cotizacion de pozo a tierra.docx

1
COTIZACION DE POZO A TIERRA MATERIALES CANTIDAD P.UNIT SUB TOTAL DOSIS DE THORGHEL 2 69.90 139.80 BENTONITA 1 25.10 25.10 VARILLA DE COBRE 3/4 1 309.90 309.90 CONECTOR DE 3/4 1 15.OO 15.00 CAJA DE REGISTRO 1 27.20 27.20 TOTAL $/ 517.00 MANO DE OBRA COSTO POR MANO DE OBRA, NO INCLUYE IGV $/ 250.00 (DOSCIENTOS CINCUENTA NUEVOS SOLES)

Upload: jose-vilchez-ballona

Post on 19-Dec-2015

253 views

Category:

Documents


10 download

DESCRIPTION

fhsfhsfhsfhsfhssssssssssssssssssssssssssssssssssssssssssssssssssssssssssssssssssssssssssssssssssssssssssssssssssssssssssssssssssssssssssssssssssssssssssssssssssssssssskdfashfasjfhasddfhasfhashfashfhssssssssssssssssssssssssssssfsahjdfhasfhsfhshfsdhfhsjfsssssssssssssssssssssssdfsdhjshfashfhssssssssssssssss

TRANSCRIPT

COTIZACION DE POZO A TIERRA

MATERIALES CANTIDADP.UNITSUB TOTAL

DOSIS DE THORGHEL269.90139.80

BENTONITA125.1025.10

VARILLA DE COBRE 3/41309.90309.90

CONECTOR DE 3/4115.OO15.00

CAJA DE REGISTRO127.2027.20

TOTAL$/ 517.00

MANO DE OBRACOSTO POR MANO DE OBRA, NO INCLUYE IGV $/ 250.00 (DOSCIENTOS CINCUENTA NUEVOS SOLES)