za montažu toplinske izolacije akumulacijskog spremnika /for installation of thermal insulation and jacket for accumulation tank /za montažo toplotne izolacije akumulacijskega rezervoarja
TUMCAS1-08/2017
CAS; -S; -B; -BS
TEHNIČKO UPUTSTVO / TECHNICAL MANUALTEHNIČNA NAVODILA
HR EN SLO
HEATING TECHNIQUE
Centrometal d.o.o. - Glavna 12, 40306 Macinec, Croatia, tel: 040 372 600, fax: 040 372 611
2 Montaža toplinske izolacije CAS, CAS-B, CAS-S i CAS-BS
Montaža toplinske izolacije na spremnike CAS, CAS-B, CAS-S i CAS-BS
U ovim je uputama prikazan postupak postavljanja toplinske izolacije na akumulacijske spremnike CAS, CAS-B, CAS-S i CAS-BS. Na slikama je prikazan CAS-S.
Postaviti spremnik na vodoravnu plohu te umetnutni temperaturne osjetnike u tuljce na spremniku (slika 1.).
1.
slika 1.slika 2.spužva sa skajem
U slučaju naknadnog postavljanja osjetnika spužva se ne treba micati nego samo nožem skinuti potrebne otvore za temp osjetnike.
2.
mogući otvori za temp. osjetnike mogući otvori za priključke izmjenjivačakoriste se kod spremnika CAS-S i CAS-BS
otvori za termometre
Kada se otpakira spužva sa skajem, pomoću pantetnog zatvarača se spoje dvije polovice spužve (spaja se od gore prema dolje) (slika 2.).
3.
tuljac 3/8''
temp. osjetnik
tuljac za temp.osjetnik
kolčak 1/2''
slika 3. poklopacod spužve
slika 4.
smjer spajanja
otvori za priključke(8 kom)
HR
27Tehničko uputstvo CentroMini 3
Montaža toplinske izolacije na spremnike CAS, CAS-B, CAS-S i CAS-BS
Montaža toplinske izolacije CAS, CAS-B, CAS-S i CAS-BS
Poklopac od spužve postaviti na vrh spremnika preko priključka (slika 4.).5.
Poklopac spremnika postaviti na vrh spremnika preko priključka i rubova spužve te uvrnuti termometre u tuljac za termometre 1/2'' (slika 4. i slika 7.).
6.
crnarozeta
crnarozeta
poklopacspremnika
termometar
slika 5. slika 6.
Na priključke postaviti rozete te na poklopac naljepiti naljepnice na otvore za priključke (slika 6. i slika 7.).
7.
uvodnica
Poklopac za CAS i CAS-S
priključak(crna rozeta)
slika 7.
uvodnica
topla sanitarna voda
priključak(crna rozeta)
recirkulacija
hladna sanitarna voda
Poklopac za CAS-B i CAS-BS
Zatim se spužva postavi na priključke 6/4'', obavije oko spremnika, rukom se prilagodi spremniku te se spoji patentnim zatvaračem (od gore prema dolje) (slika 3.).
4.
crnarozeta
crnarozeta
crnarozeta
crna rozeta
crnarozeta crna
rozeta
HR
Kod nižih temperatura se mijenjaju svojstva izolacije pa se stoga izolacija mora montirati na sobnoj temperaturi. Preporuča se montaža na cca. 20°C, u protivnom će montaža biti otežana.
Spremnik je spreman za spajanje na sustav centralnog grijanja (CAS, CAS-S, CAS-B i CAS-BS) i sustav sanitarne vode (CAS-B i CAS-BS).
8.
Ako se izolacija nalazi u hladnom prostoru, potrebno je do 24 sata držati izolaciju na sobnoj temperaturi da izolacija bude spremna za montažu.
Izolacija se isporučuje presavinuta pa su moguće manje nepravilnosti u izgledu. Te nepravilnosti će nestati u roku 48 sati od montaže.
9.
VAŽNO!
1.
2.
HR
4 Montaža toplinske izolacije CAS, CAS-B, CAS-S i CAS-BS
Install the accumulation tank on the horizontal surface and insert the temperature sensors in the tube on the tank (picture 1.)
1.
picture 1.picture 2.
2.
3.
direction junction
Mounting of the thermal insulation and jacket on the CAS, CAS-B, CAS-Sand CAS-BS tanks
Procedure for the assembling of the thermal insulation of the accumulation tank CAS, CAS-B, CAS-S and CAS-BS is described in the extension of this manual. On the picture is shown CAS-S tank:
tube 3/8''
temp. sensor
tube for the temp. sensor
possible opening for temp. sensor
sponge with the artificial leather
possible opening for heat exchanger connection is used for accumulation tank CAS-S i CAS-BS
opening for thermometers
tube for thermometer 1/2''
In case of afterwards mounting of the sensors it is not necessary to remove the sponge then with the knife cut the jacket on the necessary places for the temp. sensors.
When You unpacked the sponge with the artificial leather, with the zipper connect the two part of sponge (it is connected from top to bottom) (picture 2).
picture 4.picture 3. lid made of sponge
27Tehničko uputstvo CentroMini 5Mounting of the thermal insulation CAS, CAS-B, CAS-S i CAS-BS
EN
On the connections placed the rosette and on the plastic lid glue the stickers on the opening for the connections (picture 6. and picture 7.)
On the top, over the connections of the tank, put the lid made of sponge (picture 4.)5.
6.
thermometer
picture 5. picture 6.
7.
picture 7.
4.
Mounting of the thermal insulation and jacket on the CAS, CAS-B, CAS-Sand CAS-BS tanks
Afterwards adjust the sponge on connection (6/4"), then wrap the sponge around the tank, push the sponge with the hand to fit the tank and connect with the zipper (it is connected from top to bottom) (picture 3.)
On the top of the tank, over the connections and edges of the sponge, adjust the plastic lid of the tank and screw the thermometers in the tube for thermometer(picture 4. and picture 7.)
plastic lid of the tank
redrosette
blackrosette
redrosette
black rosette
blackrosette
blue rosette
black rosette
introducer
connection (red rosette)
connection (red rosette)
knife
introducer
hot sanitary water(red sticker)
recirculation (red sticker)
cold sanitary water (blue sticker)
lid for CAS and CAS-S lid for CAS-B and CAS-BS
blue rosette
6 Mounting of the thermal insulation CAS, CAS-B, CAS-S i CAS-BS
EN
If the jacket is in cold room, it is necessary to keep the jacket on room temperature for 24 hours to be prepared for mounting.
By lower room temperature the material of the jacket changes his properties, so jacket must be mounted on room temperature. It is recommended to mount the jacket on ca. 20°C, if not, the mounting will be hard.
The jacket is delivered bended, so it can have some anomaly in looks. These anomalies will disappear in 48 hours from mounting.
The tank is ready for the installation on the central heating system (CAS, CAS-S, CAS-B i CAS-BS) (CAS-B i CAS-BS) and sanitary water circuit .
8.
9.
IMPORTANT!
1.
2.
27Tehničko uputstvo CentroMini 7
EN
8 Montaža toplotne izolacije CAS, CAS-B, CAS-S i CAS-BS
Montaža toplotne izolacije na rezervoarje CAS, CAS-B, CAS-S in CAS-BS
V teh navodilih je prikazan postopek postavljanja toplotne izolacije na
akumulacijske rezervoarje CAS, CAS-B, CAS-S i CAS-BS. Na slikah je prikazanCAS-S.
Postavite rezervoar na vodoravno površino in vstavite temperaturna tipala vtulce na rezervoarju (slika 1.).
1.
slika 1.slika 2.spužva sa skajem
V primeru naknadnega nameščanja tipala ni treba premikati gobe, temveč samo z nožem snemite potrebne odprtine za temp. tipala.
2.
možne odprtine za temp. tipala možne odprtine za priključke izmenjevalnikase uporabljaju pri CAS-S in CAS-BS
odprtine zatermometre
Ko odvijete gobo s skajem, s pomočjo patentnega zapirala združite dve polovici gobe (združujeta se v smeri od zgoraj navzdol) (slika 2.)
3.
tulec 3/8''
temp. tipalo
tulec za temp. tipalo
objemka 1/2''
slika 3. pokrov za gobo
slika 4.
smer priključitve
odprtine za priključke (8 kom)
SLO
27Tehničko uputstvo CentroMini 9Montaža toplotne izolacije CAS, CAS-B, CAS-S i CAS-BS
Pokrov za gobo postavite na vrh rezervoarja preko priključka (slika 4.).5.
Pokrov rezervoarja postavite na vrh rezervoarja preko priključka in preko robov gobe ter privijte termometre v tulec za termometre 1/2'' (slika 4. in slika 7.).
6.
črnarozeta
črnarozeta
pokrov rezervoarja
termometer
slika 5. slika 6.
Na priključke postavite rozete in na pokrov nalepite nalepke na odprtine za priključke (slika 6. in slika 7.).
7.
uvodnica
Pokrov za CAS i CAS-S
priključak(crna rozeta)
slika 7.
uvodnica
topla sanitarna voda
priključak(crna rozeta)
recirkulacija
hladna sanitarna voda
Pokrov za CAS-B i CAS-BS
Zatem postavite na priključke 6/4'', ovijete jo okoli rezervoarja, z roko prilagodite rezervoarju in povežete s pomočjo patentnega zapirala (od zgoraj navzdol)
(slika 3.).
4.
črnarozeta
črnarozeta
črnarozeta
črna rozeta
črnarozeta črna
rozeta
Montaža toplotne izolacije na rezervoarje CAS, CAS-B, CAS-S in CAS-BS SLO
Pri nižji temperaturah se lastnosti izolacije spreminjajo, zato je potrebno izolacijo montirati pri sobni temperaturi. Priporočamo montažo pri cca. 20°C, v nasprotnem bo montaža otežena.
Rezervoar je pripravljen za priključitev na centralni ogrevalni sistem (CAS, CAS-S, CAS-B in CAS-BS) in sistem sanitarne vode (CAS-B in CAS-BS).
8.
Če se izolacija nahaja v hladnem prostoru, je treba do 24 ohranjati izolacijo pri sobni temperaturi, zato da bo izolacija pripravljena za montažo.
Izolacija je dobavljena prepognjena, zato so možne manjše nepravilnosti pri njenem videzu. Te nepravilnosti bodo izginile v roku 48 ur od montaže.
9.
POMEMBNO!
1.
2.
10
SLO
Montaža toplotne izolacije CAS, CAS-B, CAS-S i CAS-BS
HEATING TECHNIQUE
www.centrometal.hre-mail: [email protected]
Centrometal d.o.o. Glavna 12, 40306 Macinec, Croatiacentral tel: +385 40 372 600, fax: +385 40 372 611
Centrometal d.o.o. shall not be responsible for possible incorrect data caused by printing errors or error made in transcription and all figures and diagrams are for explanatory purposes only and relevant adjustment have to be made at the spot. In any case, it reserves the right to modify its products as deemed to be required and useful without any prior notification.
Tvrtka Centrometal d.o.o. ne preuzima odgovornost za moguće netočnosti u ovoj knjižici nastale tiskarskim greškama ili prepisivanjem, sve su slike i sheme načelne te je potrebno svaku prilagoditi stvarnom stanju na terenu, u svakom slučaju tvrtka si pridržava pravo unositi vlastitim proizvodima one izmjene koje smatra potrebnim.
Podjetje Centrometal d.o.o. ne prevzema odgovornosti za možne napake v teh tehničnih navodilih, ki bi nastale zaradi tiskarskih napak pri prepisovanju ali prevajanju. Vse slike in sheme so približne in vsako je treba prilagoditi resničnemu stanju na terenu. V vsakem primeru si podjetje pridržuje pravico, da v svoje lastne proizvode vnese spremembe, za katere meni, da so potrebne.