白云机场it建设与应用 › media › aci › file › 2008 events › asq speeches...3. how...
TRANSCRIPT
白云机场IT建设与应用The Use of Airport IT at Guangzhou Baiyun Int. Airport
广东省机场管理集团公司GUANGDONG AIRPORT MANAGEMENT Co.
2008年4月1日
Chen Fenghua
OVERVIEW
• The Background of GBIA
• Issues & Challenges We Met
• How the IT Response to the Challenges
• GBIA IT Implementation Progress
• IT Application Case Study
• The Future of GBIA IT
• Terminal I of GBIA contains a 350,000 ㎡,
• Designed capacity of 25,000,000 annual passengers, 1,000,000 tones cargo per year on/before 2010.
• Two runways and a standard of 4F, meeting the criterion of A380’s take off and landing.
• Future five runways, 360,000 flights on take off/landing, annual passengers 80,000,000.
1. The Background of GBIA
1. The Background of GBIA -Fast Growth
• One night switched off on August 5th 2004• 26.32 million passengers in the year of 2005 。• Mile stone breakthrough to 30 million
passengers in the year of 2007
• At 17.8% growth rate on annual passengers
• FEDEX Asia Hub at GBIA and the Expansion on Terminal one ( 150,000 ㎡) will be fully on production In the year end of 2008
2. Issues & Challenges of GBIA
• A high effective operation on 24 hours a day, 365 days a year
• To satisfied both the customers’ & ourselves’ critical service demands
• To meet the requirement of the customers’complex and diverse demands
• To constantly striving to improve performance levels, operating efficiencies, and profitability.
3. How the IT Response to the Challenges
• Check-in, FIDS, CUSS, Baggage handling, and even the car parking system etc, depend on IT
• To provide a more effective, secure, less costly , comfortable airport depend on IT
• The investment of IT leads the cost reduction to the airport and its tenants
• The investment of IT will generate new business opportunities
• Innovation and investment does not necessarily mean additional cost or complexity
KEY:IT is the core of GBIA operations
4. The GBIA IT Implementation
(1)The integrated, reliable and open IT system
advancedpracticability
reliable
integration
Information share
ClockDGS DCS
BHS
BGA
DSS
CCTV
TVFIDS PA
PS
EPS
BA
FCS
AODBNetwoek
(2)The seven operation command center at an unified platform
Operation Command Center
Emergency Command Center
Apron Command Center
Customer ServiceCenter
Fire CommandCenter
Terminal ManagementCenter
Security CommandCenter
(3)How to achieve the purpose
• A modern, fully-integrated CAN, using IP-based technologies and operating across the entire airport campus.(ACAN)
• An open, well designed data storage & exchange system
• An open, easy-to-use application system structure
(1)A mile stone on reforming the China
Custom procedure in GBIA
5. The GBIA IT Application Case Study
The troubles of old procedure :
# A long procession and crowded
# A baggage should be check three times
# Waste more time to check in
# Hard to get full security check-up
# Passenger was embarrassed
# ……
PassDCS
Check In
The new China Custom procedure in GBIA
X‐RAY
Customs
ASI
passports
Pass
BHS X-RAY
CIQ
Boarding
Cooperate S
afety Inspection
(2)The expansion from Terminal
to Pearl River Delta Cities’ In-Town
Check-in Service
• Inquiring the flight information and booking become easy depend on the airport database
• Established GBIA’s In-Town check-in service around Pearl River Delta such as Shenzhen, Zhuhai, Dongguan, and so on
• Provide the real-time flight information and propositional measures
• Passengers can finish all the process before they come to the airport
( Con. )
6. The Future of GBIA IT
(1) E-airport materialize in every aspect
•Self-service
•Mobile information & media
•RFID used on baggage & boarding cards
•E-passport
6. The Future of GBIA IT (Con.)
(2)E-Cargo Platform in GBIA
• Depend on the Airport network an IT to realize the fully-integrated E-cargo platform connecting with the Office E-port
• Reduce the time of cargoes transacting at airport
• Provide more better service for FEDEX Asia Hub at GBIA
谢 谢!