25.08.2015 4DH Copenhagen Folie 1 von 12 www.fernwaerme.de
CHALLANGES IN SMART ENERGY
TRANSPORT BY USING TRENCHLESS
TECHNOLOGY
Dr.-Ing. Ingo Weidlich
Tel. +49 511 943 70-25
25.08.2015 4DH Copenhagen Folie 2 von 12 www.fernwaerme.de
Energy conception of the German federal government 2010:
Background – Energy concept
25.08.2015 4DH Copenhagen Folie 3 von 12 www.fernwaerme.de
Background – Power concept
Today:
Small Pilot routes for 380 kV
Source: Amprion
Source: Amprion
25.08.2015 4DH Copenhagen Folie 4 von 12 www.fernwaerme.de
Background – Heating concept
Combined heat and power (CHP) act (KWKG)
Target: Increase the share of CHP to 25% until 2020
127,7 123,4 116,0 104,8 90,8 79,9 73,2 69,3 67,4
29,026,2
22,720,0 18,3 17,3 16,8 16,5
77,9
85,6 83,3 81,9
21,1
122,9
175,9
169,7
157,4
142,8127,4
111,696,6
15,7
29,2
38,5
34,1
31,2
29,728,6
27,7
66,1
30,9
14,1
115,4109,4
97,590,2
0,8
0,9
1,2
2,0
2,0
2,12,3
2,5
2,6
127,7
338,0
313,5292,0
367,2
401,4
443,8461,1
370,4
192,1
0
40
80
120
160
200
240
280
320
360
400
440
480
520
2005 2010 2015 2020 2025 2030 2035 2040 2045 2050
Po
ten
tie
lle
De
ck
un
gs
an
teil
e d
es
Nu
tze
ne
rgie
be
da
rfs
de
r H
au
sh
alt
e
du
rch
Fe
rnw
ärm
e [
PJ
/a]
FW Bestand FW NetzverdichtungFW Netzerweiterung FW Netzerweiterung VariationErschließung neuer Gemeinden Erschließung neuer Gemeinden VariationErschließung von Neubausiedlungen
Po
ten
tia
l co
nsum
ption o
f D
H d
em
and in h
ou
sh
old
s
[PJ/a
]
So
urc
e: B
lesl, 2
01
0
25.08.2015 4DH Copenhagen Folie 5 von 12 www.fernwaerme.de
What is trenchless Technology?
Source: Dr. Hans-Joachim Bayer
25.08.2015 4DH Copenhagen Folie 6 von 12 www.fernwaerme.de
What is trenchless Technology?
Source: Dr. Hans-Joachim Bayer
25.08.2015 4DH Copenhagen Folie 7 von 12 www.fernwaerme.de
• All power cables from 1 kV to 220 kV are approved (380 kV to 400
kV are not approved for HDD)
• 1 kV, 5 kV, 10 kV, 20 KV, 30 kV are possible in bundles in one
drilling
• 60 kV, 110 kV and 125 kV need pilot drilling and backreaming
(3 times boring)
• 220 kV are single drillings (attention to distance), this means 3 times
boring for one cable
• Direct laying and laying in protective pipe
• 380 kV today only by micro tunneling, with a special cable channel
• New 400 kV are tested, Minimum distance 25 m, no experiences for
HDD (heavy cables)
Challanges for power cables
25.08.2015 4DH Copenhagen Folie 8 von 12 www.fernwaerme.de
Stress-strain analysis:
)0(MMtH EAN
)0(Ru
)0(MMt
GF
EAl
2
l
EA
Fw
2G
)0(Ru
max
•Normal force:
•Length of gliding section:
•Maximum displacement:
z,w
x,u
+
0 friction forces
adhering section gliding section
(pressure)
District heatingpipeline
Axial displacement w
Normal force N
Trenchless District Heating Pipeline
25.08.2015 4DH Copenhagen Folie 9 von 12 www.fernwaerme.de
Trenchless District Heating Pipeline
Quality contol of delivered pipes and the
constructed joints.
25.08.2015 4DH Copenhagen Folie 10 von 12 www.fernwaerme.de
Results – point of view FFI:
Horizontal Directional Drilling is the most economic
method in many cases, because no excavation is
needed. But risk of soil, blow ups and curvature
have to be taken into account.
The complete filling of the gap between pipe and
surrounding soil is not granted. Thus the contact
area is not constant among the pipe length. The
approach for the friction forces should be carefully
done.
Eurocode 7 should be respected in terms of field
investigation.
The thickness of the coating should be increased.
Trenchless Installation for District Heating pipes
Source: AGFW, Eichhorst
25.08.2015 4DH Copenhagen Folie 11 von 12 www.fernwaerme.de
Examples next research possibilities:
Development of a coupling joints for the trenchless district heating
construction.
Optimisation of bentonit suspension.
Load bearing characteristics of the district heating pipe by using of the
protective pipe.
Interaction PE Pipe – ring space?
Interaction Protective pipe – ring space?
Interaction Protective pipe – soil?
Trenchless Installation for District Heating pipes
25.08.2015 4DH Copenhagen Folie 12 von 12 www.fernwaerme.de
Thank you for your attention!
Dr.-Ing. Ingo Weidlich
Tel. +49 511 943 70 - 25