世界銀行の紹介と新調達政策 - world...

160
20171122日) 世界銀行東京事務所 ビジネス インフォメーション アドバイザー 池上隆夫 [email protected] ) 上級広報担当官 大森功一 ([email protected] ) 世界銀行ビジネスガイド http://go.worldbank.org/S7LECAT9X0 世界銀行の紹介と新調達政策

Upload: others

Post on 27-Jul-2020

2 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: 世界銀行の紹介と新調達政策 - World Bankpubdocs.worldbank.org/en/900701511321406044/112217...8 Indonesia 456,362,012 3.4% 9 Bangladesh 410,031,102 3.0% 10 Argentina 406,321,682

(2017年11月22日)

世界銀行東京事務所

ビジネス インフォメーション アドバイザー池上隆夫

[email protected])

上級広報担当官大森功一

([email protected])

世界銀行ビジネスガイド http://go.worldbank.org/S7LECAT9X0

世界銀行の紹介と新調達政策

Page 2: 世界銀行の紹介と新調達政策 - World Bankpubdocs.worldbank.org/en/900701511321406044/112217...8 Indonesia 456,362,012 3.4% 9 Bangladesh 410,031,102 3.0% 10 Argentina 406,321,682

目次

1. 世銀の概要説明 032. 世銀プロジェクト情報の探し方 163. 世銀新調達政策の主な特徴 284. Standard Procurement Documents 335. Procurement-related Complaints 896. 新調達政策概要(日本語) 102

2

Page 3: 世界銀行の紹介と新調達政策 - World Bankpubdocs.worldbank.org/en/900701511321406044/112217...8 Indonesia 456,362,012 3.4% 9 Bangladesh 410,031,102 3.0% 10 Argentina 406,321,682

1.世銀の概要説明

Page 4: 世界銀行の紹介と新調達政策 - World Bankpubdocs.worldbank.org/en/900701511321406044/112217...8 Indonesia 456,362,012 3.4% 9 Bangladesh 410,031,102 3.0% 10 Argentina 406,321,682

世界銀行グループ

IBRD国際復興開発銀行

IDA国際開発協会

MIGA多数国間

投資保証機関

制度、法制、および

規制の改革推進

一人当たりのGNIが$1,185以下の加盟国

金利免除融資

技術協力

政策助言

民間企業による新興

国向け投融資を通じ

た開発インパクトの

達成

加盟国へのクロスボーダー投融資を行う

民間企業

政治リスクの保証

信用補完

1945年設立中低所得国に貸出、保証

1960年設立最貧国に融資、贈与、保証

IFC国際金融公社

民間企業による新興

国向け投融資を通じ

た開発インパクトの

達成

加盟国の民間企業

株式投資長期融資

助言サービス

1956年設立民間セクターへ投融資

1988年設立民間投資へのリスク保証

目的

顧客

商品サービス

制度、法制、および

規制の改革推進

一人当たりのGNIが$1,185 から$7,025の

加盟国

融資技術協力政策助言

共通のミッション:“貧困撲滅と繁栄の共有”

4

Page 5: 世界銀行の紹介と新調達政策 - World Bankpubdocs.worldbank.org/en/900701511321406044/112217...8 Indonesia 456,362,012 3.4% 9 Bangladesh 410,031,102 3.0% 10 Argentina 406,321,682

1952年、日本は世界銀行に加盟

1953–1966年の間に31プロジェクト、総額8億6千万ドル相当を借入

1990年、借入を完済

日本は第2の出資国

アフリカ開発会議(TICAD)を共催

2012年、IMF・世銀年次総会 東京で開催

2004年、東京開発ラーニングセンターを開設

2014年、東京防災ハブ

世界銀行と日本

5

Page 6: 世界銀行の紹介と新調達政策 - World Bankpubdocs.worldbank.org/en/900701511321406044/112217...8 Indonesia 456,362,012 3.4% 9 Bangladesh 410,031,102 3.0% 10 Argentina 406,321,682

2013年10月、世界銀行グループとしての新戦略を発表

顧客の目標達成にWBG一体となってアドバイス:Solution Bankパートナーとプロジェクトの初期段階から積極的に協力

14のグローバル・プラクティスに組織改革

2030年までに極度の貧困を撲滅x

$1.90/day 以下で暮らす人の割合を3%までに低減する

世界銀行グループの戦略

繁栄の共有の促進X

各国の下から40%の人々の収入増大

6

Page 7: 世界銀行の紹介と新調達政策 - World Bankpubdocs.worldbank.org/en/900701511321406044/112217...8 Indonesia 456,362,012 3.4% 9 Bangladesh 410,031,102 3.0% 10 Argentina 406,321,682

7

Lending Amounts - IBRD/IDA (FY09-18)(毎年4兆円―5兆円の新プロジェクト)

Page 8: 世界銀行の紹介と新調達政策 - World Bankpubdocs.worldbank.org/en/900701511321406044/112217...8 Indonesia 456,362,012 3.4% 9 Bangladesh 410,031,102 3.0% 10 Argentina 406,321,682

8

Page 9: 世界銀行の紹介と新調達政策 - World Bankpubdocs.worldbank.org/en/900701511321406044/112217...8 Indonesia 456,362,012 3.4% 9 Bangladesh 410,031,102 3.0% 10 Argentina 406,321,682

Financing Instruments

• Investment Project Financing provides IBRD loan, IDA credit/grant and guarantee financing to governments for activities that create the physical/social infrastructure necessary to reduce poverty and create sustainable development.

• Development Policy Financing provides IBRD loan, IDA credit/grant and guarantee budget support to governments or a political subdivision for a program of policy and institutional actions to help achieve sustainable, shared growth and poverty reduction.

• Program-for-Results links disbursement of funds directly to the delivery of defined results, helping countries improve the design and implementation of their own development programs and achieve lasting results by strengthening institutions and building capacity.

9

Page 10: 世界銀行の紹介と新調達政策 - World Bankpubdocs.worldbank.org/en/900701511321406044/112217...8 Indonesia 456,362,012 3.4% 9 Bangladesh 410,031,102 3.0% 10 Argentina 406,321,682

Top areas of spend in FY16

10Source AO: BI – Information as of August 24, 2016

Transport 47% Energy & Extractives 17%Water 18%

5% 3%

17%

5%1%

1%

3%

47%

18%

Agriculture

Education

Energy & mining

Finance

Health & social serv

Industry and trade

Info & communication

Public admin, Law

Transportation

Water/sanit/fld prot

Page 11: 世界銀行の紹介と新調達政策 - World Bankpubdocs.worldbank.org/en/900701511321406044/112217...8 Indonesia 456,362,012 3.4% 9 Bangladesh 410,031,102 3.0% 10 Argentina 406,321,682

11

Page 12: 世界銀行の紹介と新調達政策 - World Bankpubdocs.worldbank.org/en/900701511321406044/112217...8 Indonesia 456,362,012 3.4% 9 Bangladesh 410,031,102 3.0% 10 Argentina 406,321,682

FY16 Top Ten Borrowers

12

RANK COUNTRY AMOUNT (USD) % OF TOTAL

1 India 2,048,801,594 15.0%

2 Ecuador 1,731,696,519 12.7%

3 China 1,241,911,943 9.1%

4 Serbia 668,914,132 4.9%

5 Africa 557,360,650 4.1%

6 Ethiopia 507,000,112 3.7%

7 Colombia 463,437,092 3.4%

8 Indonesia 456,362,012 3.4%

9 Bangladesh 410,031,102 3.0%

10 Argentina 406,321,682 3.0%

Page 13: 世界銀行の紹介と新調達政策 - World Bankpubdocs.worldbank.org/en/900701511321406044/112217...8 Indonesia 456,362,012 3.4% 9 Bangladesh 410,031,102 3.0% 10 Argentina 406,321,682

FY16 Top Ten Supplier Countries

13

RANK SUPP CTRY AMOUNT % OF TOTAL

1 China 2,119,561,201 15.7%

2 India 2,080,435,125 15.4%

3 Spain 1,492,204,350 11.1%

4 Brazil 1,278,421,512 9.5%

5 Serbia 650,091,436 4.8%

6 Vietnam 326,960,002 2.4%

7 Germany 291,109,632 2.2%

8 Greece 275,398,433 2.0%

9 Indonesia 273,301,447 2.0%

10 Bangladesh 266,864,364 2.0%

69 Japan 16,428,310 0.1%

Page 14: 世界銀行の紹介と新調達政策 - World Bankpubdocs.worldbank.org/en/900701511321406044/112217...8 Indonesia 456,362,012 3.4% 9 Bangladesh 410,031,102 3.0% 10 Argentina 406,321,682

世銀での日本の受注額は低い

$0

$100

$200

$300

$400

$500

$600

$700

$800

2000 2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015

Mill

ions

PRIOR REVIEW CONTRACTS UNDER IDA/IBRD-FINANCED PROJECTS FY2000-2015 (as of 7/6/2015)

Germany Japan United Kingdom United States PRIOR REVIEW CONTRACTS UNDER IDA/IBRD-FINANCED PROJECTS

(1) The nationality of awarded firms is based on place of registration, which may or may not be the same as the country of origin.(2) Contracts may include prior reviewed awards under the following agreement types: IDA, IBRD, Carbon Offset, Debt Reduction Facility, Global Environment Projects, GEF Medium Sized Programs, Guarantees, Institutional Development Fund, Montreal Protocol, JSA/PRSP and JSA/I-PRSP, Recipient-Executed Activities, Rainforest, Special Financing, IFAD-Funded projects, and UNDP-funded projects.

14

Page 15: 世界銀行の紹介と新調達政策 - World Bankpubdocs.worldbank.org/en/900701511321406044/112217...8 Indonesia 456,362,012 3.4% 9 Bangladesh 410,031,102 3.0% 10 Argentina 406,321,682

15

Page 16: 世界銀行の紹介と新調達政策 - World Bankpubdocs.worldbank.org/en/900701511321406044/112217...8 Indonesia 456,362,012 3.4% 9 Bangladesh 410,031,102 3.0% 10 Argentina 406,321,682

2. 世銀プロジェクト情報の探し方

Page 17: 世界銀行の紹介と新調達政策 - World Bankpubdocs.worldbank.org/en/900701511321406044/112217...8 Indonesia 456,362,012 3.4% 9 Bangladesh 410,031,102 3.0% 10 Argentina 406,321,682

押さえるべき3種類の基本情報 → 世銀サイト上で入手可

17

① 3-6年間の国別支援戦略

Country Partnership Framework (CPF)

Country Partnership Strategy (CPS)

Country Assistance Strategy (CAS)

② プロジェクト発掘段階

Project Information Document/Integrated Safeguards Data Sheet

(PID/ISDS)

③ プロジェクト審査段階

Project Appraisal Document (PAD)

Page 18: 世界銀行の紹介と新調達政策 - World Bankpubdocs.worldbank.org/en/900701511321406044/112217...8 Indonesia 456,362,012 3.4% 9 Bangladesh 410,031,102 3.0% 10 Argentina 406,321,682

基本情報の探し方

まず、世界銀行本部トップページhttp://www.worldbank.org へ!

WHERE WE WORK をクリックして国別リストへ

18

WHAT WE DOをクリックして

プロジェクト情報の検索へ

Page 19: 世界銀行の紹介と新調達政策 - World Bankpubdocs.worldbank.org/en/900701511321406044/112217...8 Indonesia 456,362,012 3.4% 9 Bangladesh 410,031,102 3.0% 10 Argentina 406,321,682

19

http://www.worldbank.org/en/country/uzbekistan

Page 20: 世界銀行の紹介と新調達政策 - World Bankpubdocs.worldbank.org/en/900701511321406044/112217...8 Indonesia 456,362,012 3.4% 9 Bangladesh 410,031,102 3.0% 10 Argentina 406,321,682

20

プロジェクト情報・調達情報の検索

プロジェクト情報の検索

(国・セクター)

調達情報の検索

(国・セクター・調達計画)

トップページWHAT WE DO

↓Projects をクリック

Page 21: 世界銀行の紹介と新調達政策 - World Bankpubdocs.worldbank.org/en/900701511321406044/112217...8 Indonesia 456,362,012 3.4% 9 Bangladesh 410,031,102 3.0% 10 Argentina 406,321,682

各プロジェクトのサイト事例 Uzbekistan Bukhara and Samarkand Sewerage Projectのページリンクはここ

21

PROCUREMENT はこのプロジェクト

における調達情報の一覧

Status は1) Active 2) Pipeline3) Closed

Team Leader =タスクチーム

リーダー

=プロジェクトの担当者

DOCUMENTS は、プロジェクトの

発掘段階、審査段階の文書などを掲載

Page 22: 世界銀行の紹介と新調達政策 - World Bankpubdocs.worldbank.org/en/900701511321406044/112217...8 Indonesia 456,362,012 3.4% 9 Bangladesh 410,031,102 3.0% 10 Argentina 406,321,682

将来の国別のプロジェクトの探し方ベトナムを例に

22

トップページWHERE WE WORK

↓国別リストから

ベトナムのページへ↓

View All Projects↓

Pipeline をクリック

例としてHCMC Flood Risk

Management Projectをクリック

Pipeline

Page 23: 世界銀行の紹介と新調達政策 - World Bankpubdocs.worldbank.org/en/900701511321406044/112217...8 Indonesia 456,362,012 3.4% 9 Bangladesh 410,031,102 3.0% 10 Argentina 406,321,682

DOCUMENTSのタブを

クリック

23

Page 24: 世界銀行の紹介と新調達政策 - World Bankpubdocs.worldbank.org/en/900701511321406044/112217...8 Indonesia 456,362,012 3.4% 9 Bangladesh 410,031,102 3.0% 10 Argentina 406,321,682

プロジェクトの発掘段階で作成される

Project Information Document (PID)

24

Page 25: 世界銀行の紹介と新調達政策 - World Bankpubdocs.worldbank.org/en/900701511321406044/112217...8 Indonesia 456,362,012 3.4% 9 Bangladesh 410,031,102 3.0% 10 Argentina 406,321,682

Component 2 – Priority Flood Risk Reduction Interventions (Estimated Cost: US$ 406 million)25. Priority Flood Risk Reduction Investments in Tham Luong – Ben Cat – Rach Nuoc Lensub-catchment. This component would support the City in implementing significant structural measures proposed in the JICA Plan (Plan 752). The scope of this work including:2.1. Construction of 2 tidal sluice gates at the end Vam Thuat and Rach Nuoc Len canal tocontrol tidal inflows.2.2. Improvements to the Tham Luong – Ben Cat – Rach Nuoc Len Canal through dredging and constructing embankments to improve its ability to discharge flood waters at the safety level of 100-year return period. At the sub-catchment level, the proposed project will examine options for storm water retention, infiltration, green areas, and pervious concrete.2.3. Construction of a primary and secondary combined storm water drainage and waste water sewage system in Go Vap District at the safety levels of 20-year and 10-year return period, respectively.2.4. Improvement of secondary canals that are connected with primary Tham Luong – Ben Cat –Rach Nuoc Len Canal at the safety level of 10-year return period to improve the urban flood management and to reduce the pollution of the Canal and Sai Gon River with sewage water.2.5. Provision of consultant services, as well as project monitoring and evaluation (M&E)functions including independent monitoring of RAP and EMP implementation, also to help the City to prepare and carry out the implementation of land acquisition and environmental impact mitigation plan.

25

Page 26: 世界銀行の紹介と新調達政策 - World Bankpubdocs.worldbank.org/en/900701511321406044/112217...8 Indonesia 456,362,012 3.4% 9 Bangladesh 410,031,102 3.0% 10 Argentina 406,321,682

26

Project Procurement PipelineMonthly Operational Summary (MOS)

http://www.worldbank.org/en/projects-operations/products-and-services/brief/monthly-operational-summary

The Monthly Operational Summary (MOS) reports on the status of projects while they are in the World Bank's lending pipeline. Projects appear in the MOS from the point they are identified up to the signing of the loan or credit agreement. After loans or credits are signed, entries for projects are dropped from the MOS.

Page 27: 世界銀行の紹介と新調達政策 - World Bankpubdocs.worldbank.org/en/900701511321406044/112217...8 Indonesia 456,362,012 3.4% 9 Bangladesh 410,031,102 3.0% 10 Argentina 406,321,682

27

Page 28: 世界銀行の紹介と新調達政策 - World Bankpubdocs.worldbank.org/en/900701511321406044/112217...8 Indonesia 456,362,012 3.4% 9 Bangladesh 410,031,102 3.0% 10 Argentina 406,321,682

3. 世銀新調達政策の主な特徴

Page 29: 世界銀行の紹介と新調達政策 - World Bankpubdocs.worldbank.org/en/900701511321406044/112217...8 Indonesia 456,362,012 3.4% 9 Bangladesh 410,031,102 3.0% 10 Argentina 406,321,682

The Procurement reform: Journey

Initiating Discussion Paper

2012

Check that the Bank’s approach is

modern, meets new needs & future

proof

Global consultations (round 1)

Proposed New Framework 2013

What we heard in consultations

Board debate & direction given

Developing the New Framework

2014

Proposals to resolve complex issues

Global consultations (Round 2)

Finalizing the New Framework 2015

Finalized Policy and approaches to complex issues

Effective July 1, 2016

Page 30: 世界銀行の紹介と新調達政策 - World Bankpubdocs.worldbank.org/en/900701511321406044/112217...8 Indonesia 456,362,012 3.4% 9 Bangladesh 410,031,102 3.0% 10 Argentina 406,321,682

CORE PROCUREMENT PRINCIPLES

30

a) Value for Money

The principle of value for money means the effective, efficient, and economic use of resources, which requires the evaluation of relevant costs and benefits, along with an assessment of risks, and non-price attributes and/or life cycle costs, as appropriate. Price alone may not necessarily represent value for money.

b) Economy c) Integrity d) Fit-for-Purpose e) Efficiency f) Transparency g) Fairness

Page 31: 世界銀行の紹介と新調達政策 - World Bankpubdocs.worldbank.org/en/900701511321406044/112217...8 Indonesia 456,362,012 3.4% 9 Bangladesh 410,031,102 3.0% 10 Argentina 406,321,682

31

Page 32: 世界銀行の紹介と新調達政策 - World Bankpubdocs.worldbank.org/en/900701511321406044/112217...8 Indonesia 456,362,012 3.4% 9 Bangladesh 410,031,102 3.0% 10 Argentina 406,321,682

32

Page 33: 世界銀行の紹介と新調達政策 - World Bankpubdocs.worldbank.org/en/900701511321406044/112217...8 Indonesia 456,362,012 3.4% 9 Bangladesh 410,031,102 3.0% 10 Argentina 406,321,682

4. Standard Procurement Documents

Page 34: 世界銀行の紹介と新調達政策 - World Bankpubdocs.worldbank.org/en/900701511321406044/112217...8 Indonesia 456,362,012 3.4% 9 Bangladesh 410,031,102 3.0% 10 Argentina 406,321,682

World Bank activityJoint activity Borrower activity

Country PartnershipFramework

Project Identification

Project Preparation

Project Appraisal

Loan NegotiationsLoan Approval & Signing

Project Supervision

Implementation

Evaluation

Investment Project Cycle

34

Page 35: 世界銀行の紹介と新調達政策 - World Bankpubdocs.worldbank.org/en/900701511321406044/112217...8 Indonesia 456,362,012 3.4% 9 Bangladesh 410,031,102 3.0% 10 Argentina 406,321,682

新調達ガイドライン(後述)

1.1 IPFプロジェクトの調達においては、

持続可能な開発の推進に当たり、借入者が、

Value for Money (VfM)を公正な形で確保

できるようでなければならない。Procurement Guidance: Value for Money

http://pubdocs.worldbank.org/en/274711479159288956/Guidance-on-VfM-FINAL.pdf

VfMとは資源の効果的、効率的、経済的な利用を意味し、そのためには、関連する費用と便益の評価に加え、リスク評価、価格以外の属性やライフサイクルコストの評価も適宜に行わなければならない。価格だけでは必ずしもVfMを表すことはできない。

35

Page 36: 世界銀行の紹介と新調達政策 - World Bankpubdocs.worldbank.org/en/900701511321406044/112217...8 Indonesia 456,362,012 3.4% 9 Bangladesh 410,031,102 3.0% 10 Argentina 406,321,682

Procurement Arrangements

36

Page 37: 世界銀行の紹介と新調達政策 - World Bankpubdocs.worldbank.org/en/900701511321406044/112217...8 Indonesia 456,362,012 3.4% 9 Bangladesh 410,031,102 3.0% 10 Argentina 406,321,682

Specifications

Generally, there are two broad categories of specifications.

• Conformance based specifications describe in detail the technical requirements of the design, method of production, construction and/or delivery.• Performance based specifications describe the outcomes or results required in terms of business or functional performance requirements. The evaluation of performance specifications can use a mixture of qualifying and rated criteria.

37

Page 38: 世界銀行の紹介と新調達政策 - World Bankpubdocs.worldbank.org/en/900701511321406044/112217...8 Indonesia 456,362,012 3.4% 9 Bangladesh 410,031,102 3.0% 10 Argentina 406,321,682

VfM involves tradeoff between the cost and time

38

Page 39: 世界銀行の紹介と新調達政策 - World Bankpubdocs.worldbank.org/en/900701511321406044/112217...8 Indonesia 456,362,012 3.4% 9 Bangladesh 410,031,102 3.0% 10 Argentina 406,321,682

Standard Bidding Documents (SBDs) vs Standard Procurement Documents (SPDs)

SBDs vs SPDsThere are now 2 sets of documents = SBDs + SPDs SBDs continue to be used for any project governed by the Guidelines SPDs to be used for projects where the new Procurement Framework

applies

Scope of application of SPDs mandatory for international competitive procurements where the

Project Concept Note is approved after 1 July 2016 may be used (as amended) for national competitive procurements,

with the Bank’s agreement

NPF | Standard Procurement DocumentsSlide 39

Page 40: 世界銀行の紹介と新調達政策 - World Bankpubdocs.worldbank.org/en/900701511321406044/112217...8 Indonesia 456,362,012 3.4% 9 Bangladesh 410,031,102 3.0% 10 Argentina 406,321,682

The new Standard Procurement Documents

Standard Procurement Documents (SPDs) 23 SPDs launched 1 July 2016 In development: RFP Works (Design + Build) RFP Streamlined RFP Competitive Dialogue SPD Framework Agreement

Translations are underway (French and Spanish)

NOTE: Of the 23 launched 12 (relating to Works) have been updated to include Environment, Social, Health + Safety (ESHS) enhancements and published in January 2017. ESHS will be covered in detail in a separate seminar.

NPF | Standard Procurement DocumentsSlide 40

Page 41: 世界銀行の紹介と新調達政策 - World Bankpubdocs.worldbank.org/en/900701511321406044/112217...8 Indonesia 456,362,012 3.4% 9 Bangladesh 410,031,102 3.0% 10 Argentina 406,321,682

List of Standard Procurement Documents

NPF | Standard Procurement DocumentsSlide 41

GoodsRFB Goods (1 envelope)

RFB Goods (2 envelope)

PQD Health Sector (PVC)

RFB Health Sector (PVC)

RFB Education (Textbooks)

WorksRFB Small Works (1 envelope)

RFB Small Works (2 envelope)

RFB Large Works (without PQ)

PQD Large WorksRFB Large Works (after PQ)

RFB Roads (Output + Performance based)

Works French Civil CodePlantRFB Plant (without PQ)

RFB Plant (with PQ)

ISD PlantRFP Plant (2 stage)

AcronymsRFB = Request for BidsPQD = Prequalification DocumentRFP = Request for ProposalsISD = Initial Selection DocumentPVC= Pharmaceuticals, Vaccines and Condoms

Page 42: 世界銀行の紹介と新調達政策 - World Bankpubdocs.worldbank.org/en/900701511321406044/112217...8 Indonesia 456,362,012 3.4% 9 Bangladesh 410,031,102 3.0% 10 Argentina 406,321,682

List of Standard Procurement Documents (cont.)

NPF | Standard Procurement DocumentsSlide 42

Consulting ServicesRFP Consultancy Services

OtherPQD Management ServicesRFB Management ServicesRFB Non-Consultant ServicesRFB Information SystemsISD Information SystemsRFP Information Systems

SPDs in development

ISD Works 2 stage (Design + Build)

RFP Works 2 stage (Design + Build)

ISD Streamlined universal

RFP Streamlined universal

ISD CD universal

RFP CD universal

SPQD Framework Agreement

RFB Framework Agreement

Page 43: 世界銀行の紹介と新調達政策 - World Bankpubdocs.worldbank.org/en/900701511321406044/112217...8 Indonesia 456,362,012 3.4% 9 Bangladesh 410,031,102 3.0% 10 Argentina 406,321,682

GOODS WORKS AND NON-CONSULTING SERVICES

key changes reflected in all SPDs

Page 44: 世界銀行の紹介と新調達政策 - World Bankpubdocs.worldbank.org/en/900701511321406044/112217...8 Indonesia 456,362,012 3.4% 9 Bangladesh 410,031,102 3.0% 10 Argentina 406,321,682

Key changes common to all SPDs

NPF | Standard Procurement DocumentsSlide 44

The next set of slides will cover the following key changes: New test to determine successful bid/proposal Abnormally Low Bid/Proposal Notification of Intention to Award, Standstill Period + debrief Procurement-related complaint (against decision to award the contract)

Anti-corruption Guidelines Sustainable procurement Business Day Eligibility of SOEs Eligibility of cross-jurisdictional procurements Value Engineering

Page 45: 世界銀行の紹介と新調達政策 - World Bankpubdocs.worldbank.org/en/900701511321406044/112217...8 Indonesia 456,362,012 3.4% 9 Bangladesh 410,031,102 3.0% 10 Argentina 406,321,682

NPF | Standard Procurement DocumentsSlide 45

New test to determine the successful bid/proposal

Most Advantageous Bid/Proposal PPSD informs evaluation methodology Criteria to be appropriate to the nature and complexity of the

procurement to allow the borrower to achieve VfM New test = “most advantageous bid/proposal” (details in later slides)

For RFP the lowest evaluated cost alone may not necessarily represent best VfM

SPD NEWfeatures

Page 46: 世界銀行の紹介と新調達政策 - World Bankpubdocs.worldbank.org/en/900701511321406044/112217...8 Indonesia 456,362,012 3.4% 9 Bangladesh 410,031,102 3.0% 10 Argentina 406,321,682

NPF | Standard Procurement DocumentsSlide 46

Abnormally Low Bid/Proposal

Enhanced provisions based on MDB Working Group findings Modified definition of ALB/P:

Where the price, in combination with other elements, appears unreasonably low, to the extent that it raises material concerns as to the bidder’s/proposer’s capability to perform the contract for that price

The 5 stages in managing an ALB/P: Identify: borrower identifies a potential ALB/PClarify: borrower seeks clarification from the bidder/proposerJustify: bidder/proposer prepares a justification of the priceVerify: borrower analyzes the justification to verify if it provides

reasonable explanation and validation of the price Decide: borrower decides whether to accept or reject the bid/proposal.

SPD NEWfeatures

Page 47: 世界銀行の紹介と新調達政策 - World Bankpubdocs.worldbank.org/en/900701511321406044/112217...8 Indonesia 456,362,012 3.4% 9 Bangladesh 410,031,102 3.0% 10 Argentina 406,321,682

NPF | Standard Procurement DocumentsSlide 47

Case study: Identification of ALB/PSPD NEWfeaturesIdentification: Scenario 1 Fewer than five compliant bids/proposals: Identification based on a

comparison of the adjusted bid/proposal price, and its constituent parts, with the borrower’s own cost estimate.

Identification: Scenario 2 At least five compliant bids/proposals: ALB/P risk zone is more than one

standard deviation below the average of the compliant bids/proposals received.

Example Bids $MBid 1 72Bid 2 92Bid 3 82Bid 4 101Bid 5 53Average 80Standard Deviation 17 ALB/P threshold 63

ALB/P risk zone

63 80

Page 48: 世界銀行の紹介と新調達政策 - World Bankpubdocs.worldbank.org/en/900701511321406044/112217...8 Indonesia 456,362,012 3.4% 9 Bangladesh 410,031,102 3.0% 10 Argentina 406,321,682

NPF | Standard Procurement DocumentsSlide 48

Notification of Intention to Award (NIA)

Once borrower decides who to award contract to it must inform other bidders/proposers

Send NIA to each bidder/proposer that submitted bid/proposal (but not to those who have previously been told they were not successful)

Sending NIA starts the standstill period NIA must include: details of the successful bidder + the contract price names of all other bidders and their prices statement why recipient was not successful instructions on how to request a debriefing date Standstill Period will end

SPD NEWfeatures

Page 49: 世界銀行の紹介と新調達政策 - World Bankpubdocs.worldbank.org/en/900701511321406044/112217...8 Indonesia 456,362,012 3.4% 9 Bangladesh 410,031,102 3.0% 10 Argentina 406,321,682

NPF | Standard Procurement DocumentsSlide 49

Standstill Period

A period of 10 Business Days, from date NIA sent, where borrower cannot award the contract

Allows unsuccessful bidders/proposers time to decide if they want: a debrief to lodge a complaint against the decision to award the contract

Standstill Period can be extended in certain circumstances Circumstances where Standstill Period does not apply: only one bid/proposal submitted direct selection call-off under framework agreement emergency situation

SPD NEWfeatures

Page 50: 世界銀行の紹介と新調達政策 - World Bankpubdocs.worldbank.org/en/900701511321406044/112217...8 Indonesia 456,362,012 3.4% 9 Bangladesh 410,031,102 3.0% 10 Argentina 406,321,682

NPF | Standard Procurement DocumentsSlide 50

Standstill period timelineSPD NEWfeatures

Page 51: 世界銀行の紹介と新調達政策 - World Bankpubdocs.worldbank.org/en/900701511321406044/112217...8 Indonesia 456,362,012 3.4% 9 Bangladesh 410,031,102 3.0% 10 Argentina 406,321,682

NPF | Standard Procurement DocumentsSlide 51

Complaints where SPDs applySPD NEWfeatures

How to handle complaints where SPDs apply Procurement Regulations Annex III sets out: 3 circumstances when complaints can be made 4 requirements for a complaint to qualify borrower’s process and timelines for handling these complaints roles and responsibilities for complainant, borrower and Bank

3 circumstances – complainant can challenge: procurement documents decision to exclude the complainant from the process decision to award the contract (during Standstill Period)

Page 52: 世界銀行の紹介と新調達政策 - World Bankpubdocs.worldbank.org/en/900701511321406044/112217...8 Indonesia 456,362,012 3.4% 9 Bangladesh 410,031,102 3.0% 10 Argentina 406,321,682

NPF | Standard Procurement DocumentsSlide 52

Complaints where SPDs apply (cont.)

4 essential requirements:

1. Who can complain? Complainant must be an ‘interested party’

2. In what circumstances? The circumstances giving rise to the complaint must be relevant to the procurement - there are 3 three relevant circumstances

3. When to make the complaint? Complaints must be made in a ‘timely manner’ - Regulations set the time limits that apply

4. What information must be included? Regulations prescribe the minimum information that must be included in the complaint

SPD NEWfeatures

Page 53: 世界銀行の紹介と新調達政策 - World Bankpubdocs.worldbank.org/en/900701511321406044/112217...8 Indonesia 456,362,012 3.4% 9 Bangladesh 410,031,102 3.0% 10 Argentina 406,321,682

NPF | Standard Procurement DocumentsSlide 53

Complaints where SPDs apply (cont.)

Complaints during the Standstill Period Can challenge the borrower’s decision to award the contract Must submit complaint before the expiry of the Standstill Period Do not need to have requested/received a debrief Borrower will acknowledge complaint within 3 Business Days Borrower will respond to complaint with 15 Business Days of receipt If complaint upheld: borrower may change the contract award recommendation borrower transmits revised intent to award

SPD NEWfeatures

Page 54: 世界銀行の紹介と新調達政策 - World Bankpubdocs.worldbank.org/en/900701511321406044/112217...8 Indonesia 456,362,012 3.4% 9 Bangladesh 410,031,102 3.0% 10 Argentina 406,321,682

NPF | Standard Procurement DocumentsSlide 54

Anti-corruption provisions

Bank’s Anti-corruption provisions continue to be included in full in each SPD: defining the sanctionable practices of corruption, fraud, collusion

and coercion sanctioning those engaged in sanctionable practices declaring ineligibility of those sanctioned in according with WB

prevailing sanctions policies requiring Bank’s right to inspect

Where SPDs are not used (i.e. alternative procurement arrangements, national competitive procurement and PPP), bidders/proposers will be required to accept the application of, and agreed to comply with, the Bank’s Anti-corruption provisions

SPD NEWfeatures

Page 55: 世界銀行の紹介と新調達政策 - World Bankpubdocs.worldbank.org/en/900701511321406044/112217...8 Indonesia 456,362,012 3.4% 9 Bangladesh 410,031,102 3.0% 10 Argentina 406,321,682

NPF | Standard Procurement DocumentsSlide 55

Sustainable procurement

Regulations support application of sustainable procurement Sustainable procurement requirements beyond the Bank’s policies (e.g.

environmental and social) are optional – at borrower’s discretion and as agreed with the Bank

Application must be consistent with Bank’s Core Procurement Principles and the borrower’s own policies

May include sustainable procurement in: technical specifications and/or business or performance requirements evaluation criteria contract terms and conditions, if relevant

Application in evaluation RFB normally (i) pass/fail and/or (ii) convert to monetary terms RFP normally assessed using combination of pass/fail and rated criteria

SPD NEWfeatures

Page 56: 世界銀行の紹介と新調達政策 - World Bankpubdocs.worldbank.org/en/900701511321406044/112217...8 Indonesia 456,362,012 3.4% 9 Bangladesh 410,031,102 3.0% 10 Argentina 406,321,682

NPF | Standard Procurement DocumentsSlide 56

Eligibility test is now:SOEs of the borrower’s country may be eligible to compete, and be awarded contracts, only if they can establish, in a manner acceptable to the Bank, that they:

1. are legally and financially autonomous2. operate under commercial law 3. are not under supervision by the agency contracting them

The requirement of ‘dependency’ on the borrower has been replaced with ‘supervision’ of the contracting entity

The ability to be contracted on an exceptional basis has been extended to include SOEs

This exception has been expanded beyond consulting services to cover GWNcS

Eligibility SOEsSPD NEWfeatures

Page 57: 世界銀行の紹介と新調達政策 - World Bankpubdocs.worldbank.org/en/900701511321406044/112217...8 Indonesia 456,362,012 3.4% 9 Bangladesh 410,031,102 3.0% 10 Argentina 406,321,682

NPF | Standard Procurement DocumentsSlide 57

Value Engineering (VE)

VE is a systematic and organized approach to increase efficiency or effectiveness by changing materials to reduce cost, or process to reduce time, without sacrificing necessary functionality In SBDs the only reference to VE is the clause in the FIDIC conditions

of contract for large Works and Management Services Procurement Regulations expand use, as appropriate, and as agreed

in the PPSD Examples: for RFBs VE can be applied during contract implementation for RFPs, this option can also be used at the pre-contract award

stage

SPD NEWfeatures

Page 58: 世界銀行の紹介と新調達政策 - World Bankpubdocs.worldbank.org/en/900701511321406044/112217...8 Indonesia 456,362,012 3.4% 9 Bangladesh 410,031,102 3.0% 10 Argentina 406,321,682

CONSULTING SERVICESupdated Request for Proposal

Page 59: 世界銀行の紹介と新調達政策 - World Bankpubdocs.worldbank.org/en/900701511321406044/112217...8 Indonesia 456,362,012 3.4% 9 Bangladesh 410,031,102 3.0% 10 Argentina 406,321,682

Updated RFP Consulting Services

Slide 59

NPF | Standard Procurement Documents

No significant changes – we have maintained Shortlisting process RFP document structure and language Selection methods (e.g. QBS FBS LCS)

Minimum changes to reflect the Regulations Inclusion of common provisions e.g. Notification of Intention to Award,

Standstill Period, debrief Shortlisting: removed the restriction of no more than 2 firms from one country changed maximum of 6 to a range = between 5 and 8

NOTE: Consulting Services SPD, where it relates to supervising engineer, has been updated to include Environment, Social, Health + Safety (ESHS) enhancements and published in January 2017.

Page 60: 世界銀行の紹介と新調達政策 - World Bankpubdocs.worldbank.org/en/900701511321406044/112217...8 Indonesia 456,362,012 3.4% 9 Bangladesh 410,031,102 3.0% 10 Argentina 406,321,682

GOODS WORKS AND NON-CONSULTING SERVICES

key changes - RFBs

Page 61: 世界銀行の紹介と新調達政策 - World Bankpubdocs.worldbank.org/en/900701511321406044/112217...8 Indonesia 456,362,012 3.4% 9 Bangladesh 410,031,102 3.0% 10 Argentina 406,321,682

RFB SPDs – key structural changes

NPF | Standard Procurement DocumentsSlide 61

RFB structural changes Maintained RFB document structure and language Maintained prequalification, now separate RFB SPDs for use: without Prequalification (for Plant and large Works)

after Prequalification Discontinued two-stage for plant (this is now RFP Plant)

Removed User’s Guide from SPDs (plan to issue as separate documents)

Introduced two envelope process (currently available for Goods and Small Works)

Updated existing Prequalification documents for: works management services health sector goods

Page 62: 世界銀行の紹介と新調達政策 - World Bankpubdocs.worldbank.org/en/900701511321406044/112217...8 Indonesia 456,362,012 3.4% 9 Bangladesh 410,031,102 3.0% 10 Argentina 406,321,682

NPF | Standard Procurement DocumentsSlide 62

Modified test for successful bid

Most Advantageous Bid (MAB)

When rated criteria are NOT used: example Request for BidsThe most advantageous bid is the bid:

1. of the bidder that meets the qualification criteria, and 2. whose bid has been determined to be:

a. substantially responsive to the RFB document, andb. the lowest evaluated cost

RFB GWNcSnew features

Page 63: 世界銀行の紹介と新調達政策 - World Bankpubdocs.worldbank.org/en/900701511321406044/112217...8 Indonesia 456,362,012 3.4% 9 Bangladesh 410,031,102 3.0% 10 Argentina 406,321,682

GOODS WORKS AND NON-CONSULTING SERVICES

key changes - new RFPs

Page 64: 世界銀行の紹介と新調達政策 - World Bankpubdocs.worldbank.org/en/900701511321406044/112217...8 Indonesia 456,362,012 3.4% 9 Bangladesh 410,031,102 3.0% 10 Argentina 406,321,682

NPF | Standard Procurement DocumentsSlide 64

Applied in competitive procurement Borrower describes requirements in terms of functionality/

performance and the market proposes solutions Supplier proposes a solution Select the appropriate SPD based on the category of GWNcS and

risk, size and complexity of procurement Where appropriate, Bank agrees to using Best and Final Offer (BAFO)

or Negotiation Can be used where borrower has capacity to undertake RFP

procurement

New RFP SPDs for goods, works and non-consulting services

Page 65: 世界銀行の紹介と新調達政策 - World Bankpubdocs.worldbank.org/en/900701511321406044/112217...8 Indonesia 456,362,012 3.4% 9 Bangladesh 410,031,102 3.0% 10 Argentina 406,321,682

Slide 65

NPF | Standard Procurement Documents

RFP SPDs for GWNcS - key characteristics complexity: non-standard procurement, or where complexity is moderate

to high and cost of bidding is high market generated solutions: the market is able to offer customized

solutions that are fit-for-purpose and deliver the desired performance/outcome

innovation: high potential for innovative solutions value-for-money (VfM): the use of quality/cost evaluation rated criteria

will lead to enhanced VfM flexibility: the borrower wants the supplier to have a greater degree of

flexibility and/or control over design and/or delivery quality: quality of design and/or execution are important priorities

RFP SPDs – key characteristics

Page 66: 世界銀行の紹介と新調達政策 - World Bankpubdocs.worldbank.org/en/900701511321406044/112217...8 Indonesia 456,362,012 3.4% 9 Bangladesh 410,031,102 3.0% 10 Argentina 406,321,682

RFP SPDs – key structural changes

NPF | Standard Procurement DocumentsSlide 66

New Initial Selection document (a form of shortlisting)

New RFP SPD documents based on existing SBDs 3 model RFP SPDs New terminology = “Proposer” and “Proposal” Single and multi-stage approaches Two envelope processes RFP 2 Stage approach for: plant (currently available)

information systems (currently available)

large works (design + build) (in development for)

Page 67: 世界銀行の紹介と新調達政策 - World Bankpubdocs.worldbank.org/en/900701511321406044/112217...8 Indonesia 456,362,012 3.4% 9 Bangladesh 410,031,102 3.0% 10 Argentina 406,321,682

Three model RFP SPDs

Slide 67

NPF | Standard Procurement Documents

Three RFP SPDs for GWNcSEach has been developed for different scenarios - from complex to very complex procurement

Universal RFP SPDs Historically the Bank has developed SBDs and SPDs based on: common procurement categories e.g.: textbooks, works, plant with features appropriate to the category, selection method and

perceived complexity, size and risk in the procurement Universal RFP SPD is planned to be category neutral Streamlined and Competitive Dialogue are planned to be universal Design and scoping document in development

Page 68: 世界銀行の紹介と新調達政策 - World Bankpubdocs.worldbank.org/en/900701511321406044/112217...8 Indonesia 456,362,012 3.4% 9 Bangladesh 410,031,102 3.0% 10 Argentina 406,321,682

Two-stage RFP

Slide 68

NPF | Standard Procurement Documents

Two-stage plus Initial Selection Independent probity assurance provider is strongly advised Borrower can describe the desired result/outcome, but can’t fully describe the

solution or wants market to propose options Borrower is seeking innovation in design of technical solution and/or delivery or

implementation Borrower wishes to explore proposed solutions with each Initially Selected

applicant. Allows a “Discovery” phase for 1-on-1 discussions with proposers Borrower may need additional specialist expertise BAFO or Negotiation used, if appropriate Takes more time and resources than RFP Streamlined, but not as much as RFP

Competitive Dialogue

CASE STUDY: Problem: Borrower needs a solution to transport foot and motor vehicle traffic over a river.Solution: Borrower has decided it wishes to build a bridge. It is looking for proposals that represent best VfM and optimize proposed solutions.

Key features:

Page 69: 世界銀行の紹介と新調達政策 - World Bankpubdocs.worldbank.org/en/900701511321406044/112217...8 Indonesia 456,362,012 3.4% 9 Bangladesh 410,031,102 3.0% 10 Argentina 406,321,682

Competitive Dialogue RFP (currently in development)

Slide 69

NPF | Standard Procurement Documents

Key features: Multi-stage plus Initial Selection Independent probity assurance provider is mandatory Borrower is able to describe the problem to be solved, and/or the result/outcome

to be achieved Solutions are not available in the market place, or Difficult to determine the best financial/commercial terms and/or legal/contractual

framework Includes “Dialogue” phase for 1-on-1 discussions with proposers Borrower needs high level of procurement capacity - may need additional

specialist expertise BAFO or Negotiation used, if appropriate Takes the longest of all RFPs and involves borrowers and proposers investing

considerable resources and expense

CASE STUDY: Problem: Borrower needs a solution to transport foot and motor vehicle traffic over a river.Solution: Borrower does not know if the best solution is a ferry service, bridge, tunnel, or some other innovative novel or unique solution.

Page 70: 世界銀行の紹介と新調達政策 - World Bankpubdocs.worldbank.org/en/900701511321406044/112217...8 Indonesia 456,362,012 3.4% 9 Bangladesh 410,031,102 3.0% 10 Argentina 406,321,682

When to use which RFP SPD

Slide 70

NPF | Standard Procurement Documents

Fit-for-purpose by design

Getting the best fit-for-purpose procurement process means choosing the most appropriate Selection Method

IN THE GRAPH:y axis = levels of complexity and risk in the procurement and time to undertake the procurementx axis = how easy/difficult is it to define:1. the outcome to be delivered, and 2. how the contract, ffinancing + commercial deal will be structured

EASYDIFFICULT

COM

PLEX

ITY

AND

RISK

LOW

HIGH

RFB

RFPStreamlined

EASE IN DEFINING OUTCOME/S + COMMERCIAL DEAL

RFPTwo-stage

RFPCompetitive

Dialogue

RFPs for GWNcS

Page 71: 世界銀行の紹介と新調達政策 - World Bankpubdocs.worldbank.org/en/900701511321406044/112217...8 Indonesia 456,362,012 3.4% 9 Bangladesh 410,031,102 3.0% 10 Argentina 406,321,682

RFP SPDs – key content changes

NPF | Standard Procurement DocumentsSlide 71

The following slides will cover: Initial Selection process and rated criteria Performance based specifications BAFO or Negotiation option Two-envelope process Closed opening VfM – combination of life cycle costing and rated criteria New test - Most Advantageous Proposal (MAP)

Page 72: 世界銀行の紹介と新調達政策 - World Bankpubdocs.worldbank.org/en/900701511321406044/112217...8 Indonesia 456,362,012 3.4% 9 Bangladesh 410,031,102 3.0% 10 Argentina 406,321,682

New RFP + Initial Selection process

Slide 72

NPF | Standard Procurement Documents

New Request for Proposals Introduced for goods, works and non-consulting services (GWNcS)

Key features: introduces Initial Selection (short listing) optimizes use of rated evaluation criteria promotes functional/performance based specifications encourages innovation and new solutions

Initial Selection“The shortlisting process used prior to inviting Request for Proposals in the procurement of Goods, Works or Non-consulting Services.”

Page 73: 世界銀行の紹介と新調達政策 - World Bankpubdocs.worldbank.org/en/900701511321406044/112217...8 Indonesia 456,362,012 3.4% 9 Bangladesh 410,031,102 3.0% 10 Argentina 406,321,682

RFP Selection Method for GWNcS

Slide 73

NPF | Standard Procurement Documents

New RFP – why? Offers greater flexibility in designing fit-for-purpose procurement process Evaluates quality of proposals, in conjunction with cost

Decision to use RFP Selection Method based on: Nature and complexity of the procurement PPSD and Procurement Plan Sufficient time to undertake a longer RFP procurement process The borrower’s capacity to: develop functional based specifications + monitor their

implementation develop and apply rated criteria and methodology

Page 74: 世界銀行の紹介と新調達政策 - World Bankpubdocs.worldbank.org/en/900701511321406044/112217...8 Indonesia 456,362,012 3.4% 9 Bangladesh 410,031,102 3.0% 10 Argentina 406,321,682

Initial Selection

Slide 74

NPF | Standard Procurement Documents

The RFP SPDs have been designed to work in conjunction with Initial Selection Regulations: “Initial Selection shall normally be used with RFP method

for GWNcS” “normally” means there must be a good business reason not to use

Initial Selection

Rationale Initial Selection enables borrower to invite only the highest ranked

applicants to submit proposals Fairer to the market as only applicants that have the best chance of

succeeding are put to the time and cost of submitting full proposals Improves quality of proposals and participation Makes the RFP process more manageable for the borrower

Page 75: 世界銀行の紹介と新調達政策 - World Bankpubdocs.worldbank.org/en/900701511321406044/112217...8 Indonesia 456,362,012 3.4% 9 Bangladesh 410,031,102 3.0% 10 Argentina 406,321,682

Initial Selection and Prequalification

Slide 75

NPF | Standard Procurement Documents

Difference between Initial Selection and Prequalification Prequalification = select all substantially qualified Applications Initial Selection = select only the best (highest scoring) qualified

Applications

Page 76: 世界銀行の紹介と新調達政策 - World Bankpubdocs.worldbank.org/en/900701511321406044/112217...8 Indonesia 456,362,012 3.4% 9 Bangladesh 410,031,102 3.0% 10 Argentina 406,321,682

Prequalification

Slide 76

NPF | Standard Procurement Documents

Page 77: 世界銀行の紹介と新調達政策 - World Bankpubdocs.worldbank.org/en/900701511321406044/112217...8 Indonesia 456,362,012 3.4% 9 Bangladesh 410,031,102 3.0% 10 Argentina 406,321,682

Initial Selection

Slide 77

NPF | Standard Procurement Documents

Page 78: 世界銀行の紹介と新調達政策 - World Bankpubdocs.worldbank.org/en/900701511321406044/112217...8 Indonesia 456,362,012 3.4% 9 Bangladesh 410,031,102 3.0% 10 Argentina 406,321,682

Range of Applications Initially Selected

Slide 78

NPF | Standard Procurement Documents

Set the range based on factors identified in PPSD: Diversity and maturity of market Complexity and/or novelty of the GWNcS being procured Level of effort required by proposers and borrower Not too few - need to maintain competitive tension Not too many - proposers need confidence that they have an increased

chance of winning: fosters quality of proposals encourages strong commitment to the process too many defies the purpose of Initial Selection

Note: range should be reasonable given nature + complexity of the procurement and market

Page 79: 世界銀行の紹介と新調達政策 - World Bankpubdocs.worldbank.org/en/900701511321406044/112217...8 Indonesia 456,362,012 3.4% 9 Bangladesh 410,031,102 3.0% 10 Argentina 406,321,682

NPF | Standard Procurement DocumentsSlide 79

Rated criteria

Benefits of rated criteria Rated criteria are weighted and evaluated using a scoring system Allows objective comparison of quality between different solutions Rated criteria may be applied to: identify the highest scoring proposed solutions assess innovative solutions criteria that cannot be expressed in monetary terms

Rewards proposals that exceed minimum requirements and demonstrate best overall VfM

Decision to award contract is based on the optimum combination of quality + cost

RFP GWNcSnew features

Page 80: 世界銀行の紹介と新調達政策 - World Bankpubdocs.worldbank.org/en/900701511321406044/112217...8 Indonesia 456,362,012 3.4% 9 Bangladesh 410,031,102 3.0% 10 Argentina 406,321,682

Rated criteria (cont.)

Slide 80

NPF | Standard Procurement Documents

To minimize subjectivity: criteria should be material and relevant to the needs each criterion should be clearly described scoring methodology should be appropriate to the nature + complexity of

procurement weightings are based on relative importance include the criteria, scores and scoring methodology in the Initial

Selection/RFP document - proposers should be fully informed Ensure: borrower has capacity to develop rated criteria and scoring methodology evaluation panel understands how to apply the criteria and methodology evaluation report details the scoring and justifies the recommendation

Page 81: 世界銀行の紹介と新調達政策 - World Bankpubdocs.worldbank.org/en/900701511321406044/112217...8 Indonesia 456,362,012 3.4% 9 Bangladesh 410,031,102 3.0% 10 Argentina 406,321,682

NPF | Standard Procurement DocumentsSlide 81

Performance based specifications

RFP Selection Method promotes performance based specifications RFP

Performance specifications: borrower describes the outcome or results to be achieved in terms of business or functional performance requirements

RFB Conformance specifications: borrower describes in detail the

technical requirements of the design, method of production, construction and/or delivery or implementation

RFP GWNcSnew features

Page 82: 世界銀行の紹介と新調達政策 - World Bankpubdocs.worldbank.org/en/900701511321406044/112217...8 Indonesia 456,362,012 3.4% 9 Bangladesh 410,031,102 3.0% 10 Argentina 406,321,682

NPF | Standard Procurement DocumentsSlide 82

Best and Final Offer (BAFO)

An option in international competitive procurement where borrower requests BAFOs

Used following evaluation and before contract award, when the procurement would benefit from bidders/proposers having a final opportunity to improve their bids/proposals

Must signal in the procurement document that BAFO may be used Borrower’s discretion to use will depend on market response If used, bidders/proposers are not required to submit a BAFO There cannot be Negotiation after BAFO If BAFO is used must employ independent Probity Assurance Provider Probity report shared with Bank, sent to proposers and published on

borrower’s website

BAFO and Negotiation are mutually exclusive i.e. you cannot use both in a single procurement

RFP GWNcSnew features

Page 83: 世界銀行の紹介と新調達政策 - World Bankpubdocs.worldbank.org/en/900701511321406044/112217...8 Indonesia 456,362,012 3.4% 9 Bangladesh 410,031,102 3.0% 10 Argentina 406,321,682

NPF | Standard Procurement DocumentsSlide 83

Negotiation

An option, in international competitive procurement, that allows the borrower to conduct a negotiation following evaluation and before contract award

Must signal in the procurement document that Negotiation may be used Borrower’s discretion to use will depend on market response Negotiation may address terms and conditions, price, social/

environmental aspects + innovation BUT must not materially change the borrower’s requirements Sequence: must negotiate first with the bidder/proposer with the MAB/P if outcome unsuccessful, negotiate with next MAB/P

Must be held in presence of independent probity assurance provider Probity report is shared with the Bank

RFP GWNcSnew features

Page 84: 世界銀行の紹介と新調達政策 - World Bankpubdocs.worldbank.org/en/900701511321406044/112217...8 Indonesia 456,362,012 3.4% 9 Bangladesh 410,031,102 3.0% 10 Argentina 406,321,682

NPF | Standard Procurement DocumentsSlide 84

2 envelope process

What is the 2 envelope process? Technical parts and financial parts of bids/proposals put in separate

envelopes Both envelopes are submitted simultaneously before the deadline At first opening only technical envelopes opened – financial

envelopes are kept in safe custody At second opening financial envelopes (for technically qualified

bids/proposals) are opened

Why have a 2 envelope process? Evaluation of technical parts is not influenced by price In BAFO/Negotiation helps maintain competitive tension between

bidders/proposers

RFP GWNcSnew features

Page 85: 世界銀行の紹介と新調達政策 - World Bankpubdocs.worldbank.org/en/900701511321406044/112217...8 Indonesia 456,362,012 3.4% 9 Bangladesh 410,031,102 3.0% 10 Argentina 406,321,682

Closed opening

Default position = maintain practice of public openings for both technical and financial partsException = closed opening with probity auditor = option that may be applied: two-envelope process, with RFP for goods, works or non-consulting services where BAFO or Negotiation are applied

Closed opening with probity auditor = new process when opening financial envelopes: opened in the presence of a probity assurance provider (not in public) auditor prepares a probity report deferred disclosure = at the same time as sending Notification of Intention

to Award the borrower: sends the probity report to proposers publishes report on website

RFP GWNcSnew features

Page 86: 世界銀行の紹介と新調達政策 - World Bankpubdocs.worldbank.org/en/900701511321406044/112217...8 Indonesia 456,362,012 3.4% 9 Bangladesh 410,031,102 3.0% 10 Argentina 406,321,682

NPF | Standard Procurement DocumentsSlide 86

Closed opening (continued)

Why closed opening and deferred publication of information? Proposers do not learn each others’ prices Maintains competitive tension while not compromising: integrity = as done in presence of probity assurance provider transparency = as full information is released later in the probity report

Reflects modern commercial practice

RFP GWNcSnew features

Page 87: 世界銀行の紹介と新調達政策 - World Bankpubdocs.worldbank.org/en/900701511321406044/112217...8 Indonesia 456,362,012 3.4% 9 Bangladesh 410,031,102 3.0% 10 Argentina 406,321,682

NPF | Standard Procurement DocumentsSlide 87

Most Advantageous Proposal (MAP)

New test to determine the successful proposal

When rated criteria are used: example Request for ProposalsThe most advantageous proposal is the proposal:1. of the proposer that meets the qualification criteria, and 2. whose proposal has been determined to be:

a. substantially responsive to the RFP document, andb. the best evaluated proposal (i.e. the highest scored proposal)

In this scenario the MAP represents the best VfM, which may not be the lowest evaluated cost

RFP GWNcSnew features

Page 88: 世界銀行の紹介と新調達政策 - World Bankpubdocs.worldbank.org/en/900701511321406044/112217...8 Indonesia 456,362,012 3.4% 9 Bangladesh 410,031,102 3.0% 10 Argentina 406,321,682

Useful links

World Bank’s Procurement Regulations for IPF Borrowers https://policies.worldbank.org/sites/ppf3/PPFDocuments/Forms/DispPage.aspx?docid=4005

World Bank’s Procurement Policy https://policies.worldbank.org/sites/ppf3/PPFDocuments/Forms/DispPage.aspx?docid=4002

Standard Procurement Documents templates

http://www.worldbank.org/en/projects-operations/products-and-services/brief/procurement-new-framework#SPD

Guidance on SPDs http://www.worldbank.org/en/projects-operations/products-and-services/brief/procurement-new-framework

Guidance on how to complain http://www.worldbank.org/en/projects-operations/products-and-services/brief/procurement-new-framework

Video: World Bank Procurement, How to bid, finding opportunities, what makes a successful bid

http://www.worldbank.org/en/news/video/2016/03/30/world-bank-procurement-video

Procurement App for IPad:Data on contracts https://itunes.apple.com/us/app/world-bank-project-procurement/id911312962?mt=8

Procurement App for IPad: Data on projects, finances and procurement data

https://itunes.apple.com/us/app/world-bank-group-finances/id465555488?mt=8

UNDB Online https://www.devbusiness.com/Search/Search.aspx?PreLoadProjects=1

Page 89: 世界銀行の紹介と新調達政策 - World Bankpubdocs.worldbank.org/en/900701511321406044/112217...8 Indonesia 456,362,012 3.4% 9 Bangladesh 410,031,102 3.0% 10 Argentina 406,321,682

5. Procurement-related Complaints

Page 90: 世界銀行の紹介と新調達政策 - World Bankpubdocs.worldbank.org/en/900701511321406044/112217...8 Indonesia 456,362,012 3.4% 9 Bangladesh 410,031,102 3.0% 10 Argentina 406,321,682

90

Possible scenarios

Complaints may be handled under three (3) possible scenarios:

1. Use of national procurement procedures 2. Alternative Procurement Arrangements (APA)3. Complaints arising under contracts where

Bank SPDs are required to use

Page 91: 世界銀行の紹介と新調達政策 - World Bankpubdocs.worldbank.org/en/900701511321406044/112217...8 Indonesia 456,362,012 3.4% 9 Bangladesh 410,031,102 3.0% 10 Argentina 406,321,682

91

Overview: Fraud and Corruption

Any complaint that includes allegations of Sanctionable Practices (Fraud and Corruption) requires special treatmentIrrespective of whether the contract is subject to prior or post review, the Bank shall apply due care and discretion on the extent of sharing information with the BorrowerComplaints alleging Fraud and Corruption are reported to INT

References: Bank’s Anti-Corruption Guidelines and Sanctions Framework. See Annex IV to the Procurement Regulations

Page 92: 世界銀行の紹介と新調達政策 - World Bankpubdocs.worldbank.org/en/900701511321406044/112217...8 Indonesia 456,362,012 3.4% 9 Bangladesh 410,031,102 3.0% 10 Argentina 406,321,682

92

Page 93: 世界銀行の紹介と新調達政策 - World Bankpubdocs.worldbank.org/en/900701511321406044/112217...8 Indonesia 456,362,012 3.4% 9 Bangladesh 410,031,102 3.0% 10 Argentina 406,321,682

93

Four (4) essential requirements 1. Who can complain?

Complainant must be an ‘interested party’

2. What can be challenged? The circumstances giving rise to the complaint must be relevant to the procurement -there are 3 (three) relevant circumstance

3. When to complain? Complaints must be filed in a ‘timely manner’ -Regulations set out the time limits that apply

4. What information to include?Regulations prescribe the minimum information that must be included in the complaint for it to considered

Page 94: 世界銀行の紹介と新調達政策 - World Bankpubdocs.worldbank.org/en/900701511321406044/112217...8 Indonesia 456,362,012 3.4% 9 Bangladesh 410,031,102 3.0% 10 Argentina 406,321,682

94

What can be challenged? Examples

1.Procurement DocumentsPrequalification documentInitial Selection documentRequest for Bids or Request for ProposalsAddenda to any of the above documents

2.DecisiontoExcludeNot qualifying in a PrequalificationNot being selected in an InitialSelectionBeing eliminated from a multi-stage procurement processNot passing the minimum technical qualifying mark in consulting services

3.Decisiontoawardacontract

Page 95: 世界銀行の紹介と新調達政策 - World Bankpubdocs.worldbank.org/en/900701511321406044/112217...8 Indonesia 456,362,012 3.4% 9 Bangladesh 410,031,102 3.0% 10 Argentina 406,321,682

95

Page 96: 世界銀行の紹介と新調達政策 - World Bankpubdocs.worldbank.org/en/900701511321406044/112217...8 Indonesia 456,362,012 3.4% 9 Bangladesh 410,031,102 3.0% 10 Argentina 406,321,682

96

Page 97: 世界銀行の紹介と新調達政策 - World Bankpubdocs.worldbank.org/en/900701511321406044/112217...8 Indonesia 456,362,012 3.4% 9 Bangladesh 410,031,102 3.0% 10 Argentina 406,321,682

97

Page 98: 世界銀行の紹介と新調達政策 - World Bankpubdocs.worldbank.org/en/900701511321406044/112217...8 Indonesia 456,362,012 3.4% 9 Bangladesh 410,031,102 3.0% 10 Argentina 406,321,682

98

Page 99: 世界銀行の紹介と新調達政策 - World Bankpubdocs.worldbank.org/en/900701511321406044/112217...8 Indonesia 456,362,012 3.4% 9 Bangladesh 410,031,102 3.0% 10 Argentina 406,321,682

99

Page 100: 世界銀行の紹介と新調達政策 - World Bankpubdocs.worldbank.org/en/900701511321406044/112217...8 Indonesia 456,362,012 3.4% 9 Bangladesh 410,031,102 3.0% 10 Argentina 406,321,682

100

Page 101: 世界銀行の紹介と新調達政策 - World Bankpubdocs.worldbank.org/en/900701511321406044/112217...8 Indonesia 456,362,012 3.4% 9 Bangladesh 410,031,102 3.0% 10 Argentina 406,321,682

101

Page 102: 世界銀行の紹介と新調達政策 - World Bankpubdocs.worldbank.org/en/900701511321406044/112217...8 Indonesia 456,362,012 3.4% 9 Bangladesh 410,031,102 3.0% 10 Argentina 406,321,682

6. 投資プロジェクト融資における調達(借入者用)

概要説明(日本語)

Page 103: 世界銀行の紹介と新調達政策 - World Bankpubdocs.worldbank.org/en/900701511321406044/112217...8 Indonesia 456,362,012 3.4% 9 Bangladesh 410,031,102 3.0% 10 Argentina 406,321,682

第1章 はじめに

1.1 IPFプロジェクトの調達においては、持続可能な開発の推進に当たり、借入者が、Value for Money (VfM)を公正な形で確保できるようでなければならない。

Procurement Guidance: Value for Money

http://pubdocs.worldbank.org/en/274711479159288956/Guidance-on-VfM-FINAL.pdf

VfMとは資源の効果的、効率的、経済的な利用を意味し、そのためには、関連する費用と便益の評価に加え、リスク評価、価格以外の属性やライフサイクルコストの評価も適宜に行わなければならない。価格だけでは必ずしもVfMを表すことはできない。

103

Page 104: 世界銀行の紹介と新調達政策 - World Bankpubdocs.worldbank.org/en/900701511321406044/112217...8 Indonesia 456,362,012 3.4% 9 Bangladesh 410,031,102 3.0% 10 Argentina 406,321,682

第2章 一般的考慮2.1 Legal Agreementは、借入者と世界銀行との法的関係を規定する。 借入者と契約者間の権利及び義務は、当該の入札依頼書/プロポーザル提出依頼書によって定められる。

104

Page 105: 世界銀行の紹介と新調達政策 - World Bankpubdocs.worldbank.org/en/900701511321406044/112217...8 Indonesia 456,362,012 3.4% 9 Bangladesh 410,031,102 3.0% 10 Argentina 406,321,682

第3章 ガバナンス

役割と責任

3.2 借入者は、世界銀行の資金による調達活動を、本調達規則に従って遂行する責任を負う。

事前レビューと事後レビュー

3.5 世界銀行は、高額または高リスク(またはその両方)の調達活動の場合、事前レビューを実施し、調達がLegal Agreementの条件に従って遂行されているかどうかを判定する。

3.6 世界銀行は、借入者の実施した調達活動についての事後レビューも実施し、調達活動がLegal Agreementの条件を満たしているかどうかを判定する。

105

Page 106: 世界銀行の紹介と新調達政策 - World Bankpubdocs.worldbank.org/en/900701511321406044/112217...8 Indonesia 456,362,012 3.4% 9 Bangladesh 410,031,102 3.0% 10 Argentina 406,321,682

利益相反機材、工事、及び非コンサルティング・サービス

3.15 以下のいずれかに該当する企業は、調達プロセスにおいて利益相反が存在するとみなされる。

a. プロジェクト準備または実施のためのコンサルティング・サービスに従事し、かつ、そのコンサルティング・サービスの結果として発生した、または直接関係する調達に従事する場合。

なお、この規定は、1)直接的または間接的に当該企業を支配する関連会社、2)当該企業により支配される関連会社、3)当該企業と共通の支配下にある関連会社にも適用される。

ただし、この規定は、ターンキー契約またはデザイン・ビルド契約の下で当該契約企業の義務を共同履行する構成企業には適用されない。

106

Page 107: 世界銀行の紹介と新調達政策 - World Bankpubdocs.worldbank.org/en/900701511321406044/112217...8 Indonesia 456,362,012 3.4% 9 Bangladesh 410,031,102 3.0% 10 Argentina 406,321,682

利益相反b. 下記のいずれかの業務に直接もしくは間接に関与している

借入者の専門スタッフと業務上密接なまたは親族関係にある場合(当該企業の従業員が該当する場合を含む)

1. 当該契約の調達文書・契約仕様書の作成、当該契約の評価プロセス、または

2. 当該契約の実行または監督に関与することになる場合

なお、かかる専門スタッフとは、1)借入者、2)プロジェクト実施機関、3)世界銀行融資の一部の受取者、4)借入者を代表するもしくは借入者の代理を務めるその他の当事者の専門職員を指す。

107

Page 108: 世界銀行の紹介と新調達政策 - World Bankpubdocs.worldbank.org/en/900701511321406044/112217...8 Indonesia 456,362,012 3.4% 9 Bangladesh 410,031,102 3.0% 10 Argentina 406,321,682

コンサルティング・サービス

3.16 世界銀行は、コンサルタントに以下を義務づけている。a.偏見のない専門的助言を客観的立場に立って与える。b. 常に借入者の利益を最優先させる。c. 助言を提供するに当たって、他の委託業務や自社の利害への抵触

を避ける。

不公正な競争上の優位性3.18 、、、コンサルタントやその子会社が、かつてかかる業務に関連し

たコンサルティング・サービスを提供したからと言って、優位に立つことは認められない。そのため、借入者はショートリストに残ったすべてのコンサルタントに対し、プロポーザル提出依頼と同時に、競争上優位となるすべての情報を開示するものとする。

108

Page 109: 世界銀行の紹介と新調達政策 - World Bankpubdocs.worldbank.org/en/900701511321406044/112217...8 Indonesia 456,362,012 3.4% 9 Bangladesh 410,031,102 3.0% 10 Argentina 406,321,682

109

One Bid/Proposal per Bidder/Consultant

機材、工事、及び非コンサルティング・サービス3.19企業は、単独にまたは別の入札/プロポーザルでのジョ

イント・ベンチャー構成企業として、複数の入札/プロポーザルを提出してはならない(代替入札/プロポーザルが許可されている場合を除く)。複数の入札/プロポーザルを提出または参加した場合、当該企業が関わるすべての入札/プロポーザルが失格となる。この規定は、複数の入札/プロポーザルにおいて任意の企業を下請業者として含めることを妨げるものではない。、、、

Page 110: 世界銀行の紹介と新調達政策 - World Bankpubdocs.worldbank.org/en/900701511321406044/112217...8 Indonesia 456,362,012 3.4% 9 Bangladesh 410,031,102 3.0% 10 Argentina 406,321,682

110

適格性

3.23 b. 借入国の国有企業 (SOE)または国有機関が借入者の国において競争し、契約できるためには、当該企業または機関が、世界銀行の同意可能な形で以下を証明する必要がある。

i. 法律上及び財務上独立していることii. 商法に従って経営されていることiii. 契約を発注する機関の監督下にないこと

SOEとJVを組む際に注意を要する。疑義のある場合は発注者に確認。

Page 111: 世界銀行の紹介と新調達政策 - World Bankpubdocs.worldbank.org/en/900701511321406044/112217...8 Indonesia 456,362,012 3.4% 9 Bangladesh 410,031,102 3.0% 10 Argentina 406,321,682

111

適格性

3.23 d. 世界銀行は、以下のすべてに該当する場合に限り、借入国の政府役人及び公務員を借入国におけるコンサルティング契約で個々に、またはコンサルティング企業により提案された専門家チームのメンバーとして雇用することに、ケースバイケースで合意する場合がある。

i. 当該の政府役人及び公務員のサービスが、ほかに代わる適切な存在がないほど優れたものである、またはその参加がプロジェクトの実行に不可欠である。ii. 当該の雇用が利害抵触を生まない。iii. 当該の雇用が借入国の法令や政策に抵触しない。

Page 112: 世界銀行の紹介と新調達政策 - World Bankpubdocs.worldbank.org/en/900701511321406044/112217...8 Indonesia 456,362,012 3.4% 9 Bangladesh 410,031,102 3.0% 10 Argentina 406,321,682

調達関係の異議

3.26 調達関係の異議は、調達プロセスの適切な段階において借入者に対して適時に提出されるべきである。かかる異議が提出された場合、借入者は速やかかつ適切に対処しなければならない。当該調達の関わるプロジェクトの不当な遅延や混乱を回避するため、異議の提出においてもその解決においても、適時性が極めて重要となる。

付記 III 調達関係の異議世界銀行の役割と責任3.9 C. 異議受理の通知を除き、評価・レビューのプロセスの間、契約決定通知の公表までは応募者/入札者/プロポーザル提出者/コンサルタントとの議論や連絡を控える。

Procurement Guidance: Procurementrelated Complaintshttp://pubdocs.worldbank.org/en/975671478891365829/Complaints-Guidance-FINAL-Revised.pdf

112

Page 113: 世界銀行の紹介と新調達政策 - World Bankpubdocs.worldbank.org/en/900701511321406044/112217...8 Indonesia 456,362,012 3.4% 9 Bangladesh 410,031,102 3.0% 10 Argentina 406,321,682

113

不正と腐敗

付記IV. 不正と腐敗2. 要件2.1 世界銀行は、世界銀行の融資による契約の調達プロセス、選定、及び契約履行の期間を通じて最高の倫理基準に従い、不正と腐敗に手を染めないよう要求している。対象となるのは、1)借入者(世界銀行融資の受益者を含む)、入札者(応募者/プロポーザル提出者)、コンサルタント、施工業者、及びサプライヤー、2)下請業者、下請コンサルタント、サービス提供者、またはサプライヤー、3)代理人(正式表明しているか否かを問わない)、4)それらの人員である。

Page 114: 世界銀行の紹介と新調達政策 - World Bankpubdocs.worldbank.org/en/900701511321406044/112217...8 Indonesia 456,362,012 3.4% 9 Bangladesh 410,031,102 3.0% 10 Argentina 406,321,682

114

2.2 a. 定義:本規則において、各用語を以下のように定義する。i. 「腐敗行為」とは、別の当事者の行動に不当に影響を与える目的

で、直接または間接に有価物を提供、贈与、受領、または要求する行為を指す。

ii.「不正行為」とは、金銭上やその他の利益を得るため、または責務を逃れるために、故意または過失により当事者を欺く、もしくは欺こうとする作為または不作為を意味する(不実表示を含む)。

iii.「共謀行為」とは、別の当事者の行動に不当に影響を及ぼすなど、不適切な目的を達成するための複数の当事者による申し合わせを意味する。

iv.「強制行為」とは、当事者の行動に不当に影響を及ぼす目的で、直接または間接に、当事者やその財産を損傷するまたは危害を加える、もしくはそのように威嚇することを意味する。

Page 115: 世界銀行の紹介と新調達政策 - World Bankpubdocs.worldbank.org/en/900701511321406044/112217...8 Indonesia 456,362,012 3.4% 9 Bangladesh 410,031,102 3.0% 10 Argentina 406,321,682

115

2.2 定義:本規則において、各用語を以下のように定義する。

v. 「妨害行為」とは、以下の (a)または (b)を指す。(a) i) 腐敗、不正、強制、あるいは共謀行為の容疑に対する世

界銀行の調査に重大な妨害を行う目的で、調査の証拠物件を故意に破壊、改ざん、変更、隠蔽する、または調査人に対し虚偽の証言をすること、及び/またはii) 調査に関する事柄についての知識の開示や調査遂行を妨げる目的で、何人かを威嚇、攻撃、脅迫すること。または、

(b) 本付記2.2節eに規定の世界銀行による検査及び監査の権利行使に対する重大な妨害を目的とする行為

Page 116: 世界銀行の紹介と新調達政策 - World Bankpubdocs.worldbank.org/en/900701511321406044/112217...8 Indonesia 456,362,012 3.4% 9 Bangladesh 410,031,102 3.0% 10 Argentina 406,321,682

開発プロジェクト調達戦略 (PPSD)

4.1世界銀行は、IPFプロジェクトについて、開発プロジェクト調達戦略 (PPSD)の策定を借入者に義務づけている。PPSDでは、調達活動がプロジェクトの開発目的をいかに支え、Value for Money (VfM)をいかに実現するかをリスクベース・アプローチで示さなければならない。 通常、最初の調達計画は、少なくともプロジェクト実施の最初の18カ月間を対象とする。Procurement Guidance: Proposed Procurement Strategy for Developmenthttp://pubdocs.worldbank.org/en/847531467334322069/PPSD-Long-Form.pdf

4.2 借入者は、プロジェクト準備期間中にPPSDと調達計画を作成し、世界銀行は融資交渉の完了前に、調達計画に合意する。調達計画は、Legal Agreementの一部を構成する。

117

Page 117: 世界銀行の紹介と新調達政策 - World Bankpubdocs.worldbank.org/en/900701511321406044/112217...8 Indonesia 456,362,012 3.4% 9 Bangladesh 410,031,102 3.0% 10 Argentina 406,321,682

第5章 調達条項

事前請負契約と遡及融資

5.1 借入者は、Legal Agreementの締結前に、調達プロセスの開始を希望する場合がある。… 借入者は自己のリスクにおいてかかる事前調達に着手するのであり、手続き、関係書類、契約対象となるプロポーザルについて世界銀行が同意したからといって、世界銀行は当該プロジェクトへの融資を義務付けられるわけではない。

118

Page 118: 世界銀行の紹介と新調達政策 - World Bankpubdocs.worldbank.org/en/900701511321406044/112217...8 Indonesia 456,362,012 3.4% 9 Bangladesh 410,031,102 3.0% 10 Argentina 406,321,682

Sample REQUEST FOR EXPRESSIONS OF INTEREST

REQUEST FOR EXPRESSIONS OF INTEREST(CONSULTING SERVICES – FIRMS SELECTION)

[COUNTRY][NAME OF PROJECT]Loan No./Credit No./ Grant No.: ___________________________

Assignment Title: __________________Reference No. (as per Procurement Plan): ___________________

The [insert name of Borrower/Beneficiary/Recipient] [has received/has applied for/intends to apply for] financing from the World Bank toward the cost of the [insert name of project or grant], and intends to apply part of the proceeds for consulting services.

予算的裏付けを確認できる。

119

Page 119: 世界銀行の紹介と新調達政策 - World Bankpubdocs.worldbank.org/en/900701511321406044/112217...8 Indonesia 456,362,012 3.4% 9 Bangladesh 410,031,102 3.0% 10 Argentina 406,321,682

中古機材の調達

5.11 世界銀行が合意し、調達計画に明記されている場合、借入者は、中古機材を調達することができる。以下の条件が適用されるものとする。

a. 必要とされるリスク軽減策がある場合、PPSDに反映されている。

b. 中古機材の調達と新品機材の調達とが併用されない。c. 技術要件/仕様書の中に、中古機材の使用年数や状態など最低限の特徴が明記されている。

d. しかるべき保証条項が明記されている。

120

Page 120: 世界銀行の紹介と新調達政策 - World Bankpubdocs.worldbank.org/en/900701511321406044/112217...8 Indonesia 456,362,012 3.4% 9 Bangladesh 410,031,102 3.0% 10 Argentina 406,321,682

121

電子調達システム5.8 借入者は、調達プロセスのうち、調達文書やアデンダムの発行、応募書

類/見積り/入札/プロポーザルの受領、その他の調達活動の実施について、電子調達システム (e-Procurement)を使用することができる。ただし、世界銀行がアクセス性、セキュリティ、公正性、機密性、監査証跡機能などシステムの適切性に満足している場合に限る。

調達計画・追跡ツール5.9 借入者は、IPFプロジェクトの調達計画を作成し、承認を得、更新し、な

らびにあらゆる調達取引を実施するに当たり、世界銀行のオンライン調達計画・追跡ツールであるSTEPを使用するものとする(ただし、LegalAgreementの中に世界銀行との別段の合意がある場合を除く)。

訳注:STEP (Systematic Tracking of Exchanges in Procurement)

Page 121: 世界銀行の紹介と新調達政策 - World Bankpubdocs.worldbank.org/en/900701511321406044/112217...8 Indonesia 456,362,012 3.4% 9 Bangladesh 410,031,102 3.0% 10 Argentina 406,321,682

122

持続可能な調達

5.12 世界銀行が合意する場合、借入者は、調達における持続可能性を確保するために、独自の持続可能な調達政策などを、調達プロセスに追加で含めることができる。ただし、そうした要件は、世界銀行の調達の基本原則に沿った形で適用されなければならない。詳細は、付記VII 「持続可能な調達」を参照。

訳注:「持続可能性」は、経済、環境、社会の3つの側面を考慮する。詳細は、Procurement Procurement Guidance: Sustainable Procurement(http://pubdocs.worldbank.org/en/788731479395390605/Sustainable-Procurement-Guidance-FINAL.pdf

Page 122: 世界銀行の紹介と新調達政策 - World Bankpubdocs.worldbank.org/en/900701511321406044/112217...8 Indonesia 456,362,012 3.4% 9 Bangladesh 410,031,102 3.0% 10 Argentina 406,321,682

123

Page 123: 世界銀行の紹介と新調達政策 - World Bankpubdocs.worldbank.org/en/900701511321406044/112217...8 Indonesia 456,362,012 3.4% 9 Bangladesh 410,031,102 3.0% 10 Argentina 406,321,682

バリュー・エンジニアリング

5.13 ……… バリュー・エンジニアリングによって、求めらる機能性、耐用寿命、信頼性を犠牲にすることなく、時間短縮、資材、方法、安価な選択肢による代替を促進することができる。 入札依頼書/プロポーザル依頼書にバリュー・エンジニアリングのアプローチを取り入れてもよい。契約履行時のバリュー・エンジニアリングの適用の仕組みは、契約文書の中に明記するものとする。

(SBD: Request for Bids Works )Para. 13.2: Value Engineering: (c) if this change results in a reduction in the

contract value of this part, the Engineer shall proceed in accordance with Sub-Clause 3.5 [Determinations] to agree or determine a fee, which shall be included in the Contract Price. This fee shall be half (50%) of the difference between the following amounts…..

124

Page 124: 世界銀行の紹介と新調達政策 - World Bankpubdocs.worldbank.org/en/900701511321406044/112217...8 Indonesia 456,362,012 3.4% 9 Bangladesh 410,031,102 3.0% 10 Argentina 406,321,682

機密情報

5.19 透明性の原則及び本調達規則に従った他の義務(特に、契約決定通知の公表ならびに契約に至らなかった入札者/プロポーザル提出者/コンサルタントへの結果説明に関係する義務)は遵守されなければならない。さらに、借入者は、応募者/入札者/プロポーザル提出者/コンサルタントから応募書類/入札/プロポーザルの中で、機密であると明記された上で提供された情報(専有情報、企業秘密、商業上または財務上の機密情報を含む場合がある)を開示してはならない。

125

Page 125: 世界銀行の紹介と新調達政策 - World Bankpubdocs.worldbank.org/en/900701511321406044/112217...8 Indonesia 456,362,012 3.4% 9 Bangladesh 410,031,102 3.0% 10 Argentina 406,321,682

126

評価情報の公開

5.20 借入者は、当該の調達文書における手続きに従って応募書類/入札/プロポーザルの評価結果を借入者が通知するまでの間、応募書類/入札/プロポーザルの審査、説明、評価に関係した情報について、その内容がいかなる入札者/プロポーザル提出者/コンサルタントにも、そうした種類の情報へのアクセス権のないいかなる者にも、開示されることがないよう、取り扱わなければならない。

コミュニケーション

5.21 調達プロセスの各段階における借入者と応募者/入札者/プロ

ポーザル提出者/コンサルタントの間でのコミュニケーションは、受領証明付きの書面により行うものとする。借入者は、初期段階での民間との対話、競争的対話、説明会などの会合について、書面にて記録に残すものとする。

Page 126: 世界銀行の紹介と新調達政策 - World Bankpubdocs.worldbank.org/en/900701511321406044/112217...8 Indonesia 456,362,012 3.4% 9 Bangladesh 410,031,102 3.0% 10 Argentina 406,321,682

127

調達機会の公表

5.22 ……..国際的な公開競争調達が予想されるすべて場合、一般調達通知書 (GPN)の作成が要求される。借入者は、プロジェクトの調達活動を開始する前にGPNを作成して世界銀行に提出しなければならない。

GPNには、以下の情報を含める。a. 借入者(または借入希望者)の名前b. 融資の目的と金額c. 調達計画による調達の範囲d. 借入者の連絡窓口e. 後に個別調達通知書 (SPN)が掲載される無料アクセス可能な

ウェブサイト(存在する場合)のアドレスf. 当該の調達機会の日程(わかる場合)

From template for GPNInterested eligible firms and individuals who would wish to be considered for theprovision of goods, works, non-consulting services and consulting services forthe above mentioned project, or those requiring additional information, shouldcontact the Borrower at the address below: ………..

GPNには興味ありと意思表示した方が良い。

Page 127: 世界銀行の紹介と新調達政策 - World Bankpubdocs.worldbank.org/en/900701511321406044/112217...8 Indonesia 456,362,012 3.4% 9 Bangladesh 410,031,102 3.0% 10 Argentina 406,321,682

128

調達機会の公表

5.23 借入者はSPNで以下の項目を広く通知するものとする。a. 無料アクセス可能な借入者のウェブサイト(存在する場合)b. 借入者の国の1紙以上の全国紙c. 官報

5.24 国際的な公開競争調達において、a. 借入者は、UNDBオンライン、ならびに可能であれば発行部数

の多い国際紙にも、SPNを掲載しなければならない。b. b.世界銀行は、SPNを世界銀行の外部向けウェブサイトに同時

に掲載するよう手配する。

Page 128: 世界銀行の紹介と新調達政策 - World Bankpubdocs.worldbank.org/en/900701511321406044/112217...8 Indonesia 456,362,012 3.4% 9 Bangladesh 410,031,102 3.0% 10 Argentina 406,321,682

標準調達文書5.25 国際競争調達において、借入者は、世界銀行の標準調達文書

(SPD)を使用するものとする。国内での調達では、借入者は世界銀行

の同意可能な独自の調達文書を用いることができる。

Procurement Guidance: Standard Procurement Documentshttp://pubdocs.worldbank.org/en/572311488224076481/SPDs-Guidance-

FINAL.pdf

規格及び技術仕様5.26 調達文書に明記される規格及び技術仕様は、可能な限り広く競争を促進すると同時に、性能など、調達の他要件を満たすものとする。……..すべての場合において、調達文書には、少なくとも指定された規格と同等の他の規格を満たす機器、材料または施工状況もまた認められると明記するものとする。

129

Page 129: 世界銀行の紹介と新調達政策 - World Bankpubdocs.worldbank.org/en/900701511321406044/112217...8 Indonesia 456,362,012 3.4% 9 Bangladesh 410,031,102 3.0% 10 Argentina 406,321,682

商標名の使用5.27 仕様書は、関連する技術的特性または性能またはその双方についての要件に基づいた内容とする。商標名、カタログ番号またはこれらに類する分類への言及は避けるものとする。特定の製造業者の商標名またはカタログ番号を明記しなければ仕様書が不完全になり、かつ明記が正当化される場合、商標名またはカタログ番号引用の後に「またはこれに同等のもの」という表現を付加し、指定された機材と同様の特性及び同等以上の性能を持つ機材の提供も認められるようにするものとする。

契約のタイプとアレンジ5.28 契約のタイプとアレンジを選択する際、調達の性質、リスク、複雑さ、VfMの

観点での留意事項を考慮に入れる。該当する契約のタイプとアレンジとしては、ランプサム方式、ターンキー方式、performance base、単価方式、タイムベース、Framework Agreement (FA)、建設・所有・操業方式、建設・操業・移譲方式がある。詳細は、付記VIII 「契約のタイプ」を参照。

Procurement Guidance: Standard Procurement Documentshttp://pubdocs.worldbank.org/en/572311488224076481/SPDs-Guidance-FINAL.pdf

130

Page 130: 世界銀行の紹介と新調達政策 - World Bankpubdocs.worldbank.org/en/900701511321406044/112217...8 Indonesia 456,362,012 3.4% 9 Bangladesh 410,031,102 3.0% 10 Argentina 406,321,682

New Standard Bidding Documents (1)http://www.worldbank.org/en/projects-operations/products-and-services/brief/procurement-

new-framework#SPD

Goods1. Request for Bids - Goods (1 envelope process) [January 2017

2. Request for Bids - Goods (2 envelope process) [January 2017],

Health 3. Prequalification Document - Health Sector (Pharmaceuticals, Vaccines and Condoms) [January 2017], 4. Request for Bids - Health (Pharmaceuticals, Vaccines and Condoms) [January 2017],

Education5. Request for Bids - Education (Textbooks)[January 2017],

Works6. *Prequalification Document – Works [January 2017], 7. *Request for Bids - Works (after prequalification) [January 2017], 8. *Request for Bids - Works (without prequalification) [January 2017]9. *Request for Bids - Works – Roads (Output and Performance Based Road Contracts) [January 2017],

131

Page 131: 世界銀行の紹介と新調達政策 - World Bankpubdocs.worldbank.org/en/900701511321406044/112217...8 Indonesia 456,362,012 3.4% 9 Bangladesh 410,031,102 3.0% 10 Argentina 406,321,682

New Standard Bidding Documents (2)http://wbnpf.procurementinet.org/spds

10. Request for Bids - Works French Civil Law [January 2017] (in French)11. *Request for Bids - Small Works (2 envelope process) [January 2017],12. *Request for Bids - Small Works (1 envelope process) [January 2017],

Design and Build13. Initial Selection [July 2017]14. Request for Proposal [July 2017]

Design, Build and Operate (DBO) Water and Wastewater Treatment Plants15. Initial Selection [July 2017]16. Guidance Note [July 2017]17. Request for Proposal [July 2017]

Plant18. Request for Bids - Plant (after prequalification) [January 2017], 19. Request for Bids - Plant (without prequalification) January 2017], 20. Initial Selection document – Plant [January 2017], 21. Request for Proposals - Plant [January 2017],

132

Page 132: 世界銀行の紹介と新調達政策 - World Bankpubdocs.worldbank.org/en/900701511321406044/112217...8 Indonesia 456,362,012 3.4% 9 Bangladesh 410,031,102 3.0% 10 Argentina 406,321,682

New Standard Bidding Documents (3)http://wbnpf.procurementinet.org/spds

Management Services22. Prequalification Document – Management Services [January 2017], 23. Request for Bids - Management Services [January 2017],

Non-Consulting Services24. Request for Bids - Non-consulting Services [January 2017],

Consulting Services25. *Request for Proposals - Consulting Services [January 2017],

Information Systems26. Request for Bids - Information Systems [January 2017], 27. Initial Selection document – Information Systems [January 2017], 28. Request for Proposals - Information Systems [January 2017],

133

Page 133: 世界銀行の紹介と新調達政策 - World Bankpubdocs.worldbank.org/en/900701511321406044/112217...8 Indonesia 456,362,012 3.4% 9 Bangladesh 410,031,102 3.0% 10 Argentina 406,321,682

調達文書の説明

5.31 調達業務の参加予定者は、借入者の発行した調達文書についての質問は書面にて依頼するものとする。……

5.32 発行済みの調達文書に修正がある場合、アデンダムとして書面にて加えるものとする。必要に応じて提出期限は延期される。

入札/プロポーザルの準備期間と提出

5.36 入札/プロポーザル提出の準備及び提出のために認められる期間は、国際的な公開競争による調達において、入札/プロポーザルの準備に認められる期間はミニマム30営業日とする。

134

Page 134: 世界銀行の紹介と新調達政策 - World Bankpubdocs.worldbank.org/en/900701511321406044/112217...8 Indonesia 456,362,012 3.4% 9 Bangladesh 410,031,102 3.0% 10 Argentina 406,321,682

135

ジョイント・ベンチャー (JV)5.38 世界銀行の融資による契約に参加する企業は、資格及びケイパ

ビリティを強化するために、国内外の企業とJVを設立することができる。JVは、長期的なもの(特定の調達とは無関係)でも特定の調達に関するものでもよい。JVでは、すべての構成企業が契約全体について連帯責任を負うものとする。世界銀行は、調達プロセスへの参加条件として、JVまたはその他企業間の提携を強制的に要求するようなものは認めない。

締切後の入札/プロポーザル5.49受付締切日時の後に受領された入札/プロポーザルは考慮されないものとす

る。

Page 135: 世界銀行の紹介と新調達政策 - World Bankpubdocs.worldbank.org/en/900701511321406044/112217...8 Indonesia 456,362,012 3.4% 9 Bangladesh 410,031,102 3.0% 10 Argentina 406,321,682

開札/開封……….5.41 通常、開札/開封は公開の場で行われる。ただし、状況によっては

(BAFOまたはネゴシエーションが行われる場合、競争的対話方式の場合など)、公開ではない時、世界銀行の同意可能な公正監査人の立ち会いを要す。

5.42 開札/開封の際、借入者はいかなる入札/プロポーザルの内容についても議論してはならず、また提出期限までに受け付けたいかなる入札/プロポーザルも拒絶してはならない。

評価基準5.50 評価基準及び評価方法は、入札依頼書/プロポーザル提出依頼書

の中に詳細に明記されるものとする。……….

Procurement Guidance: Evaluationhttp://pubdocs.worldbank.org/en/201591478724669006/Guidance-Evaluation-Criteria-

FINAL.pdf

136

Page 136: 世界銀行の紹介と新調達政策 - World Bankpubdocs.worldbank.org/en/900701511321406044/112217...8 Indonesia 456,362,012 3.4% 9 Bangladesh 410,031,102 3.0% 10 Argentina 406,321,682

137

Taxの取り扱い (Selection of Consultant SPD)

Instructions to Consultants (ITC)16. Financial Proposal……16.3 The Consultant and its Sub-consultants and Experts are responsible for meeting all tax liabilities arising out of the Contract unless stated otherwise in the Data Sheet. Information on taxes in the Client’s country is provided in the Data Sheet.

ICT-Data Sheet16.3 [If the Client has obtained a tax exemption applicable to the Contract, insert “The Client has obtained an exemption for the Consultant from payment of ___________ [insert the tax description. E.g., VAT, or local indirect taxes, etc.] in the Client’s country as per [insert reference to the applicable official source that issued an exemption].

[If there is no tax exemption in the Client’s country, insert the following:“Information on the Consultant’s tax obligations in the Client’s country can be found [insert reference to the appropriate official source]. “

Page 137: 世界銀行の紹介と新調達政策 - World Bankpubdocs.worldbank.org/en/900701511321406044/112217...8 Indonesia 456,362,012 3.4% 9 Bangladesh 410,031,102 3.0% 10 Argentina 406,321,682

Evaluation Criteria for VfM (Annex X)Para. 2.3VfMを実現するため、評価基準に以下の様な要因を考慮可能。

a. コスト:調達の性質にふさわしい以下のような方法を使用したコストの評価

i. 修正後の入札価格、または

ii. 修正後の入札価格に正味現在費用ベースでの当該資産の耐用年数にわたるランニングコスト/ライフサイクルコストを加算した額

b. 質: 質の評価は機材、工事、非コンサルティングサービス、またはコンサルティングサービスが要件をどの程度満たしているか、あるいはそれを上回っているかで判定

138

Page 138: 世界銀行の紹介と新調達政策 - World Bankpubdocs.worldbank.org/en/900701511321406044/112217...8 Indonesia 456,362,012 3.4% 9 Bangladesh 410,031,102 3.0% 10 Argentina 406,321,682

Evaluation Criteria for VfM (Annex X)

Para. 2.3 (continued)c.リスク:該当する評価リスクを軽減する基準

d.持続可能性:プロジェクトの目的を支持する経済的、環境的、社会的な利益を考慮し、ライフサイクル期間中に発生する変化に対応する提案に柔軟に適応可能な基準

e.革新性:機材、工事、非コンサルティングサービス、またはコンサルティングサービスの設計または引き渡しの革新性の評価が可能な基準、ならびに入札者/提案者が要件を上回る解決策やより大きなVfMを提供しうる代替的な解決策を必要に応じて入札/プロポーザルに含められる機会を与える基準

139

Page 139: 世界銀行の紹介と新調達政策 - World Bankpubdocs.worldbank.org/en/900701511321406044/112217...8 Indonesia 456,362,012 3.4% 9 Bangladesh 410,031,102 3.0% 10 Argentina 406,321,682

入札/プロポーザルの拒否機材、工事、及び非コンサルティング・サービス

5.58 すべての入札/プロポーザルの拒否は、世界銀行が「異議なし」と回答するのを条件に正当化される(事 前レビュー契約)

5.60 借入者は、すべての入札/プロポーザルを拒否した場合、その拒否を正当化する原因を検討し、調達書類に適切な改訂を加えた上で、新規の調達を行うものとする。

5.61 借入者は、より低価格の入札を得ることのみを目的として、すべての入札/プロポーザルを拒否し、同一の調達書類で新規調達を募集してはならない。

140

Page 140: 世界銀行の紹介と新調達政策 - World Bankpubdocs.worldbank.org/en/900701511321406044/112217...8 Indonesia 456,362,012 3.4% 9 Bangladesh 410,031,102 3.0% 10 Argentina 406,321,682

ABNORMALLY LOW BIDS

機材、工事、及び非コンサルティング・サービス5.65 極端な低価格の入札/プロポーザルとは、入札/プロポーザル価

格がその入札/プロポーザルの他の要素も合わせ、あまりに低いと思われるため、入札者がかかる提示価格で契約を履行す能力に重大な懸念。

5.66 借入者は、極端な低価格となりそうな入札/プロポーザルだと判断

した場合、入札/プロポーザル価格の詳細な価格分析を含め、契約の主題、範囲、提案されている方法、スケジュール、リスクと責任の配分をはじめ、入札依頼書/プロポーザル提出依頼書の要件との関係における説明を書面にて提出するよう、入札者/プロポーザル提出者に要求するものとする。

5.67 価格分析の評価後、入札者/プロポーザル提出者は提示価格に

て契約を履行するケイパビリティを備えていることを実証していないと借入者が判断した場合、借入者は入札/プロポーザルを拒絶するものとする。

141

Page 141: 世界銀行の紹介と新調達政策 - World Bankpubdocs.worldbank.org/en/900701511321406044/112217...8 Indonesia 456,362,012 3.4% 9 Bangladesh 410,031,102 3.0% 10 Argentina 406,321,682

142

停止期間

5.78 入札者/プロポーザル提出者/コンサルタントが契約内定通知を検討し、異議の提出が適切であるかどうかを評価する時間を与えるため、停止期間が適用になるものとする

5.79 停止期間は、借入者からの契約内定通知の送付をもって開始となる。5.82節に従って延長されない限り、この送付日から10営業日を停止期間とする。停止期間の前及び期間中は、契約を授与してはならない。

Page 142: 世界銀行の紹介と新調達政策 - World Bankpubdocs.worldbank.org/en/900701511321406044/112217...8 Indonesia 456,362,012 3.4% 9 Bangladesh 410,031,102 3.0% 10 Argentina 406,321,682

143

借入者による結果説明5.81 契約に至らなかった入札者/プロポーザル提出者/コンサルタントは、

……….借入者からの契約内定通知を受領後3日以内に、借入者に対して結果説明を書面にて要求できる。借入者は、契約に至らなかった入札者/プロポーザル提出者/コンサルタントのうち前記の期限内に要求を受領した者すべてに対して結果説明を提供するものとする。

世界銀行による結果説明5.96 契約決定通知の公表後、契約に至らなかった理由に関して借入者から

納得のいく説明を受けていない入札者/プロポーザル提出者/コンサルタントは、世界銀行に会合を申し入れることができる。申し入れ先は、借入者の国を担当するプラクティス・マネージャとする。……..かかる会合は、競合企業による入札/プロポーザルについて、事前レビューの対象となる契約の場合、借入者に伝えられた世界銀行の見解について、議論するための場ではない。

Page 143: 世界銀行の紹介と新調達政策 - World Bankpubdocs.worldbank.org/en/900701511321406044/112217...8 Indonesia 456,362,012 3.4% 9 Bangladesh 410,031,102 3.0% 10 Argentina 406,321,682

第6章所定の選定方法機材、工事、及び非コンサルティング・サービス

所定の選定方法

プロポーザル提出依頼 (RFP)

6.3 RFPは、プロポーザルを募集し、競争を通じて選定する方法である。調達する機材、工事、または非コンサルティング・サービスによっては、その性質及び複雑さゆえに、プロポーザル提出依頼書の要求事項を満たす形が様々に異なる。プロポーザル提出者に、それぞれカスタマイズされた解決策を認めた方が、借入者の事業ニーズがより満たされることがあり、そうした場合に、RFPを使用すべきである。

6.4 RFPは通常、マルチステージ方式で実施される。プロポーザルが提出依頼書の要求事項をどの程度満たしているかを評価できるよう、通常はRated-typeの評価基準が用いられる。詳細は、付記XII 「選定方法」を参照。

144

Page 144: 世界銀行の紹介と新調達政策 - World Bankpubdocs.worldbank.org/en/900701511321406044/112217...8 Indonesia 456,362,012 3.4% 9 Bangladesh 410,031,102 3.0% 10 Argentina 406,321,682

145

入札依頼 (RFB)6.5 RFBは、入札を募集し、競争を通じて選定する方法である。RFBを使用すべき

なのは、提供される機材、工事、または非コンサルティング・サービスの性質ゆえに、入札時に入札者が回答すべき詳細な要求事項を借入者が指定できる場合である。

6.6 この方法による調達は、シングルステージ方式で実施される。…. Rated-typeの評価基準は通常、RFBでは使用されない。

シングルステージ・ワンエンベロープ6.28 シングルステージ方式の調達が最もふさわしいのは、完全な入札/プロポー

ザルの提出を可能にする十分な仕様書と要件がある場合である。….

シングルステージ・ツーエンベロープ6.29 場合により、シングルステージ方式の調達でツーエンベロープ方式を使用する

ことができる。その場合、1つめのエンベロープには資格条件及び技術的提案を入れ、2つめのエンベロープには提示金額を入れる。2つのエンベロープは、順次、開札/開封され評価を受ける。

Page 145: 世界銀行の紹介と新調達政策 - World Bankpubdocs.worldbank.org/en/900701511321406044/112217...8 Indonesia 456,362,012 3.4% 9 Bangladesh 410,031,102 3.0% 10 Argentina 406,321,682

146

マルチステージ方式の調達6.30 以下のいずれかに該当する調達では、完全な技術仕様書の事前作成が往々

にして現実的でないことがある。a. プラントのデザイン・ビルドにターンキー契約が締結される大規模で複雑な

施設b. 複雑で特別な性格の工事、またはc. 急速な技術進歩のみられる複雑な情報通信技術

6.31 第1ステージでは、概念設計または性能面や機能仕様についてプロポーザルを募集する。その際、提案された方法について知るため、借入者が機密情報について確認するミーティングを開くことを条件とする。第2ステージでは、そうした内々の会合での確認事項を反映させるべく入札依頼書/プロポーザル提出依頼書を修正して資格を有する入札者/プロポーザル提出者に交付し、最終プロポーザルの提出を求める場合がある。…….

Page 146: 世界銀行の紹介と新調達政策 - World Bankpubdocs.worldbank.org/en/900701511321406044/112217...8 Indonesia 456,362,012 3.4% 9 Bangladesh 410,031,102 3.0% 10 Argentina 406,321,682

147

ベスト・アンド・ファイナル・オファー (BAFO)

6.32 …..国際競争調達において、…… BAFOとは、借入者が、要求事項を十分に満たした入札/プロポーザルを提出した者に対し、ベスト・アンド・ファイナル・オファー (BAFO)の提出を再度招請するプロセスである。そのようなプロセスが適切となり得るのは、入札者/プロポーザル提出者が最終書類を改善するため、価格を下げたり、応募書類を直したり、追加資料を提出するような場合で、それが調達プロセスにプラスに働くことが条件となる。…. 入札依頼書/プロポーザル提出依頼書の中に以下の点を明記するものとする。a. BAFOが用いられるか否か。b. 入札者/プロポーザル提出者にBAFOの提出義務はない。c. BAFO提出後、ネゴシエーションは行わない。

6.33 BAFOが用いられる場合、借入者は、公正監査人を手配しなければならない。かかる公正監査人選定は、世界銀行との間での合意が条件となる。

Page 147: 世界銀行の紹介と新調達政策 - World Bankpubdocs.worldbank.org/en/900701511321406044/112217...8 Indonesia 456,362,012 3.4% 9 Bangladesh 410,031,102 3.0% 10 Argentina 406,321,682

148

Rated-type評価基準の使用6.37 Rated-typeの評価基準とは、金額では十分な評価ができないときにメリットポ

イントで評価する基準である。詳細は、付記X 「評価基準」を参照。

競争的対話方式 (Competitive Dialogue)6.39 競争的対話方式は、プロポーザル提出者と活発に関わることのできるマルチ

ステージの対話型選定方式である。借入者は、競争的対話方式使用を正当化する根拠をPPSDの中で示すものとする。この方式は、複雑または革新的な調達でのみ使用が可能である。

6.40 競争的対話方式が適切となり得るのは、以下の場合である。a. ……..詳細な技術的・商業的アレンジについて、当事者間の協議と進展が

求められる場合b. 調達の性質及び複雑さゆえに、…..借入者が以下のいずれかまたは両方

を実施できない場合i. …技術的仕様と範囲、またはパフォーマンス仕様とその範囲を適切に

定義すること。及び/またはii. ….法的及び/または金銭的なアレンジを適切に規定すること。

Page 148: 世界銀行の紹介と新調達政策 - World Bankpubdocs.worldbank.org/en/900701511321406044/112217...8 Indonesia 456,362,012 3.4% 9 Bangladesh 410,031,102 3.0% 10 Argentina 406,321,682

149

官民パートナーシップ (PPP)

6.43 世界銀行は、PPPアレンジ、…..の下で調達が行われるプロジェクトまたは契約のうち、以下のすべてに該当するものについては、その費用を融資する場合がある。対象となるアレンジには、建設・所有・操業方式 (BOO)、建設・操業・移譲方式 (BOT)、建設・所有・操業・移譲方式 (BOOT)、コンセッションなどが含まれる。a. 世界銀行の調達の基本原則に沿って選定されている。b. 世界銀行の不正対策ガイドラインを適用した上で、選定されている。c. 本調達規則に定める条件に適宜、合致している。

6.44 詳細は、付記XIV 「官民パートナーシップ」を参照。

6.45 民間パートナーは、付記XIV 「官民パートナーシップ」に沿って選定される。当該施設のために必要となる機材、工事、非コンサルティング・サービス、及び/またはコンサルティング・サービスは、民間パートナーが、有資格者から、自らの手順にのっとり調達する。

Page 149: 世界銀行の紹介と新調達政策 - World Bankpubdocs.worldbank.org/en/900701511321406044/112217...8 Indonesia 456,362,012 3.4% 9 Bangladesh 410,031,102 3.0% 10 Argentina 406,321,682

150

VISUALIZING THE FRAMEWORK—FUNDING SOURCES DETERMINE POSSIBLE FINANCING OPTIONS AND VARY ACROSS SECTOR

Page 150: 世界銀行の紹介と新調達政策 - World Bankpubdocs.worldbank.org/en/900701511321406044/112217...8 Indonesia 456,362,012 3.4% 9 Bangladesh 410,031,102 3.0% 10 Argentina 406,321,682

151

契約における特別なアレンジ

Framework Agreement (FA)6.57 FAは、FA期間中になされる契約(以下、「コールオフ契約」という)に

適用される条件を定めたアレンジであり、1社または複数の企業との間で結ばれる。通常、ここで定められる条件には、手数料、料金、または価格決定方法が含まれる。FAは、一定期間中に必要に応じて生じると予想される機材、工事、または非コンサルティング・サービスの調達について締結されることがある。FAはいずれの当事者に対しても調達または供給を義務付けるものではない。FAの締結により、機材、工事、または非コンサルティング・サービスの調達が迅速化、効率化される。複数の企業が当事者となっているFAにおいては、借入者は、多数の企業の中から選定できるので、調達案件ごとに最大のValue for Moneyを確保するのに役立つ。

Page 151: 世界銀行の紹介と新調達政策 - World Bankpubdocs.worldbank.org/en/900701511321406044/112217...8 Indonesia 456,362,012 3.4% 9 Bangladesh 410,031,102 3.0% 10 Argentina 406,321,682

152

Performance baseの契約

6.60 Performance baseの契約とは、インプットではなくアウトプット(パフォーマンス目標に照らした成果)を測定して支払いが行われる契約関係をいう。成果は、品質、量、信頼性における機能面のニーズを満たすようにする。支払いは、求められる品質水準にて納品されたことを前提に、納品された成果の数量に応じて行われる。成果の質が低い場合、支払い金額の引き下げ、または支払いの保留が可能であり、成果の質が高めの場合、割増金が支払われることもある。契約者は、有効性が証明された確かな経験に基づき、最も適切な方法を自由に提案することができ、提案に当たっては、入札依頼書/プロポーザル提出依頼書に明記された品質水準を達成できる旨を明示するものとする。

6.61 Performance baseの調達としては、以下が挙げられる。a. 成果に基づいて支払われる非コンサルティング・サービスの提供b. 借入者が運営する施設の設計、供給、建設(または修復)、試運転、ま

たはc. 施設の設計、供給、建設(または修復)、ならびに試運転後一定年数期

間の運転及び保守の非コンサルティング・サービスの提供

Page 152: 世界銀行の紹介と新調達政策 - World Bankpubdocs.worldbank.org/en/900701511321406044/112217...8 Indonesia 456,362,012 3.4% 9 Bangladesh 410,031,102 3.0% 10 Argentina 406,321,682

153

第7章所定の選定方法 コンサルティング・サービス

7.2 コンサルティング企業について所定の選定方法は以下の通りである。a. 質とコストに基づく選定 (QCBS)b. 固定予算での選定 (FBS)c. 最安コストに基づく選定 (LCS)d. 質に基づく選定 (QBS)e. コンサルタントの資格に基づく選定 (CQS)f. 特命方式g. 商慣行

QCBS (Quality and Cost-Based Selection):コンサルタントの質に基づく選定FBS (Fixed Budget-based Selection):固定予算での選定LCS (Least Cost-based Selection):最安コストに基づく選定QBS (Quality-Based Selection):コンサルタントの質に基づく選定CQS (Consultant’s Qualifications-based Selection):コンサルタントの資格に基づく選定

Page 153: 世界銀行の紹介と新調達政策 - World Bankpubdocs.worldbank.org/en/900701511321406044/112217...8 Indonesia 456,362,012 3.4% 9 Bangladesh 410,031,102 3.0% 10 Argentina 406,321,682

Change in Consultant Selection

• Require full and complete terms of reference to be issued with the request for expression of interest.

• The shortlist shall include a sufficient number, not less than five (5) and not more than eight (8) eligible firms, with the possibility to accept less than (5) under-stated exceptional circumstances

• Shortlist Restrictions:

– Old: no more than two firms from the same country and at least one from a developing country.

– Now: legal entities that have relevant qualifications.

154

Page 154: 世界銀行の紹介と新調達政策 - World Bankpubdocs.worldbank.org/en/900701511321406044/112217...8 Indonesia 456,362,012 3.4% 9 Bangladesh 410,031,102 3.0% 10 Argentina 406,321,682

Quality and Cost Based Selection (QCBS)

155

Page 155: 世界銀行の紹介と新調達政策 - World Bankpubdocs.worldbank.org/en/900701511321406044/112217...8 Indonesia 456,362,012 3.4% 9 Bangladesh 410,031,102 3.0% 10 Argentina 406,321,682

156

付記X. 評価基準

2.3 VfMを実現するため、評価基準では以下のような要因を考慮に入れることができる。a. コスト:

i. 修正後の入札価格、またはii.修正後の入札価格に正味現在コストベースでの当該資産の耐用

年数にわたるランニングコスト/継続的費用(以下、「ライフサイクルコスト」という)を加算した額

b. 品質:機材、工事、非コンサルティング・サービス、またはコンサルティング・サービスが要件をどの程度満たしている。

c. リスク:評価された関連リスクを軽減する基準項目d. 持続可能性:プロジェクトの目標を支える明示された経済、環境、社

会面での利益を考慮する基準項目e. 革新性:要件を上回る解決策やより大きなVfMをもたらし得る代替

的な解決策を入札/プロポーザルに含める機会を与える基準項目

Page 156: 世界銀行の紹介と新調達政策 - World Bankpubdocs.worldbank.org/en/900701511321406044/112217...8 Indonesia 456,362,012 3.4% 9 Bangladesh 410,031,102 3.0% 10 Argentina 406,321,682

Life Cycle Cost (SDB:RFP Plant 2 stage)

157

3. Evaluation of Financial Part (ITP 51.1(i) )

(b) Life Cycle Costs Life cycle costing should be used when the costs of operation and/or maintenance over the specified life of the Facilities are estimated to be considerable in comparison with the initial cost and may vary among different proposals. It shall be evaluated on a net present value basis. When using life cycle costing, the Employer shall specify the following information:

Page 157: 世界銀行の紹介と新調達政策 - World Bankpubdocs.worldbank.org/en/900701511321406044/112217...8 Indonesia 456,362,012 3.4% 9 Bangladesh 410,031,102 3.0% 10 Argentina 406,321,682

Life Cycle Cost (SDB:RFP Plant 2 stage)

The operating and maintenance costs factors for calculation of the life cycle cost are:

(i) number of years for life cycle: ____[Insert number of years](ii) operating costs [to be determined from information provide by the Proposer](iii) maintenance costs, including the cost of spare parts for the initial period of operation [to be determined from information provide by the Proposer]and

(iv) Interest rate: ________[insert interest rate in percent] to be used to discount to present value all annual future costs calculated under (ii) and (iii) above for the period specified in (i).

158

Page 158: 世界銀行の紹介と新調達政策 - World Bankpubdocs.worldbank.org/en/900701511321406044/112217...8 Indonesia 456,362,012 3.4% 9 Bangladesh 410,031,102 3.0% 10 Argentina 406,321,682

Rated Type Criteria

159

Rated-Typeの基準3.2 Rated基準、すなわちメリットポイントで評価される非価格属性は、便益を

定量化することができず(またはを金額で表すことができず)、なおかつそうしたRated基準に関連する便益が入札/プロポーザルによって異なると予想されるときに使用される。

3.3 Rated基準、ならびに場合によってはその細部基準は、期待される成果を

上げる上での相対的な重要性に応じて優先順位が付けられ、メリットポイントが割り当てられ、重み付けされる。細部基準の数は最小限に留めるべきである。

3.4 Rated基準は、以下の主要点を適宜に含みうる。a. 方法および作業計画の質b. 性能、能力、または機能性c. 持続可能な調達

コンサルタント以外の調達でもJudgement の導入

Page 159: 世界銀行の紹介と新調達政策 - World Bankpubdocs.worldbank.org/en/900701511321406044/112217...8 Indonesia 456,362,012 3.4% 9 Bangladesh 410,031,102 3.0% 10 Argentina 406,321,682

Request for Proposals PlantDesign, Supply and Installation

(Two-Stage RFP, after First Stage RFP)

• Second Stage Financial and Technical Proposals (p.56)

whereC = Evaluated Proposal CostC low = the lowest of all Evaluated Proposal Cost among responsive ProposalsT = the total Technical Score awarded to the ProposalThigh = the Technical Score achieved by the Proposal that was scored best among all responsive ProposalsX = weight for Cost

160

( )XTTX

CCB

high

low−+≡ 1