dose reduction actions in tsuruga-2 npp
DESCRIPTION
2008 ISOE International ALARA Symposium. Dose reduction actions in Tsuruga-2 NPP. The Japan Atomic Power Company. Hiroshi WADA, Yuuichi HAMANAKA, Masayuki FUKUDA Tomomi YOSHINAGA, Eiji SANEHIRA,Masahiro YANO, Yasuo UNI, Kazushige HAYASHI Fumitoshi NAKAO. - PowerPoint PPT PresentationTRANSCRIPT
1
Dose reduction actions in Tsuruga-2 NPP
Hiroshi WADA, Yuuichi HAMANAKA, Masayuki FUKUDA
Tomomi YOSHINAGA, Eiji SANEHIRA,Masahiro YANO,Yasuo UNI, Kazushige HAYASHI
Fumitoshi NAKAO
The Japan Atomic Power Company
NUCLEAR PLANT SERVICE ENGINEERING Co.,Ltd.
2008 ISOE International ALARA Symposium
The following materials may contain JAPC’s proprietary and confidential information; and all or any part of these materials or informationcontained herein may NOT be used for any purposes other than originally intended or may NOT be reproduced, disclosed, transferred, distributed orin any manner transmitted in any tangible, electronic or any other form to any third party without prior written consent thereto by JAPC.
2
Contents
Outline of JAPC Transition of dose in Tsuruga-2
NPP Dose reduction actions so far Action to large-scale work Situation of countermeasure for
reducing radiation exposure Electric personnel dosimeter Conclusion
2008 ISOE International ALARA Symposium
The following materials may contain JAPC’s proprietary and confidential information; and all or any part of these materials or informationcontained herein may NOT be used for any purposes other than originally intended or may NOT be reproduced, disclosed, transferred, distributed orin any manner transmitted in any tangible, electronic or any other form to any third party without prior written consent thereto by JAPC.
3
Outline of JAPC’s NPP
Tsuruga-1 (BWR)
357 MW
Tokai II (BWR)1,100 MWe
Tsuruga-3 and 4 (PWR) (Currently planed)
JAPC Total 2,617 MWe
Tsuruga-2 (PWR)
1160 MW Tokai (GCR) (Decomi. phase)
2008 ISOE International ALARA Symposium
The following materials may contain JAPC’s proprietary and confidential information; and all or any part of these materials or informationcontained herein may NOT be used for any purposes other than originally intended or may NOT be reproduced, disclosed, transferred, distributed orin any manner transmitted in any tangible, electronic or any other form to any third party without prior written consent thereto by JAPC.
4
Outline of Tsuruga-2 NPP
2008 ISOE International ALARA Symposium
△ △ △ △ △
△
▲
Nuclear reactor
Reactor containment
To turbine
From condensor
△
R
Steam generator
(SG)
pressurizer
MCP Cold leg
The following materials may contain JAPC’s proprietary and confidential information; and all or any part of these materials or informationcontained herein may NOT be used for any purposes other than originally intended or may NOT be reproduced, disclosed, transferred, distributed orin any manner transmitted in any tangible, electronic or any other form to any third party without prior written consent thereto by JAPC.
•Entering into the reactor containment is limited in operation condition.
•Many equipments containing radioactivity are opened every periodical outage for inspection or maintenance.
5
Transition of dose in Tsuruga-2
0.74 0.76 0.60 0.62 0.49 0.49 0.45 0.44 0.580.29
0.66 0.630.94
0.760.92
0.96
0.22 0.29 0.220.51 0.26
0.39
0.41
3.27
0.59
2.63
1.020.06 0.04
0.270.66
0.15
0.0
0.5
1.0
1.5
2.0
2.5
3.0
3.5
4.0
4.5
#1 #2 #3 #4 #5 #6 #7 #8 #9 #10 #11 #12 #13 #14 #15 #16Periodical Outage
Col
lect
ive
dose
man
-Sv
()
Improvement workPeriodical inspection
MCP branch pipe repair work(0.46)Hot leg outer surface inspectionwork(0.29),etc.
Modification of primary coolant temperature measuring system (0.28)Primary coolant pump current transformer vane replacement (0.22), etc.
Plugging of SG heat transfer tube (0.80)Anti- SCC activities for SG tube sheet(0.69)CVCS pipe repair work(0.39) etc.
SG nozzle repair work (0.99)Activities associated with SG nozzle repair (0.41)Boron injection piping, etc. repair (0.41)SG shoot peening (0.33) etc.
2008 ISOE International ALARA Symposium
The following materials may contain JAPC’s proprietary and confidential information; and all or any part of these materials or informationcontained herein may NOT be used for any purposes other than originally intended or may NOT be reproduced, disclosed, transferred, distributed orin any manner transmitted in any tangible, electronic or any other form to any third party without prior written consent thereto by JAPC.
6
Dose reduction action so far (1/4)
• Design and Construction phase
• Commercial operation phase
• Action to hardware and software
• Recent action
2008 ISOE International ALARA Symposium
The following materials may contain JAPC’s proprietary and confidential information; and all or any part of these materials or informationcontained herein may NOT be used for any purposes other than originally intended or may NOT be reproduced, disclosed, transferred, distributed orin any manner transmitted in any tangible, electronic or any other form to any third party without prior written consent thereto by JAPC.
7
Dose reduction action so far (2/4)
•Action in design and Construction phase
Action to hardwareMeasures Details
Permanent shield Primary piping
Automation
Stud bolt tensionerSteam generator (SG) heat transfar tubeeddy current examination robotAutomatic UT handling system
Improvement ofwork efficiency
SG manhole cover handling system
Remote control Filter replacement system
2008 ISOE International ALARA Symposium
The following materials may contain JAPC’s proprietary and confidential information; and all or any part of these materials or informationcontained herein may NOT be used for any purposes other than originally intended or may NOT be reproduced, disclosed, transferred, distributed orin any manner transmitted in any tangible, electronic or any other form to any third party without prior written consent thereto by JAPC.
8
Dose reduction action so far (3/4)
•Action in operation phase(1/2)
Action to hardwareMeasures Details
Permanent shield Residual heat removal system, etc.
Temporary shield Primary system and piping
Improvement ofwork efficiency
Adoption of new type nozzle coverAdoption of seal plate
Chemical decon.Reactor coolant recirculation pumpinternal
Radiation sourceremoval
Highly radioactive pipe
Radiation sourcedecay
SG manhole inner cover (Rotation parts)
2008 ISOE International ALARA Symposium
The following materials may contain JAPC’s proprietary and confidential information; and all or any part of these materials or informationcontained herein may NOT be used for any purposes other than originally intended or may NOT be reproduced, disclosed, transferred, distributed orin any manner transmitted in any tangible, electronic or any other form to any third party without prior written consent thereto by JAPC.
9
Dose reduction action so far (4/4)
•Action in operation phase(2/2)
Action to hardware
Measures Details
Water chemistrycontrol
High Li operationAdoption of fine mesh filterReactor water diversion and purification at RCPstartupTwo-step pollution
Action to software
Mockup traning SG nozzle cover attachment and replacement
Awareness-buildingmeasure
Indication, participation in morningceremonies, call out, introduction of case oftroubles, etc.
2008 ISOE International ALARA Symposium
The following materials may contain JAPC’s proprietary and confidential information; and all or any part of these materials or informationcontained herein may NOT be used for any purposes other than originally intended or may NOT be reproduced, disclosed, transferred, distributed orin any manner transmitted in any tangible, electronic or any other form to any third party without prior written consent thereto by JAPC.
10
Recent action to hardware
0
20
40
60
80
100
#1 #2 #3 #4 #5 #6 #7 #8 #9 #10 #11 #12 #13 #14 #15 #16
Periodical outage
SG HOTSG COLD
Radiation source decays due tolong period outage for periodicalinspection associated with lekagefrom SG heat exchanger
Start of zincinjection
Dos
e eq
uiva
lent
rat
e (m
Sv/
h)
2008 ISOE International ALARA Symposium
The following materials may contain JAPC’s proprietary and confidential information; and all or any part of these materials or informationcontained herein may NOT be used for any purposes other than originally intended or may NOT be reproduced, disclosed, transferred, distributed orin any manner transmitted in any tangible, electronic or any other form to any third party without prior written consent thereto by JAPC.
11
Recent action to software
2008 ISOE International ALARA Symposium
JAPC ContractorRP MaintenanceMaintenance RP
Work plan
Design
Prediction,
Assessment
Rad. work plan
Shielding,Decon.
Check,Review
Cost plan
Review of work contents and radiation dose
Validitycheck /review
Work Plan Annual dose
Disapproval
Work control Radiation controlApproval Work Start
Possibility of planned dose significant exceedance
The following materials may contain JAPC’s proprietary and confidential information; and all or any part of these materials or informationcontained herein may NOT be used for any purposes other than originally intended or may NOT be reproduced, disclosed, transferred, distributed orin any manner transmitted in any tangible, electronic or any other form to any third party without prior written consent thereto by JAPC.
12
Steam (to turbine)
From condenser
From reactorto reactor
SCC at nozzle welds
SG
2008 ISOE International ALARA SymposiumAction to large-scale work (1/5)
(SG nozzle stub weld mending)
MCP*(High dose
rate)
SG lower shell(High dose
rate)
* MCP: Main Coolant PipeThe following materials may contain JAPC’s proprietary and confidential information; and all or any part of these materials or informationcontained herein may NOT be used for any purposes other than originally intended or may NOT be reproduced, disclosed, transferred, distributed orin any manner transmitted in any tangible, electronic or any other form to any third party without prior written consent thereto by JAPC.
13
SG lower shell
(High dose rate)MCP*
(High dose rate)
Elbow replacement
SG coolant inlet nozzleNozzle
stub
Cutting
Cutting
Contaminated
* MCP: Main Coolant Pipe
Contaminated
Contaminated
2008 ISOE International ALARA SymposiumAction to large-scale work (2/5)
(Work plan)
The following materials may contain JAPC’s proprietary and confidential information; and all or any part of these materials or informationcontained herein may NOT be used for any purposes other than originally intended or may NOT be reproduced, disclosed, transferred, distributed orin any manner transmitted in any tangible, electronic or any other form to any third party without prior written consent thereto by JAPC.
14
2008 ISOE International ALARA Symposium
Action to large-scale work (3/5)
(Planned dose)
1600 man-mSv
(planned)
ShieldingDecontaminationAutomatic and remote equipmentMock-up training
The following materials may contain JAPC’s proprietary and confidential information; and all or any part of these materials or informationcontained herein may NOT be used for any purposes other than originally intended or may NOT be reproduced, disclosed, transferred, distributed orin any manner transmitted in any tangible, electronic or any other form to any third party without prior written consent thereto by JAPC.
15
2008 ISOE International ALARA Symposium
Action to large-scale work (4/5)(action plan based on 1100 man-mSv)
Cutting off elbow
MCP
Shielding(additional)
Decontamination (additional)
Shielding(additional)
24 mSv/h
6 mSv/h 4.7 mSv/h
3.7 mSv/h 2.8 mSv/h 1.5 mSv/h
The following materials may contain JAPC’s proprietary and confidential information; and all or any part of these materials or informationcontained herein may NOT be used for any purposes other than originally intended or may NOT be reproduced, disclosed, transferred, distributed orin any manner transmitted in any tangible, electronic or any other form to any third party without prior written consent thereto by JAPC.
16
2008 ISOE International ALARA Symposium
Action to large-scale work (5/5)
(Reexamined plan )1600 man-mS
v (planned)
1100 man-mSv
(approved)
Additional shieldingAdditional decontamination
ShieldingDecontaminationAutomatic and remote equipmentMock-up training
Dose for additional dose reduction ~ 20 man-mSv
The following materials may contain JAPC’s proprietary and confidential information; and all or any part of these materials or informationcontained herein may NOT be used for any purposes other than originally intended or may NOT be reproduced, disclosed, transferred, distributed orin any manner transmitted in any tangible, electronic or any other form to any third party without prior written consent thereto by JAPC.
17
Situation of countermeasure for reducing radiation
exposure
2008 ISOE International ALARA Symposium
Situation of installation of shield
The following materials may contain JAPC’s proprietary and confidential information; and all or any part of these materials or informationcontained herein may NOT be used for any purposes other than originally intended or may NOT be reproduced, disclosed, transferred, distributed orin any manner transmitted in any tangible, electronic or any other form to any third party without prior written consent thereto by JAPC.
18
Situation of installation of shield ( 1/3)
• screen-type shield • Screen-type shield for watchmenDecontaminatio
n of MCP and SG nozzle inner surface
Screen-type shieldShiel
d
2008 ISOE International ALARA Symposium
The following materials may contain JAPC’s proprietary and confidential information; and all or any part of these materials or informationcontained herein may NOT be used for any purposes other than originally intended or may NOT be reproduced, disclosed, transferred, distributed orin any manner transmitted in any tangible, electronic or any other form to any third party without prior written consent thereto by JAPC.
19
Situation of installation of shield ( 2/3)
• Shielding for MCP Nozzle inside
• Shielding for SG nozzle inside
・ Shield for MCP nozzle inside Shield for SG nozzle inside
2008 ISOE International ALARA Symposium
The following materials may contain JAPC’s proprietary and confidential information; and all or any part of these materials or informationcontained herein may NOT be used for any purposes other than originally intended or may NOT be reproduced, disclosed, transferred, distributed orin any manner transmitted in any tangible, electronic or any other form to any third party without prior written consent thereto by JAPC.
20
Situation of installation of shield ( 3/3)・ Shield for RHR/SIS piping
Cold-leg, Charge, Boric acid injection, Accumulator injection piping
RHR piping
2008 ISOE International ALARA Symposium
The following materials may contain JAPC’s proprietary and confidential information; and all or any part of these materials or informationcontained herein may NOT be used for any purposes other than originally intended or may NOT be reproduced, disclosed, transferred, distributed orin any manner transmitted in any tangible, electronic or any other form to any third party without prior written consent thereto by JAPC.
21
2008 ISOE International ALARA Symposium
Result of dose rate reduction
Cutting off elbow
MCP
24 mSv/h
6 → - mSv/h 4.7 → 9.0 mSv/h
3.7 → 6.0 mSv/h 2.8 → 1.6 mSv/h 1.5 → 0.9 mSv/h
Shielding(additional)
Shielding(additional)
The following materials may contain JAPC’s proprietary and confidential information; and all or any part of these materials or informationcontained herein may NOT be used for any purposes other than originally intended or may NOT be reproduced, disclosed, transferred, distributed orin any manner transmitted in any tangible, electronic or any other form to any third party without prior written consent thereto by JAPC.
22
Situation of training by using mock-up
Installation of cutting machineInstallation of beveling machine
2008 ISOE International ALARA Symposium
The following materials may contain JAPC’s proprietary and confidential information; and all or any part of these materials or informationcontained herein may NOT be used for any purposes other than originally intended or may NOT be reproduced, disclosed, transferred, distributed orin any manner transmitted in any tangible, electronic or any other form to any third party without prior written consent thereto by JAPC.
23
Wireless monitoring unit of the E.P.D
Enable working without relying on the alarm
2008 ISOE International ALARA Symposium
Detail will be shown in another presentation of JAPC.
The following materials may contain JAPC’s proprietary and confidential information; and all or any part of these materials or informationcontained herein may NOT be used for any purposes other than originally intended or may NOT be reproduced, disclosed, transferred, distributed orin any manner transmitted in any tangible, electronic or any other form to any third party without prior written consent thereto by JAPC.
24
Result
2008 ISOE International ALARA Symposium
~1100
~990
The following materials may contain JAPC’s proprietary and confidential information; and all or any part of these materials or informationcontained herein may NOT be used for any purposes other than originally intended or may NOT be reproduced, disclosed, transferred, distributed orin any manner transmitted in any tangible, electronic or any other form to any third party without prior written consent thereto by JAPC.
25
Conclusion (1/2)
2008 ISOE International ALARA Symposium
Effective shielding and decontamination based on technical evaluation Strictly mock-up training in works Maintenance section is very cooperative for the matter which radiological protection section recommends in JAPC and MHI.
The following materials may contain JAPC’s proprietary and confidential information; and all or any part of these materials or informationcontained herein may NOT be used for any purposes other than originally intended or may NOT be reproduced, disclosed, transferred, distributed orin any manner transmitted in any tangible, electronic or any other form to any third party without prior written consent thereto by JAPC.
26
Conclusion (2/2)
2008 ISOE International ALARA Symposium
Positive inflection of the machinery automation and remoteness
Carrying out the radiation survey finely and limit an entrance to work area strictly