Factors of ost Overrun

in onstruction Industry

 

Page 2: Cost Overrun ppt.pptx

8/11/2019 Cost Overrun ppt.pptx

http://slidepdf.com/reader/full/cost-overrun-pptpptx 2/19

Group Members

Mian Hassan Naveed

Siddra QayyumKhadija Mawra

Saddam Hussain

Page 3: Cost Overrun ppt.pptx

8/11/2019 Cost Overrun ppt.pptx

http://slidepdf.com/reader/full/cost-overrun-pptpptx 3/19

Introduction to Cost

Overrun Cost overrun is the major Problem in construction

industry in developing countries as well as indevolved countries

Cost overrun found 50% to 100% were common,overrun found in each of the 20 nations and fivecontinents

Approximately 55 % Projects are cost overrun inMalaysia in public sector projects

In 1997 found that 77% of highway projects inAmerica are cost overrun

Page 4: Cost Overrun ppt.pptx

8/11/2019 Cost Overrun ppt.pptx

http://slidepdf.com/reader/full/cost-overrun-pptpptx 4/19

 Cost Overrun in Pakistan

In Pakistan in 2010 one hundred & thirty milliondollar loan by world bank to cost overrun for thecompletion of road projects

Approximately in Pakistan every project facingthe problem of cost overrun

Minimum range of cost overrun is estimated 10%of the project total cost.

Page 5: Cost Overrun ppt.pptx

8/11/2019 Cost Overrun ppt.pptx

http://slidepdf.com/reader/full/cost-overrun-pptpptx 5/19

Example of cost overrun

project in Pakistan  Nelum jehlum hydropower project initial cost is

167 million dollar in start then 935 million dollar in2011 and now its cost is 2.89 billion dollar.

Bhasha dam

Kashmir highway

Bahria ICON Tower

New Benazir International Airport

Page 6: Cost Overrun ppt.pptx

8/11/2019 Cost Overrun ppt.pptx

http://slidepdf.com/reader/full/cost-overrun-pptpptx 6/19

Cost Overrun definition

Cost Overruns are the additional percentage

or dollar amount by which actual costs

exceed estimates

Cost overrun is defined as excess of actual

cost over budget. Cost overrun is also

sometimes called "cost escalation," "cost

increase," or "budget overrun." (Zhu et al

2004).

Cost overrun is defined as the change in

contract amount divided by the original

contract

Page 7: Cost Overrun ppt.pptx

8/11/2019 Cost Overrun ppt.pptx

http://slidepdf.com/reader/full/cost-overrun-pptpptx 7/19

Cost Overrun

The larger the project, the larger theamount and rate of cost overruns

Why? The larger a project, the greaterthe complexity

Page 8: Cost Overrun ppt.pptx

8/11/2019 Cost Overrun ppt.pptx

http://slidepdf.com/reader/full/cost-overrun-pptpptx 8/19

Cost Estimating Factors 

Cost of labor

Cost of machinery

Transportation cost

High machinery maintenancecost

High interest rates by bankers

Wrong estimation method Cost of insurance

Bureaucracy in tendering method

Waste on site

Page 9: Cost Overrun ppt.pptx

8/11/2019 Cost Overrun ppt.pptx

http://slidepdf.com/reader/full/cost-overrun-pptpptx 9/19

Broad Categories of cost

overrun  Macro Economic Factors

 Management Factors

 Business and Regulatory Environment

Factors

Environmental Factors

Financing & Social Factors

Page 10: Cost Overrun ppt.pptx

8/11/2019 Cost Overrun ppt.pptx

http://slidepdf.com/reader/full/cost-overrun-pptpptx 10/19

Macro Economic Factors

Fluctuation in price of raw materials

Unstable cost of manufactured materials

High Cost of machineries

The current state of the local economy

The quality of materials and workmanshiprequired

Simple supply and demand

Page 11: Cost Overrun ppt.pptx

8/11/2019 Cost Overrun ppt.pptx

http://slidepdf.com/reader/full/cost-overrun-pptpptx 11/19

Management Factors

Additional work

Poor project site management

Improper planning

Inconsistent cash flows

Design error and changes

Inaccurate estimate

Page 12: Cost Overrun ppt.pptx

8/11/2019 Cost Overrun ppt.pptx

http://slidepdf.com/reader/full/cost-overrun-pptpptx 12/19

Business and Regulatory

Environment Lowest bidding procurement method

 Long period between design and time ofbidding/Tendering

Methods used for cost estimation during projectcost scheduling

Inappropriate government policies

Occurring disputes between owner and

contractor

Page 13: Cost Overrun ppt.pptx

8/11/2019 Cost Overrun ppt.pptx

http://slidepdf.com/reader/full/cost-overrun-pptpptx 13/19

Factors related to project

participants 

 Disputes on site

 Lack of coordination between constructionparties

 Poor financial control on site

 Poor planning

 Previous experience of contract

 Relationship between managers and labors

Page 14: Cost Overrun ppt.pptx

8/11/2019 Cost Overrun ppt.pptx

http://slidepdf.com/reader/full/cost-overrun-pptpptx 14/19

 

Environmental factors 

 level of competitors

 Manipulation of suppliers

 absence of construction-cost data economic instability

effects of weather

 government policies

Page 15: Cost Overrun ppt.pptx

8/11/2019 Cost Overrun ppt.pptx

http://slidepdf.com/reader/full/cost-overrun-pptpptx 15/19

Environmental factors

Inadequate production of raw materials by thecountry

 Monopoly by suppliers

 Number of competitors

 Number of projects going at the same time

 Political situation

 Poor productivity  Project location

 Social and cultural impacts

Page 16: Cost Overrun ppt.pptx

8/11/2019 Cost Overrun ppt.pptx

http://slidepdf.com/reader/full/cost-overrun-pptpptx 16/19

 

Financing & Social factors 

 Currency exchange

 Inflationary pressure

 Project financing  Corruption and bribery

 Political interests

Page 17: Cost Overrun ppt.pptx

8/11/2019 Cost Overrun ppt.pptx

http://slidepdf.com/reader/full/cost-overrun-pptpptx 17/19

CONCLUSION:

Factors Client Consultant contractor

Planning&monitorin

g

• Clear scope

and qualityspecs.

• Agreementon budgetand time.

• Avoid

variationsregardingscope

• Analysis of

requirements

• Clear ChangeRequests.

• Consideration of

specializedresources

• Accurate schedule

and work flowplanning

• Details of resourcesrequired

• Understanding ofscope and design

Projectcharachteristics

• Size &complexityof project

• Projectlocation

• Design a& structures• Clear assessment of

geologicalconditions

• Understanding ofsite, accessibilityand buildibality

issues

• Site related risks,safety

• Accurateassessment of siteand its specs.

Page 18: Cost Overrun ppt.pptx

8/11/2019 Cost Overrun ppt.pptx

http://slidepdf.com/reader/full/cost-overrun-pptpptx 18/19

Factors Client Consultant contractor

Marketcompetition

• Acquire

relevantknowledgeon themarketconditions

• Appropriat

e tenderprocess

• Selection of

appropriate design• Use of materials

based on marketconditions,including supply

and

demand analysis

• Careful

procurementplanning• Careful selection of

subcontractors• Early engagement

of subcontractors

andefficient contract

administration

Page 19: Cost Overrun ppt.pptx

8/11/2019 Cost Overrun ppt.pptx

http://slidepdf.com/reader/full/cost-overrun-pptpptx 19/19

References

Cost overrun Factors In Construction Industry ofPakistan ( Nida Azhar NEDUET Karachi, Rizwan U.Farooqi NEDUET Karachi, Syed M. Ahmed Florida

International University USA) Cost and Time Overruns in Highway Projects In

Pakistan ( Rafiq Muhammad Choudhry, AbdurRehman Nasir, Hamza Farooq Gabriel)

Cost overrun in the Malaysian ConstructionIndustry Projects (Zayyana Shehu, Intan RohaniEndut, Akintola Akintoye, Gray D. Holt)