dimitrios konstantinidis cv_27_12_2016
TRANSCRIPT
CV – Dimitrios Konstantinidis – [email protected] - +30 6944961819 Page 1 από 17
Dimitrios Konstantinidis Land Surveying Engineer
Born in Athens, Greece on 23rd August 1962 Nationality: Hellenic Address: 36 Zafiraki str, 13676 Athens - Greece Contact: +30 210 8824425, 6944961819 e-mail: [email protected] www.dktopo.gr
Profile: Land Surveying Engineer, working both independently or within corporate
schemes. 30 years of experience in Cadastral, Land Registry, Urban Plan & Implementation Act Designs as well as in projects regarding: Highways, Construction, Ports, Irrigation, Pipelines, Railway & Subway, Environment Special Consultant in Athens 2004 Olympic Games Construction Projects
Key Skills: High knowledge of survey field techniques, research methods, techniques and/or
sources of information, GIS concepts and processes, sophisticated GPS systems, methods of analysis for surveys associated with complex land surveying issues. With excellent abilities to analyse data and produce results with a high degree of accuracy, thinking creatively for problem resolving, with strong communication and interpersonal skills, team-working spirit and effective negotiation with national authorities and other bodies. Efficient team leader with strong organisation, people management and budget control skills.
Education
1984 - 1988 NATIONAL TECHNICAL UNIVERSITY OF ATHENS (NTUA)
Degree Rural and Surveying Engineer
1980 - 1984 T.E.I. (Technological Educational Institute) of Athens, Department of Surveying Engineering
Degree Technological Surveying Engineer
Languages Greek: mother tongue English: fluent Italian: basic
Member of professional bodies: - T.C.G (Member of the Technical Chamber of Greece) - R.S.E. (Hellenic Association of Rural and Surveying Engineers)
Academic Experience 1989-1993 National Technical University of Athens School of Rural & Surveying Engineering
Scientific Associate of the General Geodesy Laboratory
CV – Dimitrios Konstantinidis – [email protected] - +30 6944961819 Page 2 από 17
Professional Experience Mar 2015- ADELL SA Project Cycladic Islands Interconnection with the Hellenic Transmission Power
Network Budget Euro 40 million Location Cycladic Islands Project Contractor Greek Transmission Utility Independent Power Transmission Operator
(IPTO) Description The project will connect three Cycladic islands – Mykonos, Paros and
Syros – directly to mainland Lavrion, located in the southeastern coast of Attica, Greece. gas-insulated GIS Substations (Lavrio , Syros , Mykonos , Paros)
Position AUDIT Senior Surveyor Responsibilities
survey engineering activities auditing
monthly quantities auditing for the accounts
worksite steak-out issues auditing and auditing of small-scale interventions in urgent implementation studies
site installation auditing and surveying equipment standards conformance auditing
as-built works conformance auditing
cooperation with the project manager to define the construction/survey methods, schedules & dead lines
cooperation with the site manager contractor, the subcontracting companies, designers, engineers and the rest of the company’s staff
Jan 2014-Feb2015 ERGOSYN SA Project Recast of Block 9 at Likovrisi-Pefki Municipality Budget Euro 14.2 million Location Attica, Greece Project Contractor Attica Perfecture & Likovrisi-Pefki Municipality Description Public Complex with swinning pool, changing rooms, refreshment area,
underground parking, open theater, parks & recreational areas. Position Senior Site Surveyor Responsibilities
cooperation with subcontracting companies, designers, engineers and the rest of the company’s staff
meetings with national authorities and other bodies
cooperation with the project manager to define the construction/survey methods, schedules & dead lines
coordinated surveying engineering activities
preparation and edit of monthly quantities for the accounts
technical support to worksite steak-out issues and small-scale interventions in urgent studies implementation
site installation, hiring qualified staff, selecting the appropriate equipment regarding to the surveying engineering activities
checking of as-built works for conformance and ensure as built survey of the completed works
ensuring coordination of project interfaces with existing infrastructure
ensuring that all information required for checking the works is correctly extracted from the drawings and contract documents and distributed to the survey team
managing projects and/or multi-disciplinary teams
CV – Dimitrios Konstantinidis – [email protected] - +30 6944961819 Page 3 από 17
Feb 2013- Aug 2013 A. CHRONIS SA Port Projects Bathymetric mapping of the ports of: Nafplion, Mylos Island & Kimolos
Island Budget Euro 4.5 million (1.5 each port) Location Nafplion, Mylos Island & Kimolos Island, Greece Project Contractor The port fund of each region Position Survey Works Project Manager (free lance contractor) Responsibilities:
cooperation with subcontracting companies, designers, engineers and the rest of the company’s staff
cooperation with the project manager to define the survey methods, schedules & dead lines
coordinated surveying engineering activities
preparation and edit of monthly quantities for the accounts.
meetings with national authorities and other bodies
selecting the appropriate equipment regarding to the surveying engineering activities
assisting the quantity surveyor team with progress and measurement of the works
Jun 2012 – Oct 2012 DIMITRIOS KONSTANTINIDIS Study Office Study/Design Topographical studies - Cadastral Surveys and Road Design for 6 road
junctions Budget Euro 60.000 Location Attica, Greece Project Contractor Acharnai Municipality Position Project Manager Description Topographical Studies of 6 main road junctions, cadastral survey for
property compensation, study of 6 round abouts, each one according to the needed geometry of every junction in study.
Responsibilities:
management of the survey teams
meetings with national authorities and other bodies
conduct field surveys, topographic mapping, boundary surveys, construction layout, and cadastral research
perform field calculations (COGO) for stakeout, as well as office calculations and conversions as needed
communicate effectively with clients in the field to ensure proper definition of project scope and specification
perform detailed analysis and determine efficient work processes
analyze, interpret, evaluate, and make professional decisions in order to make correct corner, boundary and property ownership determinations
use coordinate geometry and other methods to perform analysis of survey data related to monumentation to ensure its completeness and accuracy
land surveys for maintenance, location, and relocation of section corners through the use of GPS equipment and/or conventional surveying equipment.
CV – Dimitrios Konstantinidis – [email protected] - +30 6944961819 Page 4 από 17
Jan 2012 – Apr 2012 DIMITRIOS KONSTANTINIDIS Study Office Study/Design Land survey mapping at ROKFELER stream (3 km) of the Nea Makri
Municipality Budget Euro 50.000 Location Attica, Greece Project Contractor Region of Attica Position Project Manager Responsibilities:
management of the survey teams
meetings with national authorities and other bodies
conduct field surveys, topographic mapping, boundary surveys, construction layout, and cadastral research
perform field calculations (COGO) for stakeout, as well as office calculations and conversions as needed
communicate effectively with clients in the field to ensure proper definition of project scope and specification
perform detailed analysis and determine efficient work processes
analyze, interpret, evaluate, and make professional decisions in order to make correct corner, boundary and property ownership determinations
use coordinate geometry and other methods to perform analysis of survey data related to monumentation to ensure its completeness and accuracy
land surveys for maintenance, location, and relocation of section corners through the use of GPS equipment and/or conventional surveying equipment.
Mar 2011-Dec 2011 ERETBO SA Road Project Pedestrian Bridge Construction, Kifisias Av. Budget Euro 2.5 million Location Attica, Greece Project Contractor Ministry of Infrastructure, Transport & Networks Description Construction of a composite cable-pedestrian bridge with its foundations,
construction of two composite ramps, placement of escalators and four elevators inside the bridge’s pillars.
Position Senior Site Surveyor Responsibilities
cooperation with subcontracting companies, designers, engineers and the rest of the company’s staff
meetings with national authorities and other bodies
cooperation with the project manager to define the construction/survey methods, schedules & dead lines
coordinated surveying engineering activities
provide technical analysis, support and resolution involving right-of-way engineering, title examination, real property conflicts, state land securement
preparation and edit of monthly quantities for the accounts
technical support to worksite issues stake out and small-scale interventions in urgent studies implementation
selecting the appropriate equipment regarding to the surveying engineering activities
checking of as-built works for conformance and ensure as built survey of the completed works
ensuring coordination of project interfaces with existing infrastructure
ensuring that all information required for checking the works is correctly extracted from the drawings and contract documents and distributed to the survey team
managing projects and/or multi-disciplinary teams
CV – Dimitrios Konstantinidis – [email protected] - +30 6944961819 Page 5 από 17
May 2009 - Feb 2011 J/V ERETBO SA – ALTEK SA – GETEM SA Hydraulic Project Water Supply – Drainage and Waste Disposal in Mytilini Island Budget Euro 17.5 million Location Mytilini Island, Greece Project Contractor Municipality of Eressos - Antissis Description Construction of water supply and sewage network and construction of
pump stations in the settlements Chidira – Rema Petrounta – Vatousa – Eresos – Skala Eresos – Mesotopos – Tavari
Position Senior Site Surveyor Responsibilities
meetings with national authorities and other bodies
coordinated surveying engineering activities
preparation and edit of monthly quantities for the accounts
selecting the appropriate equipment regarding to the surveying engineering activities
field survey of as build design
checking of as-built works for conformance and ensure as built survey of the completed works
ensuring coordination of project interfaces with existing infrastructure
ensuring that all information required for checking the works is correctly extracted from the drawings and contract documents and distributed to the survey team
Feb 2009 - Apr 2009 ISTRIA SA Hydraulic Study/Design Land survey design and preliminary design of the water supply pipe
alignment at Agria Magnissia Budget Euro 45.000 Location Magnisia Volos, Greece Project Contractor Municipality of Agria Volos Description Land survey design and preliminary design of the water supply pipe
alignment at Agria Magnissia. The study involved surveying a 150 m strip for 15 km length, preliminary design of conveyance systems of 15 km length and three reservoirs. It also involved the design for the construction of a hydroelectric power station for the needs of the municipality of Agria.
Position Assistant Project Manager Responsibilities
cooperation with subcontracting companies, designers, engineers and the rest of the company’s staff
meetings with national authorities and other bodies
provide technical analysis, support and resolution involving right-of-way engineering, title examination, real property conflicts, state land securement
cooperation with the project manager to define the construction/survey methods, schedules & dead lines
coordinated surveying engineering activities
selecting the appropriate equipment regarding to the surveying engineering activities
ensuring coordination of project interfaces with existing infrastructure
managing projects and/or multi-disciplinary teams
perform field calculations (COGO) for stakeout, as well as office calculations and conversions as needed
communicate effectively with clients in the field to ensure proper definition of project scope and specification
CV – Dimitrios Konstantinidis – [email protected] - +30 6944961819 Page 6 από 17
perform detailed analysis and determine efficient work processes
use coordinate geometry and other methods to perform analysis of survey data related to monumentation to ensure its completeness and accuracy
Mar 2008- Jan 2009 ERETBO SA Road Project Improvement of Ag. Apostoloi-Chalkoutsi Road Budget Euro 8.7 million Location Attica, Greece Project Contractor Prefectural Administration of Eastern Attica Description Second Part
The project involves the improvement and reconstruction of the coastal road “Ag. Apostoloi - Chalkoutsi “ and particularly of its first part from Ag. Apostoloi until the beach of Markopoulos (total length of interventions 6,8km). It is an urban road with planning speed, traffic width 7,50m and sidewalks width 1,50m on both sides. The project included full replacement of asphalt layers, transversal culverts construction, safety works on the parts where the road is adjacent to the coastline and specifically technical replenishment of the beach, protection of the existing walls from erosion and construction of low walls and electro lighting of the road.
Position Senior Site Surveyor Responsibilities:
cooperation with subcontracting companies, designers, engineers and the rest of the company’s staff
meetings with national authorities and other bodies
cooperation with the project manager to define the construction/survey methods, schedules & dead lines
coordinated surveying engineering activities
provide technical analysis, support and resolution involving right-of-way engineering, title examination, real property conflicts, state land securement
preparation and edit of monthly quantities for the accounts
technical support to worksite issues stake out and small-scale interventions in urgent studies implementation
selecting the appropriate equipment regarding to the surveying engineering activities
checking of as-built works for conformance and ensure as built survey of the completed works
ensuring coordination of project interfaces with existing infrastructure
ensuring that all information required for checking the works is correctly extracted from the drawings and contract documents and distributed to the survey team
managing projects and/or multi-disciplinary teams
CV – Dimitrios Konstantinidis – [email protected] - +30 6944961819 Page 7 από 17
Sep 2007- Feb 2008 ATTIKAT SA Infrastructure Hydraulic Project: Protection against flooding of the “Eschatia stream”. Budget Euro 4.5 million Location Attica, Greece Project Contractor Ministry of Environment, Physical Planning & Public Works Description The project objective is the faster possible improvement of the flood-
stricken outflow regions via interventions – improvements and additions to be carried out in the streams of Sarantapotamos, Eschatia, Agia Triada and Acharnon in selected sections needing immediate intervention, so that possible floods that may emanate from the fires on Parnitha during July 2007, may be met in the best possible way. The scope of the project included in the possible rapid improvement of conditions basin flood discharge, works cleaning streams, maintaining existing facilities retaining sediments, maintenance of existing projects lateral protection and flood protection procedures - improvements and additions in selected portions of streams that were in need of immediate intervention to address the risk of flooding after the fire in July 2007 . Also, the immediate response, with available equipment and personnel, any time of day or night and during holidays and festivals , to address urgent and emergency (emergency weather , prevent flood risk etc.) The work was carried all along the stream from the confluence with the Kifisso to Thrakomakedones.
Position Site Manager Responsibilities:
Communication with project manager in order to define the construction methods.
Coordinated project budget and schedule.
Cooperation with subcontracting companies, designers and the rest of the company’s staff.
Participating in meetings with national authorities.
Preparation and edit of monthly accounts.
Coordinate subcontractors and suppliers of materials
Site installation, hiring qualified staff, selecting the appropriate machinery
Nov 2006- Jul 2007 ERETBO SA Road Project Improvement of Ag. Apostoloi-Chalkoutsi Road Budget Euro 8.7 million Location Attica, Greece Project Contractor Prefectural Administration of Eastern Attica Description First Part
The project involves the improvement and reconstruction of the coastal road “Ag. Apostoloi - Chalkoutsi “ and particularly of its first part from Ag. Apostoloi until the beach of Markopoulos (total length of interventions 6,8km). It is an urban road with planning speed, traffic width 7,50m and sidewalks width 1,50m on both sides. The project included full replacement of asphalt layers, transversal culverts construction, safety works on the parts where the road is adjacent to the coastline and specifically technical replenishment of the beach, protection of the existing walls from erosion and construction of low walls and electro lighting of the road.
Position Senior Site Surveyor Responsibilities:
cooperation with subcontracting companies, designers, engineers and the rest of the company’s staff
CV – Dimitrios Konstantinidis – [email protected] - +30 6944961819 Page 8 από 17
meetings with national authorities and other bodies
cooperation with the project manager to define the construction/survey methods, schedules & dead lines
coordinated surveying engineering activities
provide technical analysis, support and resolution involving right-of-way engineering, title examination, real property conflicts, state land securement
preparation and edit of monthly quantities for the accounts
technical support to worksite issues stake out and small-scale interventions in urgent studies implementation
selecting the appropriate equipment regarding to the surveying engineering activities
checking of as-built works for conformance and ensure as built survey of the completed works
ensuring coordination of project interfaces with existing infrastructure
ensuring that all information required for checking the works is correctly extracted from the drawings and contract documents and distributed to the survey team
Feb 2005- Nov 2006 GHIZZIONI SpA (GHZ) Pipeline Project: Kipi (G/T border) – Alexandroupolis (Anthia) H.P. Natural Gas pipeline
25.000 m Budget Euro 30.2 million Location Attica, Greece Project Contractor DEPA SA - Public Gas Corporation S.A. Description Construction of the main high pressure gas pipeline, of 36 inches
diameter, connecting the point Kipi at the Greek-Turkish boundaries to Anthia point at Alexandroupoli city, 25.000 m of distance, part of the Interconnector Turky – Greece – Italy (ITGI) gas pipeline. Its construction included special features, horizontal borings under highways & railways, three measurement control line valve stations, anti-flooding constructions & river-bed crossings.
Position Site Manager for Survey Works, Approved & Accredited by DEPA SA, The Public Gas Corporation
Responsibilities
cooperation with subcontracting companies, designers, engineers and the rest of the company’s staff
meetings with national authorities and other bodies
provide technical analysis, support and resolution involving right-of-way engineering, title examination, real property conflicts, state land securement
cooperation with the project manager to define the construction/survey methods, schedules & dead lines
coordinated surveying engineering activities
preparation and edit of monthly quantities for the accounts
technical support to worksite steak-out issues and small-scale interventions in urgent studies implementation
site installation, hiring qualified staff, selecting the appropriate equipment regarding to the surveying engineering activities
checking of as-built works for conformance and ensure as built survey of the completed works
assisting the planning and quantity surveyor teams with progress and measurement of the works
ensuring coordination of project interfaces with existing infrastructure
ensuring that all information required for checking the works is correctly extracted from the drawings and contract documents and distributed to the survey team
managing projects and/or multi-disciplinary teams
CV – Dimitrios Konstantinidis – [email protected] - +30 6944961819 Page 9 από 17
Dec 2004 – Jan 2005 ERETBO S.A Irrigation Project Construction of Irrigation Network in Vistriza, Municipality of Fthiotida - 2nd
PHASE Budget Euro 6.5 million Location Vistriza, Fthiotida, Greece Project Contractor Ministry of Rural Development & Food Description Irrigation network construction to satisfy the needs of the region stretching
on the west side of Vistriza ravine until its confluence with the River Sperhios at the Municipality of Sperchiada and communities of St. Sostis and Mesopotamia, a total area of 22,000 acres. Particularly, the project involves construction of building works and the network, cement pathways to facilitate movement between fields, the supply and installation of PVC plastic and steel pipes of various diameters, manholes construction, installation of valves and other special components and various other works that regard the complete operation of the network and testing under pressure 10 – 18atm.r
Position Senior Site Surveyor Responsibilities
cooperation with subcontracting companies, designers, engineers and the rest of the company’s staff
meetings with national authorities and other bodies
provide technical analysis, support and resolution involving right-of-way engineering, title examination, real property conflicts, state land securement
cooperation with the project manager to define the construction/survey methods, schedules & dead lines
coordinated surveying engineering activities
preparation and edit of monthly quantities for the accounts
technical support to worksite steak-out issues and small-scale interventions in urgent studies implementation
site installation, hiring qualified staff, selecting the appropriate equipment regarding to the surveying engineering activities
checking of as-built works for conformance and ensure as built survey of the completed works
assisting the planning and quantity surveyor teams with progress and measurement of the works
ensuring coordination of project interfaces with existing infrastructure
ensuring that all information required for checking the works is correctly extracted from the drawings and contract documents and distributed to the survey team
managing projects and/or multi-disciplinary teams
2004 ERETBO SA Project Construction of Central Greece Correctional Facility at Domokos Budget Euro 42.1 million Project Contractor THEMIS CONSTRUCTION INC Location Domokos, Greece Description Construction of a prison of 13.500m² total area in a plot of 125 acres in
Domokos. Construction of the building complex divided into two functional areas: administration buildings consisting of external gatehouse, external guard and administration building and main prison buildings which include sleeping and daily activities building for 600 prisoners approximately, disciplinary cells, library and cultural events building and church.
Position Senior Site Surveyor Responsibilities
CV – Dimitrios Konstantinidis – [email protected] - +30 6944961819 Page 10 από 17
cooperation with subcontracting companies, designers, engineers and the rest of the company’s staff
meetings with national authorities and other bodies
provide technical analysis, support and resolution involving right-of-way engineering, title examination, real property conflicts, state land securement
cooperation with the project manager to define the construction/survey methods, schedules & dead lines
coordinated surveying engineering activities
preparation and edit of monthly quantities for the accounts
technical support to worksite steak-out issues and small-scale interventions in urgent studies implementation
site installation, hiring qualified staff, selecting the appropriate equipment regarding to the surveying engineering activities
checking of as-built works for conformance and ensure as built survey of the completed works
assisting the planning and quantity surveyor teams with progress and measurement of the works
ensuring coordination of project interfaces with existing infrastructure
ensuring that all information required for checking the works is correctly extracted from the drawings and contract documents and distributed to the survey team
managing projects and/or multi-disciplinary teams
2003-2004 PROODEFTIKI S.A. J/ V ERETBO SA – TOMI SA Project Construction of free spaces and green places at the Olympic Village"
contract work C Budget Euro 30.8 million Project Contractor OLYMPIC VILLAGE 2004 S.A. Location Attica, Greece Description Completion of surroundings’ configuration of the Olympic Village (building,
electromechanical and planting works) for the Olympic and post-Olympic use adjustments, construction of all the necessary infrastructures to accommodate the temporary structures needed for the Olympic Games and removal of the unnecessary ones after the Olympic Games and construction of the necessary works for the completion of the flood protection of the Olympic Village. Specifically, construction of three outdoor parking spaces (593 parking spaces, 292 parking spaces for cars and 36 parking spaces for vans and 201 parking spaces), construction of seven medium voltage substations (20KV /0,4KV), construction of water tank, four irrigation systems for a lake of total area 350m2 and volume of 195m3. Also, construction of underground pipe for the diversion of KONTITA stream at loose soils to semi-rocky soils with the pipe jacking method, length 309m.
Position Senior Site Surveyor Responsibilities
cooperation with subcontracting companies, designers, engineers and the rest of the company’s staff
meetings with national authorities and other bodies
cooperation with the project manager to define the construction/survey methods, schedules & dead lines
coordinated surveying engineering activities
preparation and edit of monthly quantities for the accounts
CV – Dimitrios Konstantinidis – [email protected] - +30 6944961819 Page 11 από 17
technical support to worksite steak-out issues and small-scale interventions in urgent studies implementation
site installation, hiring qualified staff, selecting the appropriate equipment regarding to the surveying engineering activities
checking of as-built works for conformance and ensure as built survey of the completed works
assisting the planning and quantity surveyor teams with progress and measurement of the works
ensuring coordination of project interfaces with existing infrastructure
ensuring that all information required for checking the works is correctly extracted from the drawings and contract documents and distributed to the survey team
managing projects and/or multi-disciplinary teams 2001 - 2003 ΑΤΤΙΚΑΤ SA – PROODEFTIKI SA J/V Project Olympic Village Construction contract work C Budget Euro 25 million Location Attica, Greece Project Contractor OLYMPIC VILLAGE 2004 S.A Description Construction of 602 residential units (96 Buildings at the Olympic Village,
Configuration of Surrounding Area, Roads & Infrastructure. Position Senior Site Surveyor Responsibilities
cooperation with subcontracting companies, designers, engineers and the rest of the company’s staff
meetings with national authorities and other bodies
cooperation with the project manager to define the construction/survey methods, schedules & dead lines
coordinated surveying engineering activities
preparation and edit of monthly quantities for the accounts
technical support to worksite steak-out issues and small-scale interventions in urgent studies implementation
site installation, hiring qualified staff, selecting the appropriate equipment regarding to the surveying engineering activities
checking of as-built works for conformance and ensure as built survey of the completed works
assisting the planning and quantity surveyor teams with progress and measurement of the works
ensuring coordination of project interfaces with existing infrastructure
ensuring that all information required for checking the works is correctly extracted from the drawings and contract documents and distributed to the survey team
managing projects and/or multi-disciplinary teams
CV – Dimitrios Konstantinidis – [email protected] - +30 6944961819 Page 12 από 17
2001-2003 BUNK GMBH BERATENDE INGENIEURE – GENIKI MELETON SA J/V Project Athens 2004 Olympic Games venues:
Athens Olympic Stadium
Olympic Centre of Shooting
Olympic Velodrome
Olympic Tennis Centre
Athens Kalimarmaron Stadium
Training Centers all over Greece
International Broadcasting Centre
Olympic Equestrian Center
Mountain Bike Premises at Parnitha Mountain Location Athens, Greece Project Contructor Ministry of Enviroment, Physical Planning & Public Works EEYDE-AOEE/
GGA Position Senior Survey Consultant 2000-2001 ΜΕLΚΑ S.A Project Construction monitoring of the national Highway Livadia Kastro section:
Orchomenos Bypass Budget Euro 8 million Location Kastro, Greece Project Contructor PREFECTURAL ADMINISTRATION OF VIOTIA - DIRECTORATE OF
TECHNICAL SERVICES Description 4.5 km National Hightway, 4 junctions, asphalt works, irrigation & hydraulic
works,landscaping works, Position Senior Site Surveyor Responsibilities:
cooperation with subcontracting companies, designers, engineers and the rest of the company’s staff
meetings with national authorities and other bodies
cooperation with the project manager to define the construction/survey methods, schedules & dead lines
coordinated surveying engineering activities
provide technical analysis, support and resolution involving right-of-way engineering, title examination, real property conflicts, state land securement
preparation and edit of monthly quantities for the accounts
technical support to worksite issues stake out and small-scale interventions in urgent studies implementation
selecting the appropriate equipment regarding to the surveying engineering activities
checking of as-built works for conformance and ensure as built survey of the completed works
ensuring coordination of project interfaces with existing infrastructure
ensuring that all information required for checking the works is correctly extracted from the drawings and contract documents and distributed to the survey team
managing projects and/or multi-disciplinary teams
CV – Dimitrios Konstantinidis – [email protected] - +30 6944961819 Page 13 από 17
OTHER STUDIES & DESIGNS
Road Projects
1998
Study Office: TOPODOMIKI SA Project: Land survey mapping of Thivon Av. from Iera Odos str. to Petrou Ralli str. Contractor: Ministry for the Environment, Physical Planning & Public Works Position: Head of the Survey Team
1997
Study Office: Yiannis Kaperonis Project: Surveying – Alignment design of the National Highway Molaon – Neapolis (section: Elika - Neapolis) Contractor: Ministry for the Environment, Physical Planning & Public Works Position: Head of the Survey Team
1996 to 1998
Study Office: Dimitrios Konstantinidis Project: Surveying – Alignment design of the 30 km National Highway Lepoura – Karystos Contractor: POSEIDON LTD
1994
Study Office: A. CHRONIS SA Project: Surveying mapping – Alignment design of the rural road of the Apollonia Village of Sifnos Island Contractor: Sifnos Island Municipality Position: Head of the Survey Team
1991
Study Office: Yiannis Kaperonis Project: Altimetric Design of urban roads of the Skala – Panigyristra of Lakonia, Contractor: Skala Municipality Position: Member of the Survey Team
Topographical Studies - Cadastral Surveys
2002
Study Office: Dimitrios Konstantinidis Project: Survey design project regarding cadastre elaboration for 60 km road and hydraulic projects in various areas of Greece Contractor: Ministry for the Environment, Physical Planning & Public Works
1998
Study Office: TOPODOMIKI SA Project: Land survey mapping of the expropriation map of the Ano Vergas – Kato Vergas rural road of Messinia Perfecture Contractor: Ministry for the Environment, Physical Planning & Public Works Position: Head of the Survey Team
1994
Study Office: ERATOSTHENIS LTD Project: Altimetric Design of urban roads of the 3rd Urban neighborhood of Markopoulo, Attica Contractor: Ministry for the Environment, Physical Planning & Public Works Position: Member of the Survey Team
Irrigation Projects
2000
ERGOTEK S.A. Project: Modification of the final design of 15 km Ladonas river Irrigation Project at Daphne and its wider area Contractor: West Greece District DΕΚΕ Patras Position: Head of the Survey Team
1998
Study Office: Dimitrios Konstantinidis Project: Surveying works and cadastre roads elaboration for 35 km road and hydraulic projects in various areas of Greece (Design 2/Ε) Contractor: Ministry for the Environment, Physical Planning & Public Works
CV – Dimitrios Konstantinidis – [email protected] - +30 6944961819 Page 14 από 17
OTHER STUDIES & DESIGNS
1999
Study Office: P. Eggelis Project: Land survey of 40 km Erassinos stream at Vraona, Attica Contractor: Ministry for the Environment, Physical Planning & Public Works Position: Head of the Survey Team
Pipelines Projects
1989
Study Office: G. Kounalakis Project: Alignment of 50km Natural Gas Pipeline at the section of Aliarto - Tithorea Contractor: ASPROFOS S.A. Position: Member of the Survey Team
Railway & Subway Projects
1999
Study Office: ANISMA LTD Project: Land survey in the frames of the design for the Attiko Metro of Panormou str. (Tube station) and Kifissias Av. from Ampelokipi to the OTE (Hellenic Organization of Telecommunications) building Contractor: ATTIKO METRO SA Position: Head of the Survey Team
1992 to 1996
Study Office: Α.D.Κ. S.A. (Aronis – Drettas – Karlaftis S.A.) Project: Land surveying works for Attiko Metro of Athens Contractor: ATTIKO METRO SA Position: Member of the Survey Team
Cadastral – Urban Planning
2000-2001
Study Office: KAMBI SA Project: Objection Claims processing regarding 100 km2 national land registry design for the areas: Agiou Achiliou of Prespes and Mavrochoriou of Kastoria Contractor: KTIMITOLOGIO SA Position: Cadastral Survey Engineer
1998-2001
Study Office: KAMBI SA Project: 180 km2 Cadastral survey for the elaboration of the National Cadastre Project at the Prefectures of Kastoria and Florina Contractor: National Cadastre S.A. Position: Cadastral Survey Team Supervisor
2000
Study Office: PHASMA S.A. Project: 40 km2 Cadastral survey for the elaboration of National Cadastre Project at Patras Municipality Contractor: KTIMITOLOGIO SA Position: GIS Supervisor
1999
Study Office: ANISMA LTD Project: 150 km2 Cadastral survey for the elaboration of the National Cadastre Project at Chania Municipality on Crete island Contractor: KTIMITOLOGIO SA Position: GIS Supervisor
1999
Study Office: TOPODOMIKI Project: Alignment design of axial-junctions in the frame work of the implementation act at the neighborhood 1-2 at Porto Rafti, Attica Contractor: Municipality of Markopoulo Position: Field Survey Supervisor
1998
Study Office: PHASMA S.A. Project: Urban planning of the area N. Sozopoli (B. House) of the Neon Silaton village of Chalkidiki Municipality Contractor: Ministry for the Environment, Physical Planning & Public Works Position: Head of the Field Survey Team
CV – Dimitrios Konstantinidis – [email protected] - +30 6944961819 Page 15 από 17
OTHER STUDIES & DESIGNS
1996
Study Office: ΚAMPI SA Project: Land surveying for the elaboration of the National Cadastre at Agios Dimitrios Municipality, Attica Contractor: KTIMATOLOGIO SA Position: GIS Surveyor
1996
Study Office: ΚAMPI SA Project: Land survey urban plan extension design at the areas of Kalamos – Agona – Agioi Apostoli – Vlasti – Agia Marina, Attica Contractor: Municipality of Kalamos Position: Supervisor of Field Works
1996
Study Office: TOPODOMIKI SA Project: Urban planning design of the Asprochoma Village of the Messinia Prefecture Contractor: Ministry for the Environment, Physical Planning & Public Works Position: Head of the Field Survey Team
1993
Study Office: Dimitrios Konstantinidis Project: Elaboration of supplementary survey diagrams of Poros village, on Kefalonia island, urban plan extension Contractor: Poros village on Kefalonia island (Public Authority)
1993
Study Office: Alekos Velissarios Project: Survey diagrams elaboration design of the Urban unit Laka – Soros II of Maroussi Prefecture Contractor: Maroussi Municipality Position: Field Survey Supervisor
1992 Study Office: Dimitrios Konstantinidis Project: Implementation Act Design of the Arcadian Village Contractor: Department of Housing and Urban Development (Public Authority)
1992
Study Office: K. Anagnostopoulos Project: Implementation act of Perama Prefecture, Perama Municipality Contractor: Perama Municipality Position: Field Surveyor
1992
Study Office: Α. Pantazis Project: Implementation act of the 3rd Rural neighborhood at Markopoulo Attica, Markopoulo Municipality Contractor: Markopoulo Municipality Position: Field Surveyor
1991
Study Office: J. Kaperonis Project: Implementation act of the Skala – Panigyristra of Lakonia, Prefectural Treasury of Lakonia Contractor: Skala Municipality Position: Head of the Survey Team
1991 Project: Survey mapping of an army camp Contractor: Hellenic Military Geographical Service Position: Surveyor Officer during Military Service
1991
Project: Party of maintenance and reinstallation of the pillars that mark the border-line between Greece and FYROM Contractor: Hellenic Military Geographical Service Position: Surveyor Officer during Military Service
1989
Study Office: G. Papavassiliou Project: Implementation act of Nea Magnisia, Lamia Prefecture, Lamia Municipality Contractor: Lamia Municipality Position: Field Surveyor
1989
Study Office: G. Papavassiliou Project: Implementation act at Araporema, Lamia Prefecture, Lamia Municipality Contractor: Lamia Municipality Position: Field Surveyor
CV – Dimitrios Konstantinidis – [email protected] - +30 6944961819 Page 16 από 17
OTHER STUDIES & DESIGNS
1988
Study Office: J. Kaperonis Project: Survey mapping design of URP (Urban Restructuring Program) Tyrou of Arcadia sea-side, Prefectural Treasury of Arcadia Contractor: Tyros Municipality Position: Field Surveyor
1984 to 1985
Study Office: G. Kounalakis Project: Survey mapping design of URP (Urban Restructuring Program) of Perama Municipality, Perama Municipality Contractor: Perama Municipality Position: Assistant Field Surveyor
1983 to 1984
Study Office: D. Tsouroplis Project: Survey mapping design of URP (Urban Restructuring Program) of Sperchiada – Makrakomi – Domokos Contractor: Prefectural Treasury of Fthiotida Position: Assistant Field Surveyor
Environmental
Start 2014 for 21
months
Study Office: Dimitrios Konstantinidis Project: Survey mapping support for the monitoring and assessment of the conservation status of invertebrate species of EU interest in Greece Contractor: Ministry of Environment and Climate Change Position: Project Manager of Survey Mapping
1992 Study Office: Dimitrios Konstantinidis Project: Survey maps for the areas of the wetlands of Nestos, Volvi and Lagada lagoons, for the definement design for land using areas Contractor: ARBORETUM GEOPONIKI LTD
1991 Study Office: Th. G. Lolos - Ch. Tsompanidis Project: Surveying mapping of the suggested landfill space at Gytheio Contractor: Lakonia Perfecture Position: Head of the Survey Team
Special projects
1999 Study Office: Dimitrios Konstantinidis Project: Internal – External mapping and Land survey mapping design of Saint Meletios of Attica Monastery Contractor: Saint Meletios of Attica Monastery
1998 Study Office: GEOMET SA Project: Land survey mapping and Internal – External mapping of the Old Venetian Fortress at Corfu Island Contractor: Ministry of Culture Position: Head of the Survey Teams
1998 Study Office: Dimitrios Konstantinidis Project: Land survey mapping - Internal – External mapping of the Fanari Castle at Karditsa Contractor: NATIONAL & KAPODISTRIAN UNIVERSITY OF ATHENS (Public Authority)
1998 Study Office: Dimitrios Konstantinidis Project: Monitoring of possible micro-displacements at excavations for the creation of ESE Building at Peireos str. and Eponiton str. Contractor: EDRASOMICHANIKI LTD
1997 Study Office: Dimitrios Konstantinidis Project: Monitoring of possible micro-displacements at excavations for the creation of underground parking lot on Louisis Riancour str. Contractor: EDRASOMICHANIKI LTD
CV – Dimitrios Konstantinidis – [email protected] - +30 6944961819 Page 17 από 17
OTHER STUDIES & DESIGNS
1997 Study Office: TENSOR LTD Project: Monitoring of possible micro-displacements at the under construction church-tower of Saint Photini Church at Nea Smyrni Contractor: Alexander S. Onassis Public Benefit Foundation Position: Special Survey Consultant
1997 Study Office: Dimitrios Konstantinidis Project: Internal – External mapping of the Vattis Palace at Pireus Contractor: GEOMET