cii performance excellence awards 2020 for solar and wind
TRANSCRIPT
© Confederation of Indian Industry
CII Performance Excellence Awards 2020 for Solar and Wind Plants
Category – Wind
Ostro Dakshin Power Private Ltd
Taralkatti
Amit Gandhi (Sr. Manager)
Suresh Dhange (Manager)
01 – 03 December 2020
© Confederation of Indian Industry
About the Plant
Site – Taralkatti (100 MW, 50 x 2MW)
OEM - Vestas
Model : V110
GSS - 220/110/33KV_Kustagi
Discom - GESCOM
Policy Type – Feed in Tariff
Add: Tal-Yelburga , Dist-Koppal, Karnataka
R
e
N
e
w
© Confederation of Indian Industry
About the PlantU
NIQ
UE
OP
ER
AT
NG
FE
AT
UR
ES
Monitoring & Troubleshooting
24x7 Real time monitoring & Control
through RPC3 & RPDC
Advanced AnalyticsDiagnostics and Prognostics through Dedicated Platform (ReD.)
Capability BuildingOnsite Training & Development
Programs
Corporate Social Responsibility
Dry ration distribution in
COVID 19
GovernanceReCAT for legal
compliance, Regulatory
compliances on top
Safety On Top0 Fatality & LTI, safety in collaboration with
OEM, One click Safety KPI’s in Gensuite portal
AEP ControlLPF based AEP Drive
© Confederation of Indian Industry
Detailed Evaluation Criteria
Category Criteria Unit Value
Design
Hub height m 110
Wind zone zone Class 3
Wind speed m / s 7 m/s annual average
Latitude & longitude of plant location °N, °E 15.604694, 76.1124170
PerformanceEnergy injected into the grid(01 Apr 2019 – 31 Mar 2020)
MWh / MW 3,072
O&M
Plant availability, excluding grid availability % 98.1%
Certification as per:i) ISO 18001ii) ISO 14001
Y / NY / N
i) Yii) Y
O&M cost (includes costs covering salary, admin, inventory, insurance & statutory)
Rs (lakh) / MW / yr ₹ 11.1 Lakh/MW/Year
Scheduling & forecasting capabilities in-house Y / N N
Levelised cost of electricity Rs / kWh ₹ 4.5/kWh
Grid curtailment Y / N Yes
© Confederation of Indian Industry
Initiatives to Increase Annual Generation
Reduction in Curtailment due to technical Issues by strengthening of GSS and upstream 220kV network – Loss FY19- 457.7 Lakhs Loss FY-20 – 8.8 Lakhs – Saving: 449 Lakhs
Bay strengthening and CT replacement completed
Kustagi GSS - 220kV Bus Segregation
Technical Curtailment Minimization
• Installed bird guards at Jumper and Cut-points to avoid tripping’s
• Installed group/ cluster isolators for faster identification faults in internal network
Stabilization of Grid network
• Renew power control and command center is established to monitor asset on 24X7 basis to reduce MTTR
24 x 7 Monitoring through ReNew Power Command and Control Centers
• Blade health assessment using drone inspection and Blade cleaning using water to improve the PC performance in LWS
Blade Health Assessment
© Confederation of Indian Industry
Innovative O&M Initiatives
Self O&M Wind
Value Proposition: Strong governance, safety standards, yield and reliabilityimprovement, lifecycle management and cost optimization on top of conventional O&M offering through digital-based value-added services
Key highlights so far
429 MW of Wind Asset under Self O&M
▪ Experience in maintaining OEMs such as Inox, ReGen, Senvion (Kenersys)
and SGRE built in year time and continue
ReD.
▪ Deliver tangible business value
▪ Generation Enhancement Measures
▪ Embed digital and advanced analytics as new way of working
▪ Set up a central Analytics Lab
▪ Build people capabilities across functions
A initiative for analysis & data based decisions
Launched ReD in Sept ’2019, inhouse digital and analytics transformation program to boost operational efficiency by 2% at portfolio level
~20% O&M cost saving’s per year is anticipated
© Confederation of Indian Industry
Innovative O&M Initiative – ReD (ReNew Digital)
• Identifying losses for each turbine w.r.t design power curve, while taking into account conditions such as topography, wind speed, density and pressure allows for improvement across several parameters to achieve maximum yield
• The aim is to improve productivity of each turbine within a range of 1%-10% by correcting addressable online losses without any additional CAPEX spend
• Bifurcation of addressable / non-addressable underperformance
Overall Yield Improvement use case | ~2-2.5% value
• Automatically finding the instances for de-rated turbines due to Over temperature of components, Voltage, IGBT stacks, Manual intervention , etc. and rectify the same
De-rating Use Case | 0.01% value
• To identify optimum yaw offset angle from historical SCADA data and implement identified offset (flow + physical) values in WTG's for fatigue loads optimization & annual generation improvements
Yaw Offset – Flow correction use case | 0.2-0.3% value
• Developed in-house drive train ML model to predict component issues well ahead of complete failures
Condition Monitoring – Sensor and SCADA based | Incremental value
SCADA/ FTP
APIData
PipelineML Model
Model output
Power BI
Dashboard
© Confederation of Indian Industry
Innovative O&M Initiatives
IT Enabled Business Solutions
▪ Developed various dashboards on Power-BI
application
▪ Real-time information and monitoring of O&M
▪ Transparency and single truth of data
▪ Visualization and compilation of data as per user
specific requirements
Material Consumption
Preventive Maintenance
Critical Equipment Warranty
Inventory ManagementCurtailment Management
© Confederation of Indian Industry
O&M cost reduction
▪ Deployed CBM - early detection of major failures including generator, gearbox, bearings through implemented SCADA solution and sensor base. Anticipating 0.15%* annual increment in energy production and early fault detection reduces inventory costs
It cuts lead time for spare procurement by 50%
▪ e-BoP thermography model established d. for internal and external networks to ensure optimum uptime
of Grid through developing a machine learning model to check all the images for abnormality taken by
camera without much manual intervention. Value realized @ 10-15 lakhs/ annum
Technology Initiatives
▪ Systematic ‘Asset health assurance’ program for reliability of assets
▪ Implemented ‘Road to Excellence’ to attain highest quality of each process
▪ Enhancement in energy-based availability through Lost Production Factor based performance control
▪ Uninterrupted operation during High Wind period through PSPP (Peak season preparedness Plan)
▪ Business continuation by complimenting and supplementing OEMs technically as well as financially
Improved Systems & Processes
© Confederation of Indian Industry
Future Plan
In-house PredictiveAnalysis with ML
▪ Under ReD, deployed ML model for 1 OEM drive train and plan to develop/ deployment by end of 2021 for full fleet
In-house Scheduling & Forecasting
▪ Climate connect is already acquired to achieve best-in-class S&F in the market for full portfolio
Self O&M
▪ Deployment of sites under self O&M to reduce overall cost and improve generations
© Confederation of Indian Industry