8/16/2019 Deadline Tugas Merancang Kapal Tr 1 - 5 2016 (1) http://slidepdf.com/reader/full/deadline-tugas-merancang-kapal-tr-1-5-2016-1 1/3 DEADLINE TUGAS MERANCANG KAPAL SEMESTER GENAP TAHUN AKADEMIK 2015/2016 1. TUGAS MERANCANG KAPAL I A. Linesplan B. SE 2. TUGAS MERANCANG KAPAL II A. Hydrostatic and Bounjean B. Floodable Length Tanggal Materi 18 – 22 Maret 2016 Ukuran Utama Kapal Baru 25 – 28 Maret 2016 CSA Dan AWL 29 – 04 April 2016 Body Plan & Half Breadth Ms.Excel 05 – 11 April 2016 Linesplan AutoCAD 12 – 15 April 2016 Laporan Linesplan 16  –  18 April 2016 Ujian Asdos Tanggal Materi 18 – 25 April 2016 BAB I  – BAB II 26 – 03 Mei 2016 BAB III – Resume Laporan 04 – 10 Mei 2016 Pemasangan Plat Shell Expansion 11 – 15 Mei 2016 Shell Expansion AutoCAD 16 – 18 Mei 2016 Ujian Asdos Tanggal Materi 18 – 25 Maret 2016 Tabel A - E Fix 26 – 01 April 2016 Tabel F - Hydrostatic Curve 02 – 07 April 2016 Tabel I – Bonjean Curve 08 - 15 April 2016 Laporan dan Hydrostatic Bonjean Curve AutoCAD 16 - 18 April 2016 Ujian Asdos Tanggal Materi 18 – 25 April 2016 Software Delftship dan Maxsurf 26 – 03 Mei 2016 Floodable Length Ms. Excel 04 – 11 Mei 2016 Floodable Length AutoCAD 12 – 15 Mei 2016 Laporan Floodable Length 16 – 18 Mei 2016 Ujian Asdos

Upload: karno-malau

Post on 05-Jul-2018

212 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Deadline Tugas Merancang Kapal Tr 1 - 5 2016 (1)

8/16/2019 Deadline Tugas Merancang Kapal Tr 1 - 5 2016 (1)

http://slidepdf.com/reader/full/deadline-tugas-merancang-kapal-tr-1-5-2016-1 1/3

DEADLINE TUGAS MERANCANG KAPAL

SEMESTER GENAP TAHUN AKADEMIK 2015/2016

1.  TUGAS MERANCANG KAPAL I

A. Linesplan

B.  SE

2.  TUGAS MERANCANG KAPAL II

A.  Hydrostatic and Bounjean

B.  Floodable Length

Tanggal Materi

18 – 22 Maret 2016 Ukuran Utama Kapal Baru

25 – 28 Maret 2016 CSA Dan AWL

29 – 04 April 2016 Body Plan & Half Breadth Ms.Excel

05 – 11 April 2016 Linesplan AutoCAD

12 – 15 April 2016 Laporan Linesplan

16 –

 18 April 2016 Ujian Asdos

Tanggal Materi

18 – 25 April 2016 BAB I – BAB II

26 – 03 Mei 2016 BAB III – Resume Laporan

04 – 10 Mei 2016 Pemasangan Plat Shell Expansion

11 – 15 Mei 2016 Shell Expansion AutoCAD

16 – 18 Mei 2016 Ujian Asdos

Tanggal Materi

18 – 25 Maret 2016 Tabel A - E Fix

26 – 01 April 2016 Tabel F - Hydrostatic Curve 

02 – 07 April 2016 Tabel I – Bonjean Curve

08 - 15 April 2016 Laporan dan Hydrostatic Bonjean Curve AutoCAD

16 - 18 April 2016 Ujian Asdos

Tanggal Materi

18 – 25 April 2016 Software Delftship dan Maxsurf

26 – 03 Mei 2016 Floodable Length Ms. Excel

04 – 11 Mei 2016 Floodable Length AutoCAD

12 – 15 Mei 2016 Laporan Floodable Length

16 – 18 Mei 2016 Ujian Asdos

Page 2: Deadline Tugas Merancang Kapal Tr 1 - 5 2016 (1)

8/16/2019 Deadline Tugas Merancang Kapal Tr 1 - 5 2016 (1)

http://slidepdf.com/reader/full/deadline-tugas-merancang-kapal-tr-1-5-2016-1 2/3

3.  TUGAS MERANCANG KAPAL III

A.  General Arrangement (Rencana Umum)

Tanggal  Materi 

18  – 30 Maret 2016 Bab I , II, III, IV & Side view

30 Maret - 06 April 2016 Bab V, VI, VII & Deck View

06 - 13 April 2016 Bab VIII, IX, X & Bottom Front View

13 - 20 April 2016 Laporan Fix, Gambar Selesai

22 April 2016 Ujian Asisten Dosen

B.  Kontruksi Profil

Tanggal  Materi 

20 April – 27 April 2016 Bab I, II & III

27 –

 04 Mei 2016 Bab IV & V04 – 11 Mei 2016 Bab VI, VII, VIII & Side View

11 – 18 Mei 2016 Top View, Bottom View , Front View, Tabulasi

20 Mei 2016 Ujian Asisten Dosen

4.  TUGAS MERANCANG KAPAL IV

A.  Stabilitas Kapal

Tanggal Materi

18 – 30 maretl 2016 Perhitungan LWT

30 maret - 06 April 2016 Perhitungan Ya Yb

06 - 13 April 2016 Tanki Perhitungan

13 - 20 April 2016 Lc Diagram

22 April 2016 Ujian Asisten Dosen

B.  Diagram Peluncuran

Tanggal Materi

20 –

 27 April 2016 Periode I27 April - 04 Mei 2016 Periode II, III

04- 11 Mei 2016 Tabulasi

11 - 18 Mei 2016 Laporan + Gambar

20 Mei 2016 Ujian Asisten Dosen

Page 3: Deadline Tugas Merancang Kapal Tr 1 - 5 2016 (1)

8/16/2019 Deadline Tugas Merancang Kapal Tr 1 - 5 2016 (1)

http://slidepdf.com/reader/full/deadline-tugas-merancang-kapal-tr-1-5-2016-1 3/3

5.  TUGAS MERANCANG KAPAL V

A.  Kekuatan Memanjang Kapal

Tanggal Materi

18 – 25 Maret 2016 LWT, DWT & Displace

25 Maret –

 28 Maret 2016 CSA Tenang

28 Maret – 4 April 2016 Hogging, Sagging, Tegangan ijin

4 April – 12 April 2016 Finishing Laporan Fix

14 April 2016 Ujian Asisten Dosen

15 April 2016 Ujian Dosen

B. Layout Kamar Mesin

Tanggal  Materi 15 – 21 april 2016 Perhitungan Laporan Dan Gambar Ruang Mesin

21 april – 28 April 2016 Tata Letak , Perhitungan, Gambar Selesai

28 April – 5 Mei 2016 PFD

5 – 10 Mei 2016 Acc Laporan

10 –12 Mei 2016 Ujian Asisten Dosen

16 mei 2016 Ujian Dosen