Download - 0 chengula HOTEL.pdf
-
7/25/2019 0 chengula HOTEL.pdf
1/13
-
7/25/2019 0 chengula HOTEL.pdf
2/13
GSPublisherEngine0.0.100.100
GeneralNotes
ProjectTitle:
CONSULTANT:
Date:Scale:
Title:
Client:
Designedby
PROPOSED RESIDENTIAL /COMMERCIAL BUILDING TO BE
BUILT ON PLOT NO 188 BLOCK A
KIGOGO DAR ES SALAAM
Drawnby
11/3/2015
THEODORA PIUS MWANSASUP.O. BOX3690DARESSALAAM
SheetNo: 2
O.S.
E.S.
1:125
sitehotel
20x150=3,00
0
1
2
3
4
5
6 7
8
9
10
11
12
13
14
15
16
17
18
19
20
3 ,425
150
6,000
150
13
,896
13
,80
3
15500
14
50
0
27,930
30,000
3,0
00
2,174
12
0 0
2,876
12
0 0
RESTAURANT
OPENTO
BELOW
KITCHEN
LOUN
GE
MANAGER'S
OFFICE
RECEPTION
STAFFCHANGING
ROOM
LAUNDRY
PLOTAREA: ..............431.101 sq.m.
Builtup area:Groundoor........334.41sq.m.Typical1st to7th.....334.41 x7 =2340.87sq.m.Basement..........334.41 sq.m.Totalbuilt uparea=3009.69 sq.m.Plotratio:.................. 6.9Plotcoverage:............75%
-
7/25/2019 0 chengula HOTEL.pdf
3/13
GSPublisherEngine0.0.100.100
GeneralNotes
ProjectTitle:
CONSULTANT:
Date:Scale:
Title:
Client:
Designedby
PROPOSED RESIDENTIAL /COMMERCIAL BUILDING TO BE
BUILT ON PLOT NO 188 BLOCK A
KIGOGO DAR ES SALAAM
Drawnby
11/3/2015
THEODORA PIUS MWANSASUP.O. BOX3690DARESSALAAM
SheetNo: 3
O.S.
E.S.
1:100
BASEMENT
-
7/25/2019 0 chengula HOTEL.pdf
4/13
GSPublisherEngine0.0.100.100
GeneralNotes
ProjectTitle:
CONSULTANT:
Date:Scale:
Title:
Client:
Designedby
PROPOSED RESIDENTIAL /COMMERCIAL BUILDING TO BE
BUILT ON PLOT NO 188 BLOCK A
KIGOGO DAR ES SALAAM
Drawnby
11/3/2015
THEODORA PIUS MWANSASUP.O. BOX3690DARESSALAAM
SheetNo: 5
O.S.
E.S.
1:100
GFHOTEL
20x150=3,000
1
2
3
4
5
6 7
8
9
10
11
12
13
14
15
16
17
18
19
20
3,425
4,650 5,200 4,950 5,200 4,650
5,000
5,000
3,500
4,650 5,200 4,950 5,200 4,650
5,000
5,000
3,500
13,500
24,650
24,650
150
6,000
150
RESTAURANT
OPENTO
BELOW
KITCHEN
LOUNGE
MANAGER'S
OFFICE
RECEPTION
STAFFCHANGING
ROOM
LAUNDRY
S2
S2
-
7/25/2019 0 chengula HOTEL.pdf
5/13
GSPublisherEngine0.0.100.100
GeneralNotes
ProjectTitle:
CONSULTANT:
Date:Scale:
Title:
Client:
Designedby
PROPOSED RESIDENTIAL /COMMERCIAL BUILDING TO BE
BUILT ON PLOT NO 188 BLOCK A
KIGOGO DAR ES SALAAM
Drawnby
11/3/2015
THEODORA PIUS MWANSASUP.O. BOX3690DARESSALAAM
SheetNo: 7
O.S.
E.S.
1:100
HOTEL
-
7/25/2019 0 chengula HOTEL.pdf
6/13
GSPublisherEngine0.0.100.100
GeneralNotes
ProjectTitle:
CONSULTANT:
Date:Scale:
Title:
Client:
Designedby
PROPOSED RESIDENTIAL /COMMERCIAL BUILDING TO BE
BUILT ON PLOT NO 188 BLOCK A
KIGOGO DAR ES SALAAM
Drawnby
11/3/2015
THEODORA PIUS MWANSASUP.O. BOX3690DARESSALAAM
SheetNo: 8
O.S.
E.S.
1:100
ROOFPLAN
1 1
2 2
3 3
4 4
A
A
B
B
C
C
D
D
E
E
F
F
S-S
S-S
-
7/25/2019 0 chengula HOTEL.pdf
7/13
GSPublisherEngine0.0.100.100
GeneralNotes
ProjectTitle:
CONSULTANT:
Date:Scale:
Title:
Client:
Designedby
PROPOSED RESIDENTIAL /COMMERCIAL BUILDING TO BE
BUILT ON PLOT NO 188 BLOCK A
KIGOGO DAR ES SALAAM
Drawnby
11/3/2015
THEODORA PIUS MWANSASUP.O. BOX3690DARESSALAAM
SheetNo: 9
O.S.
E.S.
1:150
SECTION
4,650 5,200 4,950 5,200 4,650
3,7
53
3,1
50
3,1
50
3,1
50
3,1
50
3,1
50
3,1
50
3,1
50
900
1,800
300
0.00
+3.75
+6.9
+10.05
+13.2
+16.35
+19.5
+22.65
+25.8
+29.0
3180
2,2
80
150
3,6
0
3
150
3,0
00
150
3,0
00
150
3,0
00
15
0
3,0
00
150
3,0
00
150
3,0
00
150
3,
000
150
754
445
1800
1000
1000
1000
1000
1000
1000
1000
BASEMENT
SHOPS
APARTMENTS
APARTMENTS
APARTMENTS
APARTMENTS
APARTMENTS
APARTMENTS
APARTMENTS
APARTMENTS
APARTMENTS
-
7/25/2019 0 chengula HOTEL.pdf
8/13
GSPublisherEngine0.0.100.100
GeneralNotes
ProjectTitle:
CONSULTANT:
Date:Scale:
Title:
Client:
Designedby
PROPOSED RESIDENTIAL /COMMERCIAL BUILDING TO BE
BUILT ON PLOT NO 188 BLOCK A
KIGOGO DAR ES SALAAM
Drawnby
11/3/2015
THEODORA PIUS MWANSASUP.O. BOX3690DARESSALAAM
SheetNo: 10
O.S.
E.S.
1:125
ELEVATION
4 3 2 1
3,500 5,000 5,000
1 2 3 4
5,000 5,000 3,500
FRONT ELEVATION REAR ELEVATION
-
7/25/2019 0 chengula HOTEL.pdf
9/13
GSPublisherEngine0.0.100.100
GeneralNotes
ProjectTitle:
CONSULTANT:
Date:Scale:
Title:
Client:
Designedby
PROPOSED RESIDENTIAL /COMMERCIAL BUILDING TO BE
BUILT ON PLOT NO 188 BLOCK A
KIGOGO DAR ES SALAAM
Drawnby
11/3/2015
THEODORA PIUS MWANSASUP.O. BOX3690DARESSALAAM
SheetNo: 11
O.S.
E.S.
1:125
RIGHTELEVATION
4,650 5,200 4,950 5,200 4,650
-
7/25/2019 0 chengula HOTEL.pdf
10/13
GSPublisherEngine0.0.100.100
GeneralNotes
ProjectTitle:
CONSULTANT:
Date:Scale:
Title:
Client:
Designedby
PROPOSED RESIDENTIAL /COMMERCIAL BUILDING TO BE
BUILT ON PLOT NO 188 BLOCK A
KIGOGO DAR ES SALAAM
Drawnby
11/3/2015
THEODORA PIUS MWANSASUP.O. BOX3690DARESSALAAM
SheetNo: 12
O.S.
E.S.
1:125
LEFTELEVATION
4,650 5,200 4,950 5,200 4,650
-
7/25/2019 0 chengula HOTEL.pdf
11/13
GSPublisherEngine0.0.100.100
GeneralNotes
ProjectTitle:
CONSULTANT:
Date:Scale:
Title:
Client:
Designedby
PROPOSED RESIDENTIAL /COMMERCIAL BUILDING TO BE
BUILT ON PLOT NO 188 BLOCK A
KIGOGO DAR ES SALAAM
Drawnby
11/3/2015
THEODORA PIUS MWANSASUP.O. BOX3690DARESSALAAM
SheetNo: 13
O.S.
E.S.
IMAGES
-
7/25/2019 0 chengula HOTEL.pdf
12/13
GSPublisherEngine0.0.100.100
GeneralNotes
ProjectTitle:
CONSULTANT:
Date:Scale:
Title:
Client:
Designedby
PROPOSED RESIDENTIAL /COMMERCIAL BUILDING TO BE
BUILT ON PLOT NO 188 BLOCK A
KIGOGO DAR ES SALAAM
Drawnby
11/3/2015
THEODORA PIUS MWANSASUP.O. BOX3690DARESSALAAM
SheetNo: 14
O.S.
E.S.
IMAGES
-
7/25/2019 0 chengula HOTEL.pdf
13/13
GeneralNotes
ProjectTitle:
CONSULTANT:
Date:Scale:
Title:
Client:
Designedby
PROPOSED RESIDENTIAL /COMMERCIAL BUILDING TO BE
BUILT ON PLOT NO 188 BLOCK A
KIGOGO DAR ES SALAAM
Drawnby
11/3/2015
THEODORA PIUS MWANSASUP.O. BOX3690DARESSALAAM
SheetNo: 15
O.S.
E.S.
SEPTICS
4 93 2 25
1,952
493 1,287 493 644 579 644
493 493 1,287 493 493
1000mmm
invariab
le
215
3,218
107
644
493 3,772 493 2,321 493
L
1,286
4
83
493
965
493
493 1,287 493 S 493 1,287 493
493
493
W
493
493
1,287
4
83
493 493 W 493 493
322
D
322
536
429
1,287
1,287
322
322
965
322
644
1,287
fluid level
150mm conc.grade20/19withmeshS193
600x450mmSABStype9Ccoverandframe
Approved geotextilemembrane
600x450mmSABStype9Ccoverandframe600x450mmSABStype9C
coverandframe600x450mmSABStype9Ccoverandframe
600x450mmSABStype9Ccoverandframe
Approvedb iddingclothallround
20-75mmCleanGranularfill tampered in place in thepercolationtrench.
110mmperforatedpitch -fibre pipe
sand
Honeycombbrickwork.
230mm bafflewall
Measuringstick
50mmofcrushedstonestopreventscour
Test Hole
ReferenceBoard
600x450mmSABStype9Ccoverandframe
600x450mmSABStype9Ccoverandframe
SECTION 2 - 2 1:20
SECTION 3 - 31:20
SECTION THROUGH A SUMP1:20
SECTION 1 - 11:20
SCHEDULE OF SEPTIC TANK AND SOAKAWAYS
SEPTIC TANK PLAN1:20
DISTRIBUTION BOX1:20
2
1 1
3
3
2
GLGLGL GL GL GL
15mmsan
d/cemen
t
pla
ster
tointernalwal
ls
150mm
r.c.slabgrad
e25/19
withtop
&botto
mmesh
assched
uled
SOAKAWAYS LENGTH "S" [m]SEPTIC TANK DETAILS
Percolation Rate (minutes per 25mm)No. ofPersons
Sewage
Depth "D" [m]Roof Slabmesh
Width
"W" [m] "L" [m]
Length
Cu. m >4mins 5mins 10mins 15mins 30mins
1
2
34
5
6
7
8
10 or Less
11-15
16-2021-25
26-35
36-50
1.200
1.350
1.5001.500
1.500
1.750
1.750
1.750
1.000
1.000
1.0001.100
1.250
1.450
1.650
1.790
2.800
3.100
3.3003.800
4.500
4.750
5.250
6.000
3.450 5.000 7.500
11.2507.5004.185
4.950 10.000 15.00018.75012.5006.270
8.440 17.500 26.250
12. 050 25.000 37. 500
52.25035.00015.160
18.795 45.000 60.000
15.000
22.500
30.00037.500
52.500
75.000
105.000
120.000 145.000
130.000
100.000
70.000
50.00040.000
30.000
20.00010.000
15.000
20.00025.000
35.000
50.000
70.000
75.000
245
245
245245
395
395
395
395
Capacity
76-100
51-75
Type
TYPICAL PERCOLATION TEST HOLE 1:20
STANDARD PERCOLATION TEST PROCEDURE
1. Excavatepercolationtestholewith diameterbetween100mm to 300mm atadepthof soakawaytrenchbyhandor auger.
2. Cover the bottom of the test hole with 50mmlayerof20mmcrushedstonesto protect the bottom of from scouring.
3. Soakthegroundbyfill ingthetestholewithwatertoa depthof300mmand maintainthislevelbyaddingwaterforatleastfour(4) hours. (Insandsoilwith littleor noclaysoakingisnotnecessary).
4. Fill the test hole with water to a depth of 150mmand measurethe dropof waterleveloveraperiodof30 minutesoruntilthewaterhasdrainedaway. (Atleastthreemeasurementareto bemade)