    Malaysia Issues onNRW

    DMA Set-Up

    Speaker- Dato Abdul Jalil Abdul Karim

  • 8/8/2019 DMA Set Up - Jalur Cahaya Sdn Bhd

    2/27

    WH AT IS A DMA?

    A District Metered Area (DMA)is a small area of distribution system whichis specifically defined

  • 8/8/2019 DMA Set Up - Jalur Cahaya Sdn Bhd

    3/27

    To monitor the performance of the area byvarious indicators: W ater balance, NR W% , NR W volume Level of leakage

    For Active Leakage Control activities Critical areas can be prioritized the for leak

    detection

    For Pressure management (where possible) Eliminating excess pressure Reducing leakage volume

    WHY DO W E NEED TO H AVE DMAs?

  • 8/8/2019 DMA Set Up - Jalur Cahaya Sdn Bhd

    4/27

    Selection criteria 500 to 2000 connections 5km to 20 km Sufficient pressure Ability to hydraulically isolate area

    GIS roles in pre-selection of area

    Zero pressure testPermanent meter & data logger installationData storage & analysis

    A DMA SET-UP

  • 8/8/2019 DMA Set Up - Jalur Cahaya Sdn Bhd

    5/27

    GIS roles in pre-selection of area

    GPS Ground Level Survey must be carried out for each feature (hydrant,air valve, pipeline etc) to have a view of terrain on the potential area of

    DMA establishment. This information is critical for pressure managementundertaking in the near future.

  • 8/8/2019 DMA Set Up - Jalur Cahaya Sdn Bhd

    6/27

    GIS roles in pre-selection of area

    The correct pipeline registration will help define the natural boundary existedby the current supply system- suitable DMA can be planned from this

    information. Pipe registration can also be used to identify the measurementof pipeline within the zone as required in the selection criteria.

  • 8/8/2019 DMA Set Up - Jalur Cahaya Sdn Bhd

    7/27

    A typical inlet point to a DMA

    Logger abinetLogger abinet trainer

    Meter

    trainer

    Meter

  • 8/8/2019 DMA Set Up - Jalur Cahaya Sdn Bhd

    8/27

    Data Center- H ome of DMAs Data

  • 8/8/2019 DMA Set Up - Jalur Cahaya Sdn Bhd

    9/27

    Netbase W ater Management Software

  • 8/8/2019 DMA Set Up - Jalur Cahaya Sdn Bhd

    10/27

    Daily DMA Monitoring using Netbase

    Leakage Leakage

    Repair Repair Repair Repair Repair

  • 8/8/2019 DMA Set Up - Jalur Cahaya Sdn Bhd

    11/27

    After a

    proper DMA Set-Up

  • 8/8/2019 DMA Set Up - Jalur Cahaya Sdn Bhd

    12/27

    PENISULAR MALAYSIA

  • 8/8/2019 DMA Set Up - Jalur Cahaya Sdn Bhd

    13/27

    SELANGOR

  • 8/8/2019 DMA Set Up - Jalur Cahaya Sdn Bhd

    14/27

    GOMBAK DISTRICT ( Total No of Connections: )

  • 8/8/2019 DMA Set Up - Jalur Cahaya Sdn Bhd

    15/27

  • 8/8/2019 DMA Set Up - Jalur Cahaya Sdn Bhd

    16/27

    GB100,Kg Dato Keramat (No Of Connections : 1510)

  • 8/8/2019 DMA Set Up - Jalur Cahaya Sdn Bhd

    17/27

    Info of DMA - GB100

    Date Established : 30 Sep 2008Mainslength of pipe :12.84 kmNo. of connections : 1510

    Pipe materials : AC ( 100

    200 dia )

  • 8/8/2019 DMA Set Up - Jalur Cahaya Sdn Bhd

    18/27

    PMI GB100

    Permanent Meter Installation (PMI) T he purpose of PMI isto measure incoming flow into the DMA

    Level : 36.197 mCoordinate : 1014405.31"E 30954.51"N

  • 8/8/2019 DMA Set Up - Jalur Cahaya Sdn Bhd

    19/27

    PRV GB100

    Pressure Reducing Valve (PRV) T he purpose of PRV is toreduce & control the incoming pressure into DMA

    Level : 38.255 mCoordinate : 1014405.31"E 30955.28"N

  • 8/8/2019 DMA Set Up - Jalur Cahaya Sdn Bhd

    20/27

    AZP GB100

    Average Zone Pressure (AZP) T o measure averagepressure inside DMA

    Level : 32.186 m

    Coordinate : 10143'25.64"E 30957.18"N

  • 8/8/2019 DMA Set Up - Jalur Cahaya Sdn Bhd

    21/27

    TP GB100

    T arget point ( T P) - T he critical (minimum) pressure insideDMA

    Level : 32.933 mCoordinate : 1014316.63"E 309'59.23"N

  • 8/8/2019 DMA Set Up - Jalur Cahaya Sdn Bhd

    22/27

    BV 1

    BoundaryValve (BV)

    DMA GB.100

    Outside DMA

    Border Of DMA GB.100

  • 8/8/2019 DMA Set Up - Jalur Cahaya Sdn Bhd

    23/27

    BV 2

    BoundaryValve (BV)

    DMA GB.100

    Outside DMA/

    District Kuala Lumpur

    Border Of DMA GB.100

    Border Of District

  • 8/8/2019 DMA Set Up - Jalur Cahaya Sdn Bhd

    24/27

    Boundary Valve (BV)

    Boundary Valve

    Valve permanently closed to maintainintegrity of DMA

  • 8/8/2019 DMA Set Up - Jalur Cahaya Sdn Bhd

    25/27

    Technological advancement & competition has givenmore equipment choices at lower cost- Battery operated Electromagnetic Flowmeter - GSM/ GPRS Data Logger

    - Longer Battery Life

    W ide GSM/ GPRS Coverage at low cost for DataPackage (only RM8/ month)

    Permanent & Continuous monitoring with GSM DataLogger is cheaper than manual data download in thelong term (savings in manhour and logistic cost)

    Current Practices & Technology

  • 8/8/2019 DMA Set Up - Jalur Cahaya Sdn Bhd

    26/27

    Poor mappingDMA breached ( opening of by-pass & BV )Limitation of pressure management

    isolated houses & elevationConnectivity issue lack of informationConflict between Operations Dept & NR W units

    Supply system changes & road wideningworksShortage of skilled staff

    Problem Encountered