S.No. Description of Item Quantity Unit
1 2 3 4
1 Earth work excavation for
a. excavation for sub-cellar & cellar 930995.6 Cft.
b. Basement wall foundation 40000 Cft.
970995.6 Cft.
2 Refilling of excaved soil
a. Column footings 22032.36 Cft.
b. Basement wall foundation 43274.89 Cft.
65307.25 Cft.
3 Filling the earth work in the plinth level
a. Inside building for plinth level raised93099.56
Cft.
b. Out side the building 6619.4163 Cft.99718.98 Cft.
4 V.P.C.C. in 1:4:8 for
a. Under Column footings 9000 Cft.
b. Under Basement wall foundation 13000 Cft.
c. Under flooring 22828.39 Cft.
d. Bed blocks for holdfast to
Doors/Windows500
Cft.
45328.39 Cft.
5 V.R.C.C. in M20 fora. allround the building 17200 Cft.
b. Footings 87199.51 Cft.
c. Column Pedestal Below plinth beam
level8500
Cft.
d. Column from plinth to beam bottom7462.44
Cft.
e. Plinth beams 5666.31 Cft.
f. Beams 8332.62 Cft.
g. Slab 53274.89 Cft.
h. Lintels 1800 Cft.
i. Chajjas
189435.77 Cft.
6 Supplying and fabrication of Fe415 steel
for
a. allround the building 57343.08 Kg's
b. Footings 290714.45 Kg's
c. Column Pedestal Below plinth beam
level28338.15
Kg's
8/3/2019 Comples Excel Boq
http://slidepdf.com/reader/full/comples-excel-boq 2/40
d. Column from plinth to beam bottom24879.03
Kg's
e. Plinth beams 18890.91 Kg's
f. Beams 27780.12 Kg's
g. Slab 177613.16 Kg's
h. Lintels 6001.02 Kg's
i. Chajjas574216.83 Kg's
7 Super structure brick masonry 6" th: in 1:6
CM8180
cft.
8180 Cft.
8 Super structure brick masonry 4.5" th: in
1:4 CM0
Cft.
0 Cft.
9 Doors openings
a. Main door-MD1 -
b.Doors- D1 75 Sq.fts
c.Doors-D2 50 Sq.fts
d.Doors-D3 -
125 Sq.fts
10 Windows openings
a. Windows- W1 100 Sq.ftsb. Windows- W2
100 Sq.fts
11 Ventilators openings
a. Ventilators -V 100 Sq.fts
b. Ventilators -V1 0 Sq.fts
100 Sq.fts
12 Plastering in two coats
a. Ceilings 44385 Sq.fts
b. Internal walls 27457.15 Sq.fts
c. External walls 8400 Sq.fts
80242.15 Sq.fts
13 Internal wall paintings
a. Ceiling 44385 Sq.fts
b.Walls 27457.15 Sq.fts
8/3/2019 Comples Excel Boq
http://slidepdf.com/reader/full/comples-excel-boq 3/40
71842.15 Sq.fts
14 External wall paintings 8400 Sq.fts
8400 Sq.fts
15 Enamil paintings
a. Doors 125 Sq.fts
b. Windows 100 Sq.fts
c. Ventilators 100 Sq.fts
d. Gates 0
325 Sq.fts
16 Supplying and fixing Iron gate Sq.fts
17 Floorings 45444.86 Sq.fts
45444.86 Sq.fts
18 Tiles
a. toilet flooring 479.89 Sq.fts
b. Toilet dadoing 839.92 Sq.fts
c. kitchen dadoing 0 Sq.fts
1319.81 Sq.fts
19 Terrace
a. Finishing 0 Sq.fts
0 Sq.fts
TOTAL AMOUNT FOR SUB-
CELLAR
S.No. Description of Item Quantity Unit
1 2 3 4
1 Earth work excavation fora. excavation for sub-cellar & cellar
b. Basement wall foundation
2 Refilling of excaved soil
a. Column footings
b. Basement wall foundation
CELLAR FLOOR QUANTITY
8/3/2019 Comples Excel Boq
http://slidepdf.com/reader/full/comples-excel-boq 4/40
3 Filling the earth work in the plinth level
a. Inside building for plinth level raised
b. Out side the building
4 V.P.C.C. in 1:4:8 for
a. Under Column footings
b. Under Basement wall foundation
c. Under flooring
d. Bed blocks for holdfast to
Doors/Windows
5 V.R.C.C. in M20 for
a. allround the building 17200 Cft.
b. Footings -
c. Column Pedestal Below plinth beam
level-
d. Column from plinth to beam bottom7462.44
Cft.
e. Plinth beams -
f. Beams 8332.62 Cft.
g. Slab 53274.89 Cft.
h. Lintels 1800 Cft.
i. Chajjas Cft.
88069.95 Cft.
6 Supplying and fabrication of Fe415 steel
for
a. allround the building 57343.08 Kg's
b. Footings Kg's
c. Column Pedestal Below plinth beam
level
Kg's
d. Column from plinth to beam bottom24879.03
Kg's
e. Plinth beams Kg's
f. Beams 27780.12 Kg's
g. Slab 177613.16 Kg's
h. Lintels 6001.02 Kg's
i. Chajjas 0 Kg's
236273.33 Kg's
8/3/2019 Comples Excel Boq
http://slidepdf.com/reader/full/comples-excel-boq 5/40
7 Super structure brick masonry 6" th: in 1:6
CM8180
Cft.
8180 Cft.
8 Super structure brick masonry 4.5" th: in
1:4 CM0
Cft.
0 Cft.
9 Doors openings
a. Main door-MD1 100 Sq.fts
b.Doors- D1 75 Sq.fts
c.Doors-D2 50 Sq.fts
d.Doors-D3 0 Sq.fts
225 Sq.fts
10 Windows openings
a. Windows- W1 100 Sq.fts
b. Windows- W2 0 Sq.fts100 Sq.fts
11 Ventilators openings
a. Ventilators -V 100 Sq.fts
b. Ventilators -V1 0 Sq.fts
100 Sq.fts
12 Plastering in two coats
a. Ceilings 502.88 Sq.fts
b. Internal walls 25907.17 Sq.fts
c. External walls 8400 Sq.fts
34810.05 Sq.fts
13 Internal wall paintings
a. Ceiling 43255.2 Sq.fts
b.Walls 25907.17 Sq.fts
69162.37 Sq.fts
14 External wall paintings 8400 Sq.fts8400 Sq.fts
15 Enamil paintings
a. Doors 250 Sq.fts
b. Windows 100 Sq.fts
c. Ventilators 100 Sq.fts
d. Gates Sq.fts
8/3/2019 Comples Excel Boq
http://slidepdf.com/reader/full/comples-excel-boq 6/40
450 Sq.fts
16 Supplying and fixing Iron gate
17 Floorings 45444.86 Sq.fts
45444.86 Sq.fts
18 Tiels for
a. toilet flooring 1500 Sq.fts
b. Toilet dadoing 2950 Sq.fts
c. kitchen dadoing Sq.fts
4450 Sq.fts
19 Terrace
a. Finishing 0 Sq.fts
0 Sq.fts
TOTAL AMOUNT FOR CELLAR
GROUND FLOOR
S.No. Description of Item Quantity Unit
1 2 3 4
1 Earth work excavation for
a. excavation for sub-cellar & cellar
b. Basement wall foundation
2 Refilling of excaved soil
a. Column footings
b. Basement wall foundation
3 Filling the earth work in the plinth level
a. Inside building for plinth level raised
b. Out side the building
4 V.P.C.C. in 1:4:8 for
a. Under Column footings
b. Under Basement wall foundation
8/3/2019 Comples Excel Boq
http://slidepdf.com/reader/full/comples-excel-boq 7/40
c. Under flooring
d. Bed blocks for holdfast to
Doors/Windows
5 V.R.C.C. in M20 for
a. allround the building
b. Footingsc. Column Pedestal Below plinth beam
level
d. Column from plinth to beam bottom7462.44
Cft.
e. Plinth beams
f. Beams 8332.62 Cft.
g. Slab 53274.89 Cft.
h. Lintels 1800 Cft.
i. Chajjas 1800 Cft.
72669.95 Cft.
6 Supplying and fabrication of Fe415 steel
for
a. allround the building 0 Kg's
b. Footings 0 Kg's
c. Column Pedestal Below plinth beam
level0
Kg's
d. Column from plinth to beam bottom24879.03
Kg's
e. Plinth beams 0 Kg's
f. Beams 27780.12 Kg's
g. Slab 177613.16 Kg's
h. Lintels 6001.02 Kg's
i. Chajjas 6001.02 Kg's
242274.35 Kg's
7 Super structure brick masonry 6" th: in 1:6
CM8180
Cft.
8180 Cft.
8 Super structure brick masonry 4.5" th: in
1:4 CM0
Cft.
0 Cft.
9 Doors openings
a. Main door-MD1 500 Sq.fts
b.Doors- D1 300 Sq.fts
c.Doors-D2 100 Sq.fts
8/3/2019 Comples Excel Boq
http://slidepdf.com/reader/full/comples-excel-boq 8/40
d.Doors-D3 100 Sq.fts
1000 Sq.fts
10 Windows openings
a. Windows- W1 225 Sq.fts
b. Windows- W2 225 Sq.fts
450 Sq.fts
11 Ventilators openings
a. Ventilators -V 125 Sq.fts
b. Ventilators -V1 125 Sq.fts
250 Sq.fts
12 Plastering in two coats
a. Ceilings 502.88 Sq.fts
b. Internal walls 40434.35 Sq.fts
c. External walls8400 Sq.fts
49337.23 Sq.fts
13 Internal wall paintings
a. Ceiling 35895 Sq.fts
b.Walls 40434.35 Sq.fts
76329.35 Sq.fts
14 External wall paintings 8400 Sq.fts
8400 Sq.fts
15 Enamil paintings
a. Doors 1000 Sq.fts
b. Windows 550 Sq.fts
c. Ventilators 250 Sq.fts
d. Gates Sq.fts
1800 Sq.fts
16 Supplying and fixing Iron gate
17 Floorings 45444.86 Sq.fts
45444.86 Sq.fts
18 Tiels for
a. toilet flooring 4500 Sq.fts
8/3/2019 Comples Excel Boq
http://slidepdf.com/reader/full/comples-excel-boq 9/40
b. Toilet dadoing 6500 Sq.fts
c. kitchen dadoing Sq.fts
11000 Sq.fts
19 Terrace
a. Finishing 0 Sq.fts
0 Sq.fts
TOTAL AMOUNT FOR GROUND
FLOOR
FIRST FLOOR
S.No. Description of Item Quantity Unit
1 2 3 4
1 Earth work excavation for
a. excavation for sub-cellar & cellar
b. Basement wall foundation
2 Refilling of excaved soil
a. Column footings
b. Basement wall foundation
3 Filling the earth work in the plinth level
a. Inside building for plinth level raised
b. Out side the building
4 V.P.C.C. in 1:4:8 for
a. Under Column footings
b. Under Basement wall foundation
c. Under flooring
d. Bed blocks for holdfast to
Doors/Windows
5 V.R.C.C. in M20 for
a. allround the building
b. Footings
c. Column Pedestal Below plinth beam
level
d. Column from plinth to beam bottom7462.44
Cft.
e. Plinth beams
8/3/2019 Comples Excel Boq
http://slidepdf.com/reader/full/comples-excel-boq 10/40
f. Beams 8332.62 Cft.
g. Slab 53274.89 Cft.
h. Lintels 1800 Cft.
i. Chajjas 1800 Cft.
72669.95 Cft.
6 Supplying and fabrication of Fe415 steel
for
a. allround the building 0 Kg's
b. Footings 0 Kg's
c. Column Pedestal Below plinth beam
level0
Kg's
d. Column from plinth to beam bottom24879.03
Kg's
e. Plinth beams 0 Kg's
f. Beams 27780.12 Kg's
g. Slab 177613.16 Kg's
h. Lintels 6001.02 Kg's
i. Chajjas 6001.02 Kg's
242274.35 Kg's
7 Super structure brick masonry 6" th: in 1:6
CM10230
Cft.
10230 Cft.
8 Super structure brick masonry 4.5" th: in
1:4 CM 0
Cft.
0 Cft.
9 Doors openings
a. Main door-MD1 750 Sq.fts
b.Doors- D1 500 Sq.fts
c.Doors-D2 250 Sq.fts
d.Doors-D3 0 Sq.fts
1500 Sq.fts
10 Windows openings
a. Windows- W1 600 Sq.fts
b. Windows- W2 200 Sq.fts
800 Sq.fts
11 Ventilators openings
a. Ventilators -V 350 Sq.fts
b. Ventilators -V1 200 Sq.fts
550 Sq.fts
8/3/2019 Comples Excel Boq
http://slidepdf.com/reader/full/comples-excel-boq 11/40
12 Plastering in two coats
a. Ceilings 502.88 Sq.fts
b. Internal walls 40434.35 Sq.fts
c. External walls 8400 Sq.fts
49337.23 Sq.fts
13 Internal wall paintings
a. Ceiling 32430.64 Sq.fts
b.Walls 40434.35 Sq.fts
72864.99 Sq.fts
14 External wall paintings 8400 Sq.fts
8400 Sq.fts
15 Enamil paintings
a. Doors 1500 Sq.fts
b. Windows 800 Sq.fts
c. Ventilators 550 Sq.fts
d. Gates Sq.fts
2850 Sq.fts
16 Supplying and fixing Iron gate
17 Floorings 45444.86 Sq.fts
45444.86 Sq.fts
18 Tiels for
a. toilet flooring 4500 Sq.fts
b. Toilet dadoing 6500 Sq.fts
c. kitchen dadoing Sq.fts
11000 Sq.fts
19 Terrace
a. Finishing 0 Sq.fts
0 Sq.fts
TOTAL FOR FIRST FLOOR
SECOND FLOOR
S.No. Description of Item Quantity Unit
1 2 3 4
8/3/2019 Comples Excel Boq
http://slidepdf.com/reader/full/comples-excel-boq 12/40
1 Earth work excavation for
a. excavation for sub-cellar & cellar
b. Basement wall foundation
2 Refilling of excaved soil
a. Column footings
b. Basement wall foundation
3 Filling the earth work in the plinth level
a. Inside building for plinth level raised
b. Out side the building
4 V.P.C.C. in 1:4:8 for
a. Under Column footings
b. Under Basement wall foundation
c. Under flooring
d. Bed blocks for holdfast to
Doors/Windows
5 V.R.C.C. in M20 fora. allround the building
b. Footings
c. Column Pedestal Below plinth beam
level
d. Column from plinth to beam bottom7462.44
Cft.
e. Plinth beams
f. Beams 8332.62 Cft.
g. Slab 53274.89 Cft.
h. Lintels 1800 Cft.
i. Chajjas 1800 Cft.
72669.95 Cft.
6 Supplying and fabrication of Fe415 steel
for
a. allround the building 0 Kg's
b. Footings 0 Kg's
c. Column Pedestal Below plinth beam
level0
Kg's
8/3/2019 Comples Excel Boq
http://slidepdf.com/reader/full/comples-excel-boq 13/40
d. Column from plinth to beam bottom24879.03
Kg's
e. Plinth beams 0 Kg's
f. Beams 27780.12 Kg's
g. Slab 177613.16 Kg's
h. Lintels 6001.02 Kg's
i. Chajjas 6001.02 Kg's242274.35 Kg's
7 Super structure brick masonry 6" th: in 1:6
CM9510
Cft.
9510 Cft.
8 Super structure brick masonry 4.5" th: in
1:4 CM0
Cft.
0 Cft.
9 Doors openings
a. Main door-MD1 800 Sq.fts
b.Doors- D1 500 Sq.fts
c.Doors-D2 100 Sq.fts
d.Doors-D3 100 Sq.fts
1500 Sq.fts
10 Windows openings
a. Windows- W1 500 Sq.fts
b. Windows- W2 300 Sq.fts
800 Sq.fts
11 Ventilators openings
a. Ventilators -V 350 Sq.fts
b. Ventilators -V1 200 Sq.fts
550 Sq.fts
12 Plastering in two coats
a. Ceilings 502.88 Sq.fts
b. Internal walls 35487.01 Sq.fts
c. External walls 8400 Sq.fts
44389.89 Sq.fts
13 Internal wall paintings
a. Ceiling 34539.6 Sq.fts
b.Walls 35487.01 Sq.fts
8/3/2019 Comples Excel Boq
http://slidepdf.com/reader/full/comples-excel-boq 14/40
70026.61 Sq.fts
14 External wall paintings 34539.6 Sq.fts
34539.6 Sq.fts
15 Enamil paintings
a. Doors 1500 Sq.fts
b. Windows 800 Sq.fts
c. Ventilators 550 Sq.fts
d. Gates
2850 Sq.fts
16 Supplying and fixing Iron gate
17 Floorings 45444.86 Sq.fts
45444.86 Sq.fts
18 Tiels for
a. toilet flooring 4500 Sq.fts
b. Toilet dadoing 6500 Sq.fts
c. kitchen dadoing Sq.fts
11000 Sq.fts
19 Terrace
a. Finishing 0 Sq.fts
0 Sq.fts
TOTAL FOR SECOND FLOOR
THIRD FLOOR
S.No. Description of Item Quantity Unit
1 2 3 4
1 Earth work excavation for
a. excavation for sub-cellar & cellar
b. Basement wall foundation
2 Refilling of excaved soil
a. Column footings
b. Basement wall foundation
3 Filling the earth work in the plinth level
8/3/2019 Comples Excel Boq
http://slidepdf.com/reader/full/comples-excel-boq 15/40
a. Inside building for plinth level raised
b. Out side the building
4 V.P.C.C. in 1:4:8 for
a. Under Column footings
b. Under Basement wall foundation
c. Under flooring
d. Bed blocks for holdfast to
Doors/Windows
5 V.R.C.C. in M20 for
a. allround the building
b. Footingsc. Column Pedestal Below plinth beam
level
d. Column from plinth to beam bottom7462.44
Cft.
e. Plinth beams
f. Beams 8332.62 Cft.
g. Slab 53274.89 Cft.
h. Lintels 1800 Cft.
i. Chajjas 1800 Cft.
72669.95 Cft.
6 Supplying and fabrication of Fe415 steel
for
a. allround the building 0 Kg's
b. Footings 0 Kg's
c. Column Pedestal Below plinth beam
level0
Kg's
d. Column from plinth to beam bottom24879.03
Kg's
e. Plinth beams 0 Kg's
f. Beams 27780.12 Kg's
g. Slab 177613.16 Kg's
h. Lintels 6001.02 Kg's
i. Chajjas 6001.02 Kg's
242274.35 Kg's
7 Super structure brick masonry 6" th: in 1:6
CM789.72
Cft.
789.72 Cft.
8/3/2019 Comples Excel Boq
http://slidepdf.com/reader/full/comples-excel-boq 16/40
8 Super structure brick masonry 4.5" th: in
1:4 CM0
Cft.
0 Cft.
9 Doors openings
a. Main door-MD1 800 Sq.fts
b.Doors- D1 500 Sq.ftsc.Doors-D2 100 Sq.fts
d.Doors-D3 100 Sq.fts
1500 Sq.fts
10 Windows openings
a. Windows- W1 500 Sq.fts
b. Windows- W2 300 Sq.fts
800 Sq.fts
11 Ventilators openings
a. Ventilators -V 350 Sq.fts
b. Ventilators -V1 200 Sq.fts
550 Sq.fts
12 Plastering in two coats
a. Ceilings 502.88 Sq.fts
b. Internal walls 24877.12 Sq.fts
c. External walls 8400 Sq.fts
33780 Sq.fts
13 Internal wall paintings
a. Ceiling 34809.99 Sq.fts
b.Walls 24877.12 Sq.fts
59687.11 Sq.fts
14 External wall paintings 34809.99 Sq.fts
34809.99 Sq.fts
15 Enamil paintings
a. Doors 1500 Sq.fts
b. Windows 800 Sq.fts
c. Ventilators 550 Sq.fts
d. Gates
2850 Sq.fts
8/3/2019 Comples Excel Boq
http://slidepdf.com/reader/full/comples-excel-boq 17/40
16 Supplying and fixing Iron gate
17 Floorings 45444.86 Sq.fts
45444.86 Sq.fts
18 Tiels for
a. toilet flooring 4500 Sq.fts
b. Toilet dadoing 6500 Sq.fts
c. kitchen dadoing Sq.fts
11000 Sq.fts
19 Terrace
a. Finishing 0 Sq.fts
0 Sq.fts
TOTAL FOR THIRD FLOOR
FOURTH FLOOR
S.No. Description of Item Quantity Unit
1 2 3 4
1 Earth work excavation for
a. excavation for sub-cellar & cellar
b. Basement wall foundation
2 Refilling of excaved soil
a. Column footings
b. Basement wall foundation
3 Filling the earth work in the plinth level
a. Inside building for plinth level raised
b. Out side the building
4 V.P.C.C. in 1:4:8 for
a. Under Column footings
b. Under Basement wall foundation
c. Under flooring
d. Bed blocks for holdfast to
Doors/Windows
8/3/2019 Comples Excel Boq
http://slidepdf.com/reader/full/comples-excel-boq 18/40
5 V.R.C.C. in M20 for
a. allround the building
b. Footings
c. Column Pedestal Below plinth beam
level
d. Column from plinth to beam bottom 7462.44 Cft.
e. Plinth beams
f. Beams 8332.62 Cft.
g. Slab 53274.89 Cft.
h. Lintels 1800 Cft.
i. Chajjas 1800 Cft.
72669.95 Cft.
6 Supplying and fabrication of Fe415 steel
for
a. allround the building 0 Kg's
b. Footings 0 Kg's
c. Column Pedestal Below plinth beam
level0
Kg's
d. Column from plinth to beam bottom24879.03
Kg's
e. Plinth beams 0 Kg's
f. Beams 27780.12 Kg's
g. Slab 177613.16 Kg's
h. Lintels 6001.02 Kg's
i. Chajjas 6001.02 Kg's
242274.35 Kg's
7 Super structure brick masonry 6" th: in 1:6
CM9510
Cft.
9510 Cft.
8 Super structure brick masonry 4.5" th: in
1:4 CM0
Cft.
0 Cft.
9 Doors openings
a. Main door-MD1 800 Sq.fts
b.Doors- D1 500 Sq.fts
c.Doors-D2 100 Sq.fts
d.Doors-D3 100 Sq.fts
1500 Sq.fts
10 Windows openings
a. Windows- W1 500 Sq.fts
8/3/2019 Comples Excel Boq
http://slidepdf.com/reader/full/comples-excel-boq 19/40
b. Windows- W2 300 Sq.fts
800 Sq.fts
11 Ventilators openings
a. Ventilators -V 350 Sq.fts
b. Ventilators -V1 200 Sq.fts
550 Sq.fts
12 Plastering in two coats
a. Ceilings 502.88 Sq.fts
b. Internal walls 30117.24 Sq.fts
c. External walls 8400 Sq.fts
39020.12 Sq.fts
13 Internal wall paintings
a. Ceiling 32469.26 Sq.fts
b.Walls 30117.24 Sq.fts
62586.5 Sq.fts
14 External wall paintings 8400 Sq.fts
8400 Sq.fts
15 Enamil paintings
a. Doors 1500 Sq.ftsb. Windows 800 Sq.fts
c. Ventilators 550 Sq.fts
d. Gates 0 Sq.fts
2850 Sq.fts
16 Supplying and fixing Iron gate
17 Floorings 45444.86 Sq.fts
45444.86 Sq.fts
18 Tiels for
a. toilet flooring 4500 Sq.fts
b. Toilet dadoing 6500 Sq.fts
c. kitchen dadoing Sq.fts
11000 Sq.fts
19 Terrace
a. Finishing 603799 Sq.fts
8/3/2019 Comples Excel Boq
http://slidepdf.com/reader/full/comples-excel-boq 20/40
603799 Sq.fts
TOTAL FOR FOURTH FLOOR
20 For water supply and Sanitary fitting charges
complete.
21 For Electrification,wiring & switches
22
a. Escalators
b. 8 person Lift
c. Genset (500 kv.)
d. Fire and safety system
e.Security system work
g. 4 side elevation ACP.
Fourty two Crores forty two lakhs seventy two thousand six hundred and fifty
Total Cost of the Project.
18% of the total cost
18% of the total cost
8/3/2019 Comples Excel Boq
http://slidepdf.com/reader/full/comples-excel-boq 21/40
Rate Amount
5 6
Total
Total
Total
Total
Total
8/3/2019 Comples Excel Boq
http://slidepdf.com/reader/full/comples-excel-boq 22/40
Total
Total
Total
Total
Total
Total
Total
8/3/2019 Comples Excel Boq
http://slidepdf.com/reader/full/comples-excel-boq 23/40
Total
Total
Total
Total
0
Total
Total
Rate Amount
5 6
8/3/2019 Comples Excel Boq
http://slidepdf.com/reader/full/comples-excel-boq 24/40
Total
Total
8/3/2019 Comples Excel Boq
http://slidepdf.com/reader/full/comples-excel-boq 25/40
Total
Total
Total
Total
Total
Total
Total
Total
8/3/2019 Comples Excel Boq
http://slidepdf.com/reader/full/comples-excel-boq 26/40
Total
Total
Total
Total
Rate Amount
5 6
8/3/2019 Comples Excel Boq
http://slidepdf.com/reader/full/comples-excel-boq 27/40
Total
Total
Total
Total
8/3/2019 Comples Excel Boq
http://slidepdf.com/reader/full/comples-excel-boq 28/40
Total
Total
Total
Total
Total
Total
Total
Total
8/3/2019 Comples Excel Boq
http://slidepdf.com/reader/full/comples-excel-boq 29/40
Total
Total
Rate Amount
5 6
8/3/2019 Comples Excel Boq
http://slidepdf.com/reader/full/comples-excel-boq 30/40
Total
Total
Total
Total
Total
Total
Total
8/3/2019 Comples Excel Boq
http://slidepdf.com/reader/full/comples-excel-boq 31/40
Total
Total
Total
Total
Total
Total
Total
Rate Amount
5 6
8/3/2019 Comples Excel Boq
http://slidepdf.com/reader/full/comples-excel-boq 32/40
Total
8/3/2019 Comples Excel Boq
http://slidepdf.com/reader/full/comples-excel-boq 33/40
Total
Total
0
Total 0
Total
Total
Total
Total
8/3/2019 Comples Excel Boq
http://slidepdf.com/reader/full/comples-excel-boq 34/40
Total
Total
Total
Total
Total
Total
Rate Amount
5 6
8/3/2019 Comples Excel Boq
http://slidepdf.com/reader/full/comples-excel-boq 35/40
Total
Total
Total
8/3/2019 Comples Excel Boq
http://slidepdf.com/reader/full/comples-excel-boq 36/40
Total
Total
Total
Total
Total
Total
Total
Total
8/3/2019 Comples Excel Boq
http://slidepdf.com/reader/full/comples-excel-boq 37/40
Total
Total
Total
Rate Amount
5 6
8/3/2019 Comples Excel Boq
http://slidepdf.com/reader/full/comples-excel-boq 38/40
Total
Total
Total
Total
Total
8/3/2019 Comples Excel Boq
http://slidepdf.com/reader/full/comples-excel-boq 39/40
Total
Total
Total
Total
Total
Total
Total
Total
8/3/2019 Comples Excel Boq
http://slidepdf.com/reader/full/comples-excel-boq 40/40
Total
five only