construction law: fidic (6) staff & labor to: dr. kamalain shaat by: ghada h. el abed

27
CONSTRUCTION LAW: CONSTRUCTION LAW: FIDIC FIDIC (6) STAFF & LABOR (6) STAFF & LABOR To: Dr. Kamalain Shaat To: Dr. Kamalain Shaat By: Ghada H. EL Abed By: Ghada H. EL Abed

Post on 20-Dec-2015

216 views

Category:

Documents


3 download

TRANSCRIPT

Page 1: CONSTRUCTION LAW: FIDIC (6) STAFF & LABOR To: Dr. Kamalain Shaat By: Ghada H. EL Abed

CONSTRUCTION LAW:CONSTRUCTION LAW:FIDICFIDIC

(6) STAFF & LABOR(6) STAFF & LABOR

To: Dr. Kamalain ShaatTo: Dr. Kamalain ShaatBy: Ghada H. EL AbedBy: Ghada H. EL Abed

Page 2: CONSTRUCTION LAW: FIDIC (6) STAFF & LABOR To: Dr. Kamalain Shaat By: Ghada H. EL Abed

STAFF AND LABORSTAFF AND LABORوالعمال والعمال المستخدمون المستخدمون

Engagement of Staff and Labor Engagement of Staff and Labor Rates of Wages and Conditions of Labors Rates of Wages and Conditions of Labors Persons in the Service of EmployerPersons in the Service of Employer Labor LawsLabor Laws Working Hours Working Hours Facilities for Staff and Labor Facilities for Staff and Labor Health and Safety Health and Safety Contractor's Superintendence Contractor's Superintendence Contractor's PersonnelContractor's Personnel Records of Contractor's Personnel and Records of Contractor's Personnel and

EquipmentEquipment Disorderly ConductDisorderly Conduct

Page 3: CONSTRUCTION LAW: FIDIC (6) STAFF & LABOR To: Dr. Kamalain Shaat By: Ghada H. EL Abed

Engagement of Staff Engagement of Staff and Laborand Labor

Except as otherwise stated in Except as otherwise stated in the specification, the contractor shall the specification, the contractor shall make arrangement of all staff and make arrangement of all staff and labor, local or otherwise, and for their labor, local or otherwise, and for their payment, housing, feeding and payment, housing, feeding and transport.transport.

: والعمال المستخدمين :تعيين والعمال المستخدمين تعيين يتخذ أن المقاول على يتعين فإنه العقد، وثائق في ذلك خالف على ينص لم يتخذ ما أن المقاول على يتعين فإنه العقد، وثائق في ذلك خالف على ينص لم ما

وسداد غيرهم، أو محليين وعمال، مستخدمين من يلزم ما لتعيين وسداد ترتيبات غيرهم، أو محليين وعمال، مستخدمين من يلزم ما لتعيين ترتيبات. ونقلهم وإطعامهم سكنهم ومستلزمات .أجورهم ونقلهم وإطعامهم سكنهم ومستلزمات أجورهم

Page 4: CONSTRUCTION LAW: FIDIC (6) STAFF & LABOR To: Dr. Kamalain Shaat By: Ghada H. EL Abed

Rates of Wages and Rates of Wages and Conditions of LaborsConditions of Labors

The contractor shall pay rates of The contractor shall pay rates of wages, and observe conditions of wages, and observe conditions of labor, which are not lower than those labor, which are not lower than those established for the trade or industry established for the trade or industry where the work is carried out. where the work is carried out.

: العمل وشروط األجور :معدالت العمل وشروط األجور معدالت العمالة شروط يراعي وأن األجور معدالت يدفع أن المقاول على العمالة يتعين شروط يراعي وأن األجور معدالت يدفع أن المقاول على يتعين

التجارة حرف أصحاب قبل من متبع هو عما مستواها في تقل ال التجارة بحيث حرف أصحاب قبل من متبع هو عما مستواها في تقل ال بحيث. األشغال فيها تنفذ التي المنطقة في .والصناعة األشغال فيها تنفذ التي المنطقة في والصناعة

Page 5: CONSTRUCTION LAW: FIDIC (6) STAFF & LABOR To: Dr. Kamalain Shaat By: Ghada H. EL Abed

Rates of Wages and Rates of Wages and Conditions of LaborsConditions of Labors

If no established rates or conditions are If no established rates or conditions are applicable, the contractor shall pay rates applicable, the contractor shall pay rates of wages and observe conditions which of wages and observe conditions which are not lower than general level of wages are not lower than general level of wages and conditions observed locally by and conditions observed locally by employers whose trade or industry is employers whose trade or industry is similar to that of the contractor.similar to that of the contractor.

األجور معدالت دفع المقاول على فإن الظروف أو المعدالت هذه مثل توجد لم األجور وإذا معدالت دفع المقاول على فإن الظروف أو المعدالت هذه مثل توجد لم وإذاالتي الظروف أو لألجور العام المستوى عن تقل ال بحث العمالة ظروف التي ومراعاة الظروف أو لألجور العام المستوى عن تقل ال بحث العمالة ظروف ومراعاةلتلك مشابهة صناعية أو تجارية لمهن العمل أصحاب قبل من � محليا مراعاتها لتلك يتم مشابهة صناعية أو تجارية لمهن العمل أصحاب قبل من � محليا مراعاتها يتم

. المقاول بها يقوم .التي المقاول بها يقوم التي

Page 6: CONSTRUCTION LAW: FIDIC (6) STAFF & LABOR To: Dr. Kamalain Shaat By: Ghada H. EL Abed

Persons in the Service Persons in the Service of Employerof Employer

The contractor shall not recruit, The contractor shall not recruit, or attempt to recruit, staff and or attempt to recruit, staff and labor from amongst the labor from amongst the employer's personnel.employer's personnel.

: العمل أصحاب لدى المستخدمون :األشخاص العمل أصحاب لدى المستخدمون األشخاص

من أي خدمات استقطاب يحاول أو يستقطب أال المقاول على من يتعين أي خدمات استقطاب يحاول أو يستقطب أال المقاول على يتعين. العمل صاحب أفراد ضمن يعملون الذين العمال أو .المستخدمين العمل صاحب أفراد ضمن يعملون الذين العمال أو المستخدمين

Page 7: CONSTRUCTION LAW: FIDIC (6) STAFF & LABOR To: Dr. Kamalain Shaat By: Ghada H. EL Abed

Labor LawsLabor Laws The contractor shall comply with all the The contractor shall comply with all the

relevant labor laws applicable to the relevant labor laws applicable to the contractor's personnel, including laws contractor's personnel, including laws relating to their employment, health, relating to their employment, health, safety, welfare, immigration and safety, welfare, immigration and emigration, and shall allow them all emigration, and shall allow them all their legal rights.their legal rights.

: العمل :قوانين العمل قوانين ،مستخدميه على التطبيق الواجبة العمل قوانين بكل التقيد المقاول على مستخدميه، ينبغي على التطبيق الواجبة العمل قوانين بكل التقيد المقاول على ينبغي

والرعاية العامة والسالمة والصحة بالتوظيف المتعلقة القوانين ذلك في والرعاية بما العامة والسالمة والصحة بالتوظيف المتعلقة القوانين ذلك في بما. القانونية حقوقهم كل يراعي وأن والهجرة، .واإلقامة القانونية حقوقهم كل يراعي وأن والهجرة، واإلقامة

Page 8: CONSTRUCTION LAW: FIDIC (6) STAFF & LABOR To: Dr. Kamalain Shaat By: Ghada H. EL Abed

Labor LawsLabor Laws The contractor shall require his The contractor shall require his

employees to obey all applicable employees to obey all applicable laws, including those concerning laws, including those concerning safety at work.safety at work.

القوانين إطاعة مستخدميه من يطلب أن المقاول على يتعين القوانين كما إطاعة مستخدميه من يطلب أن المقاول على يتعين كما. العمل في السالمة أنظمة فيها بما التطبيق، .الواجبة العمل في السالمة أنظمة فيها بما التطبيق، الواجبة

Page 9: CONSTRUCTION LAW: FIDIC (6) STAFF & LABOR To: Dr. Kamalain Shaat By: Ghada H. EL Abed

Working HoursWorking Hours No work shall be carried out on the Site No work shall be carried out on the Site

on locally recognized days of rest, or on locally recognized days of rest, or outside the normal working hours stated outside the normal working hours stated in the Appendix to Tender, unless:in the Appendix to Tender, unless:

: العمل :ساعات العمل ساعاتالمحلية - الرسمية العطل أيام خالل الموقع في األشغال تنفيذ يجوز المحلية ال الرسمية العطل أيام خالل الموقع في األشغال تنفيذ يجوز ال

ملحق في والمبينة المعتادة العمل ساعات خارج أو عليها ملحق المتعارف في والمبينة المعتادة العمل ساعات خارج أو عليها المتعارف: إذا إال المناقصة، :عرض إذا إال المناقصة، عرض

Page 10: CONSTRUCTION LAW: FIDIC (6) STAFF & LABOR To: Dr. Kamalain Shaat By: Ghada H. EL Abed

Working HoursWorking Hours UNLESSUNLESS::

otherwise stated in the contract, orotherwise stated in the contract, or the engineer gives consent, orthe engineer gives consent, or the work is unavoidable, or necessary the work is unavoidable, or necessary

for the protection of life or property, or for the protection of life or property, or for the safety of all Works, for the safety of all Works,

in which case the contractor shall in which case the contractor shall immediately advise the Engineer.immediately advise the Engineer.

أو – العقد، في ذلك خالف على � منصوصا أو كان العقد، في ذلك خالف على � منصوصا كانأو – عليها، المهندس موافقة أو تمت عليها، المهندس موافقة تمتاألشخاص، – حياة إلنقاذ � ضروريا كان أو ،� حتميا � أمرا العمل في االستمرار األشخاص، كان حياة إلنقاذ � ضروريا كان أو ،� حتميا � أمرا العمل في االستمرار كان

األشغال، سالمة على للمحافظة األشغال، أو سالمة على للمحافظة أو. بذلك � فورا المهندس إعالم المقاول على يتعين الحالة هذه مثل .وفي بذلك � فورا المهندس إعالم المقاول على يتعين الحالة هذه مثل وفي

Page 11: CONSTRUCTION LAW: FIDIC (6) STAFF & LABOR To: Dr. Kamalain Shaat By: Ghada H. EL Abed

Facilities for Staff and Facilities for Staff and LaborLabor

Except as otherwise stated in the Except as otherwise stated in the Specification, the contractor shall Specification, the contractor shall provide and maintain all necessary provide and maintain all necessary accommodation, and welfare facilities accommodation, and welfare facilities for the contractor's personnel. for the contractor's personnel.

The contractor shall also provide The contractor shall also provide facilities for the Employer's personnel facilities for the Employer's personnel as stated in the Specification.as stated in the Specification.

على يتعين فإنه العمل، صاحب متطلبات في ذلك خالف على ينص لم على ما يتعين فإنه العمل، صاحب متطلبات في ذلك خالف على ينص لم ما . , لمستخدميه الضرورية اإلعاشة وتجهيزات المرافق ويصون يوفر أن . المقاول , لمستخدميه الضرورية اإلعاشة وتجهيزات المرافق ويصون يوفر أن المقاول

. العمل صاحب ألفراد المواصفات في عليها المنصوص المرافق يوفر أن .وعليه العمل صاحب ألفراد المواصفات في عليها المنصوص المرافق يوفر أن وعليه

Page 12: CONSTRUCTION LAW: FIDIC (6) STAFF & LABOR To: Dr. Kamalain Shaat By: Ghada H. EL Abed

Facilities for Staff and Facilities for Staff and LaborLabor The contractor shall not permit any of The contractor shall not permit any of

the contractor's personnel to the contractor's personnel to maintain any temporary or maintain any temporary or permanent living quarters within the permanent living quarters within the structures forming part of the structures forming part of the permanent Works.permanent Works.

المنشآت من � أيا يتخذ أن مستخدميه من ألي يسمح ال أن المقاول على المنشآت ينبغي من � أيا يتخذ أن مستخدميه من ألي يسمح ال أن المقاول على ينبغي

إلقامتهم مؤقت أو دائم كمكان الدائمة األشغال من � جزءا تشكل إلقامتهم التي مؤقت أو دائم كمكان الدائمة األشغال من � جزءا تشكل ..التي

Page 13: CONSTRUCTION LAW: FIDIC (6) STAFF & LABOR To: Dr. Kamalain Shaat By: Ghada H. EL Abed

Health and SafetyHealth and Safety The contractor shall at all times The contractor shall at all times

take all reasonable precautions to take all reasonable precautions to maintain the health and safety of maintain the health and safety of the contractor's personnel.the contractor's personnel.

: والسالمة :الصحة والسالمة الصحة األوقات كل في المعقولة التدابير يتخذ أن المقاول على األوقات يتعين كل في المعقولة التدابير يتخذ أن المقاول على يتعين

مستخدميه، وسالمة صحة على مستخدميه، للمحافظة وسالمة صحة على للمحافظة

Page 14: CONSTRUCTION LAW: FIDIC (6) STAFF & LABOR To: Dr. Kamalain Shaat By: Ghada H. EL Abed

Health and SafetyHealth and Safety In collaboration with local health In collaboration with local health

authorities, The contactor shall ensure that authorities, The contactor shall ensure that medical staff, first aid facilities, sick bay medical staff, first aid facilities, sick bay and ambulance service are available at all and ambulance service are available at all times at the Site and at any times at the Site and at any accommodation for Contractor's and accommodation for Contractor's and Employer's personnel,Employer's personnel,

- كادر – من يلزم ما المحلية الصحية السلطات مع بالتعاون يوفر أن المقاول - على كادر – من يلزم ما المحلية الصحية السلطات مع بالتعاون يوفر أن المقاول علىتكون بحيث إسعاف، وسيارة للمرضى منامة وغرفة األولى، اإلسعاف ومرافق تكون صحي، بحيث إسعاف، وسيارة للمرضى منامة وغرفة األولى، اإلسعاف ومرافق صحي،

وأفراد المقاول لمستخدمي الجماعية المساكن وفي الموقع في األوقات كل في وأفراد جاهزة المقاول لمستخدمي الجماعية المساكن وفي الموقع في األوقات كل في جاهزةالعمل، العمل، صاحب صاحب

Page 15: CONSTRUCTION LAW: FIDIC (6) STAFF & LABOR To: Dr. Kamalain Shaat By: Ghada H. EL Abed

Health and SafetyHealth and Safety

and that suitable arrangements are and that suitable arrangements are made for all necessary welfare and made for all necessary welfare and hygiene requirements and for the hygiene requirements and for the prevention of epidemics.prevention of epidemics.

العامة الصحة لمتطلبات المناسبة الترتيبات كذلك يوفر العامة وأن الصحة لمتطلبات المناسبة الترتيبات كذلك يوفر وأن. األوبئة انتشار .ولمنع األوبئة انتشار ولمنع

Page 16: CONSTRUCTION LAW: FIDIC (6) STAFF & LABOR To: Dr. Kamalain Shaat By: Ghada H. EL Abed

Health and SafetyHealth and Safety The contractor shall appoint an The contractor shall appoint an

accident prevention officer at the Site, accident prevention officer at the Site, responsible for maintaining safety and responsible for maintaining safety and protection against accidents.protection against accidents.

الحوادث من للوقاية � ضابطا يعين أن المقاول على الحوادث يتعين من للوقاية � ضابطا يعين أن المقاول على يتعينمناسب تأهيل ذا الشخص هذا يكون بحيث الموقع، مناسب في تأهيل ذا الشخص هذا يكون بحيث الموقع، في

الحوادث ضد والوقاية السالمة أمور عن مسئوال الحوادث ليكون ضد والوقاية السالمة أمور عن مسئوال ليكون

Page 17: CONSTRUCTION LAW: FIDIC (6) STAFF & LABOR To: Dr. Kamalain Shaat By: Ghada H. EL Abed

Health and SafetyHealth and Safety • This person shall be qualified for this responsibility, This person shall be qualified for this responsibility,

and shall have the authority to issue instructions and shall have the authority to issue instructions and take protective measures to prevent accidents.and take protective measures to prevent accidents.

• Throughout the execution of the works, the Throughout the execution of the works, the contractor shall provide whatever is required by contractor shall provide whatever is required by this person to exercise this responsibility and this person to exercise this responsibility and authority.authority.

الحوادث، لدرء الالزمة الوقائية اإلجراءات واتخاذ التعليمات إصدار بصالحية � مخوال يكون الحوادث، وأن لدرء الالزمة الوقائية اإلجراءات واتخاذ التعليمات إصدار بصالحية � مخوال يكون وأنمن لتمكينه يلزم ما كل الوقاية لضابط يوفر المقاول على يتعين السياق هذا من وفي لتمكينه يلزم ما كل الوقاية لضابط يوفر المقاول على يتعين السياق هذا وفي

. ومسؤولياته صالحيته .ممارسة ومسؤولياته صالحيته ممارسة

Page 18: CONSTRUCTION LAW: FIDIC (6) STAFF & LABOR To: Dr. Kamalain Shaat By: Ghada H. EL Abed

Health and SafetyHealth and Safety The contractor shall send, to the Engineer, The contractor shall send, to the Engineer,

details of any accident as soon as practicable details of any accident as soon as practicable after its occurrence.after its occurrence.

The Contractor shall maintain records and The Contractor shall maintain records and make reports concerning health, safety and make reports concerning health, safety and welfare of persons, and damage to property, welfare of persons, and damage to property, as the Engineer may reasonably require.as the Engineer may reasonably require.

،حصوله حال يقع حادث أي تفاصيل المهندس إلى يرسل أن المقاول على يتعين حصوله، كما حال يقع حادث أي تفاصيل المهندس إلى يرسل أن المقاول على يتعين كما واألضرار العامة والسالمة بالصحة المتعلقة التقارير ويقدم السجالت بحفظ يقوم واألضرار وأن العامة والسالمة بالصحة المتعلقة التقارير ويقدم السجالت بحفظ يقوم وأن

. معقولة بصورة المهندس يطلبه الذي النحو على بالممتلكات تلحق قد .التي معقولة بصورة المهندس يطلبه الذي النحو على بالممتلكات تلحق قد التي

Page 19: CONSTRUCTION LAW: FIDIC (6) STAFF & LABOR To: Dr. Kamalain Shaat By: Ghada H. EL Abed

Contractor's Contractor's SuperintendenceSuperintendence

Throughout the execution of the works, Throughout the execution of the works, and as long as thereafter as is and as long as thereafter as is necessary to fulfill the Contactor's necessary to fulfill the Contactor's obligations, the Contractor shall provide obligations, the Contractor shall provide all necessary superintendence to plan, all necessary superintendence to plan, arrange, direct, manage, inspect and arrange, direct, manage, inspect and test the work.test the work.

: ) المقاول ) مراقبة :مناظرة ) المقاول ) مراقبة مناظرة والترتيب والتوجيه للتخطيط الالزمة المناظرة كل يوفر أن المقاول على والترتيب ينبغي والتوجيه للتخطيط الالزمة المناظرة كل يوفر أن المقاول على ينبغي

تلزم فترة ألي وبعدها التنفيذ فترة طيلة األشغال، واختبار والتفتيش تلزم واإلدارة فترة ألي وبعدها التنفيذ فترة طيلة األشغال، واختبار والتفتيش واإلدارة. بالتزاماته المقاول .لقيام بالتزاماته المقاول لقيام

Page 20: CONSTRUCTION LAW: FIDIC (6) STAFF & LABOR To: Dr. Kamalain Shaat By: Ghada H. EL Abed

Contractor's Contractor's SuperintendenceSuperintendence

Superintendence shall be given by a sufficient Superintendence shall be given by a sufficient number of persons having adequate number of persons having adequate knowledge of the language for knowledge of the language for communications communications (defined in Sub-clause 1.4[law and (defined in Sub-clause 1.4[law and language])language])

and of the operations to be carried out and of the operations to be carried out (including the methods and techniques (including the methods and techniques required, the hazards likely to be encountered required, the hazards likely to be encountered and methods of preventing accidents), for the and methods of preventing accidents), for the satisfactory and safe execution of the Works.satisfactory and safe execution of the Works.

لغة الستخدام المؤهلين األشخاص من كاف عدد بالمراقبة يقوم أن لغة ينبغي الستخدام المؤهلين األشخاص من كاف عدد بالمراقبة يقوم أن ينبغيالمادة ) بأحكام � عمال المادة ) االتصال بأحكام � عمال ( ( 1/41/4االتصال

( المطلوبة والتقنيات األساليب ذلك في بما تنفيذها يتم التي المطلوبة ) وبالعمليات والتقنيات األساليب ذلك في بما تنفيذها يتم التي وبالعمليات ) األشغال تنفيذ لغاية ، الحوادث منع وطرق لها التعرض المحتمل ( والمخاطر األشغال تنفيذ لغاية ، الحوادث منع وطرق لها التعرض المحتمل والمخاطر

. وآمنة مرضية .بصورة وآمنة مرضية بصورة

Page 21: CONSTRUCTION LAW: FIDIC (6) STAFF & LABOR To: Dr. Kamalain Shaat By: Ghada H. EL Abed

Contractor's PersonnelContractor's Personnel The Contractor's personnel shall be The Contractor's personnel shall be

appropriately qualified, skilled and appropriately qualified, skilled and experienced in their respective trades or experienced in their respective trades or occupations.occupations.

The Engineer may require the Contractor The Engineer may require the Contractor to remove (or cause to be removed) any to remove (or cause to be removed) any person employed on the Site or Works,person employed on the Site or Works,

: المقاول :مستخدمو المقاول مستخدمو مهنته في � كال مناسبة وخبرة ومهارة كفاية ذوي المقاول مستخدمو يكون أن مهنته يجب في � كال مناسبة وخبرة ومهارة كفاية ذوي المقاول مستخدمو يكون أن يجب

. حرفته .أو حرفته أو ) أي ) إبعاد على يعمل أن أو بإبعاد يقوم أن المقاول إلى الطلب المهندس ( وبإمكان أي ) إبعاد على يعمل أن أو بإبعاد يقوم أن المقاول إلى الطلب المهندس وبإمكان

األشغال، في أو الموقع في مستخدم األشغال، شخص في أو الموقع في مستخدم : شخص يلي :كما يلي كما

Page 22: CONSTRUCTION LAW: FIDIC (6) STAFF & LABOR To: Dr. Kamalain Shaat By: Ghada H. EL Abed

Contractor's PersonnelContractor's Personnel This remove includes even the Contractor's This remove includes even the Contractor's representative if applicable, Whorepresentative if applicable, Who::

persists in any misconduct or lack of care,persists in any misconduct or lack of care, carries out duties incompetently or negligently,carries out duties incompetently or negligently, fails to conform with any provisions of the fails to conform with any provisions of the

Contract, Contract, persists in any conduct which is prejudicial to persists in any conduct which is prejudicial to

safety, health, or the protection of the safety, health, or the protection of the environment.environment.

الشخص كان إذا المقاول، ممثل فيهم الشخص بمن كان إذا المقاول، ممثل فيهم ::بمن أو مستمرة، بصورة مباالته عدم أو مسلكه في � أو متماديا مستمرة، بصورة مباالته عدم أو مسلكه في � متماديا أو بإهمال، أو كافي غير بشكل بواجباته يقوم أو أنه بإهمال، أو كافي غير بشكل بواجباته يقوم أنه أو العقد، أحكام من أي بتطبيق في يخفق أو أنه العقد، أحكام من أي بتطبيق في يخفق أنه. البيئة حماية أو الصحة أو السالمة يهدد مسلك سلوك في متماد .أنه البيئة حماية أو الصحة أو السالمة يهدد مسلك سلوك في متماد أنه

Page 23: CONSTRUCTION LAW: FIDIC (6) STAFF & LABOR To: Dr. Kamalain Shaat By: Ghada H. EL Abed

Contractor's PersonnelContractor's Personnel If appropriate, the Contractor If appropriate, the Contractor

shall then appoint (or cause to be shall then appoint (or cause to be appointed) a suitable appointed) a suitable replacement person.replacement person.

( أو يعين أن عندئذ المقاول فعلى ،� مناسبا ذلك كان أو ) وإذا يعين أن عندئذ المقاول فعلى ،� مناسبا ذلك كان وإذا. ) مناسب بديل شخص تعيين على .يعمل ) مناسب بديل شخص تعيين على يعمل

Page 24: CONSTRUCTION LAW: FIDIC (6) STAFF & LABOR To: Dr. Kamalain Shaat By: Ghada H. EL Abed

Records of Records of Contractor's Personnel Contractor's Personnel and Equipmentand Equipment

The Contractor shall submit, to the The Contractor shall submit, to the Engineer:Engineer:

– details showing the number of details showing the number of each class of contractor's personnel each class of contractor's personnel

– and of each type of Contractor's and of each type of Contractor's Equipment on the Site.Equipment on the Site.

: المقاول ومعدات العمال :سجالت المقاول ومعدات العمال سجالت في يتوفر ما لبيان مفصلة بسجالت المهندس يزود أن المقاول على في يتعين يتوفر ما لبيان مفصلة بسجالت المهندس يزود أن المقاول على يتعين

المهارات، حسب مصنفين المقاول مستخدمي إعداد من المهارات، الموقع حسب مصنفين المقاول مستخدمي إعداد من الموقع . األنواع حسب مصنفة معداته إعداد . ومن األنواع حسب مصنفة معداته إعداد ومن

Page 25: CONSTRUCTION LAW: FIDIC (6) STAFF & LABOR To: Dr. Kamalain Shaat By: Ghada H. EL Abed

Records of Records of Contractor's Personnel Contractor's Personnel and Equipmentand Equipment

Details shall be submitted each Details shall be submitted each calendar month, in a form approved by calendar month, in a form approved by the Engineer, until the Contractor has the Engineer, until the Contractor has completed all work which is known to be completed all work which is known to be outstanding at the completion date outstanding at the completion date stated in the Taking-Over Certificate for stated in the Taking-Over Certificate for the Work.the Work.

يوافق التي النماذج باستعمال شهر، كل المهندس إلى السجالت هذه تقديم يوافق يتم التي النماذج باستعمال شهر، كل المهندس إلى السجالت هذه تقديم يتمبتاريخ � متبقيا ال معروف عمل أي المقاول ينجز أن إلى وذلك المهندس بتاريخ عليها � متبقيا ال معروف عمل أي المقاول ينجز أن إلى وذلك المهندس عليها

." األشغال " تسلم شهادة في المحدد ".اإلنجاز األشغال " تسلم شهادة في المحدد اإلنجاز

Page 26: CONSTRUCTION LAW: FIDIC (6) STAFF & LABOR To: Dr. Kamalain Shaat By: Ghada H. EL Abed

Disorderly ConductDisorderly Conduct The Contractor shall at times take all The Contractor shall at times take all

reasonable reasonable precautions to prevent any precautions to prevent any unlawful, riotous or disorderly conduct by or unlawful, riotous or disorderly conduct by or amongst the Contractor's personnel, amongst the Contractor's personnel,

and to preserve peace and protection of and to preserve peace and protection of persons and property on and near the persons and property on and near the Site…. Site….

: المنضبط غير :السلوك المنضبط غير السلوك للحيلولة المعقولة االحتياطات كل األوقات جميع في يتخذ أن المقاول على للحيلولة يتعين المعقولة االحتياطات كل األوقات جميع في يتخذ أن المقاول على يتعين

مستخدمي قبل من بالنظام إخالل أو القانون على تجاوز أو شغب أي وقوع مستخدمي دون قبل من بالنظام إخالل أو القانون على تجاوز أو شغب أي وقوع دونبينهم، فيما أو بينهم، المقاول فيما أو المقاول

.... يجاوره وما الموقع في والممتلكات األشخاص وحماية األمن على يحافظ ....وأن يجاوره وما الموقع في والممتلكات األشخاص وحماية األمن على يحافظ وأن

Page 27: CONSTRUCTION LAW: FIDIC (6) STAFF & LABOR To: Dr. Kamalain Shaat By: Ghada H. EL Abed