![Page 1: 2e Conférence Lean Construction France 10 mai 2016](https://reader031.vdocuments.pub/reader031/viewer/2022022412/58f194901a28ab852b8b45cf/html5/thumbnails/1.jpg)
CONFÉRENCE LEAN CONSTRUCTION FRANCE
Témoignages et
Tables Rondes
![Page 2: 2e Conférence Lean Construction France 10 mai 2016](https://reader031.vdocuments.pub/reader031/viewer/2022022412/58f194901a28ab852b8b45cf/html5/thumbnails/2.jpg)
BIENVENUE 2e Conférence Lean Construction
26/05/2016 LEAN CONSTRUCTION FRANCE 2
![Page 3: 2e Conférence Lean Construction France 10 mai 2016](https://reader031.vdocuments.pub/reader031/viewer/2022022412/58f194901a28ab852b8b45cf/html5/thumbnails/3.jpg)
BIENVENUE 2e Conférence Lean Construction
26/05/2016 LEAN CONSTRUCTION FRANCE 3
BIENVENUE A TOUS A LA 2e CONFERENCE
![Page 4: 2e Conférence Lean Construction France 10 mai 2016](https://reader031.vdocuments.pub/reader031/viewer/2022022412/58f194901a28ab852b8b45cf/html5/thumbnails/4.jpg)
PROGRAMME
26/05/2016 LEAN CONSTRUCTION FRANCE 4
09H20 : Introduction, Florian GAYRAUD
09H30 : Optimisation de la logistique interne du chantier, Alexis GROSSKOPF, BOUYGUES Rénovation
Privée
09H45 : Table Ronde : Préfabrication, kitting et logistique
10H15 : Retour d'un Maitre d'ouvrage sur un chantier de logement plus rapide, moins cher et de
meilleure qualité, Chris LEE, Pierre JANGOUX, JM Construction
10H45 : Le Last planner system pour piloter un grand projet hospitalier, Vincent LEGROS, BESIX
11H15 : PAUSE
11H30 : Campus des métiers design et habitat, Michel SAUZET, ENISE
12H00 : Pourquoi mettre en place une démarche Lean? Hervé SMADJA, ROUGNON
12H30 : TR: Conduite du changement, devenir une entreprise apprenante
![Page 5: 2e Conférence Lean Construction France 10 mai 2016](https://reader031.vdocuments.pub/reader031/viewer/2022022412/58f194901a28ab852b8b45cf/html5/thumbnails/5.jpg)
PROGRAMME
26/05/2016 LEAN CONSTRUCTION FRANCE 5
13H-14H : PAUSE REPAS
14H15 : Le Lean Construction dans le monde, Patrick DUPIN, DELTA PARTNERS
14H45 : Mise en place du lean en entreprise générale, Willy MOREL, NCN Bâtiment
15H15 : Quelles passerelles entre Lean et Prévention, Jean-François CANAL, OPPBTP
15H45 : TR: La sécurité du chantier avec le Lean, agir indirectement
16H15 : L'organisation autonome des équipes, Philippe BENQUET, ACORUS
17H15 - 18H : COCKTAIL DE CLÔTURE
![Page 6: 2e Conférence Lean Construction France 10 mai 2016](https://reader031.vdocuments.pub/reader031/viewer/2022022412/58f194901a28ab852b8b45cf/html5/thumbnails/6.jpg)
Règles du jeu 2e Conférence Lean Construction
26/05/2016 LEAN CONSTRUCTION FRANCE 6
• 15 à 20 minutes de présentation
• 5 à 10 minutes sont réservés pour les questions à la fin
des interventions
• Les questions sont bienvenues lors des tables rondes
![Page 7: 2e Conférence Lean Construction France 10 mai 2016](https://reader031.vdocuments.pub/reader031/viewer/2022022412/58f194901a28ab852b8b45cf/html5/thumbnails/7.jpg)
Introduction
2e Conférence Lean Construction France
Florian GAYRAUD
26/05/2016 LEAN CONSTRUCTION FRANCE 7
![Page 8: 2e Conférence Lean Construction France 10 mai 2016](https://reader031.vdocuments.pub/reader031/viewer/2022022412/58f194901a28ab852b8b45cf/html5/thumbnails/8.jpg)
Témoignages
Optimisation de la logistique interne du chantier
Alexis GROSSKOPF, Resp. Innovation BOUYGUES Construction
Rénovation Privée
26/05/2016 LEAN CONSTRUCTION FRANCE 8
![Page 9: 2e Conférence Lean Construction France 10 mai 2016](https://reader031.vdocuments.pub/reader031/viewer/2022022412/58f194901a28ab852b8b45cf/html5/thumbnails/9.jpg)
Table ronde
Préfabrication, kitting et logistique
Chris Lee, JM
Pierre Jangoux, JM
Alexis Grosskopf, BOUYGUES RP
Thibaut LANTHIEZ, Delta Partners
26/05/2016 LEAN CONSTRUCTION FRANCE 9
![Page 10: 2e Conférence Lean Construction France 10 mai 2016](https://reader031.vdocuments.pub/reader031/viewer/2022022412/58f194901a28ab852b8b45cf/html5/thumbnails/10.jpg)
Outils logistiques et ergonomiques
ERGOBATPrésentation des premiers outils développés:
établis à bacs et Lean X
Retrouvez les outils en accès libre
au 1er étage lors des pauses
26/05/2016 LEAN CONSTRUCTION FRANCE 10
![Page 11: 2e Conférence Lean Construction France 10 mai 2016](https://reader031.vdocuments.pub/reader031/viewer/2022022412/58f194901a28ab852b8b45cf/html5/thumbnails/11.jpg)
Témoignages
Changement vers le lean
Chris LEE & Pierre JANGOUX, Directeur Général & Chef de Production JM
Belgium / LDPS
26/05/2016 LEAN CONSTRUCTION FRANCE 11
![Page 13: 2e Conférence Lean Construction France 10 mai 2016](https://reader031.vdocuments.pub/reader031/viewer/2022022412/58f194901a28ab852b8b45cf/html5/thumbnails/13.jpg)
Préalables et pourquois – année 0
![Page 14: 2e Conférence Lean Construction France 10 mai 2016](https://reader031.vdocuments.pub/reader031/viewer/2022022412/58f194901a28ab852b8b45cf/html5/thumbnails/14.jpg)
« …Trois mois ? Mais euh à partir, euh, avec combien
de temps de retard? »
![Page 15: 2e Conférence Lean Construction France 10 mai 2016](https://reader031.vdocuments.pub/reader031/viewer/2022022412/58f194901a28ab852b8b45cf/html5/thumbnails/15.jpg)
Pourquoi l’image “grand public” des professionnels de la construction…
…ne correspond pas à la nôtre?
![Page 16: 2e Conférence Lean Construction France 10 mai 2016](https://reader031.vdocuments.pub/reader031/viewer/2022022412/58f194901a28ab852b8b45cf/html5/thumbnails/16.jpg)
![Page 17: 2e Conférence Lean Construction France 10 mai 2016](https://reader031.vdocuments.pub/reader031/viewer/2022022412/58f194901a28ab852b8b45cf/html5/thumbnails/17.jpg)
Pourquoi nous exigeons le “sans défaut” pour nous-mêmes…
…mais pas pour nos clients?
![Page 18: 2e Conférence Lean Construction France 10 mai 2016](https://reader031.vdocuments.pub/reader031/viewer/2022022412/58f194901a28ab852b8b45cf/html5/thumbnails/18.jpg)
Pourquoi un chantier moyen d’aujourd’hui ressemble à cette usine des années 30…
…et l’usine d’aujourd’hui à ceci?
![Page 19: 2e Conférence Lean Construction France 10 mai 2016](https://reader031.vdocuments.pub/reader031/viewer/2022022412/58f194901a28ab852b8b45cf/html5/thumbnails/19.jpg)
La bonne réponse c’est que nous avons loupé quelque chose…*
*…mais vous savez tous ça sinon vous ne seriez pas là aujourd’hui
![Page 20: 2e Conférence Lean Construction France 10 mai 2016](https://reader031.vdocuments.pub/reader031/viewer/2022022412/58f194901a28ab852b8b45cf/html5/thumbnails/20.jpg)
Contrairement aux idées reçus…
… nous pouvons proposer du mieux ET du plus vite ET du moins cher.
![Page 21: 2e Conférence Lean Construction France 10 mai 2016](https://reader031.vdocuments.pub/reader031/viewer/2022022412/58f194901a28ab852b8b45cf/html5/thumbnails/21.jpg)
Car nous l’avons fait…
…et continuons à le faire.
![Page 22: 2e Conférence Lean Construction France 10 mai 2016](https://reader031.vdocuments.pub/reader031/viewer/2022022412/58f194901a28ab852b8b45cf/html5/thumbnails/22.jpg)
Pratique – année 3
![Page 23: 2e Conférence Lean Construction France 10 mai 2016](https://reader031.vdocuments.pub/reader031/viewer/2022022412/58f194901a28ab852b8b45cf/html5/thumbnails/23.jpg)
Une décennie de projets chez JM Belgium
2ème Conférence Lean Construction – Paris 10 mai 2016 – Chris LEE & Pierre JANGOUX pour les sociétés LDPS sprl / JM Belgium SA,
![Page 24: 2e Conférence Lean Construction France 10 mai 2016](https://reader031.vdocuments.pub/reader031/viewer/2022022412/58f194901a28ab852b8b45cf/html5/thumbnails/24.jpg)
![Page 25: 2e Conférence Lean Construction France 10 mai 2016](https://reader031.vdocuments.pub/reader031/viewer/2022022412/58f194901a28ab852b8b45cf/html5/thumbnails/25.jpg)
Une nouvelle ère, le Quartier des Musiciens (Anderlecht - phase II):
![Page 26: 2e Conférence Lean Construction France 10 mai 2016](https://reader031.vdocuments.pub/reader031/viewer/2022022412/58f194901a28ab852b8b45cf/html5/thumbnails/26.jpg)
Le Quartier de Musiciens : Une friche industrielle assainie et réaffectée
![Page 27: 2e Conférence Lean Construction France 10 mai 2016](https://reader031.vdocuments.pub/reader031/viewer/2022022412/58f194901a28ab852b8b45cf/html5/thumbnails/27.jpg)
La méthodologie ‘Lean Construction’ et l’accompagnement par Patrick Dupin & Delta Partners
Une ère nouvelle : Quartier des Musiciens Phase II : notre laboratoire.
1. YSAYE : initiation 2. CHOPIN : déploiement3. VIVALDI : consolidation
Mise en place de la méthodologie LEAN
1
2
3
Phase II
Phase I
![Page 28: 2e Conférence Lean Construction France 10 mai 2016](https://reader031.vdocuments.pub/reader031/viewer/2022022412/58f194901a28ab852b8b45cf/html5/thumbnails/28.jpg)
1. Projet Ysaye 37 appartements livrés en mai2015 – initiation et prise en main à partir du 2nd œuvre.
Team buildingJeux de rôles
Mise en place des jalons Last Planner System
Mise en place des routines :Weekly Work PlanMake ReadyDaily Standup
5S sur chantier
![Page 29: 2e Conférence Lean Construction France 10 mai 2016](https://reader031.vdocuments.pub/reader031/viewer/2022022412/58f194901a28ab852b8b45cf/html5/thumbnails/29.jpg)
Il faut :- Maintenir le planning- Livrer à temps et sans remarque
La méthode empirique / essai jm001 : suivi planning & La tresse des livraisons
Début du travail collaboratif avec l’entreprise : l’accompagnement du planning –sessions de travail hebdomadaires
Pré-pré-réception (interne)
Pré-réception (avec client)
Réception provisoire et livraison (avec client)
Le temps de la RECHERCHE & du DEVELOPPEMENT
RESULTATS :
• 1ère Livraison le 8 avril 2015 (planifié août 2015)• 95% des appartements livrés sans réserves• 4 réserves au total (intra unités)
![Page 30: 2e Conférence Lean Construction France 10 mai 2016](https://reader031.vdocuments.pub/reader031/viewer/2022022412/58f194901a28ab852b8b45cf/html5/thumbnails/30.jpg)
RESULTATS 5S
Coexistence de projets livrés et en occupation et de chantiers.
![Page 31: 2e Conférence Lean Construction France 10 mai 2016](https://reader031.vdocuments.pub/reader031/viewer/2022022412/58f194901a28ab852b8b45cf/html5/thumbnails/31.jpg)
2. Projet Chopin 62 appartements déploiement complet de la démarche LEAN avec intégration de l’entreprise de Gros-œuvre
Fin des abords – livraison àpd juin 2016
![Page 32: 2e Conférence Lean Construction France 10 mai 2016](https://reader031.vdocuments.pub/reader031/viewer/2022022412/58f194901a28ab852b8b45cf/html5/thumbnails/32.jpg)
![Page 33: 2e Conférence Lean Construction France 10 mai 2016](https://reader031.vdocuments.pub/reader031/viewer/2022022412/58f194901a28ab852b8b45cf/html5/thumbnails/33.jpg)
![Page 34: 2e Conférence Lean Construction France 10 mai 2016](https://reader031.vdocuments.pub/reader031/viewer/2022022412/58f194901a28ab852b8b45cf/html5/thumbnails/34.jpg)
3. Projet VIVALDI 42 appartements consolidation de la démarche LEAN avec les entreprises partenaires et en amont des choses …
En cours 3ième étage GO – TS au sol – châssis sur 3 niveaux qui seront chapés avant juillet2016 – livraison mars2017
![Page 35: 2e Conférence Lean Construction France 10 mai 2016](https://reader031.vdocuments.pub/reader031/viewer/2022022412/58f194901a28ab852b8b45cf/html5/thumbnails/35.jpg)
![Page 36: 2e Conférence Lean Construction France 10 mai 2016](https://reader031.vdocuments.pub/reader031/viewer/2022022412/58f194901a28ab852b8b45cf/html5/thumbnails/36.jpg)
L’information
![Page 37: 2e Conférence Lean Construction France 10 mai 2016](https://reader031.vdocuments.pub/reader031/viewer/2022022412/58f194901a28ab852b8b45cf/html5/thumbnails/37.jpg)
![Page 38: 2e Conférence Lean Construction France 10 mai 2016](https://reader031.vdocuments.pub/reader031/viewer/2022022412/58f194901a28ab852b8b45cf/html5/thumbnails/38.jpg)
Enchaînement : 1 étage tampon
![Page 39: 2e Conférence Lean Construction France 10 mai 2016](https://reader031.vdocuments.pub/reader031/viewer/2022022412/58f194901a28ab852b8b45cf/html5/thumbnails/39.jpg)
Enchaînement : pose des menuiseries extérieures en 2 phases
![Page 40: 2e Conférence Lean Construction France 10 mai 2016](https://reader031.vdocuments.pub/reader031/viewer/2022022412/58f194901a28ab852b8b45cf/html5/thumbnails/40.jpg)
Écoute, respect, dialogue, gestion &
amélioration continue.
MERCI
Ceux qui font …
L’importance d’embarquer l’humain.
Ceux qui feront…
![Page 41: 2e Conférence Lean Construction France 10 mai 2016](https://reader031.vdocuments.pub/reader031/viewer/2022022412/58f194901a28ab852b8b45cf/html5/thumbnails/41.jpg)
Quelques lectures inspirantes …
A SUIVRE …
![Page 42: 2e Conférence Lean Construction France 10 mai 2016](https://reader031.vdocuments.pub/reader031/viewer/2022022412/58f194901a28ab852b8b45cf/html5/thumbnails/42.jpg)
Témoignages
Le Last Planner System™ pour piloter un important projet hospitalier
Vincent LEGROS, Directeur de Projet BESIX
26/05/2016 LEAN CONSTRUCTION FRANCE 42
![Page 43: 2e Conférence Lean Construction France 10 mai 2016](https://reader031.vdocuments.pub/reader031/viewer/2022022412/58f194901a28ab852b8b45cf/html5/thumbnails/43.jpg)
© BESIX 2016
Retour d’Expérience duLean Construction appliqué sur le chantier du Centre Hospitalier de
Melun comme vecteur de performance
« Regarder autrement
ce que l’on connaît
sur le bout des doigts »
![Page 44: 2e Conférence Lean Construction France 10 mai 2016](https://reader031.vdocuments.pub/reader031/viewer/2022022412/58f194901a28ab852b8b45cf/html5/thumbnails/44.jpg)
© BESIX 2016
Vincent LEGROS
Formation Architecte, Coordinateur sécurité, Préventionniste incendie Cours de Management des Grands Projets ULB
Expérience professionnelle 20 années d’expérience dans le bâtiment Dirigeant d’entreprise de construction Directeur de projets :
• LOIX : Construction de plusieurs immeubles résidentiels• BAM : Construction du nouveau siège de l’OTAN (Bruxelles)• BESIX : Construction du Centre Hospitalier et la Clinique de Melun (Paris)
Applique le Lean Construction depuis 2014
Formateur Coordinateur Sécurité Niveau A
![Page 45: 2e Conférence Lean Construction France 10 mai 2016](https://reader031.vdocuments.pub/reader031/viewer/2022022412/58f194901a28ab852b8b45cf/html5/thumbnails/45.jpg)
© BESIX 2016
Sécurité, qualité, productivité et délais sont liés:
10% du chiffre d’affaire passe en reprises qualité30% des heures sur chantier sont gaspillées
35% du délai chantier peut être réduit
En moyenne:
- un compagnon marche 20% de son temps (7-12km) par jour- Un chef de chantier est interrompu toutes les 6 minutes !
Le saviez-vous ?
![Page 46: 2e Conférence Lean Construction France 10 mai 2016](https://reader031.vdocuments.pub/reader031/viewer/2022022412/58f194901a28ab852b8b45cf/html5/thumbnails/46.jpg)
© BESIX 2016
Le Projet du Centre Hospitalier de Melun
Un hôpital (+ une Clinique)
A Melun ( 30 km Sud Est de Paris )
![Page 47: 2e Conférence Lean Construction France 10 mai 2016](https://reader031.vdocuments.pub/reader031/viewer/2022022412/58f194901a28ab852b8b45cf/html5/thumbnails/47.jpg)
© BESIX 2016
Février 2010 : remise de l’offre
Juin 2012 : notification du marché conception-réalisation
Juillet 2014 : installation de chantier, travaux de terrassement et de voierie.
Novembre 2014 : démarrage du Gros Œuvre
Décembre 2014 : arrêt de chantier suite à la découverte de problèmes géotechniques
Avrils 2015 : démarrage des pieux
Septembre 2015 : démarrage du LEAN
Novembre 2015 : démarrage des Corps d’Etat Secondaires
Avril 2016 : fin du Gros Œuvre du bâtiment principal
Juin 2016 : fin du Gros Œuvre du Pôle énergie
Février 2018 : fin du Projet
Quelques dates
![Page 48: 2e Conférence Lean Construction France 10 mai 2016](https://reader031.vdocuments.pub/reader031/viewer/2022022412/58f194901a28ab852b8b45cf/html5/thumbnails/48.jpg)
© BESIX 2016
Budget : 117 millions d’euros
510 lits
76.000 m³ de mouvements de terre sans évacuation.
26.000 m³ de béton
1.100 tonnes d’acier
19.000 m² de dallages
56.000 m² de surface exploitable (88% de prédalles)
32.000 m² de murs (50/50 de voiles et de prémurs)
810 colonnes
6,7 km de poutres préfabriquées
Quelques Chiffres
![Page 49: 2e Conférence Lean Construction France 10 mai 2016](https://reader031.vdocuments.pub/reader031/viewer/2022022412/58f194901a28ab852b8b45cf/html5/thumbnails/49.jpg)
© BESIX 2016
Gros œuvre : Préfabrication de poutres
Préfabrication des planchers
Préfabrication de murs
Corps d’état secondaires Préfabrication des nappes de chauffage
Préfabrication de la chaufferie
Préfabrication des salles de bain
Modes constructifs innovants
![Page 50: 2e Conférence Lean Construction France 10 mai 2016](https://reader031.vdocuments.pub/reader031/viewer/2022022412/58f194901a28ab852b8b45cf/html5/thumbnails/50.jpg)
© BESIX 2016
Gros œuvre : Préfabrication de poutres
Préfabrication des planchers
Préfabrication de murs
Corps d’état secondaires Préfabrication des nappes de chauffage
Préfabrication de la chaufferie
Préfabrication des salles de bain…
Modes constructifs innovants
![Page 51: 2e Conférence Lean Construction France 10 mai 2016](https://reader031.vdocuments.pub/reader031/viewer/2022022412/58f194901a28ab852b8b45cf/html5/thumbnails/51.jpg)
© BESIX 2016
Gros œuvre : Préfabrication de poutres
Préfabrication des planchers
Préfabrication de murs
Corps d’état secondaires Préfabrication des nappes de chauffage
Préfabrication de la chaufferie
Préfabrication des salles de bain…
Modes constructifs innovants
![Page 52: 2e Conférence Lean Construction France 10 mai 2016](https://reader031.vdocuments.pub/reader031/viewer/2022022412/58f194901a28ab852b8b45cf/html5/thumbnails/52.jpg)
© BESIX 2016
Gros œuvre : Préfabrication de poutres
Préfabrication des planchers
Préfabrication de murs
Corps d’état secondaires Préfabrication des nappes de chauffage
Préfabrication de la chaufferie
Préfabrication des salles de bain…
Modes constructifs innovants
![Page 53: 2e Conférence Lean Construction France 10 mai 2016](https://reader031.vdocuments.pub/reader031/viewer/2022022412/58f194901a28ab852b8b45cf/html5/thumbnails/53.jpg)
© BESIX 2016
Gros œuvre : Préfabrication de poutres
Préfabrication des planchers
Préfabrication de murs
Corps d’état secondaires Préfabrication des nappes de chauffage
Préfabrication de la chaufferie
Préfabrication des salles de bain…
Modes constructifs innovants
![Page 54: 2e Conférence Lean Construction France 10 mai 2016](https://reader031.vdocuments.pub/reader031/viewer/2022022412/58f194901a28ab852b8b45cf/html5/thumbnails/54.jpg)
© BESIX 2016
Modes constructifs innovants
![Page 55: 2e Conférence Lean Construction France 10 mai 2016](https://reader031.vdocuments.pub/reader031/viewer/2022022412/58f194901a28ab852b8b45cf/html5/thumbnails/55.jpg)
© BESIX 2016
Modes constructifs innovants
![Page 56: 2e Conférence Lean Construction France 10 mai 2016](https://reader031.vdocuments.pub/reader031/viewer/2022022412/58f194901a28ab852b8b45cf/html5/thumbnails/56.jpg)
© BESIX 2016
COURBES DE PRODUCTION DU BETON
LEAN Last Planner System ®
• Master Planning• Make Ready• Weekly Work Progress
5S Management Visuel
TODOist (système KABAN)
Les outils utilisés COURBES LEAN TODOist
![Page 57: 2e Conférence Lean Construction France 10 mai 2016](https://reader031.vdocuments.pub/reader031/viewer/2022022412/58f194901a28ab852b8b45cf/html5/thumbnails/57.jpg)
© BESIX 2016
Les outils utilisés COURBES LEAN TODOist
![Page 58: 2e Conférence Lean Construction France 10 mai 2016](https://reader031.vdocuments.pub/reader031/viewer/2022022412/58f194901a28ab852b8b45cf/html5/thumbnails/58.jpg)
© BESIX 2016
0
86
714
904
1 25
8 1 34
6
1 34
6
1 34
6
1 34
6
1 78
9
1 98
8
2 64
9
2 26
8
2 26
8
2 52
02
345
2 34
5
1 83
8
2 11
0 2 20
4
1 81
1
1 60
7
1 76
6
1 38
2
1 17
6
1 53
6
1 23
9 1 33
3
911
570
354 38
9
389
389
389
389
105
468
426
363
363 41
8 455
455
91
0 0 0 0 0 0 00 0 0 0
724
1 43
7
1 06
6
1 41
8
820
809
615
1 35
7
1 40
0
2 35
12
509
1 33
0
1 91
4
2 45
4
2 46
6
1 33
5
1 30
4
2 28
2
1 60
7
2 16
1
1 90
9
551
819 85
1
700
2 40
6
967
850
1 64
4
1 11
0
1 95
2
2 14
7
1 72
6
545
160
500
416
50025 (M2)51445 (M2)
50612 (M2)
0
10 000
20 000
30 000
40 000
50 000
60 000
0
500
1000
1500
2000
2500
3000
Se
m2
7
Se
m2
8
Se
m2
9
Se
m3
0
Se
m3
1
Se
m3
2
Se
m3
3
Se
m3
4
Se
m3
5
Se
m3
6
Se
m3
7
Se
m3
8
Se
m3
9
Se
m4
0
Se
m4
1
Se
m4
2
Se
m4
3
Se
m4
4
Se
m4
5
Se
m4
6
Se
m4
7
Se
m4
8
Se
m4
9
Se
m5
0
Se
m5
1
Se
m5
2
Se
m 1
Se
m 2
Se
m 3
Se
m 4
Se
m 5
Se
m 6
Se
m 7
Se
m 8
Se
m 9
Se
m 1
0
Se
m 1
1
Se
m 1
2
Se
m 1
3
Se
m 1
4
Se
m 1
5
Se
m 1
6
Se
m 1
7
Se
m 1
8
Se
m 1
9
Se
m 2
0
Se
m 2
1
Se
m 2
2
Se
m 2
3
Se
m 2
4
Se
m 2
5
Se
m 2
6
PREDALLES (M2)
Planning Semaine(m²) Réel Semaine(m²) Planning Cumulé(m²) Réel Cumulé(m²)
86
714
904
1 25
8
1 34
6
1 34
6
1 34
6
1 34
6
1 78
9
1 98
8
1 83
8
1 81
1
1 60
7
1 76
6
1 38
2
724
1 43
7
1 06
6
1 41
8
820
809
615
1 35
7 1 40
0
1 33
0
1 91
4
1 33
5
1 30
4
1 60
7
500
1000
1500
2000
Les outils utilisés COURBES LEAN TODOist
Suivi de la Production hebdomadaire: Prédalles
![Page 59: 2e Conférence Lean Construction France 10 mai 2016](https://reader031.vdocuments.pub/reader031/viewer/2022022412/58f194901a28ab852b8b45cf/html5/thumbnails/59.jpg)
© BESIX 2016
Faible activité à VA observée
G2
Les outils utilisés COURBES LEAN TODOist
![Page 60: 2e Conférence Lean Construction France 10 mai 2016](https://reader031.vdocuments.pub/reader031/viewer/2022022412/58f194901a28ab852b8b45cf/html5/thumbnails/60.jpg)
© BESIX 2016
Analyse des temps de grues
Les outils utilisés COURBES LEAN TODOist
Grue 2Grue 3
Grue 4 Grue 5
![Page 61: 2e Conférence Lean Construction France 10 mai 2016](https://reader031.vdocuments.pub/reader031/viewer/2022022412/58f194901a28ab852b8b45cf/html5/thumbnails/61.jpg)
© BESIX 2016
Les outils utilisés COURBES LEAN TODOist
Comment en est on arrivé là?
![Page 62: 2e Conférence Lean Construction France 10 mai 2016](https://reader031.vdocuments.pub/reader031/viewer/2022022412/58f194901a28ab852b8b45cf/html5/thumbnails/62.jpg)
© BESIX 2016
Les outils utilisés COURBES LEAN TODOist
Mise en place du LEAN
Last Planner System ®• Master Planning• Make Ready• Weekly Work Progress
5S Management Visuel
Une philosophie • Un état d’esprit, une façon de penser avec une volonté
d’amélioration permanente.• Un mode de management tourné vers le travail collaboratif.• L’idéal LEAN : fournir au client ce dont il ont besoin sans
gaspillage.
Plus que des outils….
![Page 63: 2e Conférence Lean Construction France 10 mai 2016](https://reader031.vdocuments.pub/reader031/viewer/2022022412/58f194901a28ab852b8b45cf/html5/thumbnails/63.jpg)
© BESIX 2016
Les outils utilisés COURBES LEAN TODOist
Last Planner® System
G2
G3
![Page 64: 2e Conférence Lean Construction France 10 mai 2016](https://reader031.vdocuments.pub/reader031/viewer/2022022412/58f194901a28ab852b8b45cf/html5/thumbnails/64.jpg)
© BESIX 2016
0
86
714
904
1 25
8 1 34
6
1 34
6
1 34
6
1 34
6
1 78
9
1 98
8
2 64
9
2 26
8
2 26
8
2 52
02
345
2 34
5
1 83
8
2 11
0 2 20
4
1 81
1
1 60
7
1 76
6
1 38
2
1 17
6
1 53
6
1 23
9 1 33
3
911
570
354 38
9
389
389
389
389
105
468
426
363
363 41
8 455
455
91
0 0 0 0 0 0 00 0 0 0
724
1 43
7
1 06
6
1 41
8
820
809
615
1 35
7
1 40
0
2 35
12
509
1 33
0
1 91
4
2 45
4
2 46
6
1 33
5
1 30
4
2 28
2
1 60
7
2 16
1
1 90
9
551
819 851
700
2 40
6
967
850
1 64
4
1 11
0
1 95
2
2 14
7
1 72
6
545
160
500
416
50025 (M2)51445 (M2)
50612 (M2)
0
10 000
20 000
30 000
40 000
50 000
60 000
0
500
1000
1500
2000
2500
3000
Se
m2
7
Se
m2
8
Se
m2
9
Se
m3
0
Se
m3
1
Se
m3
2
Se
m3
3
Se
m3
4
Se
m3
5
Se
m3
6
Se
m3
7
Se
m3
8
Se
m3
9
Se
m4
0
Se
m4
1
Se
m4
2
Se
m4
3
Se
m4
4
Se
m4
5
Se
m4
6
Se
m4
7
Se
m4
8
Se
m4
9
Se
m5
0
Se
m5
1
Se
m5
2
Se
m 1
Se
m 2
Se
m 3
Se
m 4
Se
m 5
Se
m 6
Se
m 7
Se
m 8
Se
m 9
Se
m 1
0
Se
m 1
1
Se
m 1
2
Se
m 1
3
Se
m 1
4
Se
m 1
5
Se
m 1
6
Se
m 1
7
Se
m 1
8
Se
m 1
9
Se
m 2
0
Se
m 2
1
Se
m 2
2
Se
m 2
3
Se
m 2
4
Se
m 2
5
Se
m 2
6
PREDALLES (M2)
Planning Semaine(m²) Réel Semaine(m²) Planning Cumulé(m²) Réel Cumulé(m²)
Les outils utilisés COURBES LEAN TODOist
![Page 65: 2e Conférence Lean Construction France 10 mai 2016](https://reader031.vdocuments.pub/reader031/viewer/2022022412/58f194901a28ab852b8b45cf/html5/thumbnails/65.jpg)
© BESIX 2016
Les outils utilisés COURBES LEAN TODOist
Last Planner® System
![Page 66: 2e Conférence Lean Construction France 10 mai 2016](https://reader031.vdocuments.pub/reader031/viewer/2022022412/58f194901a28ab852b8b45cf/html5/thumbnails/66.jpg)
© BESIX 2016
Les outils utilisés COURBES LEAN TODOist
Last Planner® System
PARETO
80% des problèmes proviennent de 20% des causes racines
![Page 67: 2e Conférence Lean Construction France 10 mai 2016](https://reader031.vdocuments.pub/reader031/viewer/2022022412/58f194901a28ab852b8b45cf/html5/thumbnails/67.jpg)
© BESIX 2016
Les outils utilisés COURBES LEAN TODOist
Last Planner® System
Adaptation de l’outil à la situation actuelle
![Page 68: 2e Conférence Lean Construction France 10 mai 2016](https://reader031.vdocuments.pub/reader031/viewer/2022022412/58f194901a28ab852b8b45cf/html5/thumbnails/68.jpg)
© BESIX 2016
Les outils utilisés COURBES LEAN TODOist
Last Planner® System
Adaptation de l’outil à la situation actuelle
![Page 69: 2e Conférence Lean Construction France 10 mai 2016](https://reader031.vdocuments.pub/reader031/viewer/2022022412/58f194901a28ab852b8b45cf/html5/thumbnails/69.jpg)
© BESIX 2016
Les outils utilisés COURBES LEAN TODOist
Mise en place du “5S” (ERNEST)
Créer des conditions de travail propices à la performance
![Page 70: 2e Conférence Lean Construction France 10 mai 2016](https://reader031.vdocuments.pub/reader031/viewer/2022022412/58f194901a28ab852b8b45cf/html5/thumbnails/70.jpg)
© BESIX 2016
Les outils utilisés COURBES LEAN TODOist
Mise en place du “5S” (ERNEST)
![Page 71: 2e Conférence Lean Construction France 10 mai 2016](https://reader031.vdocuments.pub/reader031/viewer/2022022412/58f194901a28ab852b8b45cf/html5/thumbnails/71.jpg)
© BESIX 2016
Les outils utilisés COURBES LEAN TODOist
Mise en place du “5S” (ERNEST)
AVANT
APRES
![Page 72: 2e Conférence Lean Construction France 10 mai 2016](https://reader031.vdocuments.pub/reader031/viewer/2022022412/58f194901a28ab852b8b45cf/html5/thumbnails/72.jpg)
© BESIX 2016
Les outils utilisés COURBES LEAN TODOist
Management Visuel
![Page 73: 2e Conférence Lean Construction France 10 mai 2016](https://reader031.vdocuments.pub/reader031/viewer/2022022412/58f194901a28ab852b8b45cf/html5/thumbnails/73.jpg)
© BESIX 2016
Les outils utilisés COURBES LEAN TODOist
Management Visuel
![Page 74: 2e Conférence Lean Construction France 10 mai 2016](https://reader031.vdocuments.pub/reader031/viewer/2022022412/58f194901a28ab852b8b45cf/html5/thumbnails/74.jpg)
© BESIX 2016
Les outils utilisés COURBES LEAN TODOist
TODOist ®
…faire les choses différemment pour avoir un résultat différent
![Page 75: 2e Conférence Lean Construction France 10 mai 2016](https://reader031.vdocuments.pub/reader031/viewer/2022022412/58f194901a28ab852b8b45cf/html5/thumbnails/75.jpg)
© BESIX 2016
L’application du LEAN pour les CES
OBJECTIFS:
1. Mettre le bâtiment à disposition à temps pour les CEA/CET
2. Terminer le chantier dans les délais.
3. Respecter les couts de construction.
4. Augmenter le niveau de qualité et de sécurité.
![Page 76: 2e Conférence Lean Construction France 10 mai 2016](https://reader031.vdocuments.pub/reader031/viewer/2022022412/58f194901a28ab852b8b45cf/html5/thumbnails/76.jpg)
© BESIX 2016
L’application du LEAN pour les CES
Mise à disposition d’un salle de reunion
dediée au LEAN : La “COCKPIT ROOM”
![Page 77: 2e Conférence Lean Construction France 10 mai 2016](https://reader031.vdocuments.pub/reader031/viewer/2022022412/58f194901a28ab852b8b45cf/html5/thumbnails/77.jpg)
© BESIX 2016
L’application du LEAN pour les CES
Micro-zoning
![Page 78: 2e Conférence Lean Construction France 10 mai 2016](https://reader031.vdocuments.pub/reader031/viewer/2022022412/58f194901a28ab852b8b45cf/html5/thumbnails/78.jpg)
© BESIX 2016
L’application du LEAN pour les CES
Micro-zoning
1 entreprise principale par zone
Stockage tampon localisé
Optimisation de l’espace chantier
![Page 79: 2e Conférence Lean Construction France 10 mai 2016](https://reader031.vdocuments.pub/reader031/viewer/2022022412/58f194901a28ab852b8b45cf/html5/thumbnails/79.jpg)
© BESIX 2016
L’application du LEAN pour les CES
Analyse du flux des travaux
![Page 80: 2e Conférence Lean Construction France 10 mai 2016](https://reader031.vdocuments.pub/reader031/viewer/2022022412/58f194901a28ab852b8b45cf/html5/thumbnails/80.jpg)
© BESIX 2016
L’application du LEAN pour les CES
LPS - Planification Collaborative
![Page 81: 2e Conférence Lean Construction France 10 mai 2016](https://reader031.vdocuments.pub/reader031/viewer/2022022412/58f194901a28ab852b8b45cf/html5/thumbnails/81.jpg)
© BESIX 2016
L’application du LEAN pour les CES
LPS - Planification Collaborative
![Page 82: 2e Conférence Lean Construction France 10 mai 2016](https://reader031.vdocuments.pub/reader031/viewer/2022022412/58f194901a28ab852b8b45cf/html5/thumbnails/82.jpg)
© BESIX 2016
L’application du LEAN pour les CES
LPS - Planification Collaborative
![Page 83: 2e Conférence Lean Construction France 10 mai 2016](https://reader031.vdocuments.pub/reader031/viewer/2022022412/58f194901a28ab852b8b45cf/html5/thumbnails/83.jpg)
© BESIX 2016
L’application du LEAN pour les CES
LPS - Make Ready
![Page 84: 2e Conférence Lean Construction France 10 mai 2016](https://reader031.vdocuments.pub/reader031/viewer/2022022412/58f194901a28ab852b8b45cf/html5/thumbnails/84.jpg)
© BESIX 2016
L’application du LEAN pour les CES
LPS - Weekly Work Plan
![Page 85: 2e Conférence Lean Construction France 10 mai 2016](https://reader031.vdocuments.pub/reader031/viewer/2022022412/58f194901a28ab852b8b45cf/html5/thumbnails/85.jpg)
© BESIX 2016
L’application du LEAN pour les CES
LPS - Weekly Work Plan
![Page 86: 2e Conférence Lean Construction France 10 mai 2016](https://reader031.vdocuments.pub/reader031/viewer/2022022412/58f194901a28ab852b8b45cf/html5/thumbnails/86.jpg)
© BESIX 2016
L’application du LEAN pour les CES
LPS - Weekly Work Plan
![Page 87: 2e Conférence Lean Construction France 10 mai 2016](https://reader031.vdocuments.pub/reader031/viewer/2022022412/58f194901a28ab852b8b45cf/html5/thumbnails/87.jpg)
© BESIX 2016
L’application du LEAN pour les CES
LPS - Weekly Work Plan
![Page 88: 2e Conférence Lean Construction France 10 mai 2016](https://reader031.vdocuments.pub/reader031/viewer/2022022412/58f194901a28ab852b8b45cf/html5/thumbnails/88.jpg)
© BESIX 2016
L’application du LEAN pour les CES
LPS - Weekly Work Plan
Taux de respect des engagements (WWP)
![Page 89: 2e Conférence Lean Construction France 10 mai 2016](https://reader031.vdocuments.pub/reader031/viewer/2022022412/58f194901a28ab852b8b45cf/html5/thumbnails/89.jpg)
© BESIX 2016
L’application du LEAN pour les CES
LPS – Planifaction collaborative & Courbes
![Page 90: 2e Conférence Lean Construction France 10 mai 2016](https://reader031.vdocuments.pub/reader031/viewer/2022022412/58f194901a28ab852b8b45cf/html5/thumbnails/90.jpg)
© BESIX 2016
L’application du LEAN pour les CES
Avancement en images après
trois mois de travaux et 15 zones
ouvertes sur un total de 43
![Page 91: 2e Conférence Lean Construction France 10 mai 2016](https://reader031.vdocuments.pub/reader031/viewer/2022022412/58f194901a28ab852b8b45cf/html5/thumbnails/91.jpg)
© BESIX 2016
L’application du LEAN pour les CES
![Page 92: 2e Conférence Lean Construction France 10 mai 2016](https://reader031.vdocuments.pub/reader031/viewer/2022022412/58f194901a28ab852b8b45cf/html5/thumbnails/92.jpg)
© BESIX 2016
Next Step : clinique
Méthodes prises en charge par BESIX
Engagements des entreprises (article du contrat)
Mise en application du LPS® dés les études d’exécution
• Make ready pour la passation des contrats
• WWP pour le respect de nos propres engagements
• …
Utilisation du Todoist®
Gestion contractuelle avec le représentant du client
• Utilisation du SDMS
• Utilisation du LEAN
• Formation de l’OPC
![Page 93: 2e Conférence Lean Construction France 10 mai 2016](https://reader031.vdocuments.pub/reader031/viewer/2022022412/58f194901a28ab852b8b45cf/html5/thumbnails/93.jpg)
© BESIX 2016
Objectif futur: Comment chiffrer le gain
![Page 94: 2e Conférence Lean Construction France 10 mai 2016](https://reader031.vdocuments.pub/reader031/viewer/2022022412/58f194901a28ab852b8b45cf/html5/thumbnails/94.jpg)
© BESIX 2016
Pistes d’améliorations
Utilisation du Lean par tout les acteurs dès les études
(Architecte, Ingénieur, BET, Entreprises,…)
Utilisation BIM et modélisation en 8D
Optimisation de la préfabrication du Gros Œuvre et
utilisation d’une main d’œuvre plus qualifiée
Préfabrication et supportage commun des réseaux
(Aéraulique, électrique et plomberie)
Préfabrication des cloisons intérieurs
Préfabrication des façades extérieurs
![Page 95: 2e Conférence Lean Construction France 10 mai 2016](https://reader031.vdocuments.pub/reader031/viewer/2022022412/58f194901a28ab852b8b45cf/html5/thumbnails/95.jpg)
Témoignages
Campus des métiers design et habitat
Michel SAUZET, Directeur relations entreprises et de la
communication ENISE
26/05/2016 LEAN CONSTRUCTION FRANCE 95
![Page 96: 2e Conférence Lean Construction France 10 mai 2016](https://reader031.vdocuments.pub/reader031/viewer/2022022412/58f194901a28ab852b8b45cf/html5/thumbnails/96.jpg)
Conférence Lean-Construction
10-05-2016
Campus des métiers
« design et habitat »
![Page 97: 2e Conférence Lean Construction France 10 mai 2016](https://reader031.vdocuments.pub/reader031/viewer/2022022412/58f194901a28ab852b8b45cf/html5/thumbnails/97.jpg)
Partenaires
• Les partenaires industriels;• Les partenaires de formation : académie de LYON,
université de Saint Etienne, écoles d’ingénieurs, CFA et opérateurs de formation continue et/ou par alternance ; école d’architecture ; école d’art et de design.
• Les partenaires institutionnels : Rectorat, Conseil régional;
• Les syndicats professionnels et organismes professionnels associés ;
• Les métropoles partenaires .
![Page 98: 2e Conférence Lean Construction France 10 mai 2016](https://reader031.vdocuments.pub/reader031/viewer/2022022412/58f194901a28ab852b8b45cf/html5/thumbnails/98.jpg)
Objet du campus
• Thématiques
• Pédagogiques– Sécurisation de parcours
– Innovation pédagogique
– Partage de moyens
• Positionnement
NUMÉRIQUE DANS
L’HABITAT
CONSTRUCTION RÉHABILITATION
GESTIONANALYSE DES
USAGESDESIGN POUR
TOUS
Entreprises
Campus des métiersPôles de
compétitivité et Clusters
![Page 99: 2e Conférence Lean Construction France 10 mai 2016](https://reader031.vdocuments.pub/reader031/viewer/2022022412/58f194901a28ab852b8b45cf/html5/thumbnails/99.jpg)
Objet du campus
• Usager : Cité du Design,
• Urbanité : l’habitat dans son environnement,
• Numérique dans et pour l’habitat : la maison connectée et le BIM (Maquette Numérique 3D de Projet de Construction),
• Efficacité énergétique : principalement l’enveloppe du bâtiment.
Pas de compromis entre « l’équité d’accès aux parcours de formation» et la « notion d’excellence »
![Page 100: 2e Conférence Lean Construction France 10 mai 2016](https://reader031.vdocuments.pub/reader031/viewer/2022022412/58f194901a28ab852b8b45cf/html5/thumbnails/100.jpg)
Projets
• Innovations pédagogiques – partage de moyen : – BIM : concours BIM’SE
– Plateforme BIM - Lean-construction :
• Expérimentation (semaine Lean) en décembre 2016
• Formation des enseignants lean-construction
– PFE coachés
• Démonstrateurs –chantiers écoles – Rue Paul BERT
– La Richelandière
• Parcours sécurisés :– Bac pro – BTS (septembre 2014-mai 2016)
– BTS – INGE (novembre 2015-mai 2016)
– Apprentissage: livret électronique d’apprentissage (septembre 2015-)
• Amélioration du logement pour le Maintien à domicile
![Page 101: 2e Conférence Lean Construction France 10 mai 2016](https://reader031.vdocuments.pub/reader031/viewer/2022022412/58f194901a28ab852b8b45cf/html5/thumbnails/101.jpg)
Semaine LeanProjet visé
D’où on part
![Page 102: 2e Conférence Lean Construction France 10 mai 2016](https://reader031.vdocuments.pub/reader031/viewer/2022022412/58f194901a28ab852b8b45cf/html5/thumbnails/102.jpg)
Chacun son rôle
102
Montrer la différence entre un chantier « classique » et un chantier « lean »
![Page 103: 2e Conférence Lean Construction France 10 mai 2016](https://reader031.vdocuments.pub/reader031/viewer/2022022412/58f194901a28ab852b8b45cf/html5/thumbnails/103.jpg)
Pourquoi BIM-Lean
103
![Page 104: 2e Conférence Lean Construction France 10 mai 2016](https://reader031.vdocuments.pub/reader031/viewer/2022022412/58f194901a28ab852b8b45cf/html5/thumbnails/104.jpg)
Phase 1 : PROGRAMME
Phase 2 :PROJET
Phase 3 :REALISATION
Temps
Valeur acquiseDépenses cumulées
Dréelles
VacquiseDoptimisées
Gains possibles= 30%
Remise en question
du travail du maître
d’ouvrage
Remise en question du
travail du maître d’œuvre :
on cherche d’autres
solutions, des variantes
Reprise du travail fait par les
études de prix et les méthodes :
on cherche à travailler comme
on a l’habitude
Réserves : coûts de
non qualité
Maîtrise des processus
![Page 105: 2e Conférence Lean Construction France 10 mai 2016](https://reader031.vdocuments.pub/reader031/viewer/2022022412/58f194901a28ab852b8b45cf/html5/thumbnails/105.jpg)
État des lieux CNQ dans le bâtiment
Maîtrise des processus
![Page 106: 2e Conférence Lean Construction France 10 mai 2016](https://reader031.vdocuments.pub/reader031/viewer/2022022412/58f194901a28ab852b8b45cf/html5/thumbnails/106.jpg)
BIM-LeanMaîtrise des processus
Prise en compte
des usages en amont
Marché OS Réception
Etudes deConception
EtudesD’exécution
PréparationDe chantier
Production ExploitationMaintenance
Offre dePrix
Propre ST GO CES
RéalisationConception Exploitation
Programme
Maître d’ouvrage
Architectes BET EntreprisesBET
d’exécution Entreprises Entreprises
Normes en vigueur
DCE DCENormes OrchestraPlans
d’exécutionDIUO
: Lean-construction
![Page 107: 2e Conférence Lean Construction France 10 mai 2016](https://reader031.vdocuments.pub/reader031/viewer/2022022412/58f194901a28ab852b8b45cf/html5/thumbnails/107.jpg)
BIM-LeanMaîtrise des processus
Prise en compte
des usages en amont
Marché OS Réception
Etudes deConception
EtudesD’exécution
PréparationDe chantier
Production ExploitationMaintenance
Offre dePrix
Propre ST GO CES
RéalisationConception Exploitation
Programme
Maître d’ouvrage
Architectes BET EntreprisesBET
d’exécution Entreprises Entreprises
Normes en vigueur
DCE DCENormes OrchestraPlans
d’exécutionDIUO
: Lean-construction
Efficience des processusDémarche d’améliorationIndicateurs de performance
![Page 108: 2e Conférence Lean Construction France 10 mai 2016](https://reader031.vdocuments.pub/reader031/viewer/2022022412/58f194901a28ab852b8b45cf/html5/thumbnails/108.jpg)
BIM-LeanMaîtrise des processus
Prise en compte
des usages en amont
Marché OS Réception
Etudes deConception
EtudesD’exécution
PréparationDe chantier
Production ExploitationMaintenance
Offre dePrix
Propre ST GO CES
RéalisationConception Exploitation
Programme
Maître d’ouvrage
Architectes BET EntreprisesBET
d’exécution Entreprises Entreprises
Normes en vigueur
DCE DCENormes OrchestraPlans
d’exécutionDIUO
:
Maquette numérique de projet
Lean-construction
Efficience du processusDémarche d’améliorationIndicateurs de performance
Optimiser les échanges d’informations
![Page 109: 2e Conférence Lean Construction France 10 mai 2016](https://reader031.vdocuments.pub/reader031/viewer/2022022412/58f194901a28ab852b8b45cf/html5/thumbnails/109.jpg)
Système d’information109
Tableurs, Courbes,Notes, Rapports,
Plans, Vidéos3D, …
Thermique
Structure
CETMéthodes,Planning,Sécurité
Synthèse
Suivi deChantier
Métrés &Etudes de prix
Architecture MNP
Facility management
Communication compagnons
Programmation
Documentation
![Page 110: 2e Conférence Lean Construction France 10 mai 2016](https://reader031.vdocuments.pub/reader031/viewer/2022022412/58f194901a28ab852b8b45cf/html5/thumbnails/110.jpg)
Conclusion
• BIM et lean :
– des objectifs communs
• BIM au service de l’approche processus - projet
Sécurité / pénibilité
qualité
Délais-réactivité
coûts
![Page 111: 2e Conférence Lean Construction France 10 mai 2016](https://reader031.vdocuments.pub/reader031/viewer/2022022412/58f194901a28ab852b8b45cf/html5/thumbnails/111.jpg)
Réflexion Manufacturing Excellence opérationnelle
► Cartographie des processus► Indicateurs de mesures
► Démarche de progrès PDCA
Lean construction
VA – NVA► Valeur ajoutée
► NVA : le client de souhaite pas la payer
7 sources de gaspillage 5S
Définition
du
programme
Conception
Du
projet
Réponse
À Appel
d’offre
Préparation
méthodes
Réalisation
Achats Gestion
RH
Pilotage
Stratégie
Politiques
RV - RA
![Page 112: 2e Conférence Lean Construction France 10 mai 2016](https://reader031.vdocuments.pub/reader031/viewer/2022022412/58f194901a28ab852b8b45cf/html5/thumbnails/112.jpg)
Sortir des Paradigmes du BTP
L’entreprise du BTP produit des prototypes, ► Ce qui rend complétement caduque les transferts d’outils
d’amélioration provenant de l’industrie.
Résoudre l’équation impossible ► Pression sur les prix de vente à qualité supérieure
► Augmentation de la Marge
► Amélioration du bien être dans l’entreprise (+ développement des
partenaires ST)
![Page 113: 2e Conférence Lean Construction France 10 mai 2016](https://reader031.vdocuments.pub/reader031/viewer/2022022412/58f194901a28ab852b8b45cf/html5/thumbnails/113.jpg)
Témoignages
Pourquoi mettre en place une démarche Lean?
Hervé SMADJA, Gérant ROUGNON
26/05/2016 LEAN CONSTRUCTION FRANCE 113
![Page 114: 2e Conférence Lean Construction France 10 mai 2016](https://reader031.vdocuments.pub/reader031/viewer/2022022412/58f194901a28ab852b8b45cf/html5/thumbnails/114.jpg)
Table ronde
Conduite du changement, devenir une « entreprise apprenante »
Pierre Jangoux, JM
Hervé Smadja, Rougnon
Philippe Benquet, Acorus
26/05/2016 LEAN CONSTRUCTION FRANCE 114
![Page 115: 2e Conférence Lean Construction France 10 mai 2016](https://reader031.vdocuments.pub/reader031/viewer/2022022412/58f194901a28ab852b8b45cf/html5/thumbnails/115.jpg)
Outils Lean
Rappels Lean Construction
Patrick DUPIN
26/05/2016 LEAN CONSTRUCTION FRANCE 115
![Page 116: 2e Conférence Lean Construction France 10 mai 2016](https://reader031.vdocuments.pub/reader031/viewer/2022022412/58f194901a28ab852b8b45cf/html5/thumbnails/116.jpg)
© Delta Partners 2015
Lean Gros Oeuvre
DEMARCHES LEAN CONSTRUCTION
![Page 117: 2e Conférence Lean Construction France 10 mai 2016](https://reader031.vdocuments.pub/reader031/viewer/2022022412/58f194901a28ab852b8b45cf/html5/thumbnails/117.jpg)
© Delta Partners 2015
OUTILS
ERGONOMIQUES
Réduire les distances, les efforts, les risques, les pertes.
![Page 118: 2e Conférence Lean Construction France 10 mai 2016](https://reader031.vdocuments.pub/reader031/viewer/2022022412/58f194901a28ab852b8b45cf/html5/thumbnails/118.jpg)
© Delta Partners 2015
Des résultats visibles
AVANT
APRES
![Page 119: 2e Conférence Lean Construction France 10 mai 2016](https://reader031.vdocuments.pub/reader031/viewer/2022022412/58f194901a28ab852b8b45cf/html5/thumbnails/119.jpg)
© Delta Partners 2015
Implication de tous
IMPLICATION
OUVRIERS
CTX
![Page 120: 2e Conférence Lean Construction France 10 mai 2016](https://reader031.vdocuments.pub/reader031/viewer/2022022412/58f194901a28ab852b8b45cf/html5/thumbnails/120.jpg)
© Delta Partners 2015
Lean TCEEntrepreneur Général
DEMARCHES LEAN CONSTRUCTION
![Page 121: 2e Conférence Lean Construction France 10 mai 2016](https://reader031.vdocuments.pub/reader031/viewer/2022022412/58f194901a28ab852b8b45cf/html5/thumbnails/121.jpg)
© Delta Partners 2015
LAST PLANER®
SYSTEM
![Page 122: 2e Conférence Lean Construction France 10 mai 2016](https://reader031.vdocuments.pub/reader031/viewer/2022022412/58f194901a28ab852b8b45cf/html5/thumbnails/122.jpg)
© Delta Partners 2015
12
2
![Page 123: 2e Conférence Lean Construction France 10 mai 2016](https://reader031.vdocuments.pub/reader031/viewer/2022022412/58f194901a28ab852b8b45cf/html5/thumbnails/123.jpg)
© Delta Partners 2015
![Page 124: 2e Conférence Lean Construction France 10 mai 2016](https://reader031.vdocuments.pub/reader031/viewer/2022022412/58f194901a28ab852b8b45cf/html5/thumbnails/124.jpg)
© Delta Partners 2015
![Page 125: 2e Conférence Lean Construction France 10 mai 2016](https://reader031.vdocuments.pub/reader031/viewer/2022022412/58f194901a28ab852b8b45cf/html5/thumbnails/125.jpg)
© Delta Partners 2015
![Page 126: 2e Conférence Lean Construction France 10 mai 2016](https://reader031.vdocuments.pub/reader031/viewer/2022022412/58f194901a28ab852b8b45cf/html5/thumbnails/126.jpg)
© Delta Partners 2015
COLLEGE MONTREUIL 17068
PPC 83% 34Je Ve Sa Sa Lu Ma Me
10/4 11/4 12/4 13/4 14/4 15/4 16/4
x x x x x xx x x x x xx x x x x
x x xx x x
x xx x
X
x
X X X X X
X X XX X X X Xx Xx x
X X
X X
X X Xx x xX X X
X X Xx x x x
Chantier:
Anticipation 15 jours
ENTREPRISE Activité de la semainePromesse
Tenue ?Raison(s)
1 GRT suite ventil R+2 (Fin) 1
1 BTB Début VDI CFA R+1 Circulations
1 GRT Pb Test R+2 1
1 CARI MENpose tablettes, lisses protections,
plinthes Zone 1.11
1 BTBDébut distri cloisons salles de classes
R+31 PANS EN COURS DE VALIDATION
1 BTB R+2 distribution circulations (FIN)
1 GRT Fin calorifugeage R+1 1
1 OLI Ragréage de sol R+1 A PARTIR DE VENDREDI APRES MIDI
1 TT DEBARRASSER R+1 (Stockage, outils…)
1 GRT Fin ventilation R+3 1
1 GRT Plomberie Cuisine (Plénum)
0
FAY GRT Point sur Test GRT R+1 11
1 GRT CVC Cuisine (Plénum) 0
1 GRT Pb Test R+1 1 Toujours en test suite à demande de Marc
126
![Page 127: 2e Conférence Lean Construction France 10 mai 2016](https://reader031.vdocuments.pub/reader031/viewer/2022022412/58f194901a28ab852b8b45cf/html5/thumbnails/127.jpg)
© Delta Partners 2015
MICRO ZONING
![Page 128: 2e Conférence Lean Construction France 10 mai 2016](https://reader031.vdocuments.pub/reader031/viewer/2022022412/58f194901a28ab852b8b45cf/html5/thumbnails/128.jpg)
© Delta Partners 2015
128
![Page 129: 2e Conférence Lean Construction France 10 mai 2016](https://reader031.vdocuments.pub/reader031/viewer/2022022412/58f194901a28ab852b8b45cf/html5/thumbnails/129.jpg)
© Delta Partners 2015
129
![Page 130: 2e Conférence Lean Construction France 10 mai 2016](https://reader031.vdocuments.pub/reader031/viewer/2022022412/58f194901a28ab852b8b45cf/html5/thumbnails/130.jpg)
© Delta Partners 2015
Séance Weekly Work Plan
![Page 131: 2e Conférence Lean Construction France 10 mai 2016](https://reader031.vdocuments.pub/reader031/viewer/2022022412/58f194901a28ab852b8b45cf/html5/thumbnails/131.jpg)
© Delta Partners 2015
13
1
Menuiseries
extérieures
Etage tampon
Gros Œuvre en
cours
Stockage limité
Accès
unique
![Page 132: 2e Conférence Lean Construction France 10 mai 2016](https://reader031.vdocuments.pub/reader031/viewer/2022022412/58f194901a28ab852b8b45cf/html5/thumbnails/132.jpg)
© Delta Partners 2015
Lean CETTechniques Spéciales
DEMARCHES LEAN CONSTRUCTION
![Page 133: 2e Conférence Lean Construction France 10 mai 2016](https://reader031.vdocuments.pub/reader031/viewer/2022022412/58f194901a28ab852b8b45cf/html5/thumbnails/133.jpg)
© Delta Partners 2015
ERGONOMIE &
PREFABRICATION
Réduire les distances, les efforts, les risques, les pertes.
![Page 134: 2e Conférence Lean Construction France 10 mai 2016](https://reader031.vdocuments.pub/reader031/viewer/2022022412/58f194901a28ab852b8b45cf/html5/thumbnails/134.jpg)
© Delta Partners 2015
![Page 135: 2e Conférence Lean Construction France 10 mai 2016](https://reader031.vdocuments.pub/reader031/viewer/2022022412/58f194901a28ab852b8b45cf/html5/thumbnails/135.jpg)
© Delta Partners 2015
![Page 136: 2e Conférence Lean Construction France 10 mai 2016](https://reader031.vdocuments.pub/reader031/viewer/2022022412/58f194901a28ab852b8b45cf/html5/thumbnails/136.jpg)
© Delta Partners 2015
Pré-assemblage des colliers et tiges
![Page 137: 2e Conférence Lean Construction France 10 mai 2016](https://reader031.vdocuments.pub/reader031/viewer/2022022412/58f194901a28ab852b8b45cf/html5/thumbnails/137.jpg)
© Delta Partners 2015 ©P
roj
exi
Flux tiré d’équipements
![Page 138: 2e Conférence Lean Construction France 10 mai 2016](https://reader031.vdocuments.pub/reader031/viewer/2022022412/58f194901a28ab852b8b45cf/html5/thumbnails/138.jpg)
© Delta Partners 2015
![Page 139: 2e Conférence Lean Construction France 10 mai 2016](https://reader031.vdocuments.pub/reader031/viewer/2022022412/58f194901a28ab852b8b45cf/html5/thumbnails/139.jpg)
© Delta Partners 2015
Pré-découpage et connectique pour câblage rapide
Déroulage facilité et potentiel disparition diminué
![Page 140: 2e Conférence Lean Construction France 10 mai 2016](https://reader031.vdocuments.pub/reader031/viewer/2022022412/58f194901a28ab852b8b45cf/html5/thumbnails/140.jpg)
© Delta Partners 2015
![Page 141: 2e Conférence Lean Construction France 10 mai 2016](https://reader031.vdocuments.pub/reader031/viewer/2022022412/58f194901a28ab852b8b45cf/html5/thumbnails/141.jpg)
© Delta Partners 2015
QUELQUES
EXEMPLES CONCRETS
Observer, mesurer,
améliorer, re-mesurer
Et recommencer ! …
![Page 142: 2e Conférence Lean Construction France 10 mai 2016](https://reader031.vdocuments.pub/reader031/viewer/2022022412/58f194901a28ab852b8b45cf/html5/thumbnails/142.jpg)
© Delta Partners 2015
142
Analyse poste: Pose 1 radiateur (cc alim, distribution et raccordement)
![Page 143: 2e Conférence Lean Construction France 10 mai 2016](https://reader031.vdocuments.pub/reader031/viewer/2022022412/58f194901a28ab852b8b45cf/html5/thumbnails/143.jpg)
© Delta Partners 2015
Client: LSF Poste: Mise en place d'un radiateur
Date: 21.03.2014 Méthode: Traditionnelle
Chantier: CREUZWALD Exécution: Ouvrier Qualifié
Tâche Minutes VA NVA SYS NVA
1 Pré-assemblage chevilles + colliers 5,5 5,5
2 Préparation perceuse (mèche) 0,5 0,5
3 Recherche du niveau (outil) 0,5 0,5
4 préparation reste outils 2,5 2,5
5 amenée radiateur à poste 1 1
6 report de l'axe de la fenêtre 0,5 0,5
7 Implantation trous consoles(x4) 4,66 4,66
8 perçage 0,33 0,33
9 mise en place consoles + chevilles 0,5 0,5
10 Pré-serrage 1 1
11 vérification niveau 0,33 0,33
12 serrage complémentaire consoles 0,2 0,2
13 repérage trou bas (1x) 1,5 1,5
14 mise en place radiateur 0,33 0,33
15 Déballage tuyaux 0,4 0,4
16 montage té de réglage thermostatique 0,33 0,33
17 traçage des trous de coté (x5) 4,33 4,33
18 vérification implantation 0,2 0,2
19 chercher des chevilles 0,33 0,33
20 serrage chevilles 2,66 2,66
21 décollage scotch de packaging tuyaux 0,33 0,33
22 découpe tuyaux 2,66 2,66
30,59 7,61 22,15 0,83
ANALYSE VA-NVA SYS- NVA
Précadre
Précadre
intervention à même le sol. A faire préassembler par séries.
Commentaire/ Axe d'amélioration
Mise en place d'un outil dédié
Fixer le niveau sur le cadre, à côté de la molette de réglage
Servante à poste
Voir pour lift véhicule
dans pièce adjacente
gêne par la présence du radiateur, tourne vis (ou clé) butte dessus
poste de découpe dessus servante à développer
Précadre
7,61
22,15
0,83
VA
NVA SYS
NVA
ANALYSE DE POSTE (cc alim, distribution et raccordement)
Mesure initiale (par un
Ouvrier Qualifié)
![Page 144: 2e Conférence Lean Construction France 10 mai 2016](https://reader031.vdocuments.pub/reader031/viewer/2022022412/58f194901a28ab852b8b45cf/html5/thumbnails/144.jpg)
© Delta Partners 2015
Client: LSF Poste: Mise en place d'un radiateur
Date: 21.03.2014 Méthode: Traditionnelle
Chantier: CREUZWALD Exécution: Ouvrier Qualifié
Tâche Minutes VA NVA SYS NVA
1 Pré-assemblage chevilles + colliers 5,5 5,5
2 Préparation perceuse (mèche) 0,5 0,5
3 Recherche du niveau (outil) 0,5 0,5
4 préparation reste outils 2,5 2,5
5 amenée radiateur à poste 1 1
6 report de l'axe de la fenêtre 0,5 0,5
7 Implantation trous consoles(x4) 4,66 4,66
8 perçage 0,33 0,33
9 mise en place consoles + chevilles 0,5 0,5
10 Pré-serrage 1 1
11 vérification niveau 0,33 0,33
12 serrage complémentaire consoles 0,2 0,2
13 repérage trou bas (1x) 1,5 1,5
14 mise en place radiateur 0,33 0,33
15 Déballage tuyaux 0,4 0,4
16 montage té de réglage thermostatique 0,33 0,33
17 traçage des trous de coté (x5) 4,33 4,33
18 vérification implantation 0,2 0,2
19 chercher des chevilles 0,33 0,33
20 serrage chevilles 2,66 2,66
21 décollage scotch de packaging tuyaux 0,33 0,33
22 découpe tuyaux 2,66 2,66
30,59 7,61 22,15 0,83
ANALYSE VA-NVA SYS- NVA
Précadre
Précadre
intervention à même le sol. A faire préassembler par séries.
Commentaire/ Axe d'amélioration
Mise en place d'un outil dédié
Fixer le niveau sur le cadre, à côté de la molette de réglage
Servante à poste
Voir pour lift véhicule
dans pièce adjacente
gêne par la présence du radiateur, tourne vis (ou clé) butte dessus
poste de découpe dessus servante à développer
Précadre
7,61
22,15
0,83
VA
NVA SYS
NVA
ANALYSE DE POSTE (cc alim, distribution et raccordement)
Mesure initiale (par un
Ouvrier Qualifié)
![Page 145: 2e Conférence Lean Construction France 10 mai 2016](https://reader031.vdocuments.pub/reader031/viewer/2022022412/58f194901a28ab852b8b45cf/html5/thumbnails/145.jpg)
© Delta Partners 2015
Client: LSF Poste: Mise en place d'un radiateur
Date: 21.03.2014 Méthode: Traditionnelle
Chantier: CREUZWALD Exécution: Ouvrier Qualifié
Tâche Minutes VA NVA SYS NVA
1 Pré-assemblage chevilles + colliers 5,5 5,5
2 Préparation perceuse (mèche) 0,5 0,5
3 Recherche du niveau (outil) 0,5 0,5
4 préparation reste outils 2,5 2,5
5 amenée radiateur à poste 1 1
6 report de l'axe de la fenêtre 0,5 0,5
7 Implantation trous consoles(x4) 4,66 4,66
8 perçage 0,33 0,33
9 mise en place consoles + chevilles 0,5 0,5
10 Pré-serrage 1 1
11 vérification niveau 0,33 0,33
12 serrage complémentaire consoles 0,2 0,2
13 repérage trou bas (1x) 1,5 1,5
14 mise en place radiateur 0,33 0,33
15 Déballage tuyaux 0,4 0,4
16 montage té de réglage thermostatique 0,33 0,33
17 traçage des trous de coté (x5) 4,33 4,33
18 vérification implantation 0,2 0,2
19 chercher des chevilles 0,33 0,33
20 serrage chevilles 2,66 2,66
21 décollage scotch de packaging tuyaux 0,33 0,33
22 découpe tuyaux 2,66 2,66
30,59 7,61 22,15 0,83
ANALYSE VA-NVA SYS- NVA
Précadre
Précadre
intervention à même le sol. A faire préassembler par séries.
Commentaire/ Axe d'amélioration
Mise en place d'un outil dédié
Fixer le niveau sur le cadre, à côté de la molette de réglage
Servante à poste
Voir pour lift véhicule
dans pièce adjacente
gêne par la présence du radiateur, tourne vis (ou clé) butte dessus
poste de découpe dessus servante à développer
Précadre
7,61
22,15
0,83
VA
NVA SYS
NVA
ANALYSE DE POSTE (cc alim, distribution et raccordement)
Mesure initiale (par un
Ouvrier Qualifié)
![Page 146: 2e Conférence Lean Construction France 10 mai 2016](https://reader031.vdocuments.pub/reader031/viewer/2022022412/58f194901a28ab852b8b45cf/html5/thumbnails/146.jpg)
© Delta Partners 2015
Client: LSF Poste: Mise en place d'un radiateur
Date: 21.03.2014 Méthode: Traditionnelle
Chantier: CREUZWALD Exécution: Ouvrier Qualifié
Tâche Minutes VA NVA SYS NVA
1 Pré-assemblage chevilles + colliers 5,5 5,5
2 Préparation perceuse (mèche) 0,5 0,5
3 Recherche du niveau (outil) 0,5 0,5
4 préparation reste outils 2,5 2,5
5 amenée radiateur à poste 1 1
6 report de l'axe de la fenêtre 0,5 0,5
7 Implantation trous consoles(x4) 4,66 4,66
8 perçage 0,33 0,33
9 mise en place consoles + chevilles 0,5 0,5
10 Pré-serrage 1 1
11 vérification niveau 0,33 0,33
12 serrage complémentaire consoles 0,2 0,2
13 repérage trou bas (1x) 1,5 1,5
14 mise en place radiateur 0,33 0,33
15 Déballage tuyaux 0,4 0,4
16 montage té de réglage thermostatique 0,33 0,33
17 traçage des trous de coté (x5) 4,33 4,33
18 vérification implantation 0,2 0,2
19 chercher des chevilles 0,33 0,33
20 serrage chevilles 2,66 2,66
21 décollage scotch de packaging tuyaux 0,33 0,33
22 découpe tuyaux 2,66 2,66
30,59 7,61 22,15 0,83
ANALYSE VA-NVA SYS- NVA
Précadre
Précadre
intervention à même le sol. A faire préassembler par séries.
Commentaire/ Axe d'amélioration
Mise en place d'un outil dédié
Fixer le niveau sur le cadre, à côté de la molette de réglage
Servante à poste
Voir pour lift véhicule
dans pièce adjacente
gêne par la présence du radiateur, tourne vis (ou clé) butte dessus
poste de découpe dessus servante à développer
Précadre
7,61
22,15
0,83
VA
NVA SYS
NVA
ANALYSE DE POSTE (cc alim, distribution et raccordement)
Mesure initiale (par un
Ouvrier Qualifié)
![Page 147: 2e Conférence Lean Construction France 10 mai 2016](https://reader031.vdocuments.pub/reader031/viewer/2022022412/58f194901a28ab852b8b45cf/html5/thumbnails/147.jpg)
© Delta Partners 2015
Client: LSF Poste: Mise en place d'un radiateur
Date: 21.03.2014 Méthode: Traditionnelle
Chantier: CREUZWALD Exécution: Ouvrier Qualifié
Tâche Minutes VA NVA SYS NVA
1 Pré-assemblage chevilles + colliers 5,5 5,5
2 Préparation perceuse (mèche) 0,5 0,5
3 Recherche du niveau (outil) 0,5 0,5
4 préparation reste outils 2,5 2,5
5 amenée radiateur à poste 1 1
6 report de l'axe de la fenêtre 0,5 0,5
7 Implantation trous consoles(x4) 4,66 4,66
8 perçage 0,33 0,33
9 mise en place consoles + chevilles 0,5 0,5
10 Pré-serrage 1 1
11 vérification niveau 0,33 0,33
12 serrage complémentaire consoles 0,2 0,2
13 repérage trou bas (1x) 1,5 1,5
14 mise en place radiateur 0,33 0,33
15 Déballage tuyaux 0,4 0,4
16 montage té de réglage thermostatique 0,33 0,33
17 traçage des trous de coté (x5) 4,33 4,33
18 vérification implantation 0,2 0,2
19 chercher des chevilles 0,33 0,33
20 serrage chevilles 2,66 2,66
21 décollage scotch de packaging tuyaux 0,33 0,33
22 découpe tuyaux 2,66 2,66
30,59 7,61 22,15 0,83
ANALYSE VA-NVA SYS- NVA
Précadre
Précadre
intervention à même le sol. A faire préassembler par séries.
Commentaire/ Axe d'amélioration
Mise en place d'un outil dédié
Fixer le niveau sur le cadre, à côté de la molette de réglage
Servante à poste
Voir pour lift véhicule
dans pièce adjacente
gêne par la présence du radiateur, tourne vis (ou clé) butte dessus
poste de découpe dessus servante à développer
Précadre
7,61
22,15
0,83
VA
NVA SYS
NVA
ANALYSE DE POSTE (cc alim, distribution et raccordement)
Mesure initiale (par un
Ouvrier Qualifié)
![Page 148: 2e Conférence Lean Construction France 10 mai 2016](https://reader031.vdocuments.pub/reader031/viewer/2022022412/58f194901a28ab852b8b45cf/html5/thumbnails/148.jpg)
© Delta Partners 2015
En quatre mois: 12 minutes par un apprenti (Le Sanitaire
Français, 2014)
ANALYSE DE POSTE (cc alim, distribution et raccordement)
![Page 149: 2e Conférence Lean Construction France 10 mai 2016](https://reader031.vdocuments.pub/reader031/viewer/2022022412/58f194901a28ab852b8b45cf/html5/thumbnails/149.jpg)
© Delta Partners 2015
7,61
22,15
0,83
VA
NVA SYS
NVA
Analyse poste: Pose 1 radiateur (cc alim, distribution et raccordement)
5,95
4,7
VA
NVA SYS
NVA
par radiateur: 30 minutes par radiateur: 13 minutes
marge prévisionnelle : -7% marge réalisée: +8%
SCHEMA « CLASSIQUE » SCHEMA « LEAN »
Marge opérationnelle
AMÉLIORÉ DE 15 points!
L’utilisation de la préfabrication et préparation chantier
Moins d’aléas, plus d’efficacité
L’amélioration des rendements toujours possible:
![Page 150: 2e Conférence Lean Construction France 10 mai 2016](https://reader031.vdocuments.pub/reader031/viewer/2022022412/58f194901a28ab852b8b45cf/html5/thumbnails/150.jpg)
© Delta Partners 2015
ERGONOMIE &
PREPARATION CHANTIER
Réduire les distances, les efforts, les risques, les pertes.
1. Avitailler le chantier
![Page 151: 2e Conférence Lean Construction France 10 mai 2016](https://reader031.vdocuments.pub/reader031/viewer/2022022412/58f194901a28ab852b8b45cf/html5/thumbnails/151.jpg)
© Delta Partners 2015
2. Organiser le stockage chantier
![Page 152: 2e Conférence Lean Construction France 10 mai 2016](https://reader031.vdocuments.pub/reader031/viewer/2022022412/58f194901a28ab852b8b45cf/html5/thumbnails/152.jpg)
© Delta Partners 2015
3. Faciliter la prise et le déplacement des matériaux
![Page 153: 2e Conférence Lean Construction France 10 mai 2016](https://reader031.vdocuments.pub/reader031/viewer/2022022412/58f194901a28ab852b8b45cf/html5/thumbnails/153.jpg)
© Delta Partners 2015 15
3
4. Disposer les matériaux à poste
![Page 154: 2e Conférence Lean Construction France 10 mai 2016](https://reader031.vdocuments.pub/reader031/viewer/2022022412/58f194901a28ab852b8b45cf/html5/thumbnails/154.jpg)
© Delta Partners 2015
Mise en place 22 %
Transport 15%
Manutention 29 %
Chutes & gaspillages 22%
Autres coûts 12%
Analyse de coûts INITIALE: Poste plaques de plâtres (hors fourniture)
![Page 155: 2e Conférence Lean Construction France 10 mai 2016](https://reader031.vdocuments.pub/reader031/viewer/2022022412/58f194901a28ab852b8b45cf/html5/thumbnails/155.jpg)
© Delta Partners 2015
Analyse de coûts INITIALE: Poste plaques de plâtres (hors fourniture)
![Page 156: 2e Conférence Lean Construction France 10 mai 2016](https://reader031.vdocuments.pub/reader031/viewer/2022022412/58f194901a28ab852b8b45cf/html5/thumbnails/156.jpg)
© Delta Partners 2015
Mise en place 49 %
Transport 12%
Manutention 10 %
Chutes & gaspillages 18%
Autres coûts 12%
Valeur Ajoutée: +50%
Processus repensés et standardisés
AMELIORATION PRODUCTIVITE: + 55%
(Entreprise SOCOGYPS)
Analyse de coûts FINALE: Poste plaques de plâtres (hors fourniture)
![Page 157: 2e Conférence Lean Construction France 10 mai 2016](https://reader031.vdocuments.pub/reader031/viewer/2022022412/58f194901a28ab852b8b45cf/html5/thumbnails/157.jpg)
© Delta Partners 2015
Mise en place 49 %
Transport 12%
Manutention 10 %
Chutes & gaspillages 18%
Autres coûts 12%
STANDARDISER LES PROCESSUS DE TRAVAIL
Qualité et sécurité améliorées
L’amélioration des rendements toujours possible:
Poste Pose des plaques de plâtre:
AMÉLIORÉ DE 33%
Analyse de coûts FINALE: Poste plaques de plâtres (hors fourniture)
![Page 158: 2e Conférence Lean Construction France 10 mai 2016](https://reader031.vdocuments.pub/reader031/viewer/2022022412/58f194901a28ab852b8b45cf/html5/thumbnails/158.jpg)
© Delta Partners 2015
Transformation Lean: de 2012 à 2015
![Page 159: 2e Conférence Lean Construction France 10 mai 2016](https://reader031.vdocuments.pub/reader031/viewer/2022022412/58f194901a28ab852b8b45cf/html5/thumbnails/159.jpg)
© Delta Partners 2015
Entreprise COGIR (du 20/01/2016 au 10/03/2016)
Calcul Efficience Chantier (Vente – Coûts) Par Chef d’équipe
Début action Lean Systématisation Amélioration
0,00
+
-
![Page 160: 2e Conférence Lean Construction France 10 mai 2016](https://reader031.vdocuments.pub/reader031/viewer/2022022412/58f194901a28ab852b8b45cf/html5/thumbnails/160.jpg)
© Delta Partners 2015
160
Eliminer 20 % des gaspillages
=
+ 1,5 heure de production / jour
![Page 161: 2e Conférence Lean Construction France 10 mai 2016](https://reader031.vdocuments.pub/reader031/viewer/2022022412/58f194901a28ab852b8b45cf/html5/thumbnails/161.jpg)
© Delta Partners 2015
161
Améliorer sa marge opérationnelle de
main d’œuvre de 5%
=
Faire en 57 minutes ce que l’on fait
généralement en 1 heure …
![Page 162: 2e Conférence Lean Construction France 10 mai 2016](https://reader031.vdocuments.pub/reader031/viewer/2022022412/58f194901a28ab852b8b45cf/html5/thumbnails/162.jpg)
© Delta Partners 2015
Cré
ati
on
des C
om
ités d
e
Pilo
tag
e e
t d
e D
irecti
on
Formation/ Ateliers
Une Démarche Structurée et Structurante
Immersion
Analyses Postes
Outils physiques
5S/ LPS / MV
Préparation J-1
Autocontrôle
Formalisation
Lean_1.0
Intégration
Déploiement
![Page 163: 2e Conférence Lean Construction France 10 mai 2016](https://reader031.vdocuments.pub/reader031/viewer/2022022412/58f194901a28ab852b8b45cf/html5/thumbnails/163.jpg)
© Delta Partners 2015
Réinventons ensemble le monde du BTP
en construisant plus vite, de meilleure qualité, plus économique,
en toute sécurité et sérénité, à l’aide du Lean Construction, …
…c’est notre mission depuis plus de 150 projets.
… Serez vous les prochains?
![Page 164: 2e Conférence Lean Construction France 10 mai 2016](https://reader031.vdocuments.pub/reader031/viewer/2022022412/58f194901a28ab852b8b45cf/html5/thumbnails/164.jpg)
© Delta Partners 2015
Patrick DUPIN, Gérant Fondateur; Delta Partners
www.delta-partners.fr / 06 79 08 96 58
164
Mini-Audit Gratuit
![Page 165: 2e Conférence Lean Construction France 10 mai 2016](https://reader031.vdocuments.pub/reader031/viewer/2022022412/58f194901a28ab852b8b45cf/html5/thumbnails/165.jpg)
Témoignages
Mise en place du lean en entreprise générale
Willy MOREL & Aurélie JUILIENPrésident NCN & Service SQE
26/05/2016 LEAN CONSTRUCTION FRANCE 165
![Page 166: 2e Conférence Lean Construction France 10 mai 2016](https://reader031.vdocuments.pub/reader031/viewer/2022022412/58f194901a28ab852b8b45cf/html5/thumbnails/166.jpg)
166
![Page 167: 2e Conférence Lean Construction France 10 mai 2016](https://reader031.vdocuments.pub/reader031/viewer/2022022412/58f194901a28ab852b8b45cf/html5/thumbnails/167.jpg)
Présentation
de l’entreprise
167
![Page 168: 2e Conférence Lean Construction France 10 mai 2016](https://reader031.vdocuments.pub/reader031/viewer/2022022412/58f194901a28ab852b8b45cf/html5/thumbnails/168.jpg)
Historique de NCN
168
![Page 169: 2e Conférence Lean Construction France 10 mai 2016](https://reader031.vdocuments.pub/reader031/viewer/2022022412/58f194901a28ab852b8b45cf/html5/thumbnails/169.jpg)
169
Implantation du Groupe NCN
![Page 170: 2e Conférence Lean Construction France 10 mai 2016](https://reader031.vdocuments.pub/reader031/viewer/2022022412/58f194901a28ab852b8b45cf/html5/thumbnails/170.jpg)
170
Localisation des ouvrages réalisés ou en cours
![Page 171: 2e Conférence Lean Construction France 10 mai 2016](https://reader031.vdocuments.pub/reader031/viewer/2022022412/58f194901a28ab852b8b45cf/html5/thumbnails/171.jpg)
Comment
manager le
Groupe ?
171
![Page 172: 2e Conférence Lean Construction France 10 mai 2016](https://reader031.vdocuments.pub/reader031/viewer/2022022412/58f194901a28ab852b8b45cf/html5/thumbnails/172.jpg)
Organigramme du Groupe
172
16 salariés 32 salariés
16 salariés
47 salariés
196 salariés
![Page 173: 2e Conférence Lean Construction France 10 mai 2016](https://reader031.vdocuments.pub/reader031/viewer/2022022412/58f194901a28ab852b8b45cf/html5/thumbnails/173.jpg)
173
![Page 174: 2e Conférence Lean Construction France 10 mai 2016](https://reader031.vdocuments.pub/reader031/viewer/2022022412/58f194901a28ab852b8b45cf/html5/thumbnails/174.jpg)
POURQUOI?
COMMENT?
QUOI?
Basé sur le cercle doré:
![Page 175: 2e Conférence Lean Construction France 10 mai 2016](https://reader031.vdocuments.pub/reader031/viewer/2022022412/58f194901a28ab852b8b45cf/html5/thumbnails/175.jpg)
POURQUOI?
Depuis juin 2012, l’entreprise a été
certifiée ISO 9001 2008, auprès de
l’organisme de certification CERTIBAT.
![Page 176: 2e Conférence Lean Construction France 10 mai 2016](https://reader031.vdocuments.pub/reader031/viewer/2022022412/58f194901a28ab852b8b45cf/html5/thumbnails/176.jpg)
COMMENT?
LEAN CONSTRUCTION
![Page 177: 2e Conférence Lean Construction France 10 mai 2016](https://reader031.vdocuments.pub/reader031/viewer/2022022412/58f194901a28ab852b8b45cf/html5/thumbnails/177.jpg)
LEAN CONSTRUCTION
QUOI?
![Page 178: 2e Conférence Lean Construction France 10 mai 2016](https://reader031.vdocuments.pub/reader031/viewer/2022022412/58f194901a28ab852b8b45cf/html5/thumbnails/178.jpg)
En marche
vers
l’amélioration
continue …178
![Page 179: 2e Conférence Lean Construction France 10 mai 2016](https://reader031.vdocuments.pub/reader031/viewer/2022022412/58f194901a28ab852b8b45cf/html5/thumbnails/179.jpg)
Les Valeurs du Groupe
179
Juillet 2015: Revue de la devise et des valeurs du Groupe
![Page 180: 2e Conférence Lean Construction France 10 mai 2016](https://reader031.vdocuments.pub/reader031/viewer/2022022412/58f194901a28ab852b8b45cf/html5/thumbnails/180.jpg)
La mise en place du LEAN
180
Octobre 2015: Intervention de Delta Partners pour la mise en place du LEAN basé sur la méthode des 5S ou ERNEST
Qu’est ce que le LEAN??
Maximiser la valeur Client en minimisant lesgaspillages, en chassant tout ce qui produit de lanon-valeur ajoutée (ce que le client n’est pas prêt àpayer: transport, déplacement, …)
8 Sources de gaspillage:Attentes
DéplacementsTransport
Sur-qualitéSous-qualité
Stockage Le potentiel humain
La débrouille
![Page 181: 2e Conférence Lean Construction France 10 mai 2016](https://reader031.vdocuments.pub/reader031/viewer/2022022412/58f194901a28ab852b8b45cf/html5/thumbnails/181.jpg)
Les solutions
d’amélioration
181
![Page 182: 2e Conférence Lean Construction France 10 mai 2016](https://reader031.vdocuments.pub/reader031/viewer/2022022412/58f194901a28ab852b8b45cf/html5/thumbnails/182.jpg)
Modification du fil à ligature
182
AVANT APRES
BOBINE DE 5KG = 5€5022€00 pour 20 kg
1 min 30 pour faire une boule. 2h15 pour
faire 90 boules
SCEAU DE 20 KG = 39€34
90 boules dans un sceauprêtes à l’emploi
Moins de gâchisGain de 2h15 / sceau
En 2015: 450 bobines de 5 kg
consommées
En 2016: gain d’environ 30 000€ grâce à la mise en
place des sceaux de bobines
![Page 183: 2e Conférence Lean Construction France 10 mai 2016](https://reader031.vdocuments.pub/reader031/viewer/2022022412/58f194901a28ab852b8b45cf/html5/thumbnails/183.jpg)
Création d’une desserte à banche
183
AVANT APRES
Investissement de 450€/desserte mais:Moins de déplacements
Moins de gâchis dans les consommables banches
Gestion des flux de chantiers et
approvisionnement au poste
![Page 184: 2e Conférence Lean Construction France 10 mai 2016](https://reader031.vdocuments.pub/reader031/viewer/2022022412/58f194901a28ab852b8b45cf/html5/thumbnails/184.jpg)
Réorganisation du Service Matériel:Stockage Bois
184
AVANT APRES
![Page 185: 2e Conférence Lean Construction France 10 mai 2016](https://reader031.vdocuments.pub/reader031/viewer/2022022412/58f194901a28ab852b8b45cf/html5/thumbnails/185.jpg)
Réorganisation du Service Matériel:Stockage Consoles
185
AVANT APRES
![Page 186: 2e Conférence Lean Construction France 10 mai 2016](https://reader031.vdocuments.pub/reader031/viewer/2022022412/58f194901a28ab852b8b45cf/html5/thumbnails/186.jpg)
Réorganisation du Service Matériel:Stockage Apports de Banches
186
AVANT APRES
![Page 187: 2e Conférence Lean Construction France 10 mai 2016](https://reader031.vdocuments.pub/reader031/viewer/2022022412/58f194901a28ab852b8b45cf/html5/thumbnails/187.jpg)
Réorganisation du Service Matériel:Mise en place d’un « magasin
retour chantier »
187
AVANT APRES
Chaque chose à sa place1 personne partie à la retraite non remplacée
(env. 45 000€/an)
![Page 188: 2e Conférence Lean Construction France 10 mai 2016](https://reader031.vdocuments.pub/reader031/viewer/2022022412/58f194901a28ab852b8b45cf/html5/thumbnails/188.jpg)
Mise en place du Last PlannerSystem en réunion de chantier
188
Synchronisation des tâches
![Page 189: 2e Conférence Lean Construction France 10 mai 2016](https://reader031.vdocuments.pub/reader031/viewer/2022022412/58f194901a28ab852b8b45cf/html5/thumbnails/189.jpg)
Mise en place du micro zoning
189
![Page 190: 2e Conférence Lean Construction France 10 mai 2016](https://reader031.vdocuments.pub/reader031/viewer/2022022412/58f194901a28ab852b8b45cf/html5/thumbnails/190.jpg)
Mise en place du 5S sur les chantiers
![Page 191: 2e Conférence Lean Construction France 10 mai 2016](https://reader031.vdocuments.pub/reader031/viewer/2022022412/58f194901a28ab852b8b45cf/html5/thumbnails/191.jpg)
Amélioration de l’image pour nos clients
![Page 192: 2e Conférence Lean Construction France 10 mai 2016](https://reader031.vdocuments.pub/reader031/viewer/2022022412/58f194901a28ab852b8b45cf/html5/thumbnails/192.jpg)
Dans le futur …
192
![Page 193: 2e Conférence Lean Construction France 10 mai 2016](https://reader031.vdocuments.pub/reader031/viewer/2022022412/58f194901a28ab852b8b45cf/html5/thumbnails/193.jpg)
De la formation, de la communication
«On ne peut améliorer ce
que l’on ne peut mesurer...»
Règle du CP²:CommunicationPédagogiePreuve
![Page 194: 2e Conférence Lean Construction France 10 mai 2016](https://reader031.vdocuments.pub/reader031/viewer/2022022412/58f194901a28ab852b8b45cf/html5/thumbnails/194.jpg)
Situer les sources de gaspillage
VA OU NVA?AVONS-NOUS LES OUTILS ADAPTES?
QUI EST MIEUX ADAPTE POUR ENLEVER LA MATRICE?LE CHANTIER? LE SERVICE MATERIEL?
RETOUR D’EXPERIENCE ET CHIFFRAGE POUR FUTURS PROJETS POUR PRISE DE DECISIONS SI EN PREFA OU COULE EN PLACE?
![Page 195: 2e Conférence Lean Construction France 10 mai 2016](https://reader031.vdocuments.pub/reader031/viewer/2022022412/58f194901a28ab852b8b45cf/html5/thumbnails/195.jpg)
Améliorer les processus de production: réalisation des voiles
banchés
![Page 196: 2e Conférence Lean Construction France 10 mai 2016](https://reader031.vdocuments.pub/reader031/viewer/2022022412/58f194901a28ab852b8b45cf/html5/thumbnails/196.jpg)
Prendre en compte la courbe du changement
![Page 197: 2e Conférence Lean Construction France 10 mai 2016](https://reader031.vdocuments.pub/reader031/viewer/2022022412/58f194901a28ab852b8b45cf/html5/thumbnails/197.jpg)
Témoignages
Quelles passerelles entre Lean et Prévention?
Jean-François CANAL, Cadre Conseiller Prévention OPPBTP
26/05/2016 LEAN CONSTRUCTION FRANCE 197
![Page 198: 2e Conférence Lean Construction France 10 mai 2016](https://reader031.vdocuments.pub/reader031/viewer/2022022412/58f194901a28ab852b8b45cf/html5/thumbnails/198.jpg)
© OPPBTP
LA PRÉVENTION
AMÉLIORE AUSSI LA
PERFORMANCE
ECONOMIQUE DE
L’ENTREPRISE
![Page 199: 2e Conférence Lean Construction France 10 mai 2016](https://reader031.vdocuments.pub/reader031/viewer/2022022412/58f194901a28ab852b8b45cf/html5/thumbnails/199.jpg)
© OPPBTP
Une action, quelle que soit
sa motivation d’origine,
réduit ou supprime un ou
plusieurs risques à effets
immédiats ou différés.
![Page 200: 2e Conférence Lean Construction France 10 mai 2016](https://reader031.vdocuments.pub/reader031/viewer/2022022412/58f194901a28ab852b8b45cf/html5/thumbnails/200.jpg)
© OPPBTP200 Dimeco 2015
L’étude d’évaluation quantitative
86 entreprises volontaires
180 cas d’actions de prévention étudiés
• 69 cas ent. < 20 salariés
• 49 cas ent. de 20 à 50 salariés
• 62 cas ent. > 50 salariés
Majorité de métiers couverts
Cas tous duplicables et transposables
pour d’autres métiers
3 grandes familles d’actions de
prévention étudiées : O, T, H
48 mois de terrain et d’analyse :
Quels
résultats
Une étude pour vérifier s’il y a un LIEN REEL et
QUANTIFIABLE entre la prévention et la
performance économique ?
![Page 201: 2e Conférence Lean Construction France 10 mai 2016](https://reader031.vdocuments.pub/reader031/viewer/2022022412/58f194901a28ab852b8b45cf/html5/thumbnails/201.jpg)
© OPPBTP201 Dimeco 2015
Bilan global des 180 cas
![Page 202: 2e Conférence Lean Construction France 10 mai 2016](https://reader031.vdocuments.pub/reader031/viewer/2022022412/58f194901a28ab852b8b45cf/html5/thumbnails/202.jpg)
© OPPBTP202 Dimeco 2015
Analyses par taille
![Page 203: 2e Conférence Lean Construction France 10 mai 2016](https://reader031.vdocuments.pub/reader031/viewer/2022022412/58f194901a28ab852b8b45cf/html5/thumbnails/203.jpg)
© OPPBTP203 Dimeco 2015
Mêmes les bilans négatifs sont gagnants !
Des coûts supérieurs aux gains dans 10%
des cas.
Rendement moyen de ces actions = 0,73
Les gains couvrent les 2/3 des dépenses
Lorsque la prévention n’est pas
bénéficiaire, elle coûte bien moins
que ce que l’on imagine
initialement.
![Page 204: 2e Conférence Lean Construction France 10 mai 2016](https://reader031.vdocuments.pub/reader031/viewer/2022022412/58f194901a28ab852b8b45cf/html5/thumbnails/204.jpg)
© OPPBTP204 Dimeco 2015
Enseignement n°1
L’impact économique de la
prévention est mesurable.
180 cas quantifiés
![Page 205: 2e Conférence Lean Construction France 10 mai 2016](https://reader031.vdocuments.pub/reader031/viewer/2022022412/58f194901a28ab852b8b45cf/html5/thumbnails/205.jpg)
© OPPBTP205 Dimeco 2015
Enseignement n°2
La prévention génère des
GAINS ECONOMIQUES
1 € investi = 2,34 € de gain
![Page 206: 2e Conférence Lean Construction France 10 mai 2016](https://reader031.vdocuments.pub/reader031/viewer/2022022412/58f194901a28ab852b8b45cf/html5/thumbnails/206.jpg)
© OPPBTP206 Dimeco 2015
Enseignement n°3
La prévention contribue à
l’excellence opérationnelle
71 % des gains observés ont pour origine une meilleure productivité
Des ressources mieux maitrisées génèrent des gains sur les achats à
hauteur de 14 %
80% des actions étudiées ont un impact sur la qualité
10% des gains proviennent de la marge obtenue par la croissance du
Chiffre d’Affaires liée à la naissance de nouvelles activités
![Page 207: 2e Conférence Lean Construction France 10 mai 2016](https://reader031.vdocuments.pub/reader031/viewer/2022022412/58f194901a28ab852b8b45cf/html5/thumbnails/207.jpg)
© OPPBTP207 Dimeco 2015
Enseignement n°4
La prévention est à la portée de tous
La prévention est accessible :
le cout moyen d’une action est de 17 000 €
Le bilan par an et par salarié d’une TPE est supérieur à celui d’une
PME 2800 € versus 1800 €
Les ROP pour les TPE sont de 2,8 versus 2,4 pour les PME et 2,16
pour les entreprises dont les effectifs sont supérieurs à 50 salariés
Les gains sont issus à 70 % de la productivité
La trésorerie est épargnée : PAY BACK= 1,5 an
![Page 208: 2e Conférence Lean Construction France 10 mai 2016](https://reader031.vdocuments.pub/reader031/viewer/2022022412/58f194901a28ab852b8b45cf/html5/thumbnails/208.jpg)
© OPPBTP
Les orientations retenues par le groupe permanent
d’orientation du COCT
pour le troisième Plan Santé au Travail (PST3)
« Inciter au développement de la
prévention en démontrant et en
faisant savoir que les
investissements dans la santé et la
sécurité au travail, outre qu’ils
participent au bien-être des personnels,
sont effectivement rentables…… »
![Page 209: 2e Conférence Lean Construction France 10 mai 2016](https://reader031.vdocuments.pub/reader031/viewer/2022022412/58f194901a28ab852b8b45cf/html5/thumbnails/209.jpg)
© OPPBTP
Marine Jeantet, Directrice des risques
professionnels CNAM TS
« …ll faut convaincre les chefs d'entreprise que la
prévention est rentable pour eux. »…
« II faut aussi systématiser les études sur les gains
et avantages de la prévention, L'Organisme professionnel
de prévention du BTP (OPPBTP) a commencé
a mener ce type de démarche envers ses
bénéficiaires, et les premiers résultats indiquent
qu'il existe une vraie demande de la part des
employeurs envers ces actions…. »
![Page 210: 2e Conférence Lean Construction France 10 mai 2016](https://reader031.vdocuments.pub/reader031/viewer/2022022412/58f194901a28ab852b8b45cf/html5/thumbnails/210.jpg)
© OPPBTP
Organisation 5S de l’atelier, du magasin et du parc
L'action de prévention
Dans le cadre de la réorganisation
de sa structure logistique - parc,
dépôt et atelier, l'entreprise décide
de se faire accompagner par
l'Association française pour la
qualité et la performance (AFQP)
dans une démarche 5S.
L'association l'intègre dans un
groupe de travail avec d'autres
entreprises engagées pour deux
ans dans cette même démarche.
L'entreprise
75 personnes, travaux de VRD avec son propre bureau d'études techniques et
d'études de prix, et un parc d'engins et de camions lui offrant une totale autonomie.
Elle collabore également avec des entreprises sous-traitantes techniques pour pallier
les pics d'activité.
![Page 211: 2e Conférence Lean Construction France 10 mai 2016](https://reader031.vdocuments.pub/reader031/viewer/2022022412/58f194901a28ab852b8b45cf/html5/thumbnails/211.jpg)
© OPPBTP
Organisation 5S de l’atelier, du magasin et du parc
Après
Le magasin est structuré en zones dédiées. Il est équipé de racks de rangement
approvisionnés mécaniquement à l'aide d'un chariot élévateur.
Les circulations dans le magasin sont tracées et signalées.
L'atelier est ordonné, les engins sont levés sur colonnes pour la maintenance.
Les produits chimiques sont stockés séparément et protégés ou verrouillés en fonction
de la nature du risque. Les déchets sont triés dans des bacs distincts.
Le parc est nivelé et ordonné. Des conteneurs y sont installés pour stocker les pièces à
eau et les joints de grand format.
Avant
Le magasin, le parc et l'atelier étaient gérés au jour le jour par le magasinier, le chef de
parc et le chef d'atelier.
Les équipes s'approvisionnaient et s'équipaient sans se préoccuper de la façon dont ils
déposaient matériels et matériaux.
Le stock grossissait et devenait difficile à gérer. L'approvisionnement et la recherche de
pièces ou d'outils prenaient un temps excessif.
L'atelier était encombré de matériel divers, les circulations n'étaient pas fluides.
![Page 212: 2e Conférence Lean Construction France 10 mai 2016](https://reader031.vdocuments.pub/reader031/viewer/2022022412/58f194901a28ab852b8b45cf/html5/thumbnails/212.jpg)
© OPPBTP
Organisation 5S de l’atelier, du magasin et du parc
L'animatrice QPE de l'entreprise s'est engagée dans
une formation pratique constituée de rencontres
d'une journée, tous les 2 mois, pendant 2 ans.
Ces rencontres étaient ponctuées, pendant les
intersessions, par des travaux pratiques individuels
dans l'entreprise. Ils concernaient l'atelier de
réparation mécanique des engins et des machines, le
magasin pour les matériels et matériaux, l'outillage et
les équipements de travail, ainsi que le parc extérieur
recevant les véhicules, les engins et le matériel lourd.
Les personnes concernées en priorité par cette
démarche sont le magasinier, le chef de parc, le
chef d'atelier et l'animatrice QPE.
Le CHSCT a participé aux réflexions et aux décisions,
ainsi que le magasinier, les mécaniciens et le chef de
parc.
La préparation s'est tenue sur 2 ans, puis une durée
de 1 an a permis d'en évaluer l'efficacité.
![Page 213: 2e Conférence Lean Construction France 10 mai 2016](https://reader031.vdocuments.pub/reader031/viewer/2022022412/58f194901a28ab852b8b45cf/html5/thumbnails/213.jpg)
© OPPBTP
Organisation 5S de l’atelier, du magasin et du parc
La démarche a entraîné plusieurs actions marquantes :
• la réorganisation des espaces par zones ;
• la signalisation et le traçage des circulations séparées engins/piétons et des aires
de stockage ;
• l'agrandissement d'une porte d'accès à l'élévateur ;
• l'installation de bacs de rétention pour le stock des produits ;
• la mise en place de containers
extérieurs pour les grosses
pièces à eau en fonte et les
joints.
• le stockage sur des lieux dédiés ;
• le gain de place
![Page 214: 2e Conférence Lean Construction France 10 mai 2016](https://reader031.vdocuments.pub/reader031/viewer/2022022412/58f194901a28ab852b8b45cf/html5/thumbnails/214.jpg)
© OPPBTP
Organisation 5S de l’atelier, du magasin et du parc
Résultats prévention
• Suppression des manutentions manuelles dans des zones fortement
encombrées.
• Réduction des risques de chutes de plain-pied et de hauteur.
• Réduction du risque chimique.
• Suppression du stress grâce à la facilité de recherche et au temps gagné par
les responsables de parc, du magasin et de l'atelier.
• Vérification et remise en parfait état des équipements.
• Stockage des produits chimiques dans des conditions réglementaires et requises
pour éviter toutes émanations dangereuses.
Le stock apparent ne laisse se périmer ni se perdre aucune pièce.
Tous les équipements ont été vérifiés et remis en parfait état ; l'approvisionnement
en matériaux et matériels est complet...
![Page 215: 2e Conférence Lean Construction France 10 mai 2016](https://reader031.vdocuments.pub/reader031/viewer/2022022412/58f194901a28ab852b8b45cf/html5/thumbnails/215.jpg)
© OPPBTP
Organisation 5S de l’atelier, du magasin et du parc
Résultats économiques
http://www.preventionbtp.fr/Documentation/Explorer-par-produit/Terrain/Prevention-
et-performance/Methode-des-5S-du-magasin-de-l-atelier-et-du-parc/Bilan-
economique
![Page 216: 2e Conférence Lean Construction France 10 mai 2016](https://reader031.vdocuments.pub/reader031/viewer/2022022412/58f194901a28ab852b8b45cf/html5/thumbnails/216.jpg)
© OPPBTP216 Dimeco 2015
Dès maintenant
Passer d’une logique
« D’évitement des pertes"
à une logique
« D’espérance de gains"
![Page 217: 2e Conférence Lean Construction France 10 mai 2016](https://reader031.vdocuments.pub/reader031/viewer/2022022412/58f194901a28ab852b8b45cf/html5/thumbnails/217.jpg)
© OPPBTP217 Dimeco 2015
Conclusion
la prévention est à la portée de tous,
vite profitable,
et mesurable
la prévention est à la portée de tous,
vite profitable,
et mesurable
![Page 218: 2e Conférence Lean Construction France 10 mai 2016](https://reader031.vdocuments.pub/reader031/viewer/2022022412/58f194901a28ab852b8b45cf/html5/thumbnails/218.jpg)
© OPPBTP218 Dimeco 2015
MERCI DE VOTRE ATTENTION
www.preventionbtp.fr
![Page 219: 2e Conférence Lean Construction France 10 mai 2016](https://reader031.vdocuments.pub/reader031/viewer/2022022412/58f194901a28ab852b8b45cf/html5/thumbnails/219.jpg)
Table ronde
La sécurité de chantier avec le Lean : agir indirectement
Alex Maire, Casso & Associés
Jean-François Canal, OPPBTP
Patrick Dupin, Delta Partners
26/05/2016 LEAN CONSTRUCTION FRANCE 219
![Page 220: 2e Conférence Lean Construction France 10 mai 2016](https://reader031.vdocuments.pub/reader031/viewer/2022022412/58f194901a28ab852b8b45cf/html5/thumbnails/220.jpg)
Témoignages
Qualité et satisfaction client
Philippe BENQUET, Président ACORUS
26/05/2016 LEAN CONSTRUCTION FRANCE 220
![Page 221: 2e Conférence Lean Construction France 10 mai 2016](https://reader031.vdocuments.pub/reader031/viewer/2022022412/58f194901a28ab852b8b45cf/html5/thumbnails/221.jpg)
Autonomie des équipes et Lean Construction
![Page 222: 2e Conférence Lean Construction France 10 mai 2016](https://reader031.vdocuments.pub/reader031/viewer/2022022412/58f194901a28ab852b8b45cf/html5/thumbnails/222.jpg)
Comment optimiser l’organisation d’un service de dépannagede 50 techniciens sur toute l’Ile de France ?
![Page 223: 2e Conférence Lean Construction France 10 mai 2016](https://reader031.vdocuments.pub/reader031/viewer/2022022412/58f194901a28ab852b8b45cf/html5/thumbnails/223.jpg)
CENTRE D’APPEL « ASSISTANTES COMMERCIALES »
CLIENTS CHEFS TECHNICIENS
![Page 224: 2e Conférence Lean Construction France 10 mai 2016](https://reader031.vdocuments.pub/reader031/viewer/2022022412/58f194901a28ab852b8b45cf/html5/thumbnails/224.jpg)
REALISATION D’UNE FICHE DE TRAVAIL JOURNALIERE
TROP CHARGEE
PAS ASSEZ CHARGEE
Interventions inachevéesMatériels non adaptés
Gestion des urgences difficile
Insatisfactions techniciensInsatisfactions clients
Déplacements inutilesSur-qualité
Reprogrammations
Insatisfactions techniciensInsatisfactions clients
IL FAUT OPTIMISER !!!
![Page 225: 2e Conférence Lean Construction France 10 mai 2016](https://reader031.vdocuments.pub/reader031/viewer/2022022412/58f194901a28ab852b8b45cf/html5/thumbnails/225.jpg)
Formation Assistantes
commerciales
Amélioration des stocks camions et
veille matériel
Planification et contrôle
des interventions
Logistique dédiée à l’urgence
Engagement sur délais de
ré-intervention
Mission Lean ConstructionAvec Delta Partner (1)
![Page 226: 2e Conférence Lean Construction France 10 mai 2016](https://reader031.vdocuments.pub/reader031/viewer/2022022412/58f194901a28ab852b8b45cf/html5/thumbnails/226.jpg)
Formation Assistantes
commerciales
Amélioration des stocks camions et
veille matériel
Planification et contrôle
des interventions
Logistique dédiée à l’urgence
Engagement sur délais de
ré-intervention
Mission Lean ConstructionAvec Delta Partner
Toujours plus d’insatisfactionsdes techniciens et des clients
Le cercle vicieux de l’optimisation Lean sans
autonomie
![Page 227: 2e Conférence Lean Construction France 10 mai 2016](https://reader031.vdocuments.pub/reader031/viewer/2022022412/58f194901a28ab852b8b45cf/html5/thumbnails/227.jpg)
AUTONOMIE
Ce n’est pas à moi de te direcomment faire ton travail
(mais j’ai tout planifié et je contrôlerai !)
FAUSSE VRAIE
Tu as les moyens de décidercomment faire ton travail
(et je suis là pour t’aider, si besoin !)
![Page 228: 2e Conférence Lean Construction France 10 mai 2016](https://reader031.vdocuments.pub/reader031/viewer/2022022412/58f194901a28ab852b8b45cf/html5/thumbnails/228.jpg)
AUTONOMIE
Tu es responsable de réaliser la journéede travail que je t’ai préparé
FAUSSE VRAIE
Tu es responsable de résoudreles problèmes de tes clients
![Page 229: 2e Conférence Lean Construction France 10 mai 2016](https://reader031.vdocuments.pub/reader031/viewer/2022022412/58f194901a28ab852b8b45cf/html5/thumbnails/229.jpg)
Sectorisation des
techniciens
Prise de rendez-vous
par les techniciens
Contact directs
techniciens-clients
Choix des matériels et
stock camions par techniciens
Priorité à la résolution du
problème clients
Mission Lean ConstructionAvec Delta Partner (2)
![Page 230: 2e Conférence Lean Construction France 10 mai 2016](https://reader031.vdocuments.pub/reader031/viewer/2022022412/58f194901a28ab852b8b45cf/html5/thumbnails/230.jpg)
![Page 231: 2e Conférence Lean Construction France 10 mai 2016](https://reader031.vdocuments.pub/reader031/viewer/2022022412/58f194901a28ab852b8b45cf/html5/thumbnails/231.jpg)
Sectorisation des
techniciens
Prise de rendez-vous
par les techniciens
Contact directs
techniciens-clients
Choix des matériels et
stock camions par techniciens
Priorité à la résolution du
problème clients
Mission Lean ConstructionAvec Delta Partner (2)
Toujours plus de satisfactionsdes techniciens et des clients
Le cercle vertueux de l’optimisation Lean avec
autonomie
![Page 232: 2e Conférence Lean Construction France 10 mai 2016](https://reader031.vdocuments.pub/reader031/viewer/2022022412/58f194901a28ab852b8b45cf/html5/thumbnails/232.jpg)
L’ORGANIGRAMME D’ACORUS
![Page 233: 2e Conférence Lean Construction France 10 mai 2016](https://reader031.vdocuments.pub/reader031/viewer/2022022412/58f194901a28ab852b8b45cf/html5/thumbnails/233.jpg)
L’ORGANIGRAMME D’ACORUS
![Page 234: 2e Conférence Lean Construction France 10 mai 2016](https://reader031.vdocuments.pub/reader031/viewer/2022022412/58f194901a28ab852b8b45cf/html5/thumbnails/234.jpg)
LA MINI-ENTREPRISE ACORUS
AutonomieEt
collaboration
![Page 235: 2e Conférence Lean Construction France 10 mai 2016](https://reader031.vdocuments.pub/reader031/viewer/2022022412/58f194901a28ab852b8b45cf/html5/thumbnails/235.jpg)
L’ORGANIGRAMME D’ACORUS
AutonomieEt
collaboration
![Page 236: 2e Conférence Lean Construction France 10 mai 2016](https://reader031.vdocuments.pub/reader031/viewer/2022022412/58f194901a28ab852b8b45cf/html5/thumbnails/236.jpg)
Rémunération
autonome
Recrutement autonome
Investissement
autonome
Développement
autonome
Sécurité autonome
Pour aller plus loin !
![Page 237: 2e Conférence Lean Construction France 10 mai 2016](https://reader031.vdocuments.pub/reader031/viewer/2022022412/58f194901a28ab852b8b45cf/html5/thumbnails/237.jpg)
CA : +38 %
![Page 238: 2e Conférence Lean Construction France 10 mai 2016](https://reader031.vdocuments.pub/reader031/viewer/2022022412/58f194901a28ab852b8b45cf/html5/thumbnails/238.jpg)
Eff. : +68 %
![Page 239: 2e Conférence Lean Construction France 10 mai 2016](https://reader031.vdocuments.pub/reader031/viewer/2022022412/58f194901a28ab852b8b45cf/html5/thumbnails/239.jpg)
MERCI DE VOTRE PARTICIPATION
À votre disposition,
Florian Gayraud, [email protected], 06 26 53 64 36
Patrick Dupin, [email protected], 06 79 08 96 58
26/05/2016LEAN CONSTRUCTION FRANCE
sponsored by Delta Partners239