CURRICULUM VITAE Hany Ahmed AL-Swasany Address: Agami betash, Alexandria. Cellular: +201225658184 / +201124488445 Email: [email protected] Objective To obtain a Management position with leadership responsibilities including planning, organizing, problem solving and managing projects in a company where my experience can be utilized to beneficially contribute to the organization I join. Education A Project Management diploma from AUC (PRMG). Tanta University, Faculty of Engineering. B. Sc. Civil Engineering, 2009. Graduation project: design of steel structures, grade: excellent. Previous Employments & Training jobs Through 8 years of success in the field of civil engineering develop a very good experience working in 1 st class organizations well known in Egypt: From Mars 2014 till now Rowad Modern Engineering (RME). With responsibilities of civil work included (earth work, conc. work). Working as A SENIOR CIVIL ENGINEER in projects : - AL MOSTASMEREEN 220/66/11 KV GIS SUBSTATION (ELECTRICAL SUB- STATION) a consortium with (GE.ALSTOM) fast track project…as I represent the main contractor dealing with owner (MINISTRY OF ELECTRICITY AND ENERGY) with responsibilities of all civil Work, finishing, landscape, sewage and roads. - ATTAQA 650 mw simple cycle (Siemens gas turbines Power Plant) fast track project…taking the responsibilities of civil work for the whole power block area which consist of 4 `

Upload: hany-ahmed

Post on 24-Jan-2017

20 views

Category:

Documents


6 download

TRANSCRIPT

Page 1: C.V. eng.hany

C U R R I C U L U M V I TA EHany Ahmed AL-Swasany

Address: Agami betash, Alexandria. Cellular: +201225658184 / +201124488445 Email: [email protected]

ObjectiveTo obtain a Management position with leadership responsibilities including planning, organizing, problem solving and managing projects in a company where my experience can be utilized to beneficially contribute to the organization I join.

Education A Project Management diploma from AUC (PRMG). Tanta University, Faculty of Engineering.

B. Sc. Civil Engineering, 2009.Graduation project: design of steel structures, grade: excellent.

Previous Employments & Training jobs

Through 8 years of success in the field of civil engineering develop a very good experience working in 1st class organizations well known in Egypt:

From Mars 2014 till nowRowad Modern Engineering (RME). With responsibilities of civil work included (earth work, conc. work). Working as A SENIOR CIVIL ENGINEER in projects: - AL MOSTASMEREEN 220/66/11 KV GIS SUBSTATION (ELECTRICAL SUB-STATION) a

consortium with (GE.ALSTOM) fast track project…as I represent the main contractor dealing with owner (MINISTRY OF ELECTRICITY AND ENERGY) with responsibilities of all civil Work, finishing, landscape, sewage and roads.

- ATTAQA 650 mw simple cycle (Siemens gas turbines Power Plant) fast track project…taking the responsibilities of civil work for the whole power block area which consist of 4 gas turbines its skids and utilities, the transformers units, stacks units, the GIS building also the GIS control building, and other ancillary buildings, landscape and roads.

- EZZ Rolling Mills (DRI PLANT) an extension for the existing factory to produce the iron raw material with new technology in the Middle East called (DRI – Direct reducing iron) Mega project and also fast track in Ain Sukhna with DANIELI MEES. Finished civil work for 6 buildings included its utilities, 4 conveyors with its transfer towers and its electrical substation.

`

Page 2: C.V. eng.hany

- NEW GIZA UNIVERSITY 6thof Oct. city, with area of 20000 m2 finished civil work of the utilities building (ground water tank with capacity of 3000 m3, chillers room and electrical trenches) and faculty of medicine with high quality standards within 3 months.

Sep 2012 – Feb 2014 Protection for contracting and design (PSC).Accomplished three projects As a site engineer with responsibilities of (earth work, conc. Work).

Elif global packaging at 6th of Oct. city, Egypt – Turkish investment Area of the site=22000 m² (Project budget 50,000,000 L.E)

Main building of area =17000 m² (steel structure ) Water tank & Pump room with capacity= 1000 m³. Gas tank & truck scale. Loading deck of length=56 m. Mezzanine of area = 1500m². Slab on grade helicopter finished floor of area= 17000 m² Administrative building 3 stories of area = 700 m2.

Ragab sons hyper market at el shrouk city, Egypt Area of the site=38000 m² (Project budget 180,000,000 L.E)

1-Basement with area = 34000 m2 & consists of: Post tension roof slab of area 32000 m². Cold store with area =800 m². Water tank & Pump room with capacity= 500 m³. Loading Area =500 m². Parking area = 26000 m². Two warehouses each of area 2600 m². Chillier room and electric room of area 600 m². Service rooms with area =1300 m².

2-Ground floor consists of: (Steel structure) with area = 32000 m².

3-Mezzanine inside the warehouse with area=2800 m².4-Boundary walls with length= 800 m.

Ragab sons distribution centre extension at Cairo Ismailia Desert road Warehouse of area=2660 m² (Project budget 12,000,000 L.E)

Warehouse of area=2660 m² (steel structure). Cold store with area =600 m². Loading deck of length=72 m. Mezzanine of area = 500 m². Slab on grade helicopter finished floor of area=3400 m² Two fair face blocks fences of length 350m.

June 2010 – Aug 2012

Page 3: C.V. eng.hany

DAR EL-EMEARA CONTRACTORS, Cairo, Egypt. With responsibilities of site and t.o. engineer in projects:

- Constructing and Renewing (Tanash, Imbaba River Port), under supervision Of (National River Ports Management Company- NRPMC.), project budget 18,000,000 L.E.

- Constructing the Garage and, car sheds, warehouse and the administration building of (ACC CEMENT CO.) In Ain sukhna, under supervision Of (Reliance for Heavy Industry-RHI.), project budget 13,500,000 L.E.

Also manage to achieve a higher experience dealing with (epoxy materials, isolation materials, repair and strengthen work as well): - Repairing and reconstructing ovens footings of (Al Nasr for Casting Metal) in Giza.

- Supporting and repairing of (Palm Hills) 5th phase villas in 6 October city. - Repairing and reconstructing villas at (Mena Garden City) in 6 October city. - Repairing villas and the expansion of other villas in (Palm Hills236 Fadden qattamya)

- Isolation work cement isolation, membrane isolation of (ALLEGRIA Compound)

Industrial flooring:

- Heavy duty S.O.G AT (CPC industrial zone) in 6 October with self-levelling epoxy.- High finished S.O.G at (6 October’s university garage) with epoxy painting.- Heavy duty cementious Polyurethane Flooring System at (Ice man Factory).- High finished S.O.G in (Porsa building at smart village) with self-levelling epoxy.

Sep 2009 – May 2010 KASSAB FOR TRADING AND CONTRACTING.The executive engineer for (Zefta's Insurance Office Building) under supervision of

(The ministry of housing), (Project budget 8,000,000 L.E).

Courses - (OSHA) occupational safety and health administration for construction from AUC. - (ICDL) (Windows-Word-Excel-Internet). -Drawing Programs: (AutoCAD 2D). -Very good command of English both written and spoken. -Toefl degree: 554 certified from Alexandria University.

Training History -Trained at (AL-Ryad for construction and real estate investment). -Trained at (The Extension of Tanta stadium, ministry of housing). -Trained at (The engineering management of Cairo for oil refining).

Position code

Page 4: C.V. eng.hany

Senior civil engineer / Project engineer

Personal Information

Date of birth: 2 / 1 /1987.Nationality: EgyptianMarital Status: MarriedMilitary Status: Exempted.Have a driving license.Have a passport, willing to relocate and travel.Have a safety appreciation certificates from the client of the industrial projects which I joined.

References are furnished upon request Thanks.