DENR

CATANDUANES

1ST SEMESTER

ACCOMPLISHMENT REPORT

CY 2011

FOREST MANAGEMENT

A. Accomplishment on all regular target:

1. Management of forest land and forest resources;

a. Processing of applications → ( A18 out of 8T ) 225%

b. Price monitoring → ( A6 out of 6T ) 100%

c. FIS maintenance → ( A1 out of 1T ) 100%

d. LGUs assisted → ( A 3 out of 1T ) 300%

2. Forest protection program;

a. Monitor entry points → ( A 2 out of 1T ) 200%

b. MFPC strengthening → ( A1 out of 1T ) 100%

c. Ground surveillance → ( A 36121 ha. out of

d. T 36121 ha ) 100%

MANAGEMENT OF FORESTLAND

0

2

4

6

8

10

12

14

16

18

Processed applications

Price monitored

FIS updated LGUs assisted

Target

Accomplishents

FOREST PROTECTION PROGRAM

00.20.40.60.8

11.21.41.61.8

2

Monitor entry points

MFPC Ground surveillance

Target

Accomplishments

COMMUNITY BASED FOREST

MANAGEMENT PROGRAM

Assessment and Evaluation of CSCs

A. Regular Target = A 35 out of 35 T 100%

B. Central Based

Target = A 50 out of

50 T 100%

PAWCZMS

1. Protected Area and Wildlife Mgt.

a. PAMB Meeting → ( A2 out of 2T ) 100%

b. PA patrolling → ( A1 out of 1T ) 100%

c. Wildlife Inspection → ( A6 out of 6T ) 100%

d. Wetlands recommended

as RAMSAR → ( A 2 out of 1 T) 200%

2. CMMS

a. Mangrove Rehab → (A1 out of 1T) 100%

b. TA to LGU on ICM → (A1 out of 1T) 100%

c. Law Enforcement → (A1 out of 1T) 100%

d. PCRA = (A1 out of 1T) 100%

PROTECTED AREA MANAGEMENT

0

1

2

3

4

5

6

PAMB meeting

PA patrol Wildlife inspection

Wetlands as RAMSAR

Target

Accomplishments

COASTAL AND MARINE

MANAGEMENT

LAND MANAGEMENT

A. Land cases investigated → A4 out of 1 400%

B. Public land records → A 500 out of

500 T 100%

c. School site → A 8 out of 13 T 61%

D. PPI as of June, 2011

1. Transmitted to ROD

i. Lots → A 95 lots out of 212 T 44 %

ii. Area → A 106.6869 hectares out of

i. 212 hectares T 50 %

2. Processing of Residential Patents

→ A 31 lots out of T 330 lots

9%

REVENUE COLLECTION

Forest Management

A Php 13, 917.40 out of

T Php 13,917.40 (100%)

Land Management

A Php 38, 845.50 out of

T Php 38, 845.50 (100%)

National

Greening

Program

NGP Schedule of Activities

CENRO Virac/PENRO Catanduanes

Major Activity Location Target Time Frame Remarks

Barangay

Municipality

June

July

Aug.

Sept.

Oct.

Nov.

Dec.

(Status of Implementation)

A. Creation of Muicipal Coordinators

Special Order accomplished

B. Social Mobilization (SocMob)

a. Courtesy calls Province wide accomplished

a.1 Cong. Cesar V. Sarmiento

a.2 Gov. Joseph C. Cua

a.3 Municipal Mayors

a.4 NGAs

a.5 Barangay LGUs

a.6 Other Stakeholders

Major Activity Location Target Time Frame Remarks

Barangay

Municipality

June

July

Aug.

Sept.

Oct.

Nov.

Dec. (Status of Implementation)

b. IEC Province wide Accomplished

meetings conducted

dialogues facilitated

reports submitted on going activity

(weekly report from

Municipal Coordinators for

consolidation and submission

to RO and CO)

c. MOA/LOA signing on NGP Province wide MOAs/LOAs signed

MOAs signed 15% accomplishment

= Samahang Magsasaka sa

reports submitted withMaunlad na Lupa ng

Progreso,

documentationInc. c/o Rico Redulla (PO

Category)

= Barangay LGU of Progreso

c/o BC Jorge Bagadiong

Major Activity Location Target Time Frame Remarks

Barangay

Municipality

June

July

Aug.

Sept.

Oct.

Nov.

Dec. (Status of Implementation)

C. Site Preparation Province wide

a. Site assessment areas identified accomplished

b. Survey, Mapping and Planning areas mapped out on-going

c. Control Map prepared1 Control Map for

NGP sites

d. Brushing

e. Hauling of seedlings (brgy to the

planting sites)

Major Activity Location Target Time Frame Remarks

Barangay

Municipality

June

July

Aug.

Sept.

Oct.

Nov.

Dec. (Status of Implementation)

f. Hole digging

g. Staking

h. Documentation

i. Report preparation and submission

June 24, 2011 (province wide

tree planting)

D. Planting (SocMob) Province wideJune 27, 2011 (San

Miguel)

tree planting)

monthly tree planting (SocMob)

Major Activity Location Target Time Frame Remarks

Barangay

Municipality

June

July

Aug.

Sept.

Oct.

Nov.

Dec. (Status of Implementation)

E. Convergence Initiatives sites identified 50 hectares (Palumbanes Island)

(in coordination with DAR)

meetings conducted with

accomplished with DENR as

DA and DARhost agency, DA host

agency

for the next meeting.

Name of

Adoptors/Sta

keholders

Location

(Brgy./Munici

pality)

Area

(hectares)

NGP

Category

Status of

Implementati

on

1. Batalay

Elementary

School c/o

Mrs. Susan

B. Molina,

Principal

2. Barangay

LGU c/o BC

Ma. Severa

G. Regalado

3. Bagumbaya

n Elem Sch

c/o Mrs.

Marites R.

Vargas,

Principal

4. Brgy. LGU

c/o Mr.

Gerome

Trijo

Batalay, Bato

Bagumbayan,

Bato

10

.155

Mangrove

Urban areas

(within school

compound)

IEC conducted;

conducted

mangrove tree

planting

(SocMob);

IEC

accomplished;

for MOA

signing

Name of

Adoptors/Sta

keholders

Location

(Brgy./Munici

pality)

Area

(hectares)

NGP

Category

Status of

Implementati

on

5. Bato Central

Elem Sch. c/o

Mr. Isidro

Molina,

Principal

6. Genitligan

Upland

Farmers Ass.,

Inc. c/o Mr.

Salvador

Balcueva,

President

7. LGU Baras

c/o Mayor

Chito Chi

8. SUWECO

c/o Mr. Floro

BArrameda

Libjo, Bato

Genitligan,

Baras

Salvacion,

Baras

Obi,

Caramoran

5

40

20

30

Urban

CBFM

Mangrove

Protected Area

IEC

accomplished;

IEC

accomplished;

for MOA

signing

IEC

accomplished;

MOA signed

Name of

Adoptors/Sta

keholders

Location

(Brgy./Munici

pality)

Area

(hectares)

NGP

Category

Status of

Implementati

on

9. Hitoma

Bulalacao

ES

10. Brgy LGU

c/o BC

Oscar Brizo

11. Mr.

Rolando

Eustaquio

12. Elena

Condeno

13. MFARMC

c/o

Chairman

Nestor

Condeno

14. Brgy LGU

c/o BC

Wilson

Boneo

Bulalacao,

Caramoran

Inalmasinan,

Caramoran

Dariao,

Caramoran

Dariao,

Caramoran

Toytoy,

Caramoran

San Pedro,

Gigmoto

1.5

2.0

2.0

1.0

1.0

25

35

Urban

Urban

Urban

Urban

Mangrove

Watershed

Protected Area

IEC

accomplished;

for MOA

signing

For MOA

signing

For MOA

signing

For MOA

signing

For MOA

signing;with

GPS reading

Name of

Adoptors/Sta

keholders

Location

(Brgy./Munici

pality)

Area

(hectares)

NGP

Category

Status of

Implementati

on

15Gigmoto

Rural Devt HS

c/o Mrs.

Remedios

Crispino,

Principal

16.

Balangonan

ES c/o Mrs.

Mary Jane

Rima

17. Pandan

School of Arts

and Trade c/o

Mrs. Salve

Alcantara,

OIC, Principal

18. Brgy LGU

c/o BC

Eustaquio

Rodriguez

Poblacion,

Gigmoto

Balangonan,

Pandan

Poblacion,

Pandan

Brgy del Sur,

Pandan

2.0

2.2

5.0

8

Urban

Urban

Urban

Mangrove

With GPS

reading; for

MOA signing

For MOA

signing

For MOA

signing

For MOA

signing

Name of

Adoptors/Sta

keholders

Location

(Brgy./Munici

pality)

Area

(hectares)

NGP

Category

Status of

Implementati

on

19. Zenayda

Lopez

20. Freddie de

Quiroz

21. Maning

Gianan

22.

Panganiban

CES c/o Mrs.

Linda dela

Rosa, Principal

23. ACOMDO

c/o Robin

Sontillano,

President

24. Brgy. LGU

c/o BC Sabas S.

Aquino, Jr.

Libod, Pandan

Libod, Pandan

Libod, Pandan

Poblacion

Agojo, San

Andres

Carangag, SA

5

2

2

.2

10

25

Watershed

Watershed

Watershed

Urban

Mangrove

Watershed

For MOA

signing

IEC

accomplished

IEC

accomplished

IEC

accomplished

Name of

Adoptors/Sta

keholders

Location

(Brgy./Munici

pality)

Area

(hectares)

NGP

Category

Status of

Implementati

on

25. San Isidro

Upland

Farmers,

Ass.Inc c/o

Oscar Tan,

Pres.

26.Hawan

Grande ES

c/o Marilyn A.

Tapia, OIC

Principal

27. Brgy LGU

c/o BC Rene

DL Matienzo

28. SM CE

School c/o Ms.

Gloria Soriao

29. KAPARIZ

c/o Rey Soneja

San Isidro, SA

Hawan, Virac

Palta, Virac

San Miguel,

Catanduanes

Buyo, Virac

30

2

1

2

2

CBFM

Urban

Urban

Urban

Urban

For MOA

signing; IEC

accomplished

IEC

accomplished

IEC

accomplished

IEC

accomplished;

for MOA

signing

MOA signed

Name of

Adoptors/Sta

keholders

Location

(Brgy./Munici

pality)

Area

(hectares)

NGP

Category

Status of

Implementati

on

30. Buhi ES c/o

Head Teacher

Mr. Ronito

Soriao

31. Alma ES

c/o Head

Teacher Wilma

Lizaso

32. Brgy. LGU

c/o Jorge

Bagadiong

33. PO

Progreso c/o

Rico Redulla

34. SUWECO

c/o Mr. Floro

Barrameda

35. Brgy. LGU

c/o BC Mauro

Tindugan

Buhi, San

Miguel

Alma, San

Miguel

Progreso, SM

Progreso, SM

Solong, SM

Solong, SM

1

1

25

40

20

Urban

Urban

Protected Area

CBFM/ISF

Watershed

IEC

accomplished

MOA signed

MOA signed

MOA signed

MOA signed

Name of

Adoptors/Sta

keholders

Location

(Brgy./Munici

pality)

Area

(hectares)

NGP

Category

Status of

Implementati

on

36. SUFAI c/o

Mr. Eddie

Tenoria,

President

37. Viga PO c/o

Mr. Eddie

Tapel

Summit, Viga

P. Vera, Viga

10

10

CBFM

CBFM

IEC

accomplished

IEC

accomplished

ACCOMPLISHMENTS A. IEC Province wide =100%

* barangay LGUs

* municipal LGUs

* schools

B. Site Identification and Assessment = 100%

C. Id. of Adoptors/Stakeholders = 80%

D. MOAs Signed = 15 % (on going activity)

E. Mapping =15 % (on going activity)

F. Tree Planting (SocMob) (100% participation of all LGUs in the province during the province wide tree planting activity facilitated by DENR Catanduanes last June 24, 2011, with 20, 000 seedlings planted)

LGU

Panganiban LGU Baras

LGU Gigmoto

LGU Bagamanoc

LGU San Miguel

LGU San Andres LGU Viga

Coordination with Municipal LGUs

NGP meetings with Barangay LGUs

and POs

IEC on NGP to different schools

GPS reading

of NGP

sites

MOA SIGNING with the

Manager of SUWECO,

school principal and

Barangay

Captain of Progreso, San

Miguel.

Panoramic view of

URBAN AREA -

proposed 1 hectare

NGP site within

school compound

BAGUMBAYAN ELEMENTARY

SCHOOL

Bato, Catanduanes

Adoptors : Mrs. Marites Vargas

Principal

Mr. Gerome T. Trijo

Barangay Captain

NGP site = 25 hectares watershed areas located at San

Pedro, Gigmoto, Catanduanes.

Adoptor : Barangay LGU c/o BC Wilson Boneo

Soc Mob Initiatives : DENR in

Catanduanes facilitated the province wide tree planting

activity last June 24, 2011 and planted 20, 000 seedlings

The activity

started with a

ceremonial tree

planting with

former

Congressman

Neric Acosta.

Congressman Cesar V. Sarmiento Former Cong. Neric Acosta

Memento of the tree planting with Congressman Cesar

V. Sarmiento, Former Cong. Neric Acosta and Governor

Joseph C. Cua together with Chiefs of different agencies

NGP Province wide tree

planting June 24, 2011

Catanduanes DA- DAR- DENR

Convergence Initiative – 1st twg

meeting (JMC-01-2010)

Panoramic view of the 50 hectares NGP and

convergence site of Catanduanes convergence initiative

TWG (Palumbanes Island, Caramoran, Catanduanes)

Thank You !!!