Complete Closure andRemediation of the
Gyöngyösoroszi Lead-ZincMine
Gyöngyösoroszi’s attitude in Hungary
Gyöngyösoroszi
Mátraszentimre
Hasznosi-víztározóHasznosi reservoir
Mátraszentimre
Gyöngyösoroszi
Topological map
Complete Remediation
of the Gyöngyösoroszi Ore Mining
Realization chart of the complete remediationproject
Main objectsof the mine
Mátraszentimrei telér
Központi bányamezõ
Károly táró
Bányabérci teléraltáró
Altáró kifolyó,Vízkezelõ
Vein of Mátraszentimre
Vein of Bányabérc
Central mining area
Károly adit
Minewater discharge point
Mine water treatmentplant
Tailing pond Bencevölgy
Adit level
Recent state
Mine waterZn: ~ 20 mg/lQ: 4000m3/day
Water treatmentstation
V-2 plug (dam)
V-3 plug(dam)
Conception of the mine closing
Water treatmentstation
Hazard of the recent state
Polluted springsV-3 plug
(dam)
V-2 plug(dam)
rippings
Cinktartalom a bányavízben
0
10
20
30
40
50
60
70
80
90
1988 .02.29
1989 .10
.2319
90 .09.18
1991 .07.31
1992 .11.2519
93 .11.11
1994 .09.05
1995 .11.1619
96 .10.03
1997 .09.021998 .09.3019
99 .10.21
2000 .08.292001 .10.082002 .09.052004 .02.20
cink
kon
c. m
g/l
Zn concentration in mine water at dischargeBányavíz pH-ja és oldott anyag tartalma 1988-2004 között
0
1
2
3
4
5
6
7
8
1988
.02.29
1989
.10.23
1990
.09.18
1991
.07.31
1992
.11.25
1993
.11.11
1994
.09.05
1995
.11.16
1996
.10.03
1997
.09.02
1998
.09.30
1999
.10.21
2000
.08.29
2001
.10.08
2002
.09.05
2004
.02.20
pH
0
1000
2000
3000
4000
5000
6000
7000
8000
mg/
lpH
oldott anyag
pH and TDS of the mine water between 1988-2004
TDS
Conception of the mine closing
Expected quality ofthe mine water afterthe backfilling:
Zn:~ 5,6 mg/l
Q: 2500 m3/day
Water treatmentstation
Backfilling ofthe
Mátraszentimreregion
Backfilling the inner part
of the main adit with
coarse limestone
Conception of the mine closing
Pollution sources on the surface
Pollution sources on the surface
Tailing ponds:Tailing pond SzárazvölgyTailing pond Bencevölgy
Toka-stream and catchment basin:bed of streamswater reservoir of flotation mill (northern)agricultural water reservoir (southern)water reservoir Gyöngyösrédei
Waste rock piles:more than 30 waste rock piles
(100 m3 – 50.000 m3)
Recent state
Water treatment plant
Sedimentation basin I.
Sedimentation basin II.
Tailing pondBencevölgy
Toka - stream
Underground pipeline
Pump building
Remediation concept
� Taking-up water slurry
� Dewatering slurry
� Transportation to hazardous wasterepository
� Remediation
� Deadline: 31st December 2006
Tailings pond Bencevölgy
Recent state� 150 000 – 190 000 m3 water slurry
� 6 – 10 % total solid
� Non appropriate protection
� High contamination hazard
Average chemical composition of water slurry
559851713613612231000
AsMnCuCdPbZnmg/kg
Recent state� 182 000 m3 water
� 39 000 – 40 000 m3 sludge
� Extremly high Cd concentration
� Non appropriate protection
� High contamination hazard
Average chemical composition of sludge
1456328821281527
ZnPbCuCdAsmg/kg
Reservoir of flotation mill
Remediation concept
� Taking-up sludge
� Dewatering sludge
� Transportation to tailings pond ofSzárazvölgy
� Remediation
� Save the lake as a recreation area
Tailings pond Szárazvölgy
Recent state� 2 018 000 m3 cleaner tailings
� approximately 3 000 000 t
� 3 fields
� Non appropriate protection
� High contamination hazard
Average chemical composition of sludge
169768827811185
ZnPbCuCdAsmg/kg
Remediation concept
� building access roads
� Groundwater restoration
� Fine tailings stabilisation
� Reconturing and preparation ofthe surface for covering
� Covering
� Biological remediation, re-vegetation
Drilling of monitoring wells Mszi-1, Mszi-1/1
Water treatmentstation
V-2 plug (dam)
V-3 plug(dam)
Borehole Mszi-1, Mszi-1/1
What is the aim:-Target area: mining cavities at 424 asl- measuring potentiometric water level during mine closing
Northern
part
ofthearea,
springsandstream
Toka-stream,
Száraz-stream
Tailingpondsand
waterreservoirs
Environmental state surveys 2003-2004:-More than 700
- water samples,- waste rock samples,- sludge samples
Water reservoir Nagyréde
Water reservoir flotation mill
Tailing pond Bence-völgy
Toka-stream
Toka-stream
Toka-stream ADIT Péter-Pál
Bánya-stream
Csege-stream
421332.23
517
518
519
520
521
522
277600.00
157312.41
158315.84
II.g t
337.93
336.45 328.63
55
5657
58
525453
505141
27
62
61
6059
k£t
f£r s
f£r sf£r s
508
88
8990
91
92
931004
116
327.83
328.77
344.10
94
99
100101
102
103
344.07
49345.48
333.93
330.17
345.82343.99
345.42
345.38342.27
345.26
345.13
345.36
344.00
345.53 345.17
345.56
344.02
110
112
113
114
115
328.66
328.47
330.90
330.79
331.04
330.79
321.40
330.90330.96
345.88
328.75
I.g tv¡z fel�let
328.73
330.80
329.56
329.50
337.29
338.54 329.07
327.85
327.61
328.48
327.49
329.22
329.34
328.08
327.49
328.28
329.29
327.50
327.84
329.05
23
509510
511
1005
344.75
95
96
97
98104
105 106
107
108
109 111
329.76
117
118
119120
121
122
123
124125
126
317.54
127
128
329.33
328.18
132
133
134
135
330.00
330.05
313.17
310.35
329.92
152301.54
140
141 142
143144
145
327.56
327.63
328.34
327.73328.39
327.64
337.49146
f£r s
156307.47
329.44
329.57
329.35
330.03
330.61
512513
1006
129
330.78
130
131
136
137153297.30
154296.51
155296.49
161294.43
f£r s
I/a.g tv¡z fel�let
71
335.40
337.64
337.31334.84
334.90
332.31
332.61
335.33
84
344.37
346.43346.34
346.28
346.51
346.73
346.19
1003
12
77
73
343.7378
67
344.38
79344.25
80343.42
68344.41
343.41
344.75
72
343.75
345.25346.45
346.43
344.34
81344.42
345.83
346.38
345.29
501
74346.86
346.66
346.16
75
343.44
344.47
76
346.63
17
37
43
42
3640
353839
6463
65
13
15
16
14
18
19
6966 83
70 523
524
525
526527528529
k£t
f£r s
f£r s
328.04327.12
3
159322.41
160324.18
1
514515
2
327.87
138
139
148
149
150
151
330.00
330.19
330.85
330.58
330.60
330.73
516
327.64
1474 331.25
k£t
329.86
329.43
10
11
344.85
344.28346.15
346.09
346.51
34
2829
3332
327.01
329.00
327.14328.06
328.71
342.23
345.09
344.14
345.15
344.30
345.74
346.03
346.28
344.08
1002346.11
5
6
78
26
24
22
21
20
25
31
30
9
f£r s
v¡zelvezet“ rok
k£t
46
85
v¡zelvezet“ rok
278400.00
502503
504
505
506507
8687
345.37
44344.39
82
344.24
45
339.36
347.29
346.3247
345.06
48345.26
338.25
712500 712700 712900
277600
277800
278000
278200
278400
Gy-Szv-1
Gy-Szv-2
Gy-Szv-3
Gy-Szé-1
702000 704000 706000 708000 710000 712000 714000
284000
286000
288000
290000
Gy-Kp-1
Gy-Csp-1
Gy-Nvp-1Gy-Tvp-1
Gy-Kvp-1
Gy-Csp-2
Gy-Gp-1
Gy-Mszt-1
Hasznosi-víztározó
Mátrakeresztes
Mátraszentimre
Gyöngyöstarján
Gyöngyösoroszi
Károlytárólakótelep
Száraz-völgyizagytározó
710000 712000 714000
270000
272000
274000
276000
278000
280000
282000
51 7
5 1 8
5 19
52 0
5 2 1
52 2
7126
00.0
0
2 77 60 00 0
575 8
I I g t
55
565 7
5 8
55
53
505
7
6
66059
f s
f s f s
5 0 8
8 8
8 990
9
9
930 0
6
9
99
00
0
0
0 3
9
0
3
5
I g tf
3
50 95 1 051 1
0 05
9 5
9 6
97
9 80
05 06
0 7
0 8
0 9
7
8
90
3
5
67
8
3
33
3
3 5
5
0
3
5
6
f s
56
51 25 1 3
00 6
9
30
3
36
3 75 35
55 6
f s
I /a g tf
7
8
0 03
77
73
3 78
67
7 9
8 0
68
7
8
5 01
7
7 5
76
3
7
3 7
3
360
353 839
66 3
65
3
5
6
8
9
6 96 6 8 3
705 2 3
5 2 4
5 25
52 65 2 7
52 852 9
f s
f s
3
59
6 0
51 45 1 5
3 8
3 9
8
950
5
5 16
7
0
3
89
333
0 0
5
6
78
6
0
5
3
3 0
9
f s
6
8 5
71
3000
.00
78 40 0 00
5 0 2 50 3
5 0 4
5 0 5
50 650 7
8 68 7
8
5
7
8
Gy-Tp-4
Gy-Tp-5
Gy-Tp-10
Gy-Tp-11
Gy-Tp-11/a
Gy-Tp-13
Gy-Tp-14
Gy-Tarj-1
Gy-Lé-1
Gyöngyös - Rédeivíztározó
Mezõgazdasági-víztározó
Ipari - víztározó
Gy-Tp-8
711400 711600 711800 712000
Gy-Atk-2Gy-Bvgsz-1
Gy-Bvö-1
Gy-Üsz-1 (I)Gy-Üsz-3 (III)Gy-Üsz-2 (XIII)
Gy-pH-3
Gy-Tp-15Gy-Tp-15/a
Bence-völgyi zagytározó
Southern part
Tailing pond Bence-völgy andMine water treatment plant
Northern part
Tailing pond Száraz-völgy
Hydrogeological monitoring objects
SOMETIMES FOGGY BUT NOT GLOOMYSOMETIMES FOGGY BUT NOT GLOOMYSOMETIMES FOGGY BUT NOT GLOOMYSOMETIMES FOGGY BUT NOT GLOOMY