Page 1: Ccc工厂检查简介

LOGO

CCC工厂检查简介

Brief Introduction of CCC Factory Inspection

CCC工厂检查简介

Brief Introduction of CCC Factory

Inspection

2014年11月

November 2014

Page 2: Ccc工厂检查简介

LOGO

Contents:

1. Basic information

2. Requirements to be emphasized

3. Procedure and fee of factory inspection

4. Common problem and suggestion

CCC工厂检查简介

Brief Introduction of CCC Factory Inspection

内容:

1. 基本情况

2. 重点介绍

3. 工厂检查流程与费用

4. 常出现的问题和建议

Page 3: Ccc工厂检查简介

LOGO

基本情况

Basic information

1. CCC 认证

CCC means:

China Compulsory Certification

Page 4: Ccc工厂检查简介

LOGO

基本情况

Basic information

2. 列入CCC目录的产品需要认证。截止到2014年10月1日,共有20大类158中产品。根据CNCA的2012年30号公告(WWW.CNCA.GOV.CN),这些产品包括:

2. Product in CCC catalogue should be certified and applied

CCC mark.

By the end of October 1, 2014, CCC catalogue contains 20

categories product including 158 sub-categories. Base on

the No.30th Announcement of 2012 issued by Certification

and Accreditation Administration of the People’s Republic

of China (CNCA in brief), the product of CCC catalogue

includes:

Page 5: Ccc工厂检查简介

LOGO

基本情况

Basic information

1) 电子:IT, AV, 电信终端,

Electronic product: Information technology equipment (IT),

Audio and video apparatus (AV), Telecommunication Terminal

Equipment

2) 家电

Household and similar electrical appliances

3) 电工产品: 电线电缆,电器附件,灯具,低压电器,机,电焊机,电动工具,安全技术防范产品(如入侵探测器)等。

Electrical products: Electrical wires and cables, Electrical

accessories, Lighting apparatus, Low-voltage electrical

apparatus, Small power motors, Welding machines, Electric

tools, Security and protection products (like detectors for intruder

alarm systems) etc.

Page 6: Ccc工厂检查简介

LOGO

基本情况

Basic information

4) 机动车辆及安全附件(安全带、制动软管、座椅等)、机动

车辆轮胎、安全玻璃

Motor vehicles and safety parts (safety belt, brake hose,

automobile seat and head restraint etc), Motor Vehicle Tyres,

Safety Glass

5) 玩具

Toy product

6) 建材:涂料、瓷砖

Decoration and fitment product: like solvent based coatings for

woodenware, Ceramic tiles and so on

Page 7: Ccc工厂检查简介

LOGO

基本情况

Basic information

CQC具有18大类的CCC认证资质(除消防、农机外)

CQC has the qualification of 18 CCC categories product

certification, except firefighting equipment, agricultural machinery

etc.

Page 8: Ccc工厂检查简介

LOGO

3. 法律法规和规则

Laws, Regulations and Implementation rules

1) 《认证认可条例》2003年9月3日

Regulations of the People’s Republic of China on certification and

accreditation, issued on September 3, 2003.

2) 质检总局第117号令《强制性产品认证管理规定》

Regulations for Compulsory Product Certification, No. 117th decree of

2009, issued by General Administration of Quality Supervision,

Inspection and Quarantine of the People’s Republic of China (AQSIQ in

brief)

基本情况

Basic information

Page 9: Ccc工厂检查简介

LOGO

3) 通用实施规则 CCC Implementation rules in general

——《强制性产品认证实施规则 工厂质量保证能力要求》

Implementation rules for Compulsory product Certification- Requirements

for Factory’s Quality Assurance Capability

——《强制性产品认证实施规则 工厂检查通用要求》

Implementation rules for Compulsory product Certification- General

Requirements for Factory Inspection

——《强制性产品认证实施规则 生产企业分类管理、认证模式选择与确

定》

Implementation rules for Compulsory product Certification- Factory

Classification, Certification Mode Selection and Determination

基本情况

Basic information

Page 10: Ccc工厂检查简介

LOGO

基本情况

Basic information

——《强制性产品认证实施规则 生产企业检测资源及其他认证结果的利用》

Implementation rules for Compulsory product Certification-

Utilization of factory’s Test Resources and Other Certification

Result

——《强制性产品认证证书注销、暂停、撤销实施规则》

The Implementation Rule for Cancellation, suspension and

withdrawal of CCC Certificate

——《强制性产品认证实施规则中涉及ODM模式的补充规定》

Additional Regulation of Implementation Rules for

Compulsory product Certification Involving ODM

Page 11: Ccc工厂检查简介

LOGO

基本情况

Basic information

4) 各类产品实施规则

Implementation Rules for Compulsory Certification of each

product (CCC Implementation Rules in brief(

5) 在各类产品实施规则的基础上,相关认证机构编制实施细则

Product certification implementation detailed rules issued by

designated certification body base on the requirement of

CCC Implementation Rules

Page 12: Ccc工厂检查简介

LOGO

1. 认证要素(2个):试验和工厂检查

The certification element: test and factory inspection

2. 试验:分为型式试验和证后的监督抽样检验(需要时,依据实施细则)

Test including type test and sampling tests for certified product ( if

properly,according to detail rules of CCC)

重点介绍

Requirements to be emphasized

Page 13: Ccc工厂检查简介

LOGO

3. 工厂检查: 初始工厂检查(如果在获证后进行:首次检查),监督检查,

特殊检查、恢复证书的检查等。监督频次根据企业分类管理的结果可以改变。

通常为1次/每年。

Factory inspection: including initial factory inspection (if the inspection is

carried after the certificate has been issued, it is called the first time

inspection) ,follow-up inspection,special inspection and inspection for

certificate resumption. Usually, the frequency of follow-up inspection is once

per year, it can also be adjusted by certification body base on the result of

factory classification.

重点介绍

Requirements to be emphasized

Page 14: Ccc工厂检查简介

LOGO

重点介绍

Requirements to be emphasized

4. 型式试验:有些产品为送样,有些产品为抽样

Type test : the way of obtaining type test product includes

delivering and sampling.

如:电线:有抽样,送样的两种模式。

涂料,瓷砖: 初始工厂检查时,进行抽样。

For example: for electrical wires and cables, the type test

product can be delivered by factory or be sampled by

certification body. For solvent based coatings for

woodenware and ceramic tiles, the type test product shall be

sampled during initial factory inspection.

Page 15: Ccc工厂检查简介

LOGO

重点介绍

Requirements to be emphasized

5. 监督抽样检测:可以在工厂,也可以在市场。

Sampling tests for certified product : the product can be

obtained either in the factory or in the market.

6. 检查的方式:可以事先通知检查,也可以事先不通知的检查。对中国大陆外的工厂,通常采取事先通知的检查。

The way of inspection: include announced and un-

announced inspection. For overseas factory, usually the

inspection will be announced in advance.

Page 16: Ccc工厂检查简介

LOGO

重点介绍

Requirements to be emphasized

7. 企业分类管理

Factory Classification

1 ( 分为A, B, C, D类

Factories are classified into four categories as class A,

class B, class c and class D

Page 17: Ccc工厂检查简介

LOGO

重点介绍

Requirements to be emphasized

2 ( A为优质企业

需评估的质量信息有:工厂检查结果,监督抽样检测结果,国抽、省抽检验的结果(政府部门对产品的抽样检测);企业的设计能力、企业是否有实验室资源等。

The related quality information needed to be evaluated

including: result of factory inspection, result of sampling

tests for certified product, result of random inspection of

national/ provincial surveillance (sampling test organized by

china government), factory’s design and/ or testing capacity

etc.

Page 18: Ccc工厂检查简介

LOGO

重点介绍

Requirements to be emphasized

3 ( B类为正常企业,每年通常监督一次。且通常采用事先通知的工厂检查。

Class B refers to the factory without quality problem.

Usually, the frequency of follow-up inspection is once per

year, and generally the inspection will be announced in

advance.

4 ( C类有一定的质量问题,但不是特别严重。第二年采用事先不通知的检查。

Class C refers to the factory without serious quality problem.

After the factory is classified as C, the follow-up inspection

will be unannounced.

Page 19: Ccc工厂检查简介

LOGO

重点介绍

Requirements to be emphasized

5 ( D类有过严重的质量问题。如:工厂检查的结果且为产品本身的问题(非管理要素)、监督抽样检测的结果(严重的问题,通常铭牌和标志不列入)、国抽和省抽的结果。采用特殊检查的方式,增加工厂检查的频次。且为事先不通知的检查。

Class D refers to the factory with serious quality problem.

For example: the problem concerning product quality

founded in factory inspection (not the problem of quality

management), nonconforming result of sampling tests for

certified product (serious quality problem, usually not include

the nonconforming of nameplate and product identification),

nonconforming result of random inspection of national/

provincial surveillance.

Page 20: Ccc工厂检查简介

LOGO

重点介绍

Requirements to be emphasized

After the factory is classified as D, the special inspection will

be implemented and the frequency of follow-up inspection

will be added, the inspection above shall be unannounced.

6 ( 考虑到境外的特殊情况(需要邀请函办理签证),不采取事先不通知的检查。

For overseas factory, usually the inspection will be announced

in advance concerning the need of factory’s invitation letter

for visa.

Page 21: Ccc工厂检查简介

LOGO

重点介绍

Requirements to be emphasized

7. ODM生产模式

ODM certification mode

产品相同、工厂质量保证能力要求相同(或者为保证产品安全质量的核心内容相同)。因此在颁发证书时,免除了型式试验和初始工厂检查。

For ODM certification mode, the relevant product shall be

same, the factory’s quality assurance capability shall be

same (or the core content of factory’s ensuring product

quality shall be same). Base on the two conditions above,

the type test and initial factory inspection can be exempted

before issuing the other ODM certificate .

Page 22: Ccc工厂检查简介

LOGO

重点介绍

Requirements to be emphasized

但在出现问题时,会一同处理。具体为:

But in case of some problem was founded, the ODM

certificate shall be treated (suspension or withdrawal)

together. For example:

——主证书(首张证书提出注销,其他一同注销(

If the initial ODM certificate (the first ODM certificate) is

suspended, the other ODM certificate shall be all suspend.

——任何一张证书由于质量问题被暂停、撤销,其他相关证书也将被暂停或撤销。

Any ODM certificate is suspended or withdrawn because of

quality problem, the other relevant ODM certificate shall be

all suspend or withdraw.

Page 23: Ccc工厂检查简介

LOGO

重点介绍

Requirements to be emphasized

——只有首张证书变更,其他才能变更

Only after the change of initial ODM certificate has been

approved by the certification body, the other ODM certificate

may apply for change.

——只有初始ODM证书的恢复被批准后,其它ODM证书持证人方可提交恢复申请。。

In case of certification suspension, only after the initial ODM

certificate become valid, the other ODM certificate may

apply for certificate resumption.

Page 24: Ccc工厂检查简介

LOGO

重点介绍

Requirements to be emphasized

9. 认证模式

Certification mode

1) 型式试验+首次工厂检查+获证后监督 (包括抽样检测)

Type test + initial factory inspection + follow-up inspection

(including sampling tests for certified product(

2) 型式试验+获证后监督(玩具(

Type test + follow-up inspection (Toy product(

Page 25: Ccc工厂检查简介

LOGO

重点介绍

Requirements to be emphasized

3) 型式试验+首次工厂检查(3个月内)+获证后监督

Type test + first time factory inspection (within 3 month after

the certificate has been issued) + follow-up inspection

注:IT,AV, 电信终端产品全部采用第3)种模式。家电等其他产品只有A类企业才采用这种模式。

Note: Product that using the third certification mode include :

IT,AV products and Telecommunication Terminal

Equipment.

For household and similar electrical appliances and other

electrical products, only the factory which has been

classified as category A is applied to this certification mode.

Page 26: Ccc工厂检查简介

LOGO

重点介绍

Requirements to be emphasized

10. 证书的处置

The treatment of certificate

分为:暂停、撤销、注销。

Include: Cancellation, suspension and withdrawal

Page 27: Ccc工厂检查简介

LOGO

重点介绍

Requirements to be emphasized

11 .工厂质量保证能力要求(CNCA发布的2014年1号公告(

Requirements for Factory’s Quality Assurance Capability

(the first Announcement of 2014 issued by CNCA(

1) 该要求包括以下11个条款,其中技术负责人在公告中术语中进行了解释 。

This regulation includes 11 clauses as below .The

Certification Technical Representative was defined in Terms

and Definitions of this regulation.

Page 28: Ccc工厂检查简介

LOGO

重点介绍

Requirements to be emphasized

条款1:职责和资源

Clause 1: Responsibility and Resource

条款2:文件和记录

Clause 2: Documents and Records条款3: 采购与关键件控制

条款3: 采购与关键件控制

Clause 3: Purchasing and Critical parts Control

条款4: 生产过程控制

Clause 4: Production Process Control

Page 29: Ccc工厂检查简介

LOGO

重点介绍

Requirements to be emphasized

条款5: 例行检验和/或确认检验

Clause 5: Routine Tests and/or Product Verification Tests

条款6: 检验试验仪器设备

Clause 6: Control of Monitoring and Measuring Device

条款7: 不合格品的控制

Clause 7: Control of Nonconforming Product

条款8: 内部质量审核

Clause 8: Internal Quality Audit

Page 30: Ccc工厂检查简介

LOGO

重点介绍

Requirements to be emphasized

条款9: 认证产品的变更及一致性控制

Clause 9: Change of Certified Products and Their Consistency

Control

条款10: 产品防护与交付

Clause 10: Product Preservation and Delivery

条款11: CCC证书和标志

Clause 11: CCC Certificate and Mark

Page 31: Ccc工厂检查简介

LOGO

重点介绍

Requirements to be emphasized

2 ) 全条款(IT, AV, 电信终端(

Factory inspection requirements for IT, AV and

telecommunication terminal equipment: 11 clauses

3 ) 部分条款,但条款名称和内容没有重大变化。如:家电,删除了8,10;但在第一节增加了“认证联络人 ”。

Factory inspection requirements for other electrical and

electronic products: part clauses. For the factory inspection

requirements of household and similar electrical appliances,

the clause 8 and 10 has been deleted; the Certification

Contact Person has been added in clause 1.

Page 32: Ccc工厂检查简介

LOGO

重点介绍

Requirements to be emphasized

4 ) 部分条款,且条款名称和内容发生重大变化。如:涂料等。Factory inspection requirements for non-electrical and

electronic products: part clauses. The clause title and

content is rather different with the 11 clauses, for example

the solvent based coatings for woodenware.

Page 33: Ccc工厂检查简介

LOGO

工厂检查流程与费用

Procedure and fee for factory inspection

1. 初始工厂检查

Initial factory inspection

1) 通常由CQC组团完成。从中国大陆出发。

Usually, the audit team will be organized by CQC and the

auditor comes from China Mainland.

2) 一个团组中通常包括多个工厂,这样可以减少费用。必要时,可以单个工厂为一个团组,费用会大大提高,但时间应有一定的保证。

Usually, the audit team will inspect several factories for cost

savings. The audit team may inspect one factory if

necessary, in that case, the fee will be increased

substantially but the factory inspection period will be shorter

comparing the several factory’s audit team.

Page 34: Ccc工厂检查简介

LOGO

工厂检查流程与费用

Procedure and fee for factory inspection

3) 组团进行检查通常需要2~3个月。为节省时间,建议在进行型式试验阶段,即开始申请组团。同时,请配合出具邀请函。

Usually, the period of factory inspection will be 2 to 3 month

(the major cost of time will be the work of forming a

delegation of audit team to go abroad). It is suggested that

the applicant apply for forming the audit team during the

stage of type test, and cooperate CQC’s work of forming

the delegation, for example providing the invitation letter in

case of need.

4) 费用:约为5.5万人民币(约9000美元(

Fee: 55000 RMB (9000 US dollar) approximately

Page 35: Ccc工厂检查简介

LOGO

工厂检查流程与费用

Procedure and fee for factory inspection

2. 监督检查

Follow-up inspection

根据地域不同,委托不同的CCIC集团的海外公司或与CQC有合作关系的国外认证机构(如:UL, VDE等)。费用约为6000美元。

Entrust the overseas company of China Certification &

Inspection (Group) Co., Ltd (CCIC in brief) or the overseas

certification body which has the cooperation agreement with

CQC (like UL, VDE etc). Fee: 6000 US dollar approximately.

Page 36: Ccc工厂检查简介

LOGO

常出现的问题和建议

Common questiones and Suggestion

1. 证书有效性的保持和确认

The keeping and confirmation of certificate effectiveness

1) 为保证已进入中国大陆的产品进行销售,应尽可能接受工厂检查,保持证书处于有效状态。

In order to sale product in China market, factory shall accept

follow-up inspection, and ensure the validity of certificate .

Page 37: Ccc工厂检查简介

LOGO

常出现的问题和建议

Common questiones and Suggestion

2) 发货前,查看证书的有效性。以免产品在中国海关无法通关,在经济上造成损失。可能产生证书被暂停或撤销的原因:

In order to ensure the smooth customs clearance, it is

suggested that factory check the validity of certificate before

the delivery of product. The probable reasons of certificate

suspension or withdrawal are:

Page 38: Ccc工厂检查简介

LOGO

常出现的问题和建议

Common questiones and Suggestion

——在中国大陆销售的产品,被中国质量监督管理部门进行抽查,发现产品不合格。

The product sold in China market has been sampled by local

quality supervision government, and nonconforming product

was found.

——有些客户或销售商将非销往中国的产品,向中国出口,造成产品不符合中国的标准。如IT产品,中国的插头形状和尺寸与欧洲的不同。

Some client or seller import the product which sales region

is not china market, and result in not compliance with CCC

standards. Like IT, the shape and dimension of plug is

different between China and Europe.

Page 39: Ccc工厂检查简介

LOGO

常出现的问题和建议

Common questiones and Suggestion

2 . 标准换版

The change of standard version

中国的标准换版时间比较短,应在日常过程中,密切关注换版信息。www.cqc.com.cn ( Bulletin: Notice for standard

version changing (

Because the period of changing for standard version in

China is short relatively, it is suggested that the factory pay

close attention to this information in daily work.

website:

www.cqc.com.cn ( Bulletin: Notice for standard version

changing (

Page 40: Ccc工厂检查简介

LOGO

常出现的问题和建议

Common questiones and Suggestion

1) 按照中国的标准化法,不符合中国的强制标准的产品,不得进口不符合强制性标准的产品,禁止生产、销售和进口。

Base on the standardization law of the people’s republic of

China, The products which do not measures up to

compulsory standards may not be allowed to be produced,

marketed or imported.

2) CCC认证中,采用的标准,几乎都为强制标准。

The CCC standards are almost compulsory standards

Page 41: Ccc工厂检查简介

LOGO

常出现的问题和建议

Common questiones and Suggestion

3) 在中国,给标准换版的时间通常不超过12个月。对于标准有差异,需要进行试验才能换发新证书的情况,尤其应加快申请换版的进程。

Usually, the period of changing for standard version will no

longer than 12 month. For the product need to be tested

before issuing the new standard version certificate because

of the standard difference, it is suggested that the factory to

accelerate the application process.

Page 42: Ccc工厂检查简介

LOGO

常出现的问题和建议

Common questiones and Suggestion

3 . ODM(一个制造商的产品出现问题,其他的制造商的证书也会被暂停(

ODM (if the quality problem has been found within one

manufacturer’s product, the other manufacturer’s certificate

will be suspended or withdrawn(

ODM的质量状况有时与制造商的采购价格密切相关,证书的有效性完全不受控(特别是ODM制造商非常多的情况),因此,建议尽可能不采取ODM生产模式。

In sometime, the quality of ODM product is closely related to

procurement price, and the certificate effectiveness is out of

control (especially there are so many ODM manufacturer), it

is suggested that the applicant does not choice the ODM

mode to obtain the certificate.

Page 43: Ccc工厂检查简介

LOGO

常出现的问题和建议

Common questiones and Suggestion

认证的前段看起来节省了费用和时间。但证书的状态不可控,会影响未来的产品销售和公司形象。

Although the fee and time can be saved before the

certificate approval, but the out of control of certificate

effectiveness will result in harmful influence on the sale of

product and the image of the company.

Page 44: Ccc工厂检查简介

LOGO

今后如果出现有关工厂检查的问题,请通过以下联络方式进行咨询:

For the questions of factory inspection, please contact:

Manager: Ms. Zhu Manchen ( Maggie )

Tel: +86-10-83886228

Fax: +86-10-83886232

E-mail: [email protected]

International section of factory inspection department.

(Not international affair department. )

China Quality Certification Centre ( CQC )

问题解答和联络方式

Contact information for questions of factory inspection

Page 45: Ccc工厂检查简介

LOGO

CCC工厂检查要求

Requirement on CCC Factory Inspection

谢谢!