1 China's Regulatory Practice On New Reactors Transition To Operation National Nuclear Safety Administration, P.R.China Mar. 14, 2019

Upload: others

Post on 21-Feb-2021

0 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: China's Regulatory Practice On New Reactors Transition To … · 2020. 10. 31. · Fang Cheng Gang Chang Jiang 3. 4 1.1 Overview of NPPs in Mainland of China 4 Commercial Operation

1

China's Regulatory Practice On New Reactors Transition To Operation

National Nuclear Safety Administration, P.R.China

Mar. 14, 2019

Page 2: China's Regulatory Practice On New Reactors Transition To … · 2020. 10. 31. · Fang Cheng Gang Chang Jiang 3. 4 1.1 Overview of NPPs in Mainland of China 4 Commercial Operation

2

1

Regulatory Approach on New Reactor Commissioning2

3

NPPs in the Mainland of China

Contents

2

Regulatory Approach on Transition to Operation

Page 3: China's Regulatory Practice On New Reactors Transition To … · 2020. 10. 31. · Fang Cheng Gang Chang Jiang 3. 4 1.1 Overview of NPPs in Mainland of China 4 Commercial Operation

3

1.1 Overview of NPPs in the Mainland of China

吉林

黑龙江

Hongyanhe

Haiyang

Shidaowan

Tianwan

Qinshan

Qinshan Phase IIQinshan Phase IIISanmenNingde

Fuqing

Dayabay

Lingao

Taishan

Yangjiang

In Commercial Operation(45)

Under Construction (11)

陕西陕西

吉林

黑龙江

新疆

西藏

青海

甘肃 内蒙古

四川

云南

贵州

山西

重庆湖北

湖南

广西 广东

江西

安徽

河南

山东

河北

北京

辽宁

江苏

浙江

福建

台湾

海南

上海

天津

宁夏

Fang Cheng GangChang Jiang 3

Page 4: China's Regulatory Practice On New Reactors Transition To … · 2020. 10. 31. · Fang Cheng Gang Chang Jiang 3. 4 1.1 Overview of NPPs in Mainland of China 4 Commercial Operation

4

1.1 Overview of NPPs in Mainland of China

4

Commercial Operation

45 units,45898 Gross Electrical Capacity (MW)

• 1 CNP300 unit• 6 CNP600 units• 4 VVER units• 2 CANDU units• 27 M310/M310+ units• 4 AP1000 units• 1 ERP unit

Construction Commissioning

11 units, 12181 Gross Electrical Capacity (MW)

• 5 M310+ units• 1 EPR units• 4 HPR-1000 units• 1 HTGR unit

Page 5: China's Regulatory Practice On New Reactors Transition To … · 2020. 10. 31. · Fang Cheng Gang Chang Jiang 3. 4 1.1 Overview of NPPs in Mainland of China 4 Commercial Operation

5

1.2 NPP License issuance in 2018

5

• Operation License

Units Reactor type Date of issuance

Hongyanhe 1&2 M310+ Feb 5,2018

Yangjiang 1&2 M310+ Feb 22,2018

Fangjiashan 1&2 M310+ Feb 22,2018

Page 6: China's Regulatory Practice On New Reactors Transition To … · 2020. 10. 31. · Fang Cheng Gang Chang Jiang 3. 4 1.1 Overview of NPPs in Mainland of China 4 Commercial Operation

6

1.2 NPP License issuance in 2018

6

• First fuel loading approval

Units Reactor type Date of issuance Status

Taishan 1 EPR Apr 9,2018 Commercial operation

Yangjiang 5 M310+ Apr 17,2018 Commercial operation

Sanmen 1&2 AP1000Apr 27,2018Jul 4,2018

Commercial operation

Haiyang 1&2 AP1000Jun 21,2018Aug 7, 2018

Commercial operationCommercial operation in Jan. 2019

Tianwan 4 VVER Aug 23, 2018 Commercial operation

Page 7: China's Regulatory Practice On New Reactors Transition To … · 2020. 10. 31. · Fang Cheng Gang Chang Jiang 3. 4 1.1 Overview of NPPs in Mainland of China 4 Commercial Operation

7

7

Year20092010

2016 20182017

2017-12-19Start of Unit 2 CI cold

flushing

Unit 1

2009-10-26FCD

2016-1-27CFT completed

2010-4-15FCD

2017-08-5HFT completed

1.3 New Reactor Status―Taishan Projects (EPR Type)

Unit 2

2018-4-10First Fuel Load

(FFL)

2018-6-6Initial Criticality

2018-12-13End of Performance

Test

2018-7-15CFT finish

2019-1-25HFT finish

2019-3-31End of

Performance Test

Page 8: China's Regulatory Practice On New Reactors Transition To … · 2020. 10. 31. · Fang Cheng Gang Chang Jiang 3. 4 1.1 Overview of NPPs in Mainland of China 4 Commercial Operation

8

8

Year2009

2010

2016 20182017

2017-9-17CFT

completed

2018-1-31HFT completed

Unit 1

2009-4-19FCD

2016-5-26CFT completed

2017-6-30HFT completed

2018-4-29FFL completed

2009-12-15FCD

2018-6-20Initial Criticality

1.4 New Reactor Status―Sanmen Projects (AP1000 Type)

Unit 22018-7-8

FFL completed

2018-9-21End of Performance

Test

2018-8-17Initial Criticality

2018-11-5End of Performance

Test

Page 9: China's Regulatory Practice On New Reactors Transition To … · 2020. 10. 31. · Fang Cheng Gang Chang Jiang 3. 4 1.1 Overview of NPPs in Mainland of China 4 Commercial Operation

9

9

Year2009

2010

2016

2018

2017-12-27CFT completed

2018-5-26HFT completed

Unit 1

2009-9-24FCD

2016-7-2CFT completed

2017-7-12HFT completed

2018-6-25FFL completed

2010-6-20FCD

2018-8-8Initial Criticality

1.5 New Reactor Status―Haiyang Projects (AP1000 Type)

Unit 2

2018-11-10End of Performance

Test

2018-9-29Initial Criticality

2018-8-11FFL completed

2019-1-20End of Performance

Test

2019

2017

Page 10: China's Regulatory Practice On New Reactors Transition To … · 2020. 10. 31. · Fang Cheng Gang Chang Jiang 3. 4 1.1 Overview of NPPs in Mainland of China 4 Commercial Operation

10

1

Regulatory Approach on New Reactor Commissioning2

3

NPPs in the Mainland of China

Contents

10

Regulatory Approach on Transition to Operation

Page 11: China's Regulatory Practice On New Reactors Transition To … · 2020. 10. 31. · Fang Cheng Gang Chang Jiang 3. 4 1.1 Overview of NPPs in Mainland of China 4 Commercial Operation

11

2.1 Nuclear Safety Laws and Regulations System

11

2 Laws

7 Decrees

30 DepartmentRules

93 Regulatory Guides

• 《 Nuclear Safety Act 》came into force on 1st

January 2018.

Page 12: China's Regulatory Practice On New Reactors Transition To … · 2020. 10. 31. · Fang Cheng Gang Chang Jiang 3. 4 1.1 Overview of NPPs in Mainland of China 4 Commercial Operation

12

2.2 Licensing review before first fuel loading

13 documents including:• FSAR/Final Safety Analysis Report,• Environmental Impact Report,• Commissioning Program, • In-service Inspection Program,• Maintenance Program,• Quality Assurance Program (commissioning stage) ,• Commissioning Report before Fuel Loading,• and so on…

12

Page 13: China's Regulatory Practice On New Reactors Transition To … · 2020. 10. 31. · Fang Cheng Gang Chang Jiang 3. 4 1.1 Overview of NPPs in Mainland of China 4 Commercial Operation

13

13

-National Nuclear Safety Administration (NNSA HQ)- 6 Regional Offices-Technical Support (TSO)-Expert Committee---------technical support

inspecting

2.3 Regulation

NNSA(HQ)

Regional Office

NPP

TSOExpert Committee

2.3.1 Organization

Page 14: China's Regulatory Practice On New Reactors Transition To … · 2020. 10. 31. · Fang Cheng Gang Chang Jiang 3. 4 1.1 Overview of NPPs in Mainland of China 4 Commercial Operation

14

14

Previous (Reactor Status)

• General Division

• Division I (Operation)

• Division II (Under Construction)

• Division III(New Reactors)

• Reactor Division

Now (Regional)

• General Division

• Division I (Southern)

• Division II (South‐East)

• Division III (North‐East)

• Reactor Division

• Experience Feedback Division

Organization of Nuclear Power Department

Page 15: China's Regulatory Practice On New Reactors Transition To … · 2020. 10. 31. · Fang Cheng Gang Chang Jiang 3. 4 1.1 Overview of NPPs in Mainland of China 4 Commercial Operation

15

2.3.2 Inspection of EPR/AP1000 Commissioning (1)NNSA approved the Commissioning Program of Taishan(EPR) ,Sanmen and Haiyang (AP1000) Unit 1&2, and the subsequent revisions.

(2)NNSA issued Commissioning Inspection Program of Taishan, Sanmenand Haiyang Unit 1&2 in 2016.

15

Page 16: China's Regulatory Practice On New Reactors Transition To … · 2020. 10. 31. · Fang Cheng Gang Chang Jiang 3. 4 1.1 Overview of NPPs in Mainland of China 4 Commercial Operation

16

2.3.2 Inspection of EPR/AP1000 Commissioning (3)Joint team consists of inspectors and technical staff were set up to inspect selected significant tests, including First Of A Kind Tests.

(4)NNSA and Regional Offices (SRO and ERO) developed commissioning test inspection procedures for all selected tests.

16

Page 17: China's Regulatory Practice On New Reactors Transition To … · 2020. 10. 31. · Fang Cheng Gang Chang Jiang 3. 4 1.1 Overview of NPPs in Mainland of China 4 Commercial Operation

17

2.3.2 Inspection of EPR/AP1000 Commissioning (5)International regulators were invited to observe commissioning inspection and share regulatory experience.

(6)Extensive international cooperation facilitated common position on key issues and regulation consistency.

17

Page 18: China's Regulatory Practice On New Reactors Transition To … · 2020. 10. 31. · Fang Cheng Gang Chang Jiang 3. 4 1.1 Overview of NPPs in Mainland of China 4 Commercial Operation

18

2.4 Commissioning Inspection Activities Before the FFL NNSA finished 2 control points , including:

• Cold hydrostatic test for Reactor Coolant System• First fuel loading NNSA witnessed 56 commissioning tests for EPR, 47 tests for AP1000.

18

Page 19: China's Regulatory Practice On New Reactors Transition To … · 2020. 10. 31. · Fang Cheng Gang Chang Jiang 3. 4 1.1 Overview of NPPs in Mainland of China 4 Commercial Operation

19

2.5 Key steps before issuing the first fuel loading permit

All remaining questions found during the review must be closed before licensing, if not, a viable action plan must be provided.

All commissioning items in the Commissioning Program (approved by regulatory authority) must be completed, acceptance criteria must be met.

Non-conformance or unexpected results during commissioning must be closed.

After the above requirements are met, the results of the review will be submitted to expert committee for consultation, after which the licensee shall obtain the permit for the first fuel loading.

19

Page 20: China's Regulatory Practice On New Reactors Transition To … · 2020. 10. 31. · Fang Cheng Gang Chang Jiang 3. 4 1.1 Overview of NPPs in Mainland of China 4 Commercial Operation

20

2.6 Inspection Activities After the FFL

20

4 control point inspections, including:• Initial criticality• Before leaving 5% rated power or Before

connection to the grid(AP1000 or EPR)• Before leaving 50% or 60% rated power

(AP1000 or EPR)• Before leaving 90% rated power Dozens of commissioning tests to witness

or review test reports.

Page 21: China's Regulatory Practice On New Reactors Transition To … · 2020. 10. 31. · Fang Cheng Gang Chang Jiang 3. 4 1.1 Overview of NPPs in Mainland of China 4 Commercial Operation

21

1

Regulatory Approach on New Reactor Commissioning2

3

NPPs in the Mainland of China

Contents

21

Regulatory Approach on Transition to Operation

Page 22: China's Regulatory Practice On New Reactors Transition To … · 2020. 10. 31. · Fang Cheng Gang Chang Jiang 3. 4 1.1 Overview of NPPs in Mainland of China 4 Commercial Operation

22

3.1 Licensing review for operation permit after one year

• Revised FSAR • Commissioning Report after Fuel Loading• Quality Assurance Program (operation stage)

22

If the documents are acceptable after reviewing, NNSA will issue Operation License.

Page 23: China's Regulatory Practice On New Reactors Transition To … · 2020. 10. 31. · Fang Cheng Gang Chang Jiang 3. 4 1.1 Overview of NPPs in Mainland of China 4 Commercial Operation

23

3.2 Changes After Nuclear Safety Act Came Into Force

To improve NNSA’s efficiency and optimize regulatory resource allocation , and streamline the licensing process

NNSA combined the First Fuel Loading Permit and the Operation Permit into the Operation License.

Operation Licensee shall be obtained Operation License before the first fuel loading.

23

Page 24: China's Regulatory Practice On New Reactors Transition To … · 2020. 10. 31. · Fang Cheng Gang Chang Jiang 3. 4 1.1 Overview of NPPs in Mainland of China 4 Commercial Operation

24

Optimization of the division of responsibilities between the NNSA headquarters and regional offices:

• Regional offices: onsite inspection; hold points review and release such as refueling.

• Headquarters: licensing modifications, nuclear and radiological events, major and common issues.

Development of regulatory tools, optimization of the Inspection Program and procedures such as the revision of the Commissioning Inspection Program.

24

Page 25: China's Regulatory Practice On New Reactors Transition To … · 2020. 10. 31. · Fang Cheng Gang Chang Jiang 3. 4 1.1 Overview of NPPs in Mainland of China 4 Commercial Operation

25

3.3 Develop Generic Inspection ProgramsNNSA have integrated all project Inspection Programs and develop 3 Generic Inspection Programs (including construction, commissioning and operation).

25

Page 26: China's Regulatory Practice On New Reactors Transition To … · 2020. 10. 31. · Fang Cheng Gang Chang Jiang 3. 4 1.1 Overview of NPPs in Mainland of China 4 Commercial Operation

26

Thank You for Your Attention!

26