DAFTAR BIAYA SEWA PERALATAN PER JAM KERJABIAYANo.URAIANKODEHPKAPASITASHARGA ALATSEWA ALAT/JAM (di luar PPN)KET.1. 2. 3. 4. 5. 6. 7. 8. 9. 10. 11. 12. 13. 14. 15. 16. 17. 18. 19. 20. 21. 22. 23. 24. 25. 26. 27. 28. 29. 30. 31. 32. 33. 34. 35. 36. 37. 38.ASPHALT MIXING PLANT ASPHALT FINISHER ASPHALT SPRAYER BULLDOZER 100-150 HP COMPRESSOR 4000-6500 L\M CONCRETE MIXER 0.3-0.6 M3 CRANE 10-15 TON DUMP TRUCK 3-4 M3 FLAT BED TRUCK EXCAVATOR 80-140 HP FLAT BED TRUCK 3-4 M3 GENERATORTRANSCRIPT
File : document.xls
DAFTAR BIAYA SEWA PERALATAN PER JAM KERJA
No. URAIAN KODE HP KAPASITAS HARGAALAT
1. ASPHALT MIXING PLANT E01 125.0 50.0 T/Jam 1,710,625,000
2. ASPHALT FINISHER E02 47.0 6.0 Ton 636,093,750
3. ASPHALT SPRAYER E03 25.0 1,000.0 Liter 143,750,000
4. BULLDOZER 100-150 HP E04 105.0 - - 783,437,500
5. COMPRESSOR 4000-6500 L\M E05 35.0 5,000.0 5,000.00 143,750,000
6. CONCRETE MIXER 0.3-0.6 M3 E06 10.0 0.3 M3 43,125,000
7. CRANE 10-15 TON E07 200.0 25.0 Ton 765,516,600
8. DUMP TRUCK 3-4 M3 E08 120.0 4.0 Ton 120,176,000
9. FLAT BED TRUCK E09 145.0 8.0 Ton 204,843,750
10. EXCAVATOR 80-140 HP E10 105.0 0.9 M3 682,812,500
11. FLAT BED TRUCK 3-4 M3 E11 145.0 5.0 M3 179,687,500
12. GENERATOR SET E12 170.0 125.0 KVA 341,406,250
13. MOTOR GRADER >100 HP E13 125.0 - - 664,843,750
14. TRACK LOADER 75-100 HP E14 95.0 1.5 M3 220,000,000
15. WHEEL LOADER 1.0-1.6 M3 E15 85.0 1.5 M3 571,406,250
16. THREE WHEEL ROLLER 6-8 T E16 60.0 8.0 Ton 428,770,000
17. TANDEM ROLLER 6-8 T. E17 60.0 8.0 Ton 348,593,750
18. TIRE ROLLER 8-10 T. E18 60.0 95.0 Ton 343,750,000
19. VIBRATORY ROLLER 5-8 T. E19 60.0 90.0 Ton 424,062,500
20. CONCRETE VIBRATOR E20 4.0 - - 8,265,625
21. STONE CRUSHER E21 60.0 60.0 T/Jam 1,423,250,703
22. WATER PUMP E22 8.0 2.0 2.00 14,375,000
23. WATER TANKER 3000-4500 L. E23 115.0 4,000.0 Liter 115,000,000
24. PEDESTRIAN ROLLER E24 5.0 1.00 Ton 12,500,000
25. TAMPER E25 5.0 0.60 Ton 16,171,875
26. JACK HAMMER E26 8.0 - - 10,781,250
27. FULVI MIXER E27 75.0 - - 46,000,000
28. CONCRETE PUMP E28 60.0 0.75 M3 112,500,000
29. TRAILER 20 TON E29 175.0 20.00 Ton 166,250,000
30. PILE DRIVER + HAMMER E30 25.0 2.50 Ton 70,000,000
31. CRANE ON TRACK 35 TON E31 125.0 35.0 Ton 350,000,000
32. WELDING SET E32 40.0 250.0 Amp 17,500,000
33. BORE PILE MACHINE E33 150.0 2,000.0 Meter 2,250,000,000
34. ASPHALT LIQUID MIXER E34 5.0 1,000.0 Liter 15,000,000
35. TRAILLER 15 TON E35 150.0 15.0 Ton 115,000,000
36. ROCK DRILL BREAKER E36 3.0 - 27,721,250
37. COLD MILLING E37 125 - 474,750,000
38. VIBRATORY ROLLER 1 T. E38 7.0 1.00 Ton 48,000,000
File : document.xls
DAFTAR BIAYA SEWA PERALATAN PER JAM KERJA
BIAYA
SEWA KET.
ALAT/JAM
(di luar PPN)
1,217,541.46 Alat Baru
146,607.43 Alat Baru
60,409.82 Alat Baru
222,398.67 Alat Baru
57,956.96 Alat Baru
32,470.08 Alat Baru
257,166.67 Alat Baru
72,040.74 Alat Baru
108,425.20 Alat Baru
199,511.80 Alat Baru
122,796.29 Alat Baru
154,376.44 Alat Baru
208,702.98 Alat Baru
105,083.86 Alat Baru
171,762.14 Alat Baru
132,283.32 Alat Baru
116,682.82 Alat Baru
135,157.44 Alat Baru
141,569.60 Alat Baru
18,449.81 Alat Baru
353,388.66 Alat Baru
23,488.61 Alat Baru
91,905.53 Alat Baru
17,921.42 Alat Baru
18,921.74 Alat Baru
18,765.68 Alat Baru
56,329.28 Alat Baru
65,205.94 Alat Baru
127,072.26 Alat Baru
45,272.22 Alat Baru
138,129.09 Alat Baru
41,619.39 Alat Baru
489,586.25 Alat Baru
26,170.92 Alat Baru
109,304.19 Alat Baru
42,075.84 Alat Baru
211,426.55 Alat Baru
30,201.45 Alat Baru
ANALIS EE155 asphalt mixing plants
E157 asphalt finisher
E154 asphalt sprayer
E001 bulldozer
E301 air compressor
E06 concrete mixer
E07 crane
E212 truck
E221 dump truck
E10 excavator
E11 flat bed truck
E12 generator set
E010 motor grader
E14 track loader
E052 whell loader
E080 three whell roller
E081 tandem roller
E084 pneumatic tire roller
E082 vibratory roller
E089 concrete vibrator
E031 stone crusher
E341 water pump
E182 water tanker
E24 pedestrian roller
E25 plate temper
E26 jack hammer
E27 fulvi mixer
E28 concrete pump
E29 trailer
E30 pile diver hammer
E31 crane on truck
E32 velding set
E33 bore pile
E34 asphalt liquid mixer
E35 trailler
E36 cold milling (winget)
E37 rock drill breaker
File : document.xls
URAIAN ANALISA ALAT
Tabel-tabel di bawah iniNo. U R A I A N KODE KOEF. SATUAN KET.
Merupakan acuan untukHARGA
A. URAIAN PERALATAN ALAT
1. Jenis Peralatan TRAILLER 15 TON E35 2. Tenaga Pw 150.0 HP UE' 3. Kapasitas Cp 15.0 Ton ### 4. Alat Baru : a. Umur Ekonomis A 10.0 Tahun E35
b. Jam Kerja Dalam 1 Tahun W 1,500.0 Jam ### c. Harga Alat B 115,000,000 Rupiah ###
5. Alat Yang Dipakai : a. Umur Ekonomis A' 10.0 Tahun Alat Baru b. Jam Kerja Dalam 1 Tahun W' 1,500.0 Jam Alat Baru c. Harga Alat (*) B' 115,000,000 Rupiah Alat Baru
###B. BIAYA PASTI PER JAM KERJA ###
1. Nilai Sisa Alat = 10 % x B C 11,500,000 Rupiah ###
### 2. Faktor Angsuran Modal = i x (1 + i)^A' D 0.19171 - ###
(1 + i)^A' - 1 ### 3. Biaya Pasti per Jam : ###
a. Biaya Pengembalian Modal = ( B' - C ) x D E 13,228.23 Rupiah ###W' ###
###b. Asuransi, dll = 0.002 x B' F 153.33 Rupiah ###
W' ###
###Biaya Pasti per Jam = ( E + F ) G 13,381.57 Rupiah ###
###C. BIAYA OPERASI PER JAM KERJA ###
### 1. Bahan Bakar = (0.125-0.175 Ltr/HP/Jam) x Pw x Ms H 39,375.00 Rupiah ###
###
### 2. Pelumas = (0.01-0.02 Ltr/HP/Jam) x Pw x Mp I 26,250.00 Rupiah ###
### 3. Perawatan dan = (12,5 % - 17,5 %) x B K 9,583.33 Rupiah ###
perbaikan W' ### 4. Operator = ( 1 Orang / Jam ) x U1 L 14,285.71 Rupiah ### 5. Pembantu Operator = ( 1 Orang / Jam ) x U2 M 19,285.71 Rupiah ###
###Biaya Operasi per Jam = (H+I+K+L+M) P 108,779.76 Rupiah ###
###D. TOTAL BIAYA SEWA ALAT / JAM = ( G + P ) T 122,161.33 Rupiah ###
###
###E. LAIN - LAIN ###
1. Tingkat Suku Bunga i 14.00 % / Tahun ###
2. Upah Operator / Sopir U1 14,285.71 Rp./Jam ### 3. Upah Pembantu Operator / Pmb.Sopir U2 6,428.57 Rp./Jam ### 4. Bahan Bakar Bensin Mb 2,400.00 Liter ### 5. Bahan Bakar Solar Ms 2,100.00 Liter ### 6. Minyak Pelumas Mp 17,500.00 Liter ### 7. PPN diperhitungkan pada lembar Rekapitulasi ###
Biaya Pekerjaan ######
File : document.xls
###
URAIAN ANALISA ALAT
Tabel-tabel di bawah iniNo. U R A I A N KODE KOEF. SATUAN KET.
Merupakan acuan untukHARGA
A. URAIAN PERALATAN ALAT
1. Jenis Peralatan COLD MILLING (WINGET) E36 2. Tenaga Pw 125.0 HP UE' 3. Kapasitas Cp - - ### 4. Alat Baru : a. Umur Ekonomis A 10.0 Tahun E35
b. Jam Kerja Dalam 1 Tahun W 1,500.0 Jam ### c. Harga Alat B 474,750,000 Rupiah ###
5. Alat Yang Dipakai : a. Umur Ekonomis A' 5.0 Tahun Alat Baru b. Jam Kerja Dalam 1 Tahun W' 1,500.0 Jam Alat Baru c. Harga Alat (*) B' 474,750,000 Rupiah Alat Baru
###B. BIAYA PASTI PER JAM KERJA ###
1. Nilai Sisa Alat = 10 % x B C 47,475,000 Rupiah ###
### 2. Faktor Angsuran Modal = i x (1 + i)^A' D 0.29128 - ###
(1 + i)^A' - 1 ### 3. Biaya Pasti per Jam : ###
a. Biaya Pengembalian Modal = ( B' - C ) x D E 82,972.12 Rupiah ###W' ###
###b. Asuransi, dll = 0.002 x B' F 633.00 Rupiah ###
W' ###
###Biaya Pasti per Jam = ( E + F ) G 83,605.12 Rupiah ###
###C. BIAYA OPERASI PER JAM KERJA ###
### 1. Bahan Bakar = (0.125-0.175 Ltr/HP/Jam) x Pw x Ms H 32,812.50 Rupiah ###
###
### 2. Pelumas = (0.01-0.02 Ltr/HP/Jam) x Pw x Mp I 21,875.00 Rupiah ###
### 3. Perawatan dan = (12,5 % - 17,5 %) x B' K 39,562.50 Rupiah ###
perbaikan W' ### 4. Operator = ( 1 Orang / Jam ) x U1 L 14,285.71 Rupiah ### 5. Pembantu Operator = ( 1 Orang / Jam ) x U2 M 19,285.71 Rupiah ###
###Biaya Operasi per Jam = (H+I+K+L+M) P 127,821.43 Rupiah ###
###D. TOTAL BIAYA SEWA ALAT / JAM = ( G + P ) T 211,426.55 Rupiah ###
###
###E. LAIN - LAIN ###
1. Tingkat Suku Bunga i 14.00 % / Tahun ###
2. Upah Operator / Sopir U1 14,285.71 Rp./Jam ### 3. Upah Pembantu Operator / Pmb.Sopir U2 6,428.57 Rp./Jam ### 4. Bahan Bakar Bensin Mb 2,400.00 Liter ### 5. Bahan Bakar Solar Ms 2,100.00 Liter ### 6. Minyak Pelumas Mp 17,500.00 Liter ### 7. PPN diperhitungkan pada lembar Rekapitulasi ###
Biaya Pekerjaan ######
###
URAIAN ANALISA ALAT######
No. U R A I A N KODE KOEF. SATUAN KET.> 15th ?
Kondisi Alat
A. URAIAN PERALATAN Nilai B' dari
1. Jenis Peralatan ROCK DRILL BREAKER E37 2. Tenaga Pw 3.0 HP 3. Kapasitas Cp - - ### 4. Alat Baru : a. Umur Ekonomis A 10.0 Tahun E38
b. Jam Kerja Dalam 1 Tahun W 1,500.0 Jam ### c. Harga Alat B 27,721,250 Rupiah ###
5. Alat Yang Dipakai : a. Umur Ekonomis A' 5.0 Tahun Alat Baru
File : document.xls
b. Jam Kerja Dalam 1 Tahun W' 1,500.0 Jam Alat Baru c. Harga Alat (*) B' 27,721,250 Rupiah Alat Baru
###B. BIAYA PASTI PER JAM KERJA ###
1. Nilai Sisa Alat = 10 % x B C 2,772,125 Rupiah ######
2. Faktor Angsuran Modal = i x (1 + i)^A' D 0.29128 - ###(1 + i)^A' - 1 ###
3. Biaya Pasti per Jam : ###a. Biaya Pengembalian Modal = ( B' - C ) x D E 4,844.85 Rupiah ###
W' > 15th ? Kondisi Alat
b. Asuransi, dll = 0.002 x B' F 36.96 Rupiah Nilai B' dari
W' Depresiasi
Biaya Pasti per Jam = ( E + F ) G 4,881.81 Rupiah ### E39
C. BIAYA OPERASI PER JAM KERJA ######
1. Bahan Bakar = (0.125-0.175 Ltr/HP/Jam) x Pw x Ms H 787.50 Rupiah #########
2. Pelumas = (0.01-0.02 Ltr/HP/Jam) x Pw x Mp I 525.00 Rupiah ######
3. Perawatan dan = (12,5 % - 17,5 %) x B K 2,310.10 Rupiah ### perbaikan W' ###
4. Operator = ( 1 Orang / Jam ) x U1 L 14,285.71 Rupiah ### 5. Pembantu Operator = ( 1 Orang / Jam ) x U2 M 19,285.71 Rupiah ###
###Biaya Operasi per Jam = (H+I+K+L+M) P 37,194.03 Rupiah ###
> 15th ?D. TOTAL BIAYA SEWA ALAT / JAM = ( G + P ) T 42,075.84 Rupiah Kondisi Alat
Nilai B' dari
Depresiasi
E. LAIN - LAIN 1. Tingkat Suku Bunga i 14.00 % / Tahun ### 2. Upah Operator / Sopir U1 14,285.71 Rp./Jam E40 3. Upah Pembantu Operator / Pmb.Sopir U2 6,428.57 Rp./Jam ### 4. Bahan Bakar Bensin Mb 2,400.00 Liter ### 5. Bahan Bakar Solar Ms 2,100.00 Liter ### 6. Minyak Pelumas Mp 17,500.00 Liter ### 7. PPN diperhitungkan pada lembar Rekapitulasi ###
Biaya Pekerjaan ######