cc07 - ecr info system-ecc6
TRANSCRIPT
-
8/17/2019 CC07 - ECR Info System-ecc6
1/7
SAP PP/QM
User manual
Published by Team ofSAP Consultants
at
SAPTOPJOBS
Visit us at www.sap-topjobs.com
Copyright 2008-10@SAPTOPJOBS
All rights reserved. No part of this publication may be reproduced, stored in a retrieval system, or
transmitted in any form, or by any means electronic or mechanical including photocopying,
recording or any information storage and retrieval system without permission in writing from
SAPTOPJOBS
-
8/17/2019 CC07 - ECR Info System-ecc6
2/7
CC07 – ECR Info System
Definition:-
Engineering Change Request will contain the object to bechanged. E.g. BOM or routing to be changed using thisEngineering Change Request
Engineering change request will be normally created by thedesign department.
Objective
This document is to generate the report to see the number ofECM created for a given period
Prerequisites:-
ECR numbers already created.
Required authorization
Menu path
LogisticCentral FunctionsEngg.Change Mgmt. Reporting Info system
Double click Info System
The input screen wherein input details are to be given.
Press to get more input fields
-
8/17/2019 CC07 - ECR Info System-ecc6
3/7
On pressing the Dynamic selection subsequent screen willappear as below.
-
8/17/2019 CC07 - ECR Info System-ecc6
4/7
Double click on the relevant field to bring the field to theselection area.
Click to generate output.
By navigating the cursor up & low more heading
can be seen. If the selection is to be based on
Changed on Keep the cursor on Changed on and
double click, now it will appear in the right side
main screen to give the input.
-
8/17/2019 CC07 - ECR Info System-ecc6
5/7
Result will appear as shown below.
More information can be seen in the right side by pulling the
screen as explained below.
-
8/17/2019 CC07 - ECR Info System-ecc6
6/7
Keep the cursor in the line, which is here displayed by a circle.
User can see the change in the cursor. Cursor will appearas, at this position of cursor drag it towards right side.
This is the expanded screen where in one can see thedescription of the change number.
By Expanding the product structure tree more informationcan be obtained.
-
8/17/2019 CC07 - ECR Info System-ecc6
7/7
SAP PP/QMUser manual
Published by Team ofSAP Consultants
atSAPTOPJOBS
Visit us at www.sap-topjobs.com
Copyright 2008-10@SAPTOPJOBS
All rights reserved. No part of this publication may be reproduced, stored in a retrieval system, or
transmitted in any form, or by any means electronic or mechanical including photocopying,
recording or any information storage and retrieval system without permission in writing from
SAPTOPJOBS