN TELEPONRp.118,499,810.00VIIPEKERJAAN MATVRp.52,726,630.00VIIIPEKERJAAN PLUMBINGRp.161,518,970.00IXPEKERJAAN FIRE HYDRANT, FIRE SPRINKLER & FIRE EXTINGUISHERRp.219,825,540.00XPEKERJAAN TATA UDARARp.826,079,540.00TOTAL Rp.2,583,817,750.00PROYEK :DRC & BRC BANK MANDIRILOKASI :REMPOA - TANGERANG SELATANPEKERJAAN :BANGUNAN BRCNOURAIAN PEKERJAANSATVOLUMEHARGA SATUAN Rp.JUMLAH HARGA Rp.PEKERJAAN MEKANIKAL DAN ELEKTRIKALIPEKERJAAN LISTRIK ARUS KUATI.APekerjaan Panel-panelA.1Lantai 11SDP (N)unit1.0027,500,000.0027,500,000.002SDP (+1)unit1.0027,500,000.0027,500,000.003PP/PL-LT.1unit1.0016,375,590.0016,375,590.004PP/AC-LT.1unit1.0016,585,580.0016,585,580.00Sub totalLantai 187,961,170.00A.2Lantai 21PP/PL-LT.2unit1.0025,382,170.0025,382,170.002PP/AC-LT.2unit1.0013,488,640.0013,488,640.00Sub totalLantai 238,870,810.00Sub TotalPekerjaan Panel-panel126,831,980.00I.BPekerjaan Feeder1- NYY 4 x 1c X 240 mm2keSDP (N)mtr56.001,556,720.0087,176,320.000.02Kabel dari ATS.2 (a-b) :0.0- NYY 4 x 1c X 240 mm2keSDP (+1)mtr101.001,556,720.00157,228,720.000.03Kabel dari SDP (N)0.0- NYY 4 x 16 mm2kePP/PL-LT.1mtr8.00135,630.001,085,040.00- NYY 4 x 16 mm2kePP/PL-LT.2mtr15.00135,630.002,034,450.00- NYY 4 x 95 mm2kePP/AC-LT.1mtr9.00570,680.005,136,120.00- NYY 4 x 16 mm2kePP/AC-LT.2mtr15.00135,630.002,034,450.00- NYY 3(4 x 185) mm2keP-CHILLER.2scope chiller- NYY 3(4 x 185) mm2keP-CHILLER.3scope chiller4Kabel dari SDP (+1)- NYY 4 x 16 mm2kePP/PL-LT.1mtr8.00135,630.001,085,040.00- NYY 4 x 16 mm2kePP/PL-LT.2mtr15.00135,630.002,034,450.00- NYY 4 x 95 mm2kePP/AC-LT.1mtr9.00570,680.005,136,120.00- NYY 4 x 16 mm2kePP/AC-LT.2mtr15.00135,630.002,034,450.00- NYY 3(4 x 185) mm2keP-CHILLER.2scope chiller- NYY 3(4 x 185) mm2keP-CHILLER.3scope chillerSub TotalPekerjaan Feeder264,985,160.00I.CPekerjaan Kabel Tray dan Raised Floor DuctC.1Pekerjaan Kabel TrayC.1.1Lantai 1aArus Kuat- uk. 600 mm x 50 mmm12.00438,350.005,260,200.00- uk. 300 mm x 50 mmm12.00263,890.003,166,680.00bArus Lemah- uk. 300 mm x 100 mmm28.00322,080.009,018,240.00- uk. 200 mm x 100 mmm14.00263,890.003,694,460.00Sub totalC.1.121,139,580.00C.1.2Lantai 2- uk. 600 mm x 50 mmm10.00438,350.004,383,500.00- uk. 300 mm x 50 mmm14.00263,890.003,694,460.00Arus Lemah- uk. 300 mm x 100 mmm4.00322,080.001,288,320.00- uk. 200 mm x 100 mmm20.00263,890.005,277,800.00Sub totalC.1.214,644,080.00Sub totalPekerjaan Kabel Tray35,783,660.00C.2Raised Floor DuctC.2.1Lantai 1- Under Floor Duct PVC uk. 100 mm x 25 mm x 3.2 mm (listrik)m42.00167,530.007,036,260.00- Under Floor Duct PVC uk. 75 mm x 25 mm x 3.2 mm (telepon)m42.00154,110.006,472,620.00- Under Floor Duct PVC uk. 75 mm x 25 mm x 3.2 mm (kabel data)m42.00154,110.006,472,620.00- Service Outlet Box uk. 258 mm x 258 mm x 80 mm 4 compartmentm81.00113,850.009,221,850.00- Vertical Oultlet uk. 225 mm x 38 mm 4 compartmentbh4.001,223,970.004,895,880.00Sub totalC.2.134,099,230.00C.2.2Lantai 2- Under Floor Duct PVC uk. 100 mm x 25 mm x 3.2 mm (listrik)m50.00167,530.008,376,500.00- Under Floor Duct PVC uk. 75 mm x 25 mm x 3.2 mm (telepon)m50.00154,110.007,705,500.00- Under Floor Duct PVC uk. 75 mm x 25 mm x 3.2 mm (kabel data)m50.00154,110.007,705,500.00- Service Outlet Box uk. 258 mm x 258 mm x 80 mm 4 compartmentm90.00113,850.0010,246,500.00- Vertical Oultlet uk. 225 mm x 38 mm 4 compartmentbh6.001,223,970.007,343,820.00Sub totalC.2.241,377,820.00Sub totalRaised Floor Duct75,477,050.00Sub TotalPekerjaan Kabel Tray dan Raised Floor Duct111,260,710.00I.DPekerjaan Pentanahan1BCC 10 mmmtr76.0022,770.001,730,520.002BCC 70 mmmtr18.0082,170.001,479,060.003BCC 95 mmmtr157.00109,340.0017,166,380.00Sub TotalPekerjaan Pentanahan20,375,960.00I.EPek. Lampu / Titik Nyala / Stop KontakE.1Lantai 11Recessed Mounted type TL T-5 2 x 28 W With Diffuser ACbh23.001,654,070.0038,043,610.002Recessed Mounted type TL T-5 2 x 28 W With Returnbh12.001,792,780.0021,513,360.003Recessed Mounted type TL T-5 2 x 28 W With Return + Nicad Batterybh25.002,519,220.0062,980,500.004Lampu Wastafel Type TL 36 Wattbh2.00249,260.00498,520.005Down Light PLC 1 x 13 Wattbh8.00213,510.001,708,080.006Down Light PLC 1 x 13 Watt + Nicad Batterybh2.001,250,040.002,500,080.007Down Light PLC 2 x 13 Wattbh10.00669,240.006,692,400.008Down Light PLC 2 x 13 Watt + Nicad Batterybh3.001,238,490.003,715,470.009Stop Kontak Dinding 1 ph, 200 Wbh88.0056,760.004,994,880.0010Stop Kontak Dinding Hand Dryer 1 ph, 1000 Wbh2.0056,760.00113,520.0011Stop Kontak Lantai (Data) 1 ph, 450 Wbh81.00326,920.0026,480,520.0012Saklar Tunggalbh9.0050,490.00454,410.0013Saklar Gandabh4.0059,400.00237,600.0014Grid Switch 6 Gangbh1.00117,040.00117,040.0015Titik nyala lampu dengan kabel NYM 3 x 2,5 mm di dalam conduittitik85.00316,910.0026,937,350.00PVC HI 20 mm16Titik nyala Stop kontak NYM 3 x 2,5 mm didalam conduit PVC HI 20 mmtitik185.00354,530.0065,588,050.00Sub totalLantai 1262,575,390.00E.2Lantai 21Recessed Mounted type TL T-5 2 x 28 W With Diffuser ACbh20.001,654,070.0033,081,400.002Recessed Mounted type TL T-5 2 x 28 W With Returnbh24.001,792,780.0043,026,720.003Recessed Mounted type TL T-5 2 x 28 W With Return + Nicad Batterybh5.002,519,220.0012,596,100.004Down Light PLC 1 x 13 Wattbh8.00213,510.001,708,080.005Down Light PLC 1 x 13 Watt + Nicad Batterybh2.001,250,040.002,500,080.006Down Light PLC 2 x 13 Wattbh11.00669,240.007,361,640.007Down Light PLC 2 x 13 Watt + Nicad Batterybh2.001,238,490.002,476,980.008Lampu Wastafel Type TL 36 Wattbh2.00249,260.00498,520.009Down Light Halogen 50 Wattbh2.00234,850.00469,700.0010Lampu Baret 1 x 18 watt + Nicad Batterybh1.001,287,880.001,287,880.0011Stop Kontak Dinding 1 ph, 200 Wbh95.0056,760.005,392,200.0012Stop Kontak Dinding Hand Dryer 1 ph, 1000 Wbh2.0056,760.00113,520.0013Stop Kontak Dinding (Data) 1 ph, 450 Wbh90.00326,920.0029,422,800.0014Saklar Tunggalbh8.0050,490.00403,920.0015Saklar Gandabh4.0059,400.00237,600.0016Saklar Hotelbh1.0089,760.0089,760.0017Grid Switch 10 Gangbh1.00117,040.00117,040.0018Titik nyala lampu dengan kabel NYM 3 x 2,5 mm di dalam conduittitik77.00316,910.0024,402,070.00PVC HI 20 mm19Titik nyala Stop kontak NYM 3 x 2,5 mm didalam conduit PVC HI 20 mmtitik14.00354,530.004,963,420.00Sub totalLantai 2170,149,430.00Sub TotalPek. Lampu / Titik Nyala / Stop Kontak432,724,820.00I.FTesting & CommissioningTesting & Commissioning peralatan dan instalasi elektrikal terpasang termasuk panel - panel, pengkabelan, grounding dan instalasi lampulot1.002,750,000.002,750,000.00Sub TotalTesting & Commissioning2,750,000.00SUB TOTALPEKERJAAN LISTRIK ARUS KUAT958,928,630.00IIPEKERJAAN PENANGKAL PETIRII.AAir Terminal & Termination Networks115x500mm alumunium air rodbh4.0012,499,740.0049,998,960.00215 mm Air terminal basebh4.0080,740.00322,960.00325 x 3mm Bare Alumunium Tapemeter126.0045,980.005,793,480.004Grey 25x3mm Non-Metallic DC tape clipbh126.0029,040.003,659,040.00525 x 3mm Alumunium Square tape clampbh4.0043,560.00174,240.00Sub TotalAir Terminal & Termination Networks59,948,680.00II.BDown Conductor125x3mm Bare Alumunium Tapemeter60.0043,560.002,613,600.002Grey 25x3mm Non-Metallic DC tape clipbh60.0029,040.001,742,400.00325 x 3mm Alumunium Square tape clampbh20.0043,560.00871,200.004Test Connection Linkbh4.00275,000.001,100,000.00Sub TotalDown Conductor6,327,200.00II.CEarthing System1Polymer Inspection Pitbh4.00177,650.00710,600.0025/8" x 1800 mm Extensible Copperbond Rodbh28.0080,740.002,260,720.0035/8" Rod Couplingbh28.0033,880.00948,640.0045/8" Driving Studbh4.0058,080.00232,320.005Rod to cable clampbh4.0024,200.0096,800.006Stranded Bar copper conductor 70 mmmeter28.0062,040.001,737,120.00Sub TotalEarthing System5,986,200.00II.DLooping1Stranded Bar copper conductor 70 mmmeter164.0062,040.0010,174,560.00Sub TotalEarthing System10,174,560.00II.EBiaya Instalasi1Alat bantu perancahlot1.001,650,000.001,650,000.002Instalasi grounding/pentanahanrod10.003,814,580.0038,145,800.003Testing & Commissioninglot1.002,750,000.002,750,000.004Biaya Perijinan Depnakerlot1.005,500,000.005,500,000.00Sub TotalBiaya Instalasi48,045,800.00SUB TOTALPEKERJAAN PENANGKAL PETIR130,482,440.00IIIPEKERJAAN GENSETMasuk Gedung DRCSUB TOTALPEKERJAAN GENSETIVPEKERJAAN FIRE ALARMIV.APeralatan UtamaMasuk Gedung DRCSub TotalPeralatan UtamaIV.BKabel Utama1Kabel STP AWG # 18 dari MDFA ke TB.FA.1 s/d TB.FA.2 (Loops) dalamm88.0044,000.003,872,000.00conduit PVC HI dia. 20 mm0.02Kabel ITC 2 x 2 x dia. 0,6 mm dari MDF.FA ke TB. FA.1 s/d TB.FA.2m44.0027,060.001,190,640.00dalam conduit PVC HI dia. 20 mm0.03Kabel NYA 2 x 1,5 mm2 untuk kabel Power Horn & Strobe TB.FA.1 ~ TB.FA.Lt.2m44.0032,780.001,442,320.00dalam conduit PVC HI dia. 20 mm0.04Kabel NYA 3 x 1,5 mm2 untuk kabel Power Module TB.FA.1 ~ TB.FA.Lt.2m44.0035,640.001,568,160.00dalam conduit PVC HI dia. 20 mmSub TotalKabel Utama8,073,120.00IV.CPekerjaan Instalasi Fire Alarm dalam BangunanC.1Lantai 11Terminal Box (TB. FA -1)set1.001,268,190.001,268,190.002Horn & Strobebh1.001,268,190.001,268,190.003Manual Break Glassbh1.00383,350.00383,350.004Addresable Heat Detectorbh2.00834,680.001,669,360.005Addresable Smoke Detectorbh12.00914,870.0010,978,440.006Fire Fighting Telephonebh1.00333,190.00333,190.007End off lineset4.0082,390.00329,560.008Titik instalasi untuk Horn & Strobe dengan Kabel NYA 3 x 1,5 mm2titik1.00213,510.00213,510.00dalam conduit PVC HI dia. 20 mm9Titik instalasi untuk Detector& Break Glass dengan kabel STP AWG 18 1 pairtiitk15.00200,090.003,001,350.00dalam conduit PVC HI dia. 20 mm0.010Titik nyala jack telephone dengan kabel ITC 2 x dia. 0,6mm dalamtiitk1.00149,930.00149,930.00conduit PVC HI dia. 20 mm11Titik instalasi untuk P. AC dengan Kabel NYA 3 x 1.5 mmtitik1.00213,510.00213,510.00dalam conduit PVC HI dia. 20 mm0.012Titik instalasi untuk Flow Switch dan Tamper Switch dengantitik1.00314,270.00314,270.00Kabel NYA 3 x 1.5 mm dalam conduit PVC HI dia. 20 mmSub totalLantai 120,122,850.00C.2Lantai 21Terminal Box (TB. FA -2)set1.001,268,190.001,268,190.002Horn & Strobebh1.001,268,190.001,268,190.003Manual Break Glassbh1.00383,350.00383,350.004Addresable Heat Detectorbh2.00834,680.001,669,360.005Addresable Smoke Detectorbh12.00914,870.0010,978,440.006Fire Fighting Telephonebh1.00333,190.00333,190.007End off lineset4.0082,390.00329,560.008Titik instalasi untuk Horn & Strobe dengan Kabel NYA 3 x 1,5 mm2titik1.00213,510.00213,510.00dalam conduit PVC HI dia. 20 mm9Titik instalasi untuk Detector& Break Glass dengan kabel STP AWG 18 1 pairtiitk15.00149,930.002,248,950.00dalam conduit PVC HI dia. 20 mm0.010Titik nyala jack telephone dengan kabel ITC 2 x dia. 0,6mm dalamtiitk1.00149,930.00149,930.00conduit PVC HI dia. 20 mm11Titik instalasi untuk P. AC dengan Kabel NYA 3 x 1.5 mmtitik1.00213,510.00213,510.00dalam conduit PVC HI dia. 20 mm0.012Titik instalasi untuk Flow Switch dan Tamper Switch dengantitik1.00314,270.00314,270.00Kabel NYA 3 x 1.5 mm dalam conduit PVC HI dia. 20 mmSub totalLantai 219,370,450.00Sub TotalPekerjaan Instalasi Fire Alarm dalam Bangunan39,493,300.00IV.DTesting & CommissioningTesting & Commissioning peralatan dan instalasi fire alarm terpasanglot1.002,750,000.002,750,000.00Sub TotalTesting & Commissioning2,750,000.00SUB TOTALPEKERJAAN FIRE ALARM50,316,420.00VPEKERJAAN SOUND SYSTEM (PUBLIC ADDRESS)V.APeralatan UtamaMasuk Gedung DRCSub TotalPeralatan UtamaV.BPengkabelan Utama1Kabel NYMHY 2 (3 x 2.5 mm) di dalam conduit PVC HI dia 20 mm dari MDF ke:- TB. SS - 1m'89.0097,790.008,703,310.00- TB. SS - 2m'94.0097,790.009,192,260.00Sub TotalPengkabelan Utama17,895,570.00V.CPekerjaan Instalasi Sound System Pada BangunanC.1Lantai 11Terminal Box Sound System Lt. 1 (TB. SS. 1)bh1.00348,920.00348,920.002Ceiling Speaker 3 watt dan matching transformerbh22.00481,800.0010,599,600.003Volume Control ( Attenuator )bh6.00292,160.001,752,960.004Instalasi untuk Ceiling Speaker dengan kabel NYMHY 2 x 1.5 mm2ttk22.00364,320.008,015,040.00dalam conduit PVC HI dia. 20 mm5Instalasi untuk Volume Control/Attenuator dg kabel NYMHY 3 x 1.5 mm2ttk6.00479,160.002,874,960.00dalam conduit PVC HI dia. 20 mmSub totalLantai 123,591,480.00C.2Lantai 21Terminal Box Sound System Lt. 2 (TB. SS. 2)bh1.00348,920.00348,920.002Ceiling Speaker 3 watt dan matching transformerbh21.00481,800.0010,117,800.003Volume Control ( Attenuator )bh4.00292,160.001,168,640.004Instalasi untuk Ceiling Speaker dengan kabel NYMHY 2 x 1.5 mm2ttk21.00364,320.007,650,720.00dalam conduit PVC HI dia. 20 mm5Instalasi untuk Volume Control/Attenuator dg kabel NYMHY 3 x 1.5 mm2ttk4.00479,160.001,916,640.00dalam conduit PVC HI dia. 20 mmSub totalLantai 221,202,720.00Sub TotalPekerjaan Instalasi Sound System Pada Bangunan44,794,200.00V.DTesting & CommissioningTesting & Commissioning peralatan dan instalasi sound systemlot1.002,750,000.002,750,000.00Sub TotalPekerjaan Instalasi Sound System Pada Bangunan2,750,000.00SUB TOTALPEKERJAAN SOUND SYSTEM (PUBLIC ADDRESS)65,439,770.00VIPEKERJAAN TELEPONVI.AKabel Utama1Instalasi kabel utama- ITC 100 (2 x 0,6 mm2)dari MDF ke TB-TP.1m89.00138,930.0012,364,770.00- ITC 100 (2 x 0,6 mm2)dari MDF ke TB-TP.2m94.00138,930.0013,059,420.00Sub TotalKabel Utama25,424,190.00VI.BPekerjaan Instalasi telepon dalam bangunanB.1Lantai 11Telepon Box lantai 1 (TB-TP-1) kap. 100 pairunit1.00646,250.00646,250.002Out Let Teleponbh86.0076,450.006,574,700.003Pesawat Teleponbh85.00by owner4Pesawat Faxbh1.00by owner5Instalasi Telepon dengan kabel ITC 2 x 2 x dia. 0,6 mm dalam pipa PVCttk86.00423,170.0036,392,620.00HI dia. 3/4"Sub totalLantai 143,613,570.00B.2Lantai 21Telepon Box lantai 2 (TB-TP-2) kap. 20 pairunit1.00646,250.00646,250.002Out Let Teleponbh90.0076,450.006,880,500.003Pesawat Teleponbh90.00by owner4Instalasi Telepon dengan kabel ITC 2 x 2 x dia. 0,6 mm dalam pipa PVCttk90.00423,170.0038,085,300.00HI dia. 3/4"Sub totalLantai 245,612,050.00Sub TotalPekerjaan Instalasi telepon dalam bangunan89,225,620.00VI.CTesting & CommissioningTesting & Commissioning peralatan dan instalasi Teleponlot1.003,850,000.003,850,000.00Sub TotalTesting & Commissioning3,850,000.00SUB TOTALPEKERJAAN TELEPON118,499,810.00VIIPEKERJAAN MATVVII.APeralatan Utama1Boosterunit1.00602,030.00602,030.002Spliter 2 wayunit1.0056,870.0056,870.00Sub TotalPeralatan Utama658,900.00VII.BPeralatan Utama1Instalasi dari Tap Off 4 Way gedung DRC dengan kabel RG-11 dalam pipam'102.00423,170.0043,163,340.00conduit PVC HI dia. 20 mm ke Spliter gedung BRC :2Instalasi dari Tap Off 4 Way Lt.satu dengan kabel RG-11 dalam pipam'4.00423,170.001,692,680.00conduit PVC HI dia. 20 mm ke masing- masing Spliter tiap lantai :Sub TotalPeralatan Utama44,856,020.00VII.BPekerjaan Instalasi MATV dalam bangunanB.1Lantai 11Splitter 4 waybh1.0092,400.0092,400.002TV Outletbh4.0036,190.00144,760.003Instalasi TV Outlet dengan kabel RG-6 dalam pipa conduit HI dia. 20 mmttk4.00423,170.001,692,680.00Sub totalLantai 11,929,840.00B.2Lantai 21Splitter 4 waybh1.0092,400.0092,400.002Boosterunit1.00602,030.00602,030.003TV Outletbh4.0036,190.00144,760.004Instalasi TV Outlet dengan kabel RG-6 dalam pipa conduit HI dia. 20 mmttk4.00423,170.001,692,680.00Sub totalLantai 22,531,870.00Sub TotalPekerjaan Instalasi MATV dalam bangunan4,461,710.00VII.CTesting & CommissioningTesting & Commissioning peralatan dan instalasi MATVlot1.002,750,000.002,750,000.00Sub TotalTesting & Commissioning2,750,000.00SUB TOTALPEKERJAAN MATV52,726,630.00VIIIPEKERJAAN PLUMBINGVIII.AAir BersihA.1Pemipaan Utama &am