7/28/2019 Cronograma Val. 01...xls
1/2
OBRA: CONSTRUCCION DEL PUESTO DE SALUD DEL BARRIO LA UNION, DISTRITO DE SAPALLANGA - HUANCAYO - JUNIN
PROP.: MUNICIPALIDAD DISTRITAL DE SAPALLANGA
EJECUTA: TOP BOSS S.A.C.
FECHA: AL 01 DE ABRIL DEL 2013
PRESUPUESTO Jan-13No. DESCRIPCION BASE
P/E C. PARCIAL 1 QUINCENA 1 QUINCEN 2 QUINCEN 1 QUINCEN 2 QUINCEN 1 QUINCENA 2 QUINCENA 1 QUINCENA 2 QU
01 ESTRUCTURAS
01 OBRAS PROVISIONALES P 2,330.53 2,076.29 63.56 63.56 63.56
E 2,076.29 6.56 63.56 63.56 02 OBRAS PRELIMINARES P 897.22 897.22
E 897.22
03 MOVIMIENTO DE TIERRAS P 2,676.73 2,676.73
E 2,676.73
04 CONCRETO SIMPLE P 8,952.37 4476.185 2,238.09 2,238.09
E 7,573.43 689.47 689.47
05 CONCRETO ARMADO P 16,046.36 6418.544 6,418.54 3,209.27
E 6,406.12 9,640.24
06 ESTRUCTURAS DE MADERA P 6,687.32 3,343.66 3,343.66
E 5,888.14 799.18
07 COBERTURAS P 9,761.47 4,880.74 4,880.74
E 9,761.47
8.0 FLETE TERRESTRE P 2,652.13 1326.065 795.64 265.21 265.21E 2,250.00 250.00 152.13
02 ARQUITECTURA
1.0 MUROS, TABIQUES Y ALBAILERIA P 7,145.76 2,858.30 2,143.73 2,143.73
E 3,572.88 3,572.88
2.0 REVOQUES ENLUCIDOS Y MOLDURAS P 12,248.17
E 12,248.17
3.0 CIELORRASOS P 6,975.10
E 6,083.60
4.0 PISOS Y PAVIMENTOS P 7,638.44
E
5.0 ZOCALOS Y CONTRAZCALOS P 4,154.58
E
6.0 CARPINTERIA DE MADERA P 2,703.82
E 2,703.82
7.0 CARPINTERIA METALICA P 2,819.40
E 1,409.70 1,409.70
8.0 CERRAJERIA P 1,171.08
E
9.0 VIDRIOS, CRISTALES Y SIMILARES P 857.93
E
10.0 PINTURA P 4,379.66
E
11.0 VARIOS P 1,045.71 522.855 209.14
E 559.32
03 INSTALACIONES SANITARIAS1.0 APARATOS Y ACCESORIOS SANIT. P 841.27
E 169.49
2.0 SISTEMA DE DESAGUE P 2,408.99 1,204.50 843.15
E 1,227.22 1,181.77
3.0 SIST. DE AGUA FRIA Y C. INCENDIO P 2,139.09 1,069.55 748.68
E 833.24
4.0 SIST. DE DESAGUE PLUVIAL P 4,326.20
E
04 INSTALACIONES ELECTRICAS
1.0 SALIDAS P 1,516.49 1,516.49
E 795.79 720.70
2.0 CANALIZACIN Y/O TUBERIAS P 1,271.21 1,271.21
E 1,168.86 102.353.0 CONDUCTORES Y/O CABLES P 426.67
E
4.0 TABLERO Y CUCHILLAS P 555.81
E 292.11
5.0 ARTEFACTOS ELCTRICOS P 556.63
E 57.00
6.0 SISTEMA COMPLEMENTARIOS P 365.60
E
COSTO DIRECTO TOTAL P 115,551.74 18,393.89 14,648.18 16,144.26 15,285.57
E 0.00 21,879.79 18,245.63 41,284.28 6,582.47
GASTOS GENERALES (10%) P 11,555.17 1,839.39 1,464.82 1,614.43 1,528.56
E 0.00 2,187.98 1,824.56 4,128.43 658.25 UTILIDAD (10%) P 11,555.17 1,839.39 1,464.82 1,614.43 1,528.56
E 0.00 2,187.98 1,824.56 4,128.43 658.25
SUB-TOTAL P 138,662.09 22,072.67 17,577.82 19,373.11 18,342.68
E 0.00 26,255.75 21,894.76 49,541.14 7,898.96
IGV (18%) P 24,959.18 3,973.08 3,164.01 3,487.16 3,301.68
E 0.00 4,726.03 3,941.06 8,917.40 1,421.81
TOTAL P 163,621.26 26,045.75 20,741.82 22,860.27 21,644.36
E 0.00 30,981.78 25,835.81 58,458.54 9,320.78
% AVANCE P 100.00% 15.92% 12.68% 13.97% 13.23%
E 95.89% 18.94% 15.79% 35.73% 5.70%
95.89%
0.00000000
CRONOGRAMA DE AVANCE DE OBRA
Apr-13 May-13Feb-13 Mar-13
-
7/28/2019 Cronograma Val. 01...xls
2/2
1 QUINCENA 2 QUINCENA
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF! 0#REF! #REF!
4,882.57 0#REF! #REF!
7,638.44 0#REF! #REF!
4,154.58 00
1,351.91 00
1,409.70 00
1,171.08 0
0857.93 00
4,379.66 00
104.57 104.57 00
841.27 000000
4,326.20 00
00000000
556.63 000
016,780.16 14,998.95
0.00 0.00 59,529.911,678.02 1,499.90
0.00 0.00
1,678.02 1,499.90
0.00 0.00
20,136.19 17,998.74
0.00 0.00
3,624.51 3,239.77
0.00 0.00
23,760.71 21,238.51
0.00 0.00 84,294.3514.52% 12.98%
0.00% 0.00% 51.52%
Jun-13