WELCOMEParticipants to the
Workshop on Water Resources Demand Management Learning
Forums for Irrigation 27 JULY 2011
THABUA O&M IRRIGATION PROJECT
Regional Irrigation Office 3
แม่�น้ำ���น้ำ��น้ำแม่�น้ำ���ปิง แม่�น้ำ���วั�งแม่�น้ำ���ยม่
แม่�น้ำ���เจ้��พระย�
Bhumipol Dam
Sirikit DamCapacity 9,510 MCM.
Chaophraya Dam
Nareasuan Dam
Mae Ngod Dam
Kew Lom Dam
Yom & Nan Watershed Area
Kaewnoi Dam
แม่�น้ำ���สะแกกร�ง
Mae Yom Weir
LOGO
“ Add your company slogan ”
Nan
อ่��วัไทย
Chaophaya Dam
Ping RiverYom River
Naraesuan DamSirikit Dam
Utaradit
PhitsanulokPichitNakornsawan
Chaophaya River
Nan River
Kaewnoi Project 155166, rai ฝ�ยพญ�แม่น้ำ
ควั�ม่จ้� 9510, ล้��น้ำ ล้บ.ม่.
Kaewnoi Dam 769mcm
1600 ล้บ.ม่./วั
Chainat
Phitsanulok Irrigated Agri. Project 105000, Ha
Sirikit Dam
Namrid Project ;Q=25 MCM
Irrigation Area 36,360 rai
Namrid Project ;Q=25 MCM
Irrigation Area 36,360 rai Nareasuan
Project ;Q=63 MCMIrrigation Area
91,000 rai
Nareasuan Project ;Q=63 MCM
Irrigation Area 91,000 raiPrichumpol Project
;Q=133 MCMIrrigation Area
211,476 rai
Prichumpol Project ;Q=133 MCM
Irrigation Area 211,476 rai
Dongsettri Project ;Q=119
MCMIrrigation Area
186,000 rai
Dongsettri Project ;Q=119
MCMIrrigation Area
186,000 raiThabua
Project ;Q=107 MCM
Irrigation Area 168,540 rai
Thabua Project ;Q=107
MCMIrrigation Area
168,540 raiPumping
Station ;Q=302 MCM
Beneficial Area 360,430 rai
Pumping Station ;Q=302
MCMBeneficial Area
360,430 rai
Klong chaknam(Outside Irr.project ;Q= 178 MCMBeneficial Area 312,600
rai
Klong chaknam(Outside Irr.project ;Q= 178 MCMBeneficial Area 312,600
rai
C95 Length 2.360 km.
Irrigable area 2,695 rai Farmer 167
C95 Lateral
C95 IWUG
Leader
O&M Section Chief
Not enough water
Ditches poorly maintained
C95 Local Irrigation Research Team
observe
conflict
Seminar by
TRF on
Local Research Methodology
C95 Local Irrigation Research Team:
o Established a small research team (25 members).
o Assign facilitator (TRF, RID).
3 Major Problems:
o Irrigation water Management.
oRice production.
oFarmer debt.
water Management
Many farmers could not get enough water when they need it.
Tertiary canals were poorly maintained, It was not clear who actually operate water between ditches.
Tool for discussion:
Hand draw map.
Farm plots colors shading.
The working group has named itself as “Slow Train for Sustainable Development”
The methods of the project are the followings:
• Antecedent review
• Looking for the present situation
• Sorting out the demand, the problems, the causes of problems, and the solution
• Discussion and take note
• Interviewing by questionnaires
• Field surveying
• Participating in information
analysis
• Discussing in advantages, mistakes and solution
• Launching the local stage of discussion and taking turn to be leader of a stage
• Proceeding the improvement and operational solution in the area
Conclusion of the conflict among farmers:
o Intake structure sill was too high.
o Vegetation in canal block water flow.
o Some ditches are broken.
o Some ditches serves too large area.
How to improve the situation:
o Lower the intake sill.
o Clean lateral canal and ditch.
o Repair of broken ditch
and concrete lining.
How to improve the situation:
o Construct new intake.
o Assign person to operate check structure.
o Improve farm road along ditches.
o Establishment of Irrigation fund.
1. Building the research team which has a willingness to work for the community.
2. Learning the wisdom and knowledge components of local communities through participatory learning process. (hand draw maps/forum to discuss on data analysis, problems, cause and the way to solve the problems.)
3. Realizing problems on water usage for agriculture in the area of C 95 canal and understand others and public common interest.
4. Building process of leading to the changes of the community’s concept (learning to rely on themselves/engaged to propose their idea/ speak it out/find the way to solve the problems together.)
1. Owing to the local irrigation project, we have learned the ways of life of farmers in the irrigation area.
2. Insufficient knowledge and understanding on participation in community management.
3. Applied the local research process to the Farmers Participatory Irrigation to solve the problem.
4. The importance is to develop and strengthen water users’ group and RID staff on “Participatory Irrigation Management” in order to achieve the sustainable development.
5. Disseminating from place to place/generation to generation.