COMPANY PROFILE

A: 36b Freedom Way, Lekki Phase 1, Lekki, Lagos – Nigeria.

T: +234 1 295 5253M:

E: [email protected]+234 908 169 2330

CEO’S MESSAGE

“For over 6 years DGS has been a cornerstone of onshore and offshore turnkey pipeline projects in Nigeria’s oil and energy sector.As one of the best-rated EPCI contractors in Nigeria, we have been a consistent player in the nation’s extraordinary growth.

DGS has fully diversified contracting capabilities through which we have successfully delivered numerous prestigiousprojects for local and international clients and we continue to participate in large scale projects either independently or in ajoint venture with some of the finest companies in Nigeria.

DGS takes the lead in providing contracting services with uncompromised commitment to Quality, Health, Safety andEnvironment.

We do this through the combination of an open relationship with our employees based on mutual trust,transparency, accountability and discipline.

To that end, we continue to invest in the most qualified, best-in-class talent to manageoperations and project delivery. Our management team is backed by an experienced workforceof over 200, each trained to industry’s best practice and operating to fully accreditedmanagement systems, health, safety and environmental sustainability standards. This amountsto our ultimate goal of ensuring continued precision in everything we do. We use state-of-the-art equipment to help in participating in upcoming challenging large-scale projects.

We are proud of our achievements to date and we are committed to continuallyenhancing our capabilities to ensure we remain at the forefront of our industry bothin terms of client and project needs.”

FOUAD SOLOMONMD/CEO

DGS INTEGRATED PROJECTS | CORPORATE PROFILE | 2

OUR VISION

OUR MISSION To be the performance leader in Africa’s Energy Infrastructureindustry.

To be the recognized performance leader in energy infrastructure,design, construction and. maintenance Being the performance leadermeans we will achieve operational excellence, industry-leadingcustomer satisfaction and superior financial performance.

DGS INTEGRATED PROJECTS | CORPORATE PROFILE | 3

DGS Integrated Projects Limited is a wholly indigenous company,incorporated in August 2009 to provide integrated service packages fromturnkey onshore/offshore pipeline operations, procurement, maintenance,repairs and supplies services, marine and energy services.

Registered in Nigeria, our primary focus is the provision of best in class, fit forpurpose and effective technical solutions to the challenges of the NigerianOil, Gas and other selected sectors.

Our history is one of continuous development and up-to-date technologyinfrastructure which has allowed it to evolve to being a provider of the highquality services in the industries we operate in.

We handle Oil and Gas Separation Modules; Gas Processing HandlingPackages; Gas Compression ; Produced Water Treatment; Solids Treatment;Flow Measurement Solutions; Pressure Maintenance Equipment Modules.

DGS is the parent company of Sage Gas and Power Limited, a companyembarking on a planned power generation plant targeting an initial 120MWcapacity from its power station to be located in Ikorodu, Lagos State. AlsoAllied Mechanical & Pipelines Services (AMPS) Limited is a DGS’ pipelinedivision providing best-in-class pipeline Engineering, Procurement,Construction and Installation (EPCI) services to oil and energy companies inNigeria.

DGS operates from its Lekki, Lagos corporate office and other strewn projectlocations across Nigeria.

01

02

DGS engages overarching measures to consistently monitor performance and aims to empower employees to live its corporate values.

Sapele Gas Compression Project

AlignmentUtorogu Well 37 at OML34

01

ABOUT DGS INTEGRATED PROJECTS LIMITED

DGS INTEGRATED PROJECTS | CORPORATE PROFILE | 4

DGS Turnkey EPCI Services

Competencies Pipeline Construction Services; Oil and Gas Separation Modules; Gas Processing and Handling Packages; Gas Compression and Booster Systems;Liquid Pumping and Boosting Systems;Produced Water Treatment;Solids Treatment and Disposal;Flow Measurement Solutions;Pressure Maintenance Equipment Modules;Power Generation and Energy;Optimization;Fabrication and Installation;Facility Repairs, Revamp, and Retrofitting;Demolition and Disposal SURF Services;Marine Logistics;Heavy Lift

Sectors Oil and gas; power and energy; civil – for the public and private sectors

THE DGS ORANIZATION – SERVICE STRUCTURE

DGS INTEGRATED PROJECTS | CORPORATE PROFILE | 5

THE DGS ORGANIZATION – ORGANIZATIONAL STRUCTURE

DGS INTEGRATED PROJECTS | CORPORATE PROFILE | 6

THE DGS ORGANIZATION – AFFILIATE STRUCTURE

DGS INTEGRATED PROJECTS | CORPORATE PROFILE | 7

DGS is supported by an integrated quality management system thatunderpins every aspect of its operations.

By strategically positioning quality management to the heart of itsoperations, DGS has bound together the full value chain of an integratedturnkey pipeline company, thus embedding the concept of a triple bottomline management culture, which is central to reinforcing sustainability anddelivering a quality outcome to all stakeholders.

Quality management is the cornerstone of DGS‘ operationalculture and business approach.

PROJECT PLANNING PROCESSKey to DGS project successes are its detailed planning processes, whichensure effective project delivery

DGS’ Operational Execution Strategy follows a four-step process:1. Initial phase of data analysis and client facility

diagnostics.2. Development of optimal client-specific

solutions.3. Execution of endorsed proposals and

Implementation of solutions.4. Execution performance tracking and continual

process improvement.Over the years this strategy has progressively strengthened our corporate structure and facilitated the evolution of operational capabilities.

OPERATIONAL EXECUTION STRATEGY

BUSINESS APPROACH

DGS INTEGRATED PROJECTS | CORPORATE PROFILE | 8

Wherever we operate, DGS strives to live by it core values of:• People • Excellence• Transformation • Customer Focus• Innovation• Integrity and• Performance

Health, safety and environmental management DGS’ health, safety and environment (HSE) policy and practices centre around a zero-harm philosophy towards people, host communities and the environment. Although DGS operates in communities with differing governance standards, it consistently enforces a standard approach to HSE and does not compromise its standards of conduct.

Our PromiseOur promise to our employees, clients and the wider public is that we will strive for continuous improvement in every area of our HSE efforts. This means continuous improvement of our standards, systems, programs, safety performance, management leadership, and employees’ awareness, knowledge, commitment and involvement.

01

02

DGS’ ‘HSE Four-step Process’ is a non-negotiable minimum standard for all operations and is driven at all levels throughout the company.

The environment: our greatest asset.Canoe paddler, Brass – Nigeria.

HSE Four-step process

INTEGRATED HSE MANAGEMENT SYSTEMFOUR-STEP PROCESS

Planningidentify activities with significant hazards and risks. Identify health, safety and environmental goals, objectives and targets.

Implementation and OperationManage, control and mitigate impacts of activities.

Checking and Corrective ActionAssess performance, implement corrective actions where needed.

Management Review Management System, function goals, objectives and targets

VALUES – HSE

DGS INTEGRATED PROJECTS | CORPORATE PROFILE | 9

DGS services depend greatly on skills, distinctivecompetencies and professionalism of its employees. Tothis point, DGS allocates significant resources totraining and development programs.

We are committed to economic progress within ourproject host communities and continue todemonstrate this commitment through contributionsand local operation facilities that aide thecommunities' economic development and growth.

We are committed to excellence; technology transferand empowering local communities. As a policy, wesubcontract aspects of our jobs to Nigerian companiesthat are capable and technically qualified. Weconstantly review our personnel resources in order tomake strategic adjustments based on project executionstages, experience, professionalism, and skills.

In order to promote and support the successfulimplementation of our supply and procurementinitiatives, DGS has established mechanisms andmeasures to ensure continuous compliance of thispivotal campaign that is hopeful of transformingNigeria and Nigerians into a global resource.

01Community hires.

NOPL Node Project, Obigbo - Nigeria

VALUES – LOCAL CONTENT

DGS INTEGRATED PROJECTS | CORPORATE PROFILE | 10

PROJECTS

PORTFOLIO

DGS INTEGRATED PROJECTS | CORPORATE PROFILE | 11

Notable Projects

Engineering, procurement and installation of 70MMSCF/D Gascompression and associated Inlet Separation and Discharge Facilities atSapele, Nigeria for OANDO/ Nigeria Gas Company (NGC);

Pipeline Repair and Commissioning of 24” X 55KM damaged section ofthe Escravos-Lagos pipeline in Nigeria’s Niger Delta area for the NigeriaGas Company (NGC);

Engineering, procurement and construction of 10” X 32KM Oil and GasExport pipeline systems, pumping and metering stations from PanOcean to Oredo Flowstation in Oredo, Nigeria for the Nigerian PetroleumDevelopment Company (NPDC);

Wellhead and flowlines Construction for Utorogu Well 37 at OML34 atUtorogu, Nigeria for ND-Western/Nigerian Petroleum DevelopmentCompany (NPDC);

Procurement and Installation of 8 (nos) containerised pressureregulating and metering systems (PRMS) ranging from 1-20 MMSCF/Dfor Ibafo, Mowe and Shagamu, Interchange gas supply customers for theNigeria Gas Company (NGC);

Engineering, Procurement and Construction for 6” X 35KM gas supplyPipeline and Metering Systems to Abeokuta, Nigeria for Tempo Paperand Pulp Packaging Limited.

Engineering, Procurement and Upgrade Installation of the ChevronMakaraba Compression System Facility to Include 100MMSC/D GasConditioning Facilities, Platform extensions and Installation of additional15MSCF/D Barge Mounted Gas Compression for low pressure AssociatedGas

01

02

Line PipesEPC for Abeokuta Gas Supply

Pile Casing AlignmentSapele Gas Compression Project

NOTABLE PROJECTS

DGS INTEGRATED PROJECTS | CORPORATE PROFILE | 12

53, 000 man-hours

ENGINEERING, PROCUREMENT, CONSTRUCTION, INSTALLATION AND COMMISSIONING OF GAS COMPRESSION STATION.

DGS INTEGRATED PROJECTS | CORPORATE PROFILE | 13

Client Nigeria Gas Company

Project Scope The Major Scope of the Project consists of:• Land reclamation of swamp;• Engineering and procurement of compressor skids;• Construction of foundations;• Installation of compressors;• Fabrication and installation of interconnecting piping;• Design, procurement, and installation of ICS.

Challenges • The work area included a three (3) metre deep swamp location. • Design of unmanned non-pipeline fixed gas evacuation system.• New facility development within live gas and power facility.

Location Sapele, Delta State – Nigeria.

Completion Date Ongoing

MAKARABA CENTRAL GAS PROCESSING FACILITY.

DGS INTEGRATED PROJECTS | CORPORATE PROFILE | 14

Client Nigeria Gas Company

Project Scope The Major Scope of the Project consists of:• Platform Reengineering;• EPICOM of Compression System;• EPICOM of Gas Dew-pointing System;• EPICOM of Condensate Stabilization and Disposal System

Challenges • Remote swamp location• Processing of low pressure gas streams• High pressure discharge into the ELPS• Reuse of existing platform constrained by limited extension possibilities

Location Warri, Delta State – Nigeria

Completion Date 2015 – Ongoing

NOPL OBIGBO 24” INTERCONNECTION GAS PIPELINE PROJECT.

DGS INTEGRATED PROJECTS | CORPORATE PROFILE | 15

Client Nigeria Gas Company

Project Scope The Major Scope of the Project consists of:• PCI of Bi-directional pig traps, condensate tank and actuated ball valves

and fittings for the pipeline system.

Challenges • Major road crossing by HDD• New facility development within live gas and power facility • Right of way (ROW) with two (2) parallel high pressure gas lines;• ROW category class one (1) population density.

Location Obigbo, Rivers State – Nigeria

Completion Date 2014

85, 580 man-hours