Download - 2012 12-long term planning-output so far
![Page 1: 2012 12-long term planning-output so far](https://reader036.vdocuments.pub/reader036/viewer/2022062510/54b51ff94a7959a73c8b458b/html5/thumbnails/1.jpg)
Long term planning
![Page 2: 2012 12-long term planning-output so far](https://reader036.vdocuments.pub/reader036/viewer/2022062510/54b51ff94a7959a73c8b458b/html5/thumbnails/2.jpg)
Why Long Term Planning?
• Sustainability
• Continuity in the organization
• Effective usage of resources
![Page 3: 2012 12-long term planning-output so far](https://reader036.vdocuments.pub/reader036/viewer/2022062510/54b51ff94a7959a73c8b458b/html5/thumbnails/3.jpg)
2015 Global Goals
• GIP TN
• GIP EP
• GCDP TN
• GCDP EP
17 000
17 000
35 000
35 000
![Page 4: 2012 12-long term planning-output so far](https://reader036.vdocuments.pub/reader036/viewer/2022062510/54b51ff94a7959a73c8b458b/html5/thumbnails/4.jpg)
2015 Goals Bottomlines
AIESEC in the Czech Republic in 2015 should:
- contribute to the global balance in ICX and OGX
- contribute to the achievement of global 2015 goals
- be strong in all programmes equally by 2015
- not lose the current position in any programme
![Page 5: 2012 12-long term planning-output so far](https://reader036.vdocuments.pub/reader036/viewer/2022062510/54b51ff94a7959a73c8b458b/html5/thumbnails/5.jpg)
2015/2016 Potential ofAIESEC in the Czech Republic
TN EP Total
GIP
GCDP
TMP/TLP participants
350 500
910 840 1 750
850
760
![Page 6: 2012 12-long term planning-output so far](https://reader036.vdocuments.pub/reader036/viewer/2022062510/54b51ff94a7959a73c8b458b/html5/thumbnails/6.jpg)
GIPi
![Page 7: 2012 12-long term planning-output so far](https://reader036.vdocuments.pub/reader036/viewer/2022062510/54b51ff94a7959a73c8b458b/html5/thumbnails/7.jpg)
Vision of the product
• Companies are approaching us for cooperation
• Product based on needs of companies + supply in the network
• 4 segments: Management, IT, EDU, engineering
• ¾ of results are coming from AM
• 350 RE in 2015
![Page 8: 2012 12-long term planning-output so far](https://reader036.vdocuments.pub/reader036/viewer/2022062510/54b51ff94a7959a73c8b458b/html5/thumbnails/8.jpg)
Numbers2015 (350 total):• Management 40% (140)• IT 35% (122)• EDU 15% (53)• Engineering 10% (35)
2012 (135 total):• Management 65% (88)• IT 20% (27)• EDU 15% (20)• Engineering 0% (0)
![Page 9: 2012 12-long term planning-output so far](https://reader036.vdocuments.pub/reader036/viewer/2022062510/54b51ff94a7959a73c8b458b/html5/thumbnails/9.jpg)
Long term strategies
• Big accounts• Connections with ministries, legislative
offices• Big IT focus• Engineering (SVK?)• Not doing cold calling but more networking,
events, have positioning (web, media)• Different structure in the MC? (somebody
respo for this matching processes, somebody for promo?)
![Page 10: 2012 12-long term planning-output so far](https://reader036.vdocuments.pub/reader036/viewer/2022062510/54b51ff94a7959a73c8b458b/html5/thumbnails/10.jpg)
Comments to the output
• Still MR in egineering needs to be done (ISO norms, SVK case…)
• IT strategy (members, selling points, trends, cluster cooperations)
• NEPs redesign (NST respo for matching, GEP concept?)
• Need to go through with Mara again
![Page 11: 2012 12-long term planning-output so far](https://reader036.vdocuments.pub/reader036/viewer/2022062510/54b51ff94a7959a73c8b458b/html5/thumbnails/11.jpg)
GIPo
![Page 12: 2012 12-long term planning-output so far](https://reader036.vdocuments.pub/reader036/viewer/2022062510/54b51ff94a7959a73c8b458b/html5/thumbnails/12.jpg)
Overview of growth in segments
![Page 13: 2012 12-long term planning-output so far](https://reader036.vdocuments.pub/reader036/viewer/2022062510/54b51ff94a7959a73c8b458b/html5/thumbnails/13.jpg)
Reason behind this numbers, our estimates
BA, HR, MA, F…• We will probably not grow so
fast, because even external market is not growing so fast
T&LE• Big potential at our market –no
competitor, external potential
as well
IT• Huge potential from both sides
67%
150%
782%
2012/13- 2015/16
2012/13- 2015/16
2012/13- 2015/16From 17 – 150 Re
From 60– 150 Re
From 120– 200 Re
![Page 14: 2012 12-long term planning-output so far](https://reader036.vdocuments.pub/reader036/viewer/2022062510/54b51ff94a7959a73c8b458b/html5/thumbnails/14.jpg)
Main strategies to 2015
![Page 15: 2012 12-long term planning-output so far](https://reader036.vdocuments.pub/reader036/viewer/2022062510/54b51ff94a7959a73c8b458b/html5/thumbnails/15.jpg)
Cooperation with UNI & Ministry of EDU
– In first phase will agree on common approaching graduates and alumni for better profiles of students.
– Become official partner of UNI in providing internships to students as e.g. Erasmus.
– Have official statement that @ X is part of education
![Page 16: 2012 12-long term planning-output so far](https://reader036.vdocuments.pub/reader036/viewer/2022062510/54b51ff94a7959a73c8b458b/html5/thumbnails/16.jpg)
Long term CY & companies partnership
– Stable partnership, account management, Q evaluation
– Common planning each year– Partnership between Czech UNI and company from
abroad
• UNI coordinators from MC level are responsible for account management of big partnerships (e.g. 100 EPs)
• UNI is responsible for raising this students, company come to explain what their needs from students they need and provide feedback on education system
![Page 17: 2012 12-long term planning-output so far](https://reader036.vdocuments.pub/reader036/viewer/2022062510/54b51ff94a7959a73c8b458b/html5/thumbnails/17.jpg)
Cooperate on our product with Czech companies
– Have package for people who wants work for some companies but don’t have international experience
– Company will be actively promoting ours opportunities and will be part of selection process, because they creating pipeline for themselves in terms of high quality people with international XP.
![Page 18: 2012 12-long term planning-output so far](https://reader036.vdocuments.pub/reader036/viewer/2022062510/54b51ff94a7959a73c8b458b/html5/thumbnails/18.jpg)
General assumptions
• We have plan for each LC in terms of growth for each product (e.g. Prague will be focusing on growing in IT because they have already stable and by internal processes handled BA, HR).
• LCs using specialized units for specific products and for bigger and better managing of human resources.
![Page 19: 2012 12-long term planning-output so far](https://reader036.vdocuments.pub/reader036/viewer/2022062510/54b51ff94a7959a73c8b458b/html5/thumbnails/19.jpg)
Other topic – no LTS
• Financial conditions– Have same prices for all programs, doesn’t
matter which CY– Have more accessible product for all students
• Possible solutions:– New financial model (separate payments)– Grand (BRIC & EU CY common application)
![Page 20: 2012 12-long term planning-output so far](https://reader036.vdocuments.pub/reader036/viewer/2022062510/54b51ff94a7959a73c8b458b/html5/thumbnails/20.jpg)
GCDPi
![Page 21: 2012 12-long term planning-output so far](https://reader036.vdocuments.pub/reader036/viewer/2022062510/54b51ff94a7959a73c8b458b/html5/thumbnails/21.jpg)
GCDP incoming• Description 1 - We percieve our GCDP IC projects
(internships) as social enterprises• We are developing community in Czech republic based on the issues needed• Members are taking projects as their own businesses• Projects are financially sustainable• Our projects are sustainable in long-term thinking (we focus on product development)
• Description 2 - We have credible and well known product portfolio in order to become first choice partner in providing qualitative international internships
• Our projects have strong brand• Our projects are supported by Ministry of education, youth and sports (patronage) and another different
stakeholders
• Description 3 - Our projects create future leaders of the world• Our projects have the concept of being part of educational system (flow for different grades, continuity)• By our projects we are building pipeline for AIESEC members (from participants,..)• Our main target group are young people who have a chance to develop (child to uni student)• Thanks to trainees care we explain WHY and develop all participating people and all members of AIESEC• Our GCDP internships is taken as encouragement for trainees to have the global mindset of social
development
![Page 22: 2012 12-long term planning-output so far](https://reader036.vdocuments.pub/reader036/viewer/2022062510/54b51ff94a7959a73c8b458b/html5/thumbnails/22.jpg)
Strategies• Ministry of education
– Cooperation– Consultation– Co-creation of school curricula
• Market scanning/research– Project/product developer
• Cooperation with NGOs– Common preparation of projects
• Pilot schools
![Page 23: 2012 12-long term planning-output so far](https://reader036.vdocuments.pub/reader036/viewer/2022062510/54b51ff94a7959a73c8b458b/html5/thumbnails/23.jpg)
GCDPo
![Page 24: 2012 12-long term planning-output so far](https://reader036.vdocuments.pub/reader036/viewer/2022062510/54b51ff94a7959a73c8b458b/html5/thumbnails/24.jpg)
Vision of GCPD in 2015
• GCDP internship is the best opportunity how to get to know foreign country, culture and myself.
• How students perceive us:• First international experience which is easy to
take• International environment in projects even in
close countries• I am not doing mainstream activities – I go to
extraordinary country with extraordinary JD• It has simply BALLS
![Page 25: 2012 12-long term planning-output so far](https://reader036.vdocuments.pub/reader036/viewer/2022062510/54b51ff94a7959a73c8b458b/html5/thumbnails/25.jpg)
Overview of growth in CY/ project issues
2012/132015/16
223
200600
240
0100200
300
400
500
600
700
800
900
Others
Partnership
![Page 26: 2012 12-long term planning-output so far](https://reader036.vdocuments.pub/reader036/viewer/2022062510/54b51ff94a7959a73c8b458b/html5/thumbnails/26.jpg)
Main strategies to 2015
![Page 27: 2012 12-long term planning-output so far](https://reader036.vdocuments.pub/reader036/viewer/2022062510/54b51ff94a7959a73c8b458b/html5/thumbnails/27.jpg)
Create open database of internships (MOS: #RA-MA-RE – 75%)
• TNs raised only for Czech students
• Offline matching is possible
• Must be CY2CY cooperation
![Page 28: 2012 12-long term planning-output so far](https://reader036.vdocuments.pub/reader036/viewer/2022062510/54b51ff94a7959a73c8b458b/html5/thumbnails/28.jpg)
EP care before internship
• All information about countries in partnerships
• Visa processes support– Provide templates, process manuals– Embassy AM – cancel compulsory visas
![Page 29: 2012 12-long term planning-output so far](https://reader036.vdocuments.pub/reader036/viewer/2022062510/54b51ff94a7959a73c8b458b/html5/thumbnails/29.jpg)
CEEDerships
• Long-term – prepare whole project including matching, TNs mainly for Czech EPs
• Short-term – two weeks before X – go there, check state, save what can be saved
• ICX GCDP NST positions in partner countries are leaded by Czech AIESECers– Checking and ensuring quality, current state,
make black list
![Page 30: 2012 12-long term planning-output so far](https://reader036.vdocuments.pub/reader036/viewer/2022062510/54b51ff94a7959a73c8b458b/html5/thumbnails/30.jpg)
UNIs cooperation's
• Use segmentation – find relevant TNs for faculties and departments we have in LC cities
• Sell it directly to faculties and departments and gain support in promotion, create new channel
![Page 31: 2012 12-long term planning-output so far](https://reader036.vdocuments.pub/reader036/viewer/2022062510/54b51ff94a7959a73c8b458b/html5/thumbnails/31.jpg)
Internal processes
• Move dates of LCP and EB selections on earlier date and shorten transition
• TLs for one year
• Big autumn RCTM of newies – no need to do big spring again
• Set X mindset, promote X to members for whole year – X+T
![Page 32: 2012 12-long term planning-output so far](https://reader036.vdocuments.pub/reader036/viewer/2022062510/54b51ff94a7959a73c8b458b/html5/thumbnails/32.jpg)
Specialized unites
• Create SU according segments of faculties and fields of study– Focused only on GCDP
![Page 33: 2012 12-long term planning-output so far](https://reader036.vdocuments.pub/reader036/viewer/2022062510/54b51ff94a7959a73c8b458b/html5/thumbnails/33.jpg)
Other ideas
• Personal discovery training before X – to distinguish from others
• Be on stage of big cultural events, festivals
• High school promotion – to be perceived as ERASMUS – must have experience (or at least as well-known as ERASMUS
![Page 34: 2012 12-long term planning-output so far](https://reader036.vdocuments.pub/reader036/viewer/2022062510/54b51ff94a7959a73c8b458b/html5/thumbnails/34.jpg)
TMP/TLP
![Page 35: 2012 12-long term planning-output so far](https://reader036.vdocuments.pub/reader036/viewer/2022062510/54b51ff94a7959a73c8b458b/html5/thumbnails/35.jpg)
TMP/TLPElite Leadership Development Programs
• recognized & supported by universities, municipalities, externals
• accessible to each student in Czech Republic and other countries
• known by 100% of its students as additional edu program providing practical experience
• support members’ future career development
![Page 36: 2012 12-long term planning-output so far](https://reader036.vdocuments.pub/reader036/viewer/2022062510/54b51ff94a7959a73c8b458b/html5/thumbnails/36.jpg)
recognized by universities, municipalities, externals
1. University Relations[credits for both X and T, financial support, @positioning]
2. Educational Programs Certification[benefits for members, quality of education with
external involvement, EwA development, LLC
packaging]
![Page 37: 2012 12-long term planning-output so far](https://reader036.vdocuments.pub/reader036/viewer/2022062510/54b51ff94a7959a73c8b458b/html5/thumbnails/37.jpg)
accessible to each student in Czech Republic and other countries 1. Ongoing Recruitment[flexible XPs, FA HR needs in time, XPs based on customer
needs]
2. Virtual Team XPs[providing team/project management IT
platform supporting virtual education, tracking
and coaching]
3. Expansion Management [SU]
4. Expansion Management [Country expansions]
![Page 38: 2012 12-long term planning-output so far](https://reader036.vdocuments.pub/reader036/viewer/2022062510/54b51ff94a7959a73c8b458b/html5/thumbnails/38.jpg)
known by 100% of its students as additional edu program providing
practical experience
1. Market Positioning. Competitive Advantage Development.
Missing market knowledge and PR background
![Page 39: 2012 12-long term planning-output so far](https://reader036.vdocuments.pub/reader036/viewer/2022062510/54b51ff94a7959a73c8b458b/html5/thumbnails/39.jpg)
support members’ future career development
1. HRM system[support TMP/TLP quality, IXP strategy, LLC Development]
2. External Projects Shadowing[allign membership development with external needs,
provide constant feedback on personal strengths and
growth points from externals]
![Page 40: 2012 12-long term planning-output so far](https://reader036.vdocuments.pub/reader036/viewer/2022062510/54b51ff94a7959a73c8b458b/html5/thumbnails/40.jpg)
Long Term Crucial Projects
1. Ongoing Recruitment
2. Expansion Management
3. University Relations
contribute directly to the TMP/TLP numerical
plan and internal operations development
![Page 41: 2012 12-long term planning-output so far](https://reader036.vdocuments.pub/reader036/viewer/2022062510/54b51ff94a7959a73c8b458b/html5/thumbnails/41.jpg)
![Page 42: 2012 12-long term planning-output so far](https://reader036.vdocuments.pub/reader036/viewer/2022062510/54b51ff94a7959a73c8b458b/html5/thumbnails/42.jpg)
What else should be covered in long term plan...
• Expansions plan– Helenka, Adam, Šéďa, Pecňa
• Organizational financing plan– Mišo, Pecňa
• IM infrastructure plan + virtualization– Maťo
• Organizational structures– Helenka, Marťa, Šéďa, Mišo
• Strategic connection with universities + ministry– Adél, Šéďa
![Page 43: 2012 12-long term planning-output so far](https://reader036.vdocuments.pub/reader036/viewer/2022062510/54b51ff94a7959a73c8b458b/html5/thumbnails/43.jpg)
Thank you for your attention!
Martin Tyšer
MCP 2012/2013AIESEC in the Czech Republic
CEE GN Chair 2012/2013AIESEC in Central and Eastern Europe
[email protected]+420 733 746 744